19
PRELIMINARY DESIGN + DEVELOPMENT PLAN HARBOUR WEST PARKS WELCOME! To The Public Open House May 30 th , 2017

Transcript of To The Public Open House May 30 , 2017 · Sculling Boats Seasonal + Vistor Motor Boats Charter...

Page 1: To The Public Open House May 30 , 2017 · Sculling Boats Seasonal + Vistor Motor Boats Charter Boats Motor Boats Non-Mo- toized Boats PORT CREDIT MEMORIAL PARK (WEST) Lakeshore Rd

PRELIMINARY DESIGN + DEVELOPMENT PLANHARBOUR WEST PARKS

WELCOME!To The Public Open House

May 30th, 2017

Page 2: To The Public Open House May 30 , 2017 · Sculling Boats Seasonal + Vistor Motor Boats Charter Boats Motor Boats Non-Mo- toized Boats PORT CREDIT MEMORIAL PARK (WEST) Lakeshore Rd

PRELIMINARY DESIGN + DEVELOPMENT PLANHARBOUR WEST PARKS

Project Overview

The City’s vision for Port Credit Harbour West Parks is to develop a vibrant waterfront destination that integrates programmable and flexible multi-use civic spaces, continuous water’s edge promenade, open green spaces and facilities that support waterfront recreational uses with the natural and cultural heritage features of the project area.

Vision

The purpose of this design and development plan is to refine the Class EA Large Block Concept Plan into a development plan with detailed costing for:

• Port Credit Memorial Park West• Lakeshore Road bridge underpass• Marina Park• Rivergate Easement

***J.C. Saddington Park is excluded from scope of the current phase due to budget.

Purpose of Project

Page 3: To The Public Open House May 30 , 2017 · Sculling Boats Seasonal + Vistor Motor Boats Charter Boats Motor Boats Non-Mo- toized Boats PORT CREDIT MEMORIAL PARK (WEST) Lakeshore Rd

PRELIMINARY DESIGN + DEVELOPMENT PLANHARBOUR WEST PARKS

BackgroundPolicy ContextThere have been several policy documents which have led to the development of the Class EA which preceded this design study, they include:

• Old Port Credit Village Heritage Conservation District Plan - Update is currently underway

• Mississauga Waterfront Parks Strategy• Mississauga Official Plan• Lake Ontario Integrated Shoreline Strategy (CVC)

Page 4: To The Public Open House May 30 , 2017 · Sculling Boats Seasonal + Vistor Motor Boats Charter Boats Motor Boats Non-Mo- toized Boats PORT CREDIT MEMORIAL PARK (WEST) Lakeshore Rd

PRELIMINARY DESIGN + DEVELOPMENT PLANHARBOUR WEST PARKS

Evolution of the Project

Project Timing

What’s Happened So Far...• Project is moving ahead from the PCHWP Environmental Study Report (2013).

• Many of the elements were determined during this process.

• We are moving forward with the design based on the Class EA.

• Details and refinements to the design will be determined during this process and your feedback will help to determine the final elements.

2017 2018 2019 2020 2021 2022Preliminary Design and Development Plan

Detailed Design, Agency Consultation and Approvals

Construction - subject to budget approval, phasing and outcome of the Region’s Front Street Station Class EA

Page 5: To The Public Open House May 30 , 2017 · Sculling Boats Seasonal + Vistor Motor Boats Charter Boats Motor Boats Non-Mo- toized Boats PORT CREDIT MEMORIAL PARK (WEST) Lakeshore Rd

PRELIMINARY DESIGN + DEVELOPMENT PLANHARBOUR WEST PARKS

Tonight’s Meeting

The purpose of tonight’s meeting is to give you an update on the status of the PCHWP project.

We also would like to get your feedback on the 3 concept options being considered for Marina Park and Port Credit Memorial Park West.

We ask that you help us by providing your feedback at each of the Option Stations on our ‘Dot Matrix’ activity, drawing on the maps, providing information on sticky notes, and also by providing your thoughts on the Feedback Forms provided when you sign in.

Purpose of MeetingEach of the stations that have been set up in the room tonight represent one of the three options that have been proposed for Port Credit Memorial Park West & Marina Park.

Each option is slightly different than the last. Every station will illustrate the layout of each option by having the following:

• Panel with Option Layout Plan• Panel with Illustrative Cross Sections• Panel with Photosimulation Perspective Images• Panel with ‘Dot Matrix’ Activity. Chart containing

elements within the option for rating with ‘sticky dots.’

• A large format plan will be available on the table adjacent to the panels.

Explanation of Stations STAGE | SCREEN

STAIR

S

Concept Station

Concept Station

Concept Station

General Info

Seating for Presentation

Page 6: To The Public Open House May 30 , 2017 · Sculling Boats Seasonal + Vistor Motor Boats Charter Boats Motor Boats Non-Mo- toized Boats PORT CREDIT MEMORIAL PARK (WEST) Lakeshore Rd

PRELIMINARY DESIGN + DEVELOPMENT PLANHARBOUR WEST PARKS

FRONT STREET SOUTH

CREDIT RIVER

RIVER PROMENADESHADE STRUCTURE

PARKING

CAR-TRAILER PARKING

NON-MOTORIZED LAUNCH RAMP

LAWN

LAWN

LAWN

LAKESHORE ROAD WEST FRONT STREET NORTH

CREDIT RIVER

RIVER PROMENADE

NATURALIZATION

CIVIC PLAZA

SECURED CHARTER BOAT DOCKS

FISH CLEANING STATIONS

LOOKOUT

PARKING/EVENT SPACE

IMPROVED STREETSCAPE

IMPROVED STREETSCAPE

LOOKOUT

NATURALIZATION

RETAIN EXISTING NATURALIZED SLOPE

IMPROVED COASTAL EDGE

THE DON ROWING CLUB OF MISSISSAUGA RAMP

MISSISSAUGA CANOE CLUB RAMP

RIVER PROMENADE

PORT CREDIT HARBOUR WEST PARKS - PRELIMINARY CONCEPTS

CONCEPT 1: BUILDING ON THE EA

Concept 1 Layout

Page 7: To The Public Open House May 30 , 2017 · Sculling Boats Seasonal + Vistor Motor Boats Charter Boats Motor Boats Non-Mo- toized Boats PORT CREDIT MEMORIAL PARK (WEST) Lakeshore Rd

PRELIMINARY DESIGN + DEVELOPMENT PLANHARBOUR WEST PARKS

Concept 1Perspective

Page 8: To The Public Open House May 30 , 2017 · Sculling Boats Seasonal + Vistor Motor Boats Charter Boats Motor Boats Non-Mo- toized Boats PORT CREDIT MEMORIAL PARK (WEST) Lakeshore Rd

PRELIMINARY DESIGN + DEVELOPMENT PLANHARBOUR WEST PARKS

Concept 1 Cross Section

SOUTH SECTION - WEST PARKSMARINA PARK: CONCEPT 1

IMPROVED COASTAL EDGEGRANULAR

OFFLINE ZONE PARKLAND BIOSWALERIVER PROMENADELAUNCH RAMPQUEING LANE

CAR-TRAILEREXIT LANE

CAR-TRAILERANGLED PARKING

CAR-TRAILERENTER LANE

IMPROVED STREETSCAPE/WATERFRONT TRAIL

PARALLELPARKING

2.5 m 3.5 m 3.5 m

N BOUNDLANE

S BOUNDLANE EXISTING STREETSCAPE

PRESERVED TREE

SHADE STRUCTURE

9.5 m

FRONT STREET S

Page 9: To The Public Open House May 30 , 2017 · Sculling Boats Seasonal + Vistor Motor Boats Charter Boats Motor Boats Non-Mo- toized Boats PORT CREDIT MEMORIAL PARK (WEST) Lakeshore Rd

PRELIMINARY DESIGN + DEVELOPMENT PLANHARBOUR WEST PARKS

Concept Elements Example Image

Please indicate your support.

Lookout

Shade Structure

River Promenade

Fish Cleaning Stations

Secured Charter Boat Docks

Civic Plaza

Concept Elements Example Image

Please indicate your support.

Naturalization

Improved Coastal Edge

Improved Streetscape

Non-motorized Launch Ramp

Car-Trailer Parking

Parking / Event Space

Concept 1 - Table of Features What do you think?

Page 10: To The Public Open House May 30 , 2017 · Sculling Boats Seasonal + Vistor Motor Boats Charter Boats Motor Boats Non-Mo- toized Boats PORT CREDIT MEMORIAL PARK (WEST) Lakeshore Rd

PRELIMINARY DESIGN + DEVELOPMENT PLANHARBOUR WEST PARKS

FRONT STREET SOUTH

CREDIT RIVER

LAKESHORE ROAD WEST FRONT STREET NORTH

CREDIT RIVER

LOOKOUT

WAVE BREAKCHARTER BOAT ACCESS ROUTE

FISH CLEANING STATION

SECURED CHARTER BOAT DOCKS

RIVER PROMENADE

RIVER PROMENADE

NON-MOTORIZED LAUNCH RAMP

PARK GATEWAYSMALL INFORMAL AMPHITHEATRE PARKING/EVENT SPACE

CIVIC PLAZA

PLANTED TERRACINGLAWN

LAWN LAWN

NATURALIZATION

LOOKOUT

IMPROVED STREETSCAPEIMPROVED STREETSCAPEELEVATED LANDING AND BRIDGE REORIENTATION

NATURALIZATION

RETAIN EXISTING NATURALIZED SLOPE

IMPROVED COASTAL EDGE

THE DON ROWING CLUB OF MISSISSAUGA RAMP

MISSISSAUGA CANOE CLUB RAMP

RIVER PROMENADE

PORT CREDIT HARBOUR WEST PARKS - PRELIMINARY CONCEPTS

CONCEPT 2: CHARTER BOATS RELOCATED SOUTH & MOTORIZED BOAT LAUNCH REMOVED

Concept 2 Layout

Page 11: To The Public Open House May 30 , 2017 · Sculling Boats Seasonal + Vistor Motor Boats Charter Boats Motor Boats Non-Mo- toized Boats PORT CREDIT MEMORIAL PARK (WEST) Lakeshore Rd

PRELIMINARY DESIGN + DEVELOPMENT PLANHARBOUR WEST PARKS

Concept 2Perspective

Page 12: To The Public Open House May 30 , 2017 · Sculling Boats Seasonal + Vistor Motor Boats Charter Boats Motor Boats Non-Mo- toized Boats PORT CREDIT MEMORIAL PARK (WEST) Lakeshore Rd

PRELIMINARY DESIGN + DEVELOPMENT PLANHARBOUR WEST PARKS Concept 2 Cross Sections

RIVER PROMENADE

SHORELINEPROTECTION EDGE

NORTH SECTION - WEST PARKSMEMORIAL PARK: CONCEPT 2

PLANTED TERRACING

TERRACED PATH UPPER LAWN

FRONT STREET N

EXISTING STREETSCAPE

IMPROVED STREETSCAPE/

MULTIUSE TRAIL

PARALLEL PARKING

N BOUND LANE

S BOUND LANE

2.5 m 3.5 m

9.5 m

3.5 m

PRESERVED TREE

PRESERVED TREE PRESERVED TREE

CIVIC PLAZASTEPS STEPS

2.5 m

PARALLEL PARKING

3.25m

N BOUND LANE

3.25 m

LANE

3 m

RIGHT TURN LANE

EXISTING SIDEWALK

IMPROVED STREETSCAPE/

MULTIUSE TRAILRIVER PROMENADECREDIT RIVER

IMPROVED COASTLINE EDGE

LAKESHORE WEST BRIDGE

PRESERVED TREES

PC MEMORIAL PARK WEST - WEST PARKSCIVIC PLAZA: CONCEPT 2

FRONT STREET N

Page 13: To The Public Open House May 30 , 2017 · Sculling Boats Seasonal + Vistor Motor Boats Charter Boats Motor Boats Non-Mo- toized Boats PORT CREDIT MEMORIAL PARK (WEST) Lakeshore Rd

PRELIMINARY DESIGN + DEVELOPMENT PLANHARBOUR WEST PARKS Concept 2 Cross Sections

SOUTH SECTION - WEST PARKSMARINA PARK: CONCEPT 2

IMPROVED COASTAL EDGE RIVER PROMENADE

PEDESTRIAN ZONE/CHARTER

BOAT ACCESS

PLANTED TERRACING

CONCRETE PATH

RAISED NATURALIZED PLANTER

IMPROVED STREETSCAPE/ WATERFRONT

TRAILPARALLEL PARKING

2.5 m 3.5 m

9.5 m

3.5 m

N BOUND LANE

FRONT STREET S

S BOUND LANE

EXISTING STREETSCAPE

SECURED CHARTER BOAT DOCKS

5.5 m

17 m

5.5 m 2.5 m 3.5 m 3.5 m

9.5 m

6 m

RIVER PROMENADE

DECKED SEATING

EDGE

PEDESTRIAN ZONE/CHARTER BOAT

ACCESS ROUTESHADED

PEDESTRIAN TERRACE ANGLED PARKINGPARKING ACCESS

LANEWAY

PARKING/MULTI USE EVENT AREA FRONT STREET S

ANGLED PARKING WATERFRONT TRAILIMPROVED STREETSCAPE/ PARALLEL

PARKINGN BOUND

LANES BOUND

LANEEXISTING

STREETSCAPE

NORTH SECTION - WEST PARKSMARINA PARK: CONCEPT 1

Page 14: To The Public Open House May 30 , 2017 · Sculling Boats Seasonal + Vistor Motor Boats Charter Boats Motor Boats Non-Mo- toized Boats PORT CREDIT MEMORIAL PARK (WEST) Lakeshore Rd

PRELIMINARY DESIGN + DEVELOPMENT PLANHARBOUR WEST PARKS

Concept Elements Example Image

Please indicate your support.

Lookout

Charter Boat Access Route

Wave Break

Fish Cleaning Station

Secured Charter Boat Docks

River Promenade

Park Gateway

Non-Motorized Launch Ramp

Charter Boats Relocated South

Concept Elements Example Image

Please indicate your support.

Civic Plaza

Planted Terracing / Raised Naturalized

Planter

Small Informal Amphi-theatre

Improved Streetscape

Elevated Landing and Bridge Reorientation

Parking / Event Space

Lawn

Motorized Boat Launch Removed

Concept 2 - Table of Features What do you think?

Page 15: To The Public Open House May 30 , 2017 · Sculling Boats Seasonal + Vistor Motor Boats Charter Boats Motor Boats Non-Mo- toized Boats PORT CREDIT MEMORIAL PARK (WEST) Lakeshore Rd

PRELIMINARY DESIGN + DEVELOPMENT PLANHARBOUR WEST PARKS

Concept Elements Example Image

Please indicate your support.

Civic Plaza

Planted Terracing / Raised Naturalized

Planter

Small Informal Amphi-theatre

Improved Streetscape

Elevated Landing and Bridge Reorientation

Parking / Event Space

Lawn

Motorized Boat Launch Removed

Concept 3

FRONT STREET SOUTH

CREDIT RIVER

LAKESHORE ROAD WEST FRONT STREET NORTH

CREDIT RIVERLAWN

LAWN

LAWN

PLANTED TERRACINGRIVER PROMENADE

CIVIC PLAZA

NATURALIZATION

LOOKOUT

IMPROVED STREETSCAPE

NON-MOTORIZED LAUNCH RAMP

PARK GATEWAYSMALL INFORMAL AMPHITHEATRE PARKING/EVENT SPACE

IMPROVED STREETSCAPE

ELEVATED LANDING AND BRIDGE REORIENTATION

LOOKOUT

SHORT TERM PUBLIC DOCKING

RIVER PROMENADE

CHARTER BOATS RELOCATED ACROSS RIVER FOR IMPROVED WATER SAFETY AND SECURITY

NATURALIZATION

RETAIN EXISTING NATURALIZED SLOPE

IMPROVED COASTAL EDGE

THE DON ROWING CLUB OF MISSISSAUGA RAMP

MISSISSAUGA CANOE CLUB RAMP

RIVER PROMENADE

PORT CREDIT HARBOUR WEST PARKS - PRELIMINARY CONCEPTS

CONCEPT 3: CHARTER BOATS & MOTORIZED BOAT LAUNCH RAMP REMOVED

Page 16: To The Public Open House May 30 , 2017 · Sculling Boats Seasonal + Vistor Motor Boats Charter Boats Motor Boats Non-Mo- toized Boats PORT CREDIT MEMORIAL PARK (WEST) Lakeshore Rd

PRELIMINARY DESIGN + DEVELOPMENT PLANHARBOUR WEST PARKS

Concept 3 Cross Sections

SOUTH SECTION - WEST PARKSMARINA PARK: CONCEPT 3

IMPROVED COASTAL EDGE RIVER PROMENADE

PLANTED TERRACING

GRASS TERRACES WITHCONCRETE SEAT WALLS

CONCRETEPATH

IMPROVED STREETSCAPE/WATERFRONT TRAIL

PARALLELPARKING

2.5 m 3.5 m 3.5 m

N BOUNDLANE

S BOUNDLANE EXISTING STREETSCAPE

9.5 m

FRONT STREET S

PARALLEL PARKING

PRESERVED TREE

PROPOSED ROADWAY

2.5 mIMPROVED STREETSCAPE/

WATERFRONT TRAIL 3.5 m

9.5 m

EXISTING ROADWAY

FRONT STREET S

12 m

3.5 mSOUTH BOUND LANENORTH BOUND LANE

EXISTING SIDEWALK

UTILITIESAPPROX. 12 M HIGH

SOUTH SECTION - WEST PARKSROADWAY AND WATERFRONT TRAIL

Page 17: To The Public Open House May 30 , 2017 · Sculling Boats Seasonal + Vistor Motor Boats Charter Boats Motor Boats Non-Mo- toized Boats PORT CREDIT MEMORIAL PARK (WEST) Lakeshore Rd

PRELIMINARY DESIGN + DEVELOPMENT PLANHARBOUR WEST PARKS

Concept 3Front Street - Street View Perspective

Page 18: To The Public Open House May 30 , 2017 · Sculling Boats Seasonal + Vistor Motor Boats Charter Boats Motor Boats Non-Mo- toized Boats PORT CREDIT MEMORIAL PARK (WEST) Lakeshore Rd

LEGE

ND

On-

Roa

d C

yclin

g

Vehi

cula

r Circ

ulat

ion

Trai

l

Wat

erfro

nt T

rail

Pro

ject

Bou

ndar

y

Look

out

Stre

etsc

ape

Enh

ance

men

t

Har

d S

hore

Edg

e

Nat

ural

Sho

re E

dge

Non

-Mot

oriz

ed B

oat T

raffi

c

Mot

oriz

ed B

oat T

raffi

c

Mos

t Rec

ent S

edim

ent

Rem

oval

Exi

stin

g B

uild

ing

Mul

ti-us

e C

ivic

Spa

ce

Ope

n G

reen

Spa

ce

Park

ing

Are

a

Park

ing/

Larg

e E

vent

Fle

x S

pace

Nat

ural

izat

ion

Ser

vice

Acc

ess

Pote

ntia

l Con

flict

Zon

e

Non

-Mot

oriz

ed B

oat

Laun

ch

Mot

oriz

ed B

oat L

aunc

h

Riv

erga

te E

asem

ent

Scu

lling

B

oats

Sea

sona

l +

Vist

or M

otor

B

oats

Mot

or

Boa

ts

Cha

rter

Boa

ts

Non

-Mo-

toiz

ed

Boa

ts

PORT

CRE

DIT

MEM

ORIA

LPA

RK (W

EST)

Lake

shor

e R

d W

Cre

dit R

iver

Front St N

Front St S

Riv

erga

te

apar

tmen

t

Can

oe

Clu

b

Ligh

thou

se

Row

ing

Clu

b MAR

INA

PARK

PORT

CRE

DIT

HAR

BOUR

WES

T PA

RKS

WAT

ER T

RAFF

IC C

IRCU

LATI

ON A

ND

2013

EA

LARG

E BL

OCK

CON

CEPT

PLA

N

SCAL

E: N

.T.S

.

PREL

IMIN

ARY D

ESIG

N + DE

VELO

PMEN

T PLA

NHA

RBOU

R WES

T PAR

KS

Circu

lation

Page 19: To The Public Open House May 30 , 2017 · Sculling Boats Seasonal + Vistor Motor Boats Charter Boats Motor Boats Non-Mo- toized Boats PORT CREDIT MEMORIAL PARK (WEST) Lakeshore Rd

PRELIMINARY DESIGN + DEVELOPMENT PLANHARBOUR WEST PARKS

Concept Elements Example Image

Please indicate your support.

Lookout

Relocated Charter Boats

River Promenade

Non-Motorized Launch Ramp

Short Term Public Docking

Civic Plaza

Planted Terracing

Concept Elements Example Image

Please indicate your support.

Improved Streetscape

Parking / Event Space

Elevated Landing and Bridge

Reorientation

Park Gateway

Small Informal Amphitheatre

Lawn

Naturalization

Concept 3 - Table of Features What do you think?