1 of 5 To: All Vendors Bidding on The College of New Jersey Eickhoff Hall ADA Renovations Project From: Roselle Horodeski Finance & Business Services Date: November 3, 2015 ADDENDUM NO. 1 ISSUE DATE: November 3, 2015 REFERENCE: The College of New Jersey Eickhoff Hall ADA Renovations Bid No. AB160016 Date of Original Bidding Documents: October 13, 2015 INTENT: This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents and Prior Addenda if any, as identified above. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject Bidder to disqualification. Bidder Questions: Question 1: What type wiring for branch circuits, conduit or MC cable? Response: Refer to specification section 16110 included in Addendum 1 for information regarding rigid metallic conduit, and paragraph R for when to use flexible metallic cable (only allowed in certain locations). Question 2: What type of ceilings in rooms & corridors? Response: Student Rooms and bathrooms have veneer plaster ceilings. Corridors have ACT. The drawings (Drawing A-1.0 D1) call for any patching/new ceiling to match existing. All ceilings to be patched as required with compatible finish. Question 3: Can MC cable be used for Fire Alarm horn strobes? Response: Refer to specification section 16110, paragraph P included in Addendum 1. As per the specifications, provide rigid metallic conduit, no MC Cable allowed. Question 4: Can MC cable be used for all branch circuits?

Transcript of To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change...

Page 1: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

1 of 5

To: All Vendors Bidding on The College of New Jersey

Eickhoff Hall ADA Renovations Project

From: Roselle Horodeski

Finance & Business Services

Date: November 3, 2015

ADDENDUM NO. 1 ISSUE DATE: November 3, 2015

REFERENCE: The College of New Jersey

Eickhoff Hall ADA Renovations

Bid No. AB160016

Date of Original Bidding Documents: October 13, 2015

INTENT: This Addendum forms a part of the Contract Documents and modifies the original

Bidding Documents and Prior Addenda if any, as identified above. Acknowledge

receipt of this Addendum in the space provided on the Bid Form. Failure to do so

may subject Bidder to disqualification.

Bidder Questions:

Question 1: What type wiring for branch circuits, conduit or MC cable?

Response: Refer to specification section 16110 included in Addendum 1 for information regarding rigid metallic

conduit, and paragraph R for when to use flexible metallic cable (only allowed in certain locations).

Question 2: What type of ceilings in rooms & corridors?

Response: Student Rooms and bathrooms have veneer plaster ceilings. Corridors have ACT.

The drawings (Drawing A-1.0 D1) call for any patching/new ceiling to match existing. All ceilings to be patched

as required with compatible finish.

Question 3: Can MC cable be used for Fire Alarm horn strobes?

Response: Refer to specification section 16110, paragraph P included in Addendum 1. As per the specifications,

provide rigid metallic conduit, no MC Cable allowed.

Question 4: Can MC cable be used for all branch circuits?

Page 2: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

2 of 5

Response: Refer to specification section 16110 included in Addendum 1 for information regarding rigid metallic

conduit, and paragraph R for when to use flexible metallic cable (only allowed in certain locations).

Question 5: Since we are unable to access the site before the bid can you please advise on what the

construction of the existing walls to be demolished and ceilings to be patched.

Response: Original building as-builts show 8” reinforced concrete slab, 3-5/8” metal stud partitions with 5/8”

gypsum wallboard and veneer plaster finish. Bathrooms show veneer plaster finish ceilings. Student rooms and

laundry rooms show “Popcorn” finish veneer plaster ceilings. Corridors have ACT. All ceilings to be patched as

required with compatible finish. GC shall verify all existing conditions prior to starting any work. Also, refer to

the Finish Schedule included in Addendum 1.

Question 6: Who is the building fire alarm vendor?

Response: Eickhoff Hall Fire Alarm is a Honeywell system. The updated contact information for the Honeywell

representative that handles bid pricing is as follows:

Honeywell Automation & Controls Solutions

534 Fellowship Road

Mt. laurel, NJ 08054

Contact: Louis A. Speziale

Advanced Solution Sales, NJ District

P: 1-856-437-1844

dFax: 1-856-494-7827

oFax: 1-856-437-2730

[email protected]

Question 7: Please confirm the school will remove and reinstall the washers and dryers in the laundry

room so we can install the vct and vcb is that by others?

Response: Refer to the Finish Schedule included in Addendum 1. For new linoleum floor finish in Laundry Room

221 refer to spec section 09656 - Linoleum Floor Coverings. The annotation on drawing A-1.0, A4 calling out to

“match exist’ refers to the rubber base. Existing VCT should be replaced with new linoleum floor.

On Drawing A-1.0, detail A4 - Laundry Room 221 Plan, delete the note stating, “Existing washers and dryers to

remain.” and substitute “In Laundry Room 221, the Contractor shall disconnect (including dryer venting), remove

and store existing (2) washers and (2) electric dryers in student room 226 (protected from damage). Once Contractor

has removed the existing VCT floor and completed the new linoleum floor installation in Laundry Room 221, the

Contractor shall reinstall and connect (including dryer venting) existing (2) washers and (2) electric dryers as

originally installed.”

Question 8: I do not see any painting on the job…is that by others?

Response: Painting is by the Contractor. Refer to the Finish Schedule included in Addendum 1 and spec section

09910 – Interior Painting.

Question 9: I do not see new flooring speced for the dorm rooms, is that by others?

Page 3: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

3 of 5

Response: All new flooring is by Contractor. Refer to the Finish Schedule included in Addendum #1 and to the

specifications section 09681 – Tile Carpeting.

Question 10: Locations for painting is not specified in drawings. Ok to assume all exposed surfaces to

be painted, per specifications section 09910?

Response: See Finish Schedule included in Addendum 1, and refer to annotations of details on drawing A-1.0.

Refer to the specifications section 09910 – Interior Painting, specifically as it relates to patching after demolition,

and exposed surfaces. Contractor shall repaint bathrooms and student rooms 226 and 264 in their entirety with

colors as selected by owner. Where Contractor is installing new horns/strobes (in student rooms 228, 262 and

laundry room 221), the

Contractor shall patch and repair existing finishes to match existing in all respects, and repaint the entire surface

(ceiling or wall) affected by the work.

Question 11: Flooring is not specified in drawings. We have specifications on linoleum, base and carpet

tile but unclear as to locations. Please advise.

Response: Refer to the Finish Schedule included in Addendum 1 for room finishes and locations, and refer to

annotations of details on drawing A-1.0 for locations. See section 09681 of the specifications for information

about tile carpeting.

Changes to Specifications:

1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to

read 5/8 inch instead of 1/2 inch.

2. Add new spec section 092613 - Gypsum Veneer dated 11/3/15 included in this Addendum 1.

3. Add new spec section 16111 – Electrical Conduits included in this Addendum 1.

4. Delete spec section 16721 – Fire Alarm and replace with new spec section 16721 Fire Alarm

dated 11/3/15 included in this Addendum 1.

5. Add new spec section 09310 –Tile dated 11/3/15 included in this Addendum 1.

6. Page 4 of spec section 09310 –Tile (dated 11-3-15), Part 2, Para. 2.2 Tile Products, add the

following paragraphs:

“C. Accessories: Provide vitreous china accessories of type and size indicated suitable

for installing by same method as adjoining wall tile.

1. One soap holder with grab handle for each shower

2. One paper holder at each water closet

3. Color and finish: match adjoining glazed wall tile.

D. ADA wall mounted shower seat by Bradley or equivalent:

1. Type: reversible, hinged

2. Material: phenolic

3. Finish: matte

4. Color: white

5. Frame: satin finish stainless steel

E. Shower rod, curtain and towel rack:

Page 4: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

4 of 5

1. Shower rod by Bradley or equivalent:

i. Straight

ii. Concealed mounting

iii. Satin finish stainless steel

iv. Match width to shower stall opening

2. Shower curtain by Bradley or equivalent:

i. Antifungal, antimicrobial or mold-resistant curtain

ii. Material: polyester or vinyl

iii. Color: White

iv. Weighted hem with eyelets/grommets

v. Match width and length to shower stall opening ”

3. Towel rack by Bradley or equivalent:

i. Straight

ii. Concealed mounting

iii. Satin finish stainless steel

iv. Length: 30”(mounting to meet ADA height)

E. Spec. Section 09910 2.3-A1, change “Regal First Coat Interior Latex Primer & Underbody No,

216” to an acrylic primer of equivalent quality, and 09910 3.6-A1a, change “Acrylic-latex-

based” to “Acrylic”.

F. Page 2 of spec. section 01025 – Measurement and Payment, para. 1.06.A. delete “5. Insurance

and Bonds”, and in para. 1.06.F. after “profit” insert “Insurance, Bonds,”.

Changes to Drawings:

1. On drawing A-1.0, C5, where veneer plaster (skim coat plaster) is referred to, see attached spec

section 092613 - Gypsum Veneer dated 11/3/15 included in this Addendum 1.

2. On drawing A-1.0, Detail B1 and B3 have a note that says to, "provide a membrane" under the

bathroom and shower floor tile. Refer to the information below for waterproof membrane:

a. General: manufacturer’s standard product that complies with ANSI A118.10 and is

recommended by the manufacturer for the application indicated. Include reinforcement

and accessories recommended by the manufacturer.

b. Chlorinated polyethylene sheet: nonplasticized, chlorinated polyethylene faced on both

sides with nonwoven polyester fabric: 0.030 inch nominal thickness.

i. Products: Subject to compliance with requirements, available products that may

be incorporated into the work include, but are not limited to: Daltile Corporation:

Dal-Seal TS or equivalent.

3. On drawing A-1.0, D5 - Section Detail at ADA Floor Transition, change note that reads "rubber

transition strip" to read "marble threshold" and refer to the Tile specifications.

4. On Drawing A-1.0, detail A4 - Laundry Room 221 Plan, delete the note stating, “Existing washers

and dryers to remain.” and substitute “In Laundry Room 221, the Contractor shall disconnect

(including dryer venting), remove and store existing (2) washers and (2) electric dryers in student

room 226 (protected from damage). Once Contractor has completed the new linoleum floor install-

Page 5: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

5 of 5

lation in Laundry Room 221, the Contractor shall reinstall and connect (including dryer venting)

existing (2) washers and (2) electric dryers as originally installed.”

Changes Additional Requirements Discussed at Pre-bid:

1. TCNJ/PM will assist with coordinating the work on first floor with Sodexo (TCNJ’s Food Service

Vendor who manages the Dining Hall). This will be required for installation of new floor drains, etc.

2. Site dumpster location will be coordinated with TCNJ/PM.

3. TCNJ will provide with this Addendum 1 a typical room plan and photographs depicting a typical

student room/bathroom in Eickhoff.

Other: Sign-in sheet

END OF ADDENDUM NO. 1

Attachments: Pre-Bid Sign-In Sheet

Eickhoff Hall ADA projects - Finish Schedule dated 11/3/15

Spec. Sections: 092613 - Gypsum Veneer dated 11/3/15

09310 – Tile dated 11/3/15

16111 – Electrical Conduits dated 11/3/15

16721 – Fire Alarm dated 11/3/15

Drawings: Eickhoff Hall First Floor Plan – Location of Honeywell Fire Alarm

Annunciator Panels

Typical Student Room/Bathroom Plan keyed to Photos

Photos: Keyed to Typical Student Room/Bathroom Plan

Page 6: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613
Page 7: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

Eickhoff Hall ADA Projects - Finish Schedule 11/3/2015

Location Item Manufacturer Model # Color/Size Texture/Style

Student Rooms 226 and 264

Walls - Plaster Veneer (Including

window surounds)paint Benjamin Moore Acrylic Ivory White 925 Semi-Gloss

Floor carpet tile Tandus FlooringApplause III

02803Marine 28517 Quarter Turn

Base rubber base Johnsonite Straight Base 18 Navy Blue /4"

Ceiling (Existing Popcorn Ceiling

Finish)paint Benjamin Moore Acrylic Ivory White 925 Egg-Shell

Door/Frame HM (Off Corridor) paint Benjamin Moore Acrylic Ivory White 925Semi-Gloss, Paint

room side only

Bathrooms in Student Rooms 226

and 264

Walls - Plaster Veneer paint Benjamin Moore Acrylic Ivory White 925 Semi-Gloss

Shower Walls ceramic tile Dal Tile KeystoneBiscuit D317/ 2"x2"

MosaicUn-glazed

Floor (Bathroom/Shower) ceramic tile Dal Tile KeystoneBuffstone Range

D147/ 2"x2" MosaicUn-glazed

Base Cove (Bathroom/Shower) ceramic tile Dal Tile KeystoneBuffstone Range

D147/ 2"x2" MosaicUn-glazed

Ceiling and Soffit (Plaster Veneer)

including Shower Ceilingpaint Benjamin Moore Acrylic Ivory White 925 Semi-Gloss

Page 8: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

Door/Frame HM paint Benjamin Moore Acrylic Ivory White 925Semi-Gloss, Paint

both sides

Student Rooms 228 and 262

Walls (Existing Veneer Plaster) paint Benjamin MooreAcrylic Semi-

GlossIvory White 925

Where disturbed by

the scope of work.

Ceiling (Existing Popcorn Ceiling

Finish)paint Benjamin Moore

Acrylic Semi-

GlossIvory White 925

Where disturbed by

the scope of work.

Laundry Room 221

Walls (Existing Veneer Plaster) paint Benjamin Moore Acrylic Ivory White 925

Semi-Gloss, If

disturbed by the

scope of work.

Ceiling (Existing Popcorn Ceiling

Finish)paint Benjamin Moore Acrylic Ivory White 925

Egg-Shell, If

disturbed by the

scope of work.

Floor linoleum Forbo Marmoleum Real 2629 Eiger

Color to be

selected/approved

by Owner.

Base rubber base Johnsonite Cove Base 4" base

Color to be

selected/approved

by Owner

Corridors

Walls (Existing Veneer Plaster

Painted)

Ceiling (Existing ACT)

Floors (Existing Carpet)

Patch and repair

existing finishes to

match existing in all

respocts where

disturbed by the

scope of work.

Page 9: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

** If providing Sherwan Williams paint, Contractor to color match with Benjamin Moore color indicated above.

Patch and repair

existing finishes to

match existing in all

respocts where

disturbed by the

scope of work.

Page 10: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

Eickhoff Hall, College of New Jersey GYPSUM VENEER PLASTERING 092613 - 1

Contract Documents November 3, 2015

Farewell Architects LLC Addendum #1

SECTION 092613 - GYPSUM VENEER PLASTERING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Gypsum veneer plaster and gypsum base for veneer plaster.

B. Related Requirements:

1. Section 092216 "Non-Structural Metal Framing" for non-load-bearing steel

framing.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of product.

1.4 QUALITY ASSURANCE

A. Mockups: Provide a full-thickness finish mockup for each type and finish of gypsum veneer

plaster and substrate to demonstrate aesthetic effects and set quality standards for

materials and execution.

1. Architect will select representative surfaces and conditions for application of each

type of gypsum veneer plaster and substrate.

2. Provide mockups of partitions in sizes of at least 100 sq. ft. (9 sq. m).

3. Apply gypsum veneer plaster, according to requirements for the completed Work,

after permanent lighting and other environmental services have been activated.

4. Subject to compliance with requirements, approved mockups may become part

of the completed Work if undisturbed at time of Substantial Completion.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Deliver materials in original packages, containers, and bundles bearing brand name

and identification of manufacturer or supplier.

Page 11: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

Eickhoff Hall, College of New Jersey GYPSUM VENEER PLASTERING 092613 - 2

Contract Documents November 3, 2015

Farewell Architects LLC Addendum #1

B. Store materials inside under cover and keep them dry and protected against damage

from weather, direct sunlight, surface contamination, corrosion, construction traffic, and

other causes.

C. Stack panels flat on leveled supports off floor or slab to prevent sagging.

1.6 FIELD CONDITIONS

A. Environmental Limitations: Comply with ASTM C 843 requirements or gypsum veneer

plaster manufacturer's written recommendations, whichever are more stringent.

B. Room Temperatures: Maintain not less than 55 deg F (13 deg C) or more than 80 deg

F (27 deg C) for seven days before application of gypsum veneer plaster, continuously

during application, and after application until veneer plaster is dry.

C. Avoid conditions that result in gypsum veneer plaster drying too rapidly.

1. Distribute heat evenly; prevent concentrated or uneven heat on veneer plaster.

2. Maintain relative humidity levels, for prevailing ambient temperature, that

produce normal drying conditions.

3. Ventilate building spaces in a manner that prevents drafts of air from contacting

surfaces during veneer plaster application until it is dry.

D. Do not install panels that are wet, moisture damaged, or mold damaged.

1. Indications that panels are wet or moisture damaged include, but are not limited

to, discoloration, sagging, and irregular shape.

2. Indications that panels are mold damaged include, but are not limited to, fuzzy or

splotchy surface contamination and discoloration.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Source Limitations: Obtain gypsum veneer plaster products, including gypsum base for

veneer plaster, joint reinforcing tape, and embedding material, from single

manufacturer.

2.2 GYPSUM VENEER PLASTER

A. One-Component Gypsum Veneer Plaster: ASTM C 587, ready-mixed, smooth, finishcoat

veneer plaster formulated for application directly over substrate without use of separate

base-coat material.

1. Products: Subject to compliance with requirements, provide one of the following:

Page 12: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

Eickhoff Hall, College of New Jersey GYPSUM VENEER PLASTERING 092613 - 3

Contract Documents November 3, 2015

Farewell Architects LLC Addendum #1

a. Georgia Pacific Building; National Gypsum Company; United States

Gypsum

2.3 PANEL PRODUCTS

A. Gypsum Base for Veneer Plaster: ASTM C 1396/C 1396M.

1. Thickness: 1/2 inch (12.7 mm).

B. Gypsum Base for Veneer Plaster, Type X: ASTM C 1396/C 1396M.

1. Thickness: 5/8 inch (15.9 mm)

2.4 TRIM ACCESSORIES

A. Standard Trim: ASTM C 1047, provided or approved by manufacturer for use in gypsum

veneer plaster applications indicated.

1. Material: Galvanized-steel sheet or aluminum-coated steel sheet; rolled zinc,

plastic, or paper-faced galvanized-steel sheet.

2. Shapes:

a. Cornerbead.

b. Bullnose bead.

c. LC-Bead: J-shaped; exposed long flange receives veneer plaster.

d. L-Bead: L-shaped; exposed long flange receives veneer plaster.

e. U-Bead: J-shaped; exposed short flange does not receive veneer plaster.

f. Curved-Edge Cornerbead: With notched or flexible flanges.

g. Control joints.

2.5 JOINT REINFORCING MATERIALS

A. General: Comply with joint strength requirements in ASTM C 587 and with gypsum veneer

plaster manufacturer's written recommendations for each application indicated. B. Joint Tape:

1. Gypsum Base for Veneer Plaster: As recommended by gypsum veneer plaster

manufacturer for applications indicated.

C. Embedding Material for Joint Tape:

1. Gypsum Base for Veneer Plaster: As recommended by gypsum veneer plaster

manufacturer for use with joint-tape material and gypsum veneer plaster

applications indicated.

2.6 AUXILIARY MATERIALS

Page 13: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

Eickhoff Hall, College of New Jersey GYPSUM VENEER PLASTERING 092613 - 4

Contract Documents November 3, 2015

Farewell Architects LLC Addendum #1

A. General: Provide auxiliary materials that comply with referenced product standards and

manufacturer's written recommendations.

B. Steel Drill Screws: ASTM C 1002 unless otherwise indicated.

1. Use screws complying with ASTM C 954 for fastening panels to steel members from

0.033 to 0.112 inch (0.84 to 2.84 mm) thick.

C. Sound Attenuation Blankets: ASTM C 665, Type I (blankets without membrane facing),

produced by combining thermosetting resins with mineral fibers manufactured from

glass, slag wool, or rock wool.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates, areas, and conditions, with Installer present, for compliance with

requirements for installation tolerances and other conditions affecting performance of

the Work.

B. Examine panels before installation. Reject panels that are wet, moisture damaged, or

mold damaged.

C. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 INSTALLING PANELS, GENERAL

A. Gypsum Base for Veneer Plaster: Apply according to ASTM C 844 unless

manufacturer's written recommendations are more stringent.

1. Do not allow gypsum base to degrade from exposure to sunlight, as evidenced

by fading of paper facing.

2. Erection Tolerance: No more than 1/16-inch (1.6-mm) offsets between planes of

gypsum base panels, and 1/8 inch in 8 feet (3 mm in 2.4 m) noncumulative, for

level, plumb, warp, and bow.

B. Install sound attenuation blankets before installing gypsum base for veneer plaster.

C. Install panels with face side out. Butt panels together for a light contact at edges and

ends with not more than 1/16 inch (1.6 mm) of open space between panels. Do not

force into place.

D. Locate edge and end joints over supports, except in ceiling applications where

intermediate supports or back-blocking is provided behind end joints. Do not place

tapered edges against cut edges or ends. Stagger vertical joints on opposite sides of

partitions. Do not locate joints, other than control joints, at corners of framed openings.

Page 14: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

Eickhoff Hall, College of New Jersey GYPSUM VENEER PLASTERING 092613 - 5

Contract Documents November 3, 2015

Farewell Architects LLC Addendum #1

E. Attach panels to steel studs so leading edge or end of each panel is attached to open

(unsupported) edges of stud flanges first.

F. Attach panels to framing provided at openings and cutouts.

G. Form control joints with space between edges of adjoining panels.

H. Cover both sides of partition framing with panels in concealed spaces, including above

ceilings, except in internally braced chases.

1. Unless concealed application is indicated or required for sound, fire, air, or

smoke ratings, coverage may be accomplished with scraps of not less than 8 sq.

ft. (0.74 sq. m) in area.

2. Fit panels around ducts, pipes, and conduits.

3. Where partitions intersect open concrete coffers, concrete joists, and other

structural members projecting below underside of floor/roof slabs and decks, cut

panels to fit profile formed by coffers, joists, and other structural members; allow

1/4- to 3/8-inch-(6.4- to 9.5-mm-)wide joints; seal joints with acoustical sealant.

3.3 INSTALLING PANELS

A. Install panels for veneer plaster in locations indicated on Drawings.

B. Single-Layer Application:

1. On walls, apply gypsum base panels vertically and parallel to framing unless

otherwise indicated or required by fire-resistance-rated assembly, and minimize

end joints.

a. Stagger abutting end joints not less than one framing member in alternate

courses of panels.

C. Fasteners: Drive fasteners flush with gypsum base surface. Do not overdrive fasteners

or cause surface depressions.

D. Single-Layer Fastening Methods: Apply gypsum base panels to supports with steel drill

screws.

3.4 INSTALLING TRIM ACCESSORIES

A. General: Install trim with back flanges intended for fasteners, and attach to framing with

same fasteners used for panels. Otherwise, attach trim according to manufacturer's

written instructions.

B. Control Joints: Install according to ASTM C 844 and in specific locations approved by

Architect.

Page 15: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

Eickhoff Hall, College of New Jersey GYPSUM VENEER PLASTERING 092613 - 6

Contract Documents November 3, 2015

Farewell Architects LLC Addendum #1

C. Trim: Install in the following locations:

1. Cornerbead: Use at outside corners unless otherwise indicated.

3.5 INSTALLING JOINT REINFORCEMENT

A. Gypsum Base: Reinforce interior angles and flat joints with joint tape and embedding

material to comply with ASTM C 843 and with gypsum veneer plaster manufacturer's

written recommendations.

3.6 GYPSUM VENEER PLASTERING

A. Bonding Agent: Apply bonding agent on dry Insert substrate according to gypsum

veneer plaster manufacturer's written recommendations.

B. Gypsum Veneer Plaster Mixing: Mechanically mix gypsum veneer plaster materials to

comply with ASTM C 843 and with gypsum veneer plaster manufacturer's written

recommendations.

C. Gypsum Veneer Plaster Application: Comply with ASTM C 843 and with veneer plaster

manufacturer's written recommendations.

1. One-Component Gypsum Veneer Plaster: Trowel apply base coat over substrate

to uniform thickness. Fill all voids and imperfections. Immediately double back

with same mixer batch of plaster to a uniform total thickness of 1/16 to 3/32 inch

(1.6 to 2.4 mm).

2. Where gypsum veneer plaster abuts only metal door frames, windows, and other

units, groove finish coat to eliminate spalling.

3. Do not apply veneer plaster to gypsum base if paper facing has degraded from

exposure to sunlight. Before applying veneer plaster, use remedial methods to

restore bonding capability to degraded paper facing according to manufacturer's

written recommendations.

D. Gypsum Veneer Plaster Finish: Smooth-troweled finish unless otherwise indicated.

3.7 PROTECTION

A. Protect installed gypsum veneer plaster from damage from weather, condensation,

construction, and other causes during remainder of the construction period.

B. Remove and replace gypsum veneer plaster and gypsum base panels that are wet,

moisture damaged, or mold damaged.

1. Indications that gypsum base panels are wet or moisture damaged include, but

are not limited to, discoloration, sagging, and irregular shape.

Page 16: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

Eickhoff Hall, College of New Jersey GYPSUM VENEER PLASTERING 092613 - 7

Contract Documents November 3, 2015

Farewell Architects LLC Addendum #1

2. Indications that gypsum base panels are mold damaged include, but are not

limited to, fuzzy or splotchy surface contamination and discoloration.

END OF SECTION 092613

Page 17: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

Eickhoff Hall, College of New Jersey TILE

100% Final Design 09310 - 1

Farewell Architects LLC March 6, 2014

SECTION 09310 - TILE

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Work Included: The Work of this Section includes, but is not limited to the following:

1. Colorbody porcelain tile.

2. Marble thresholds.

3. Waterproofing membrane

4. Crack isolation membrane

1.3 DEFINITIONS

A. General: Definitions in the ANSI A108 series of tile installation standards and in ANSI A137.1 apply to

Work of this Section unless otherwise specified.

B. ANSI A108 Series: ANSI A108.01, ANSI A108.02, ANSI A108.1A, ANSI A108.1B, ANSI A108.1C,

ANSI A108.4, ANSI A108.5, ANSI A108.6, ANSI A108.8, ANSI A108.9, ANSI A108.10,

ANSI A108.11, ANSI A108.12, ANSI A108.13, ANSI A108.14, ANSI A108.15, ANSI A108.16, and

ANSI A108.17, which are contained in "American National Standard Specifications for Installation of

Ceramic Tile."

C. Module Size: Actual tile size plus joint width indicated.

1.4 PERFORMANCE REQUIREMENTS

A. Static Coefficient of Friction: For tile installed on walkway surfaces, provide products with the following

values as determined by testing identical products per ASTM C 1028:

1. Level Surfaces: Minimum 0.06.

1.5 ACTION SUBMITTALS

A. Product Data: For each type of product indicated.

B. Shop Drawings: Show locations of each type of tile and tile pattern. Show widths, details, and locations

of expansion, contraction, control, and isolation joints in tile substrates and finished tile surfaces.

C. Samples for Initial Selection: For each type of tile and grout indicated. Include Samples of accessories

involving color selection.

D. Samples for Verification:

1. Full-size units of each type and composition of tile and for each color and finish required.

2. Assembled samples mounted on a rigid panel, with grouted joints, for each type and composition

of tile and for each color and finish required. Make samples at least 12 inches square, but not

fewer than 4 tiles. Use grout of type and in color or colors approved for completed Work.

3. Full-size units of each type of trim and accessory for each color and finish required.

4. Marble thresholds in 6-inch lengths.

Page 18: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

Eickhoff Hall, College of New Jersey TILE

100% Final Design 09310 - 2

Farewell Architects LLC March 6, 2014

1.6 INFORMATIONAL SUBMITTALS

A. Qualification Data: For qualified Installer.

B. Master Grade Certificates: For each shipment, type, and composition of tile, signed by tile manufacturer

and Installer.

C. Product Certificates: For each type of product, signed by product manufacturer.

D. Material Test Reports: For each tile-setting and -grouting product.

1.7 MAINTENANCE MATERIAL SUBMITTALS

A. Furnish extra materials that match and are from same production runs as products installed and that are

packaged with protective covering for storage and identified with labels describing contents.

1. Tile and Trim Units: Furnish quantity of full-size units equal to 5 percent of amount installed for

each type, composition, color, pattern, and size indicated.

2. Grout: Furnish quantity of grout equal to 3 percent of amount installed for each type,

composition, and color indicated.

1.8 QUALITY ASSURANCE

A. Source Limitations for Tile: Obtain tile of each type and color or finish from one source or producer.

1. Obtain tile of each type and color or finish from same production run and of consistent quality in

appearance and physical properties for each contiguous area.

B. Source Limitations for Setting and Grouting Materials: Obtain ingredients of a uniform quality for each

mortar, adhesive, and grout component from one manufacturer and each aggregate from one source or

producer.

C. Source Limitations for Other Products: Obtain each of the following products specified in this Section

from a single manufacturer for each product:

1. Marble thresholds.

2. Waterproofing membrane

3. Crack isolation membrane

D. Preinstallation Conference: Conduct conference at Project site.

1. Review requirements in ANSI A108.01 for substrates and for preparation by other trades.

1.9 DELIVERY, STORAGE, AND HANDLING

A. Deliver and store packaged materials in original containers with seals unbroken and labels intact until

time of use. Comply with requirements in ANSI A137.1 for labeling tile packages.

B. Store tile and cementitious materials on elevated platforms, under cover, and in a dry location.

C. Store aggregates where grading and other required characteristics can be maintained and contamination

can be avoided.

D. Store liquid materials in unopened containers and protected from freezing.

Page 19: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

Eickhoff Hall, College of New Jersey TILE

100% Final Design 09310 - 3

Farewell Architects LLC March 6, 2014

E. Handle tile that has temporary protective coating on exposed surfaces to prevent coated surfaces from

contacting backs or edges of other units. If coating does contact bonding surfaces of tile, remove coating

from bonding surfaces before setting tile.

1.10 PROJECT CONDITIONS

A. Environmental Limitations: Do not install tile until construction in spaces is complete and ambient

temperature and humidity conditions are maintained at the levels indicated in referenced standards and

manufacturer's written instructions.

PART 2 - PRODUCTS

2.1 PRODUCTS, GENERAL

A. ANSI Ceramic Tile Standard: Provide tile that complies with ANSI A137.1 for types, compositions, and

other characteristics indicated.

1. Provide tile complying with Standard grade requirements unless otherwise indicated.

B. ANSI Standards for Tile Installation Materials: Provide materials complying with ANSI A108.02, ANSI

standards referenced in other Part 2 articles, ANSI standards referenced by TCA installation methods

specified in tile installation schedules, and other requirements specified.

C. Factory Blending: For tile exhibiting color variations within ranges, blend tile in factory and package so

tile units taken from one package show same range in colors as those taken from other packages and

match approved Samples.

D. Mounting: For factory-mounted tile, provide back- or edge-mounted tile assemblies as standard with

manufacturer unless otherwise indicated.

1. Where tile is indicated for installation in wet areas, do not use back- or edge-mounted tile

assemblies unless tile manufacturer specifies in writing that this type of mounting is suitable for

installation indicated and has a record of successful in-service performance.

E. Factory-Applied Temporary Protective Coating: Where indicated under tile type, protect exposed

surfaces of tile against adherence of mortar and grout by precoating with continuous film of petroleum

paraffin wax, applied hot. Do not coat unexposed tile surfaces.

2.2 TILE PRODUCTS

A. Tile Type: Daltile – Keystones – Mosaic Colorbody porcelain unglazed floor and wall tile:

1. Location: Toilet room floors.

2. Basis-of-Design Product: Subject to compliance with requirements, provide product indicated on

Drawings or comparable product by one of the following:

a. Floor Tile: Daltile – Group 1 – Buffstone Range D147

b. Wall Tile: Daltile – Group 1 – Biscuit D317

3. Composition: Porcelain.

4. Module Size: 2”x2” Mosaic (dot mounted on 1’x2’ sheet)

5. Thickness: 1/4”.

6. Grout Color: OO White Mapei.

7. Grout Joint Recommendation: 1/8”

B. Tile Type: unglazed trim:

Page 20: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

Eickhoff Hall, College of New Jersey TILE

100% Final Design 09310 - 4

Farewell Architects LLC March 6, 2014

1. Location: Base of bathrooms

2. Basis-of-Design Product: Subject to compliance with requirements, provide product indicated on

Drawings or comparable product by one of the following:

a. Daltile: Buffstone Range D147 2x2 MB-5B

3. Composition: Porcelain.

4. Sanitary Cove Base Size: 6” by 4 ¼” (S-3419T); provide outcorner (SCR-L-3419T) at outside

corners.

5. Thickness: 5/16”.

6. Grout Color: Match Architect's sample.

7. Grout Joint Recommendation: 1/16”.

2.3 THRESHOLDS

A. General: Fabricate to sizes and profiles indicated or required to provide transition between adjacent floor

finishes.

1. Bevel edges at 1:2 slope, with lower edge of bevel aligned with or up to 1/16 inch above adjacent

floor surface. Finish bevel to match top surface of threshold. Limit height of threshold to 1/2 inch

or less above adjacent floor surface.

B. Marble Thresholds: ASTM C 503, with a minimum abrasion resistance of 10 per ASTM C 1353 or

ASTM C 241 and with honed finish. Color: Beige or tan, provide sample for approval.

2.4 SETTING MATERIALS

A. Latex-Portland Cement Mortar (Thin Set) at small format tiles: ANSI A118.4.

1. Manufacturers: Subject to compliance with requirements, available manufacturers offering

products that may be incorporated into the Work include, but are not limited to, the following:

a. Custom Building Products.

b. Laticrete International, Inc.

c. MAPEI Corporation.

2. Provide prepackaged, dry-mortar mix containing dry, redispersible, vinyl acetate or acrylic

additive to which only water must be added at Project site.

3. For wall applications, provide mortar that complies with requirements for nonsagging mortar in

addition to the other requirements in ANSI A118.4.

4. Provide integral thin, load bearing waterproofing/crack isolation membrane at shower and

bathroom.

a. Laticrete 9235 Waterproofing membrane or equivalent.

b. Daltile Corporation – Dal-Seal TS or equivalent.

2.5 GROUT MATERIALS

A. Polymer-Modified Tile Grout: ANSI A118.7.

1. Basis-of-Design Product: Ultra Color Plus Grout by Mapei Corporation. Subject to compliance

with requirements, available manufacturers offering products that may be incorporated into the

Work include, but are not limited to, the following:

a. Custom Building Products.

b. Laticrete International, Inc.

Page 21: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

Eickhoff Hall, College of New Jersey TILE

100% Final Design 09310 - 5

Farewell Architects LLC March 6, 2014

c. MAPEI Corporation, color 14 Biscuit.

2. Polymer Type: Ethylene vinyl acetate or acrylic additive, in dry, redispersible form, prepackaged

with other dry ingredients.

2.6 ELASTOMERIC SEALANTS

A. General: Provide manufacturer's standard chemically curing, elastomeric sealants of base polymer and

characteristics indicated that comply with applicable requirements in Division 7 Section "Joint Sealants."

B. Colors: Provide colors of exposed sealants to match colors of grout in tile adjoining sealed joints, unless

otherwise indicated.

C. One-Part, Mildew-Resistant Silicone Sealant: ASTM C 920; Type S; Grade NS; Class 25; Uses NT, G,

A, and, as applicable to nonporous joint substrates indicated, O; formulated with fungicide, intended for

sealing interior ceramic tile joints and other nonporous substrates that are subject to in-service exposures

of high humidity and extreme temperatures.

2.7 MISCELLANEOUS MATERIALS

A. Trowelable Underlayments and Patching Compounds: Latex-modified, portland cement-based

formulation provided or approved by manufacturer of tile-setting materials for installations indicated.

B. Temporary Protective Coating: Either product indicated below that is formulated to protect exposed

surfaces of tile against adherence of mortar and grout; compatible with tile, mortar, and grout products;

and easily removable after grouting is completed without damaging grout or tile.

C. Tile Cleaner: A neutral cleaner capable of removing soil and residue without harming tile and grout

surfaces, specifically approved for materials and installations indicated by tile and grout manufacturers.

D. Grout Sealer: Manufacturer's standard silicone product for sealing grout joints that does not change color

or appearance of grout.

1. Products: Subject to compliance with requirements, available products that may be incorporated

into the Work include, but are not limited to, the following:

a. Custom Building Products; Aqua Mix Grout Sealer

b. Jamo Inc.; Grout and Tile Sealer

c. Southern Grouts & Mortars, Inc.; Grout Sealer

2.8 MIXING MORTARS AND GROUT

A. Mix mortars and grouts to comply with referenced standards and mortar and grout manufacturers' written

instructions.

B. Add materials, water, and additives in accurate proportions.

C. Obtain and use type of mixing equipment, mixer speeds, mixing containers, mixing time, and other

procedures to produce mortars and grouts of uniform quality with optimum performance characteristics

for installations indicated.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates, areas, and conditions where tile will be installed, with Installer present, for

compliance with requirements for installation tolerances and other conditions affecting performance of

installed tile.

Page 22: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

Eickhoff Hall, College of New Jersey TILE

100% Final Design 09310 - 6

Farewell Architects LLC March 6, 2014

1. Verify that substrates for setting tile are firm, dry, clean, free of coatings that are incompatible

with tile-setting materials including curing compounds and other substances that contain soap,

wax, oil, or silicone; and comply with flatness tolerances required by ANSI A108.01 for

installations indicated.

2. Verify that concrete substrates for tile floors installed with thin-set mortar comply with surface

finish requirements in ANSI A108.01 for installations indicated.

a. Verify that surfaces that received a steel trowel finish have been mechanically scarified.

b. Verify that protrusions, bumps, and ridges have been removed by sanding or grinding.

3. Verify that installation of grounds, anchors, recessed frames, electrical and mechanical units of

work, and similar items located in or behind tile has been completed.

4. Verify that joints and cracks in tile substrates are coordinated with tile joint locations; if not

coordinated, adjust joint locations in consultation with Architect.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Fill cracks, holes, and depressions in concrete substrates for tile floors installed with thin-set mortar with

trowelable leveling and patching compound specifically recommended by tile-setting material

manufacturer.

B. Where indicated, prepare substrates to receive waterproofing by applying a reinforced mortar bed that

complies with ANSI A108.1A and is sloped 1/4 inch per foot toward drains.

C. Blending: For tile exhibiting color variations, verify that tile has been factory blended and packaged so

tile units taken from one package show same range of colors as those taken from other packages and

match approved Samples. If not factory blended, either return to manufacturer or blend tiles at Project

site before installing.

D. Field-Applied Temporary Protective Coating: If indicated under tile type or needed to prevent grout from

staining or adhering to exposed tile surfaces, precoat them with continuous film of temporary protective

coating, taking care not to coat unexposed tile surfaces.

3.3 TILE INSTALLATION

A. Comply with TCA's "Handbook for Ceramic Tile Installation" for TCA installation methods specified in

tile installation schedules. Comply with parts of the ANSI A108 Series "Specifications for Installation of

Ceramic Tile" that are referenced in TCA installation methods, specified in tile installation schedules, and

apply to types of setting and grouting materials used.

1. For the following installations, follow procedures in the ANSI A108 Series of tile installation

standards for providing 95 percent mortar coverage:

a. Tile floors in wet areas.

b. Tile floors composed of tiles 8 by 8 inches or larger.

B. Extend tile work into recesses and under or behind equipment and fixtures to form complete covering

without interruptions unless otherwise indicated. Terminate work neatly at obstructions, edges, and

corners without disrupting pattern or joint alignments.

C. Accurately form intersections and returns. Perform cutting and drilling of tile without marring visible

surfaces. Carefully grind cut edges of tile abutting trim, finish, or built-in items for straight aligned

joints. Fit tile closely to electrical outlets, piping, fixtures, and other penetrations so plates, collars, or

covers overlap tile.

Page 23: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

Eickhoff Hall, College of New Jersey TILE

100% Final Design 09310 - 7

Farewell Architects LLC March 6, 2014

D. Provide manufacturer's standard trim shapes where necessary to eliminate exposed tile edges.

E. Jointing Pattern: Lay tile in grid pattern unless otherwise indicated. Lay out tile work and center tile

fields in both directions in each space or on each wall area. Lay out tile work to minimize the use of

pieces that are less than half of a tile. Provide uniform joint widths unless otherwise indicated.

1. For tile mounted in sheets, make joints between tile sheets same width as joints within tile sheets

so joints between sheets are not apparent in finished work.

2. Where adjoining tiles on floor, base, walls, or trim are specified or indicated to be same size, align

joints.

3. Where tiles are specified or indicated to be whole integer multiples of adjoining tiles on floor,

base, walls, or trim, align joints unless otherwise indicated.

4. Where indicated, lay wall tile in horizontal bond pattern.

5. Lay out tile sizzle strips to dimensions indicated or to next full tile beyond dimensions indicated.

F. Joint Widths: See grout joint recommendations indicated beneath each tile type in section 2.2 tile

products.

G. Stone Thresholds: Install stone thresholds in same type of setting bed as adjacent floor unless otherwise

indicated.

1. At locations where mortar bed (thickset) would otherwise be exposed above adjacent floor

finishes, set thresholds in latex-portland cement mortar (thin set).

2. Do not extend waterproofing/crack isolation membrane under thresholds set in latex-portland

cement mortar. Fill joints between such thresholds and adjoining tile set on waterproofing/crack

isolation membrane with elastomeric sealant.

H. Joints, remove excess sealer and sealer from tile faces by wiping with soft cloth.

3.4 CLEANING AND PROTECTING

A. Cleaning: On completion of placement and grouting, clean all ceramic tile surfaces so they are free of

foreign matter.

1. Remove epoxy and latex-portland cement grout residue from tile as soon as possible.

2. Clean grout smears and haze from tile according to tile and grout manufacturer's written

instructions but no sooner than 10 days after installation. Use only cleaners recommended by tile

and grout manufacturers and only after determining that cleaners are safe to use by testing on

samples of tile and other surfaces to be cleaned. Protect metal surfaces and plumbing fixtures

from effects of cleaning. Flush surfaces with clean water before and after cleaning.

3. Remove temporary protective coating by method recommended by coating manufacturer and that

is acceptable to tile and grout manufacturer. Trap and remove coating to prevent drain clogging.

B. Protect installed tile work with kraft paper or other heavy covering during construction period to prevent

staining, damage, and wear. If recommended by tile manufacturer, apply coat of neutral protective

cleaner to completed tile walls and floors.

C. Prohibit foot and wheel traffic from tiled floors for at least seven days after grouting is completed.

D. Before final inspection, remove protective coverings and rinse neutral protective cleaner from tile

surfaces.

3.5 INTERIOR TILE INSTALLATION SCHEDULE

A. Interior Floor Installations, Concrete Subfloor:

1. Tile Installation F113: Thin-set mortar; TCA F113.

Page 24: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

Eickhoff Hall, College of New Jersey TILE

100% Final Design 09310 - 8

Farewell Architects LLC March 6, 2014

2. Tile Installation F122: Thin-set mortar on waterproof membrane; TCA F122.

3. Tile Installation F125A: Thin-set mortar on crack isolation membrane; TCA F125A.

B. Interior wall installation, metal stud framing and blue board:

1. Tile Installation F113: Thin-set mortar; TCA F113.

END OF SECTION 09310

Page 25: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

Eickhoff Hall, College of New Jersey 16110 –ELECTRCAL CONDUITS - 1

100% Final Design November 3, 2015

Farewell Architects LLC Addendum #1

SECTION 16110 – ELECTRICAL CONDUITS

PART 1 - GENERAL

1.1 SUMMARY

A. Scope: This section is intended to define the general installation requirements for the conduit

systems installed at The College of New Jersey. The National Electrical Code shall govern the

actual sizing of conduit during the design process. Minimum design conduit sizing shall

accommodate type XHHW insulated wire.

1.2 SUBMITTALS

A. Product Data: For each type of product indicated.

B. Field Quality-Control Test Reports: Certified by the installing contractor.

1.3 QUALITY ASSURANCE

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70,

Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for

intended use.

B. Comply with NFPA 70.

PART 2 - PRODUCTS

A. Each electrical system, such as lighting, emergency lighting, fire alarm system, telephone/data

system, Building Automation System, security system, and CCTV system shall be routed in a

dedicated conduit system.

B. Conduits shall be designed to run parallel with the lines of the building. Electrical conduits shall

not be hung on hangers with any other service pipes, ducts, or other systems and shall be

supported independent of any ceiling support systems. Related conduits shall be grouped

together and supported from a conduit rack; provide space on rack for 25 percent additional

conduits.

C. Rigid steel fittings shall be of the threaded type only; EMT fittings shall be of the compression

type; EMT fittings with set screws are not permitted.

D. Exposed raceways shall be installed above water and steam piping. Maintain a minimum 12

inches clearance between conduit and surfaces with temperatures exceeding 104 degree F.

Page 26: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

Eickhoff Hall, College of New Jersey 16110 –ELECTRCAL CONDUITS - 2

100% Final Design November 3, 2015

Farewell Architects LLC Addendum #1

E. Maintain a minimum clearance of at least 6 inches between power conduits and

telecommunications conduits and at least 12 inches between power conduits and unshielded

twisted-pair telecommunications cables or as required by EIA/TIA Standard 569.

F. Raceway shall be designed with expansion joints to allow for thermal expansion of conduit

system and of the building (at expansion joints) and keep stresses within the allowable limits of

the conduit.

G. Junction/pull boxes shall be located to facilitate installation of cables and insure that the pulling

tension of cables is not exceeded. However, install no more than the equivalent of (3) 90-degree

bends between boxes.

H. Conduit and support systems shall be designed to meet applicable seismic codes.

I. Lateral installation of conduit on rooftops is not permitted.

J. In general, conduit sizes and types shall be suitable for the applications. The following is a

summary of minimum conduit requirements. K. All conduits shall be a minimum 3/4 inch.

L. Underground Installations:

1. Concrete encased ductbanks under roadways, parking lots, or other areas subject to

vehicular traffic: Use schedule 40 PVC conduit; ductbank shall be steel reinforced

2. Concrete encased ductbanks under all other area:

a. More than five feet from foundation wall or outdoor equipment pads: Use schedule

40 PVC.

b. Within five feet of foundation wall or outdoor equipment pads: Use rigid steel

conduit.

3. Direct Burial Branch circuit wiring for lighting, pumps, receptacles, etc.: Use Schedule

40 PVC conduit.

4. Installation of conduits under slab on grade is strictly prohibited. Only service entrance

feeders shall be permitted to be installed under slab. All feeders within the building will

be served by raceway systems installed within the structure.

5. Duct banks and conduit shall be installed above water and steam piping. Maintain a

minimum 6-foot clearance between underground conduit or duct banks and any parallel

steam lines. Underground crossings above steam lines shall maintain a minimum 24-inch

clearance to be filled with foam glass insulation.

6. Concrete for ductbanks shall be colored red.

7. Warning Tape: Provide warning tape to identify ductbank location. Tape shall be 4”

wide, detectable type, colored red with suitable warning legend.

M. In slab, above grade:

1. The installation of conduit in slab is prohibited.

N. Outdoor Locations, Above Grade: In corrosive environments, use 40 MIL thick PVC coated

rigid steel conduit with PVC coated threaded fittings; otherwise galvanized rigid steel conduit.

Page 27: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

Eickhoff Hall, College of New Jersey 16110 –ELECTRCAL CONDUITS - 3

100% Final Design November 3, 2015

Farewell Architects LLC Addendum #1

O. Wet and Damp Locations: In corrosive environments, use 40 MIL thick PVC coated rigid steel

with PVC coated threaded fittings; otherwise use rigid steel conduit. All roof conduit

penetrations shall use PVC coated galvanized rigid steel conduit.

P. Dry Locations:

1. Switchboard and panelboard feeders: EMT.

2. Feeders or branch circuits 100 amps and larger: EMT.

3. Circuits operating above 600V: Galvanized rigid steel conduit.

4. Exposed conduit in finished areas: Coordinate with Architect.

5. Exposed conduit in non-finished areas (storage rooms, etc.): Use EMT with compression

fittings except RGS up to 8 feet above finished floor.

6. Equipment Rooms: Install galvanized rigid steel conduit in rough-use areas like

mechanical and electrical equipment rooms, janitor's closets, etc.

7. Conduits in exterior walls: Rigid steel conduit.

8. Conduit in Interior Walls: Electrical metallic tubing.

9. Above False Ceiling: Electrical metallic tubing.

Q. Hazardous Locations: Use galvanized rigid steel conduit.

R. Flexible Metal Conduit:

1. Provide flexible conduits for connections to motors, transformers, and other electrical

equipment when it is subject to movement, vibration, misalignment, cramped quarters or

where noise transmission is to be eliminated or reduced. Do not use flexible non-metallic

conduit. Flexible conduit shall be of the liquid-tight type when installed under any of the

following conditions:

a. Exterior locations.

b. Moisture or humidity laden atmospheres where it is possible for condensation to

accumulate.

c. Corrosive atmospheres.

d. Where water or spray due to wash-operations is frequent or possible.

e. Wherever there is a possibility of seepage or dripping of oil, grease or water.

f. Connections to pumps.

2. Flexible metallic conduit (min. 1/2 inch trade size) shall be used for connection from

junction boxes to lighting fixtures and similar equipment mounted in a suspended ceiling.

Recessed fluorescent fixtures in the general office areas shall be installed with flexible

metallic conduit of not less than 4' nor more than 6' in length to permit relocation

flexibility. The flexible conduit shall connect the fixture to an accessible junction box

above the suspended ceiling.

S. All other applications not specified herein, use galvanized rigid steel conduit.

T. Paint all medium voltage conduit and junction boxes red. Identify junction boxes with voltage.

END OF SECTION 16110

Page 28: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

Eickhoff Hall, College of New Jersey 16721 - FIRE ALARM - 1

100% Final Design November 3, 2015

Farewell Architects LLC Addendum #1

SECTION 16721 - FIRE ALARM

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes fire alarm systems with carbon monoxide detectors and fire alarm

horn/strobe devices.

1.2 DEFINITIONS

A. LED: Light-emitting diode.

B. Definitions in NFPA 72 apply to fire alarm terms used in this Section.

1.3 SYSTEM DESCRIPTION

A. Signal transmission using hardwired separate individual circuits for each zone or circuit of alarm

indication and combination of hardwired and multiplex signal transmission for alarm, trouble

and supervisory initiating, monitoring and control circuits.

1.4 SUBMITTALS

A. Wiring diagrams, and floor plans shall be developed and signed by a technician or technicians

who individually or together have NICET Level 3 Fire Alarm Certification and the proposed fire alarm

system manufacturer’s certification and shall be submitted by the contractor to the state or local

building code reviewing agency as well as to the Architect, Engineer and Authority Having Jurisdiction

(AHJ). Proof of certification shall be included with the submittal. B. Product Data: For each

type of product indicated.

C. Wiring Diagrams: Detail wiring and differentiate between manufacturer-installed and

fieldinstalled wiring. Include diagrams for equipment and for system with all terminals and

interconnections identified.

D. Floor Plans: Indicate final outlet locations and routings of raceway connections.

E. Device Address List: Coordinate with final system programming.

F. System Operation Description: Detailed description for this Project, including method of

operation and supervision of each type of circuit and sequence of operations for manually and

automatically initiated system inputs and outputs. Manufacturer's standard descriptions for

generic systems are not acceptable.

Page 29: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

Eickhoff Hall, College of New Jersey 16721 - FIRE ALARM - 2

100% Final Design November 3, 2015

Farewell Architects LLC Addendum #1

G. Product Certificates: Signed by manufacturers of system components certifying that products

furnished comply with requirements.

H. Installer Certificates: Signed by manufacturer certifying that installers comply with

requirements.

I. Field Test Reports: Indicate and interpret test results for compliance with performance

requirements. Comply with NFPA 72.

J. The following documents shall be submitted to the authority responsible for enforcing the

International Building Code for review and approval prior to installation of the fire alarm

system.

1. A floor plan.

2. Locations of alarm-initiating and notification appliances.

3. Alarm control and trouble signaling equipment.

4. Annunciation.

5. Manufacturers, model numbers and listing information for equipment, devices and

materials.

6. Details of ceiling height and construction.

7. Signed and sealed drawings by NJ licensed professional Engineer.

K. Certificate of Completion: Comply with NFPA 72.

L. NICET and Manufacturer’s Certification: Indicating the names and technical level of

achievement awarded to the personnel responsible for the layout and installation of the system.

M. Before receiving final payment and after the system has been tested, inspected, and approved by

the Authority Having Jurisdiction, the Authorized System vendor shall turn over a disc copy and

hard copy of the approved changes to the program for the specific project directly to the Owner.

The information shall be complete in all respects and contain all actions, rules, and other

information needed to change, alter, or add to the system at a future date by a licensed Factory

Certified vendor of the installed system. This information shall not be distributed to anyone not

certified by the Manufacturer and proof of Certification shall be presented to the Owner, in

writing, before the information is exchanged.

N. The Owner, as well as the system vendor, shall maintain a copy of the latest database. As

changes are made, the Owner shall receive the latest database and the vendor of record shall

maintain a copy.

O. The disc copy of the program shall be turned over to the Owner in a sealed envelope with the

following or similar verbiage:

1. COMPANY NAME acknowledges that all data included on the enveloped disc is 100%

complete. Data enclosed contains all software required to provide a 100% functioning

system as required by the contract specifications and as tested and approved by the

Authority Having Jurisdiction on DATE. The Owner shall not distribute the enclosed

software disc to any company or individual not Authorized and Certified by the System

Manufacturer. The enclosed software is licensed and protected by copyright of the

Page 30: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

Eickhoff Hall, College of New Jersey 16721 - FIRE ALARM - 3

100% Final Design November 3, 2015

Farewell Architects LLC Addendum #1

SYSTEM MANUFACTURER.

1.5 QUALITY ASSURANCE

A. Equipment, materials and system engineering shall be provided by a direct Factory Authorized

Systems Distributor. The on site management of the fire alarm portion of the project shall be the

responsibility of a Factory Trained and Authorized Engineered Systems Distributor to ensure

proper specification adherence, installation, final connection, test, turnover, warranty

compliance, and service.

B. Manufacturer Qualifications: A firm experienced in manufacturing systems similar to those

indicated for this Project and with a record of successful in-service performance.

C. Compliance with Local Requirements: Comply with applicable building code, local ordinances

and regulations, and requirements of authorities having jurisdiction.

D. Comply with NFPA 72.

E. UL Compliance and Labeling: Comply with provisions of UL Standards for Safety pertaining to

fire alarm systems and provide products that are UL listed and labeled.

F. Comply with the following:

1. 464 Audible Signal Appliances.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the

following:

1. Existing System manufacturer “Honeywell” (Contractor to field verify). Contact Jim

Jennings at 215-266-3544 or email, [email protected] for the existing fire

alarm system information.

2. For Honeywell pricing information contact Louis A. Speziale at 1-856-437-1844 or

email, [email protected] .

2.2 FUNCTIONAL DESCRIPTION OF SYSTEM

A. Carbon Monoxide detector operation initiates the following:

1. A supervisory, audible and visible “carbon monoxide” signal indication and device

location at the FACP and annunciator.

2. A remote audible and visible supervisory alarm signal at a continuously attended location

within the premises.

3. Recording the event on the system printer.

Page 31: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

Eickhoff Hall, College of New Jersey 16721 - FIRE ALARM - 4

100% Final Design November 3, 2015

Farewell Architects LLC Addendum #1

4. Transmission of supervisory and trouble signals to remote alarm receiving station. B.

Removal of an alarm-initiating device or a notification appliance initiates the

following:

1. A "trouble" signal indication at the FACP and the annunciator for the device or zone

involved.

2. Recording of the event by the system printer.

3. Transmission of trouble signal to remote alarm receiving station.

C. Printout of Events: On receipt of the signal, print alarm, supervisory, and trouble events.

Identify zone, device, and function. Include type of signal (alarm, supervisory, or trouble), and

date and time of occurrence. Differentiate alarm signals from all other printed indications. Also

print system reset event, including the same information for device, location, date, and time.

Commands initiate the printout of a list of existing alarm, supervisory, and trouble conditions in

the system and a historical log of events.

2.3 OTHER DETECTORS

A. Remote Addressable Modules: High temperature, waterproof and explosion proof units may be

provided with remotely mounted external addressable interface units.

B. Carbon Monoxide Detector: U. L. Listed to Standard 2075 including the following features:

1. Operating Voltage: 24 vdc supervised power supply from the fire alarm system.

2. Mounting: Surface or semi-flush mounting to standard outlet boxes.

3. Features: Test and reset switch; Green LED for normal operation; Red LED for alarm

indication; SPST alarm relay; SPST trouble relay.

4. Activates alarm contacts at multiple levels of exposure to carbon monoxide based on

time-weighted averages of the gas present.

5. Alarm contacts activate a supervisory condition on the fire alarm system and local

audible and visible signal via remote addressable module.

6. Activates trouble contacts upon failure of the detector or loss of operating power.

7. Trouble contacts activate a trouble condition on the fire alarm system via remote

addressable module.

2.4 NOTIFICATION APPLIANCES

A. Description: Equip for mounting as indicated and have screw terminals for system connections.

1. Combination Devices: Factory-integrated audible and visible devices in a

singlemounting assembly.

Page 32: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

Eickhoff Hall, College of New Jersey 16721 - FIRE ALARM - 5

100% Final Design November 3, 2015

Farewell Architects LLC Addendum #1

B. Horns: Electric vibrating polarized type 24 volt d.c. with operating mechanism mounted behind

a grille. Horns shall produce a minimum sound pressure level (SPL) of 92 dBA average anechoic

@ 10 ft. and 88 dBA reverberant @ 10 ft.

C. High Decibel Horns: Electronic projector polarized type 24 volt d.c. surface mounted with

adjustable mounting bracket. Horns shall produce a minimum sound pressure level of 110 dBA

at 10 ft. Horns shall be weatherproof and listed for outdoor use where applicable.

D. Visible Alarm Devices: Xenon strobe lights listed under UL 1971 with clear or nominal white

polycarbonate lens. Mount lens on an aluminum faceplate. The word "FIRE" is engraved in

minimum 1-inch- (25-mm-) high letters on the lens.

1. Rated Light Output: Comply with the minimum intensities indicated in the CABO/ANSI

A117.1-1998 “Room spacing allocation” and “Corridor spacing allocation” tables for the

quantity and locations on devices indicated on the drawings. Where the required

intensities cannot be obtained from the indicated devices, provide additional devices

evenly distributed to meet the required intensities.

2.5 WIRE

A. Fire Alarm Line Voltage Circuits: #14 AWG, stranded copper conductor with THHN or TFN,

600 volt rated insulation, in raceway.

B. Fire Alarm Line Voltage Circuits: #16 AWG, solid or bunch tinned stranded copper conductor,

600 volt TFN insulation rated 90 deg. C., Type MC metal clad cable with green insulated

grounding conductor.

C. Fire Alarm Low Voltage Circuits - Non Air-Handling Spaces: #18 AWG solid or bunch tinned

stranded copper, 300 volt, 105 deg. C., PVC insulated conductors with aluminum polyester

shield, drain wire and overall red PVC jacket, NEC Types FPLR and FPLP.

2.6 CONDUIT

A. All conduits shall be a minimum 3/4 inch.

B. In slab, above grade:

1. The installation of conduit in slab is prohibited.

C. Conduit shall be in accordance with The National Electrical Code (NEC), local and New Jersey

State requirements. Where required, all wiring shall be installed in conduit or raceway. Conduit

fill shall not exceed 40 percent of interior cross sectional area where three or more cables are

contained within a single conduit. Cable must be separated from any open conductors of power,

or Class 1 circuits, and shall not be placed in any conduit, junction box or raceway containing

these conductors, per NEC Article 760-55. Wiring for 24 volt DC control, alarm notification,

emergency communication and similar power-limited auxiliary functions may be run in the same

conduit as initiating and signaling line circuits. All circuits shall be provided with transient

suppression devices and the system shall be designed to permit simultaneous operation of all

circuits without interference or loss of signals. Conduit shall not enter the fire alarm control

Page 33: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

Eickhoff Hall, College of New Jersey 16721 - FIRE ALARM - 6

100% Final Design November 3, 2015

Farewell Architects LLC Addendum #1

panel, or any other remotely mounted control panel equipment or back-boxes, except where

conduit entry is specified by the FACP manufacturer.

D. Dry Locations:

1. Fire Alarm circuits and branch circuits: EMT.

2. Exposed conduit in finished areas: Coordinate with Architect.

3. Equipment Rooms: Install galvanized rigid steel conduit in rough-use areas like

mechanical and electrical equipment rooms, janitor's closets, etc.

4. Conduit in Interior Walls: Electrical metallic tubing.

5. Above False Ceiling: Electrical metallic tubing.

E. Hazardous Locations: Use galvanized rigid steel conduit.

F. Flexible Metal Conduit:

1. Flexible metallic conduit (min. 1/2 inch trade size) shall be used for final connections to

Fire Alarm devices. Do not use flexible non-metallic conduit. Flexible conduit shall be of

the liquid-tight type.

G. All other applications not specified herein, use galvanized rigid steel conduit.

PART 3 - EXECUTION

3.1 EQUIPMENT INSTALLATION

A. Audible Alarm-Indicating Devices: Where ceiling heights permit, install top of appliance not

less than 90 inches above the finished floor and not less than 6 inches (150 mm) below the

ceiling. Install bells and horns on flush-mounted back boxes with the device-operating

mechanism concealed behind a grille. Combine audible and visible alarms at the same location

into a single unit.

B. Horns: Generally audible signals shall be flush mounted electric vibrating horns.

1. In Laundry Room an outdoors audible signals shall be surface mounted high decibel

horns.

C. Visual Alarm Indicating Devices: Install with bottom of appliance not less than 80 inches (2030

mm) and no greater than 96 inches (2440 mm) above the finished floor.

D. Combination Audible/Visual Indicating Devices: Install with top of appliance not less than 90

inches (2280 mm) and bottom of appliance not greater than 96 inches (2440 mm) above the

finished floor.

3.2 WIRING INSTALLATION

A. Wiring Method: Install line voltage wiring in metal raceway according to Division 16 Sections.

Conceal raceway except in unfinished spaces and as indicated.

Page 34: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

Eickhoff Hall, College of New Jersey 16721 - FIRE ALARM - 7

100% Final Design November 3, 2015

Farewell Architects LLC Addendum #1

B. Make splices and connections in low voltage fire alarm cables in metal boxes with covers. Make

cable connections to fire alarm devices using metal boxes and cable connectors so there is no

strain on the wiring termination.

C. Cable Taps: Use numbered terminal strips in junction, pull and outlet boxes, cabinets, or

equipment enclosures where circuit connections are made.

3.3 IDENTIFICATION

A. Install instructions frame in a location visible from the FACP.

B. Paint power-supply disconnect switch red and label "FIRE ALARM."

3.4 GROUNDING

A. Ground cable shields and equipment according to system manufacturer's written instructions to

eliminate shock hazard and to minimize, to the greatest extent possible, ground loops, common

mode returns, noise pickup, cross talk, and other impairments.

3.5 FIELD QUALITY CONTROL

A. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect

field-assembled components and connections and to supervise pretesting, testing, and adjustment

of the system. Report results in writing.

B. Pretesting: After installation, align, adjust, and balance the system and perform complete

pretesting. Determine, through pretesting, the compliance of the system with requirements of

Drawings and Specifications. Correct deficiencies observed in pretesting. Replace

malfunctioning or damaged items with new ones, and retest until satisfactory performance and

conditions are achieved. Prepare forms for systematic recording of acceptance test results.

Report of Pretesting: After pretesting is complete, provide a letter certifying the installation is

complete and fully operable, including the names and titles of witnesses to preliminary tests.

C. Final Test Notice: Provide a minimum of 10 days' notice in writing when the system is ready for

final acceptance testing.

D. Minimum System Tests: Test the system according to procedures outlined in NFPA 72. Test the

fire alarm control panels, annunciators, and each new or relocated alarm initiating, indicating or

interfacing device in the presence of the Contractor, Owner's Representative, and the Local Fire

Subcode Official. Minimum required tests are as follows:

1. Verify the absence of unwanted voltages between circuit conductors and ground.

2. Test all conductors for short circuits using an insulation-testing device.

3. With each circuit pair, short circuit at the far end of the circuit and measure the circuit

resistance with an ohmmeter. Record the circuit resistance of each circuit on record

drawings.

Page 35: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

Eickhoff Hall, College of New Jersey 16721 - FIRE ALARM - 8

100% Final Design November 3, 2015

Farewell Architects LLC Addendum #1

4. Verify that the control unit is in the normal condition as detailed in the manufacturer's

operation and maintenance manual.

5. Test each initiating and indicating device for alarm operation and proper response at the

control unit. Test smoke detectors with actual products of combustion.

6. Test Both Primary and Secondary Power: Verify by test that the secondary power system

is capable of operating the system for the period and in the manner specified.

E. Retesting: Correct deficiencies indicated by tests and completely retest work affected by such

deficiencies. Verify by the system test that the total system meets Specifications.

F. Report of Tests and Inspections: Provide a written record of inspections, tests, and detailed test

results in the form of a test log. Submit log on the satisfactory completion of tests. Tag all

equipment, stations, and other components at which tests have been satisfactorily completed.

3.6 CLEANING, ADJUSTING AND ON-SITE ASSISTANCE

A. Cleaning: Remove paint splatters and other spots, dirt, and debris. Touch up scratches and

marred finish to match original finish. Clean unit internally using methods and materials

recommended by manufacturer. When requested within one year of date of Substantial

Completion, provide on-site assistance in adjusting sound levels, controls, and sensitivities to

suit actual occupied conditions. Provide up to two visits to Project site for this purpose.

END OF SECTION 16721

Page 36: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613
Page 37: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613
Page 38: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

Photo 1 Photo 2

Page 39: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

Photo 4

Photo 3

Page 40: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

Photo 5

Page 41: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

Photo 6 Photo 7

Page 42: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

Photo 8

Photo 9

Page 43: To: Matt Farr · 1. Spec. section 09265-2, Para. 2.2B, 2.2C and 2.2D Interior Gypsum Board, change thickness/core to read 5/8 inch instead of 1/2 inch. 2. Add new spec section 092613

Photo 10