TO LET - OFFICE SPACE IN THE HEART OF STEVENAGE

6
TO LET - OFFICE SPACE IN THE HEART OF STEVENAGE AVAILABLE FROM APRIL 2021

Transcript of TO LET - OFFICE SPACE IN THE HEART OF STEVENAGE

T O L E T - O F F I C E S P A C E I N T H E H E A R T O F S T E V E N A G E

A V A I L A B L E F R O M A P R I L 2 0 2 1

A Brighter Future for your Business

A unique offering at the heart of the UK’s Science and Technology Innovation Corridor. Two independent office entrances provide 11,130 sq ft of newly refurbished office space.

The Exchange and Works comprise the office offering of The Forge.

The Forge is a development by Reef Group, in partnership with Stevenage Borough Council, regenerating Queensway to provide revitalised retail and office space, 110 new residential apartments, restaurants and gym.

In excess of £40m has been invested to deliver The Forge which is the first phase of the wider regeneration plans for this quarter of the town.

Easy access to the train station, local amenities and surrounding green spaces provides staff and clients alike the best of what Stevenage has to offer.

S T E V E N A G EF O R G E E X C H A N G E A N D W O R K S O F F I C E S P A C E

Stevenage,

85-103 Queensway,

SG1, Stevenage

51 Welbeck Street, London, W1G 9HL

T 020 7637 0601

E [email protected]

W www.reefgroup.co.uk

FOR INFORMATION

Revision Date Comments

project

drawing number

size

A1

date

04/02/2021

scale

1:200

REPORT DISCREPANCES

DO NOT SCALE FROM THIS DRAWING

COPYRIGHT REEFGROUP

USE LATEST REVISION

CHECK ALL DIMENSIONS ON SITE

drawing title

A.03.3

revision

Key:

Second Floor Plan

Key Plan

A

client

Stevenage,

85-103 Queensway,

SG1, Stevenage

51 Welbeck Street, London, W1G 9HL

T 020 7637 0601

E [email protected]

W www.reefgroup.co.uk

FOR INFORMATION

Revision Date Comments

project

drawing number

size

A1

date

04/02/2021

scale

1:200

REPORT DISCREPANCES

DO NOT SCALE FROM THIS DRAWING

COPYRIGHT REEFGROUP

USE LATEST REVISION

CHECK ALL DIMENSIONS ON SITE

drawing title

A.03.2

revision

Key:

First Floor Plan

Key Plan

A

client

Stevenage,

85-103 Queensway,

SG1, Stevenage

51 Welbeck Street, London, W1G 9HL

T 020 7637 0601

E [email protected]

W www.reefgroup.co.uk

FOR INFORMATION

Revision Date Comments

project

drawing number

size

A1

date

04/02/2021

scale

1:200

REPORT DISCREPANCES

DO NOT SCALE FROM THIS DRAWING

COPYRIGHT REEFGROUP

USE LATEST REVISION

CHECK ALL DIMENSIONS ON SITE

drawing title

A.03.1

revision

Key:

Ground Floor Plan

Key Plan

A

client

N E W LY F I T T E D A N D D E C O R A T E D O F F I C E S U I T E S T O I N C L U D E :• Raised access floors to first floor level with floor boxes for small power and data outlets.

• Vinyl concrete effect floor tiles for turnkey fit-out.

• Wall-mounted radiators from new efficient centralised boiler plant.

• Exposed ceiling mounted mechanical ventilation with heat recovery to provide 10 litres/sec per person (based on 1 person per 19 sq m).

• Feature exposed wall and floor structures.

• Exposed suspended Office lighting to provide 350–400 lux at the working plane.

• Tea point connections including capped water supply and drainage to selected units for extensions by tenant.

• Shared fitted kitchen facilities.

• Super Loo toilet facilities.

• Shower and changing facilities.

• Lift access to first floor.

• Air Conditioning available.

S E C O N D F L O O R

G R O U N D F L O O R

F I R S T F L O O R

Service Yard

Car Parking

Service Yard

Car Parking

Service Yard

Car Parking

Queensway

The

For

um

Key:

Office

Office Communal Area

Other Uses

The

For

um

Queensway

The

For

um

Queensway

Office 1

Office 2

Office 3

Office 4 Office 5 Office 6 Office 7

Office 8

Office 1 (NIA): 3,303 sq ft (307 sq m)

Office 2 (NIA): 3,303 sq ft (309 sq m)

Office 3 (NIA): 1,238 sq ft (115 sq m)

Office 4 (NIA): 597 sq ft (55 sq m)

Office 5 (NIA): 642 sq ft (60 sq m)

Office 6 (NIA): 1,010 sq ft (94 sq m)

Office 7 (NIA): 766 sq ft (71 sq m)

Office 8 (NIA): 2,780 sq ft (258 sq m)

S T E V E N A G EF O R G E E X C H A N G E A N D W O R K S O F F I C E S P A C E

S T E V E N A G EF O R G E E X C H A N G E A N D W O R K S O F F I C E S P A C E

Sitting at the heart of the UK Innovation Corridor, just 20 minutes from London and 37 minutes from Cambridge. The Forge’s strategic position of Stevenage offers occupiers access to the next generation of science and technology partners in London, Cambridge and Harlow. This is a great opportunity to join the Life Science community of 1,400 businesses and counting.

For international travel, be it leisure or business, 3 airports are within 45 minutes via the A1 (M) & M25.

For those who like to commute by foot or bicycle, Stevenage has 40km of segregated cycling and footpaths making it a safe and easy place to navigate.

Rail

London - 20 Minutes Cambridge - 37 Minutes

Pedestrian

Pedestrian and Cyclist Friendly

S T E V E N A G E

Road

A1 (M) - 5 Minutes M25 - 20 Minutes Luton - 26 Minutes Stansted - 42 Minutes Heathrow - 59 Minutes

Over 50,000 Businesses already located in Stevenage Some of the world’s most innovative Pharmaceutical, Technology, R&D, Defence and Aerospace companies operate within Stevenage.

17% Higher than national average earnings Westgate Shopping Centre, Queensway and a number of retail parks offer a wide selection of fashion, home, beauty and technology.

20% Population increase over the next 15 years Current population of 87,000.

Higher than UK average of workforce comprising Managers, Directors and Senior fficials Investment and Council led initiatives have made Stevenage a UK leader in attracting STEM and start-up businesses to the town. 18,800 people are employed in nearby Gunnels Wood alone.

Higher than UK average of residents in professional occupations Companies such as Airbus, MBDA, GSK, Fujitsu, Cell Therapy Manufacturing Centre and the Stevenage Bioscience Catalyst are already located in Stevenage.

SG1 The largest town centre regeneration scheme in South East England. 1,800 new homes over four developments and 850 units, 53,000 sq ft of bars, restaurants, new health facility and library.

Train station expansion The addition of a 5th platform will ease congestion and improve connectivity.

7,600 Planned new homes In order to accommodate sustained housing demand.

A G R O W I N G L O C A L E C O N O M Y

L O C A T I O N

T R A N S P O R TSTEVENAGELUTON

M1

L O N D O N

HARLOW

STANSTED

CAMBRIDGE

BEDFORD

HITCHIN

M11

M25

A1 (M)

A10

A6

A11

A41

M25

A1 (M)

KINGS CROSS

M4

HEATHROW

HEMEL HEMPSTEAD

WATFORD

BOREHAMWOOD

ST ALBANS

WELWYN GARDEN CITY

M1

UK

I

NN

OV

AT

IO

N

CO

RR

ID

OR

A505 M11

M11

LEIGHTON BUZZARD

SLOUGH

BRENTWOOD

ENFIELD

HATFIELD

HERTFORD

M25

S T E V E N A G EF O R G E E X C H A N G E A N D W O R K S O F F I C E S P A C E

Tom Harker BSc (Hons) MRICS E: [email protected] T: 01908 544905 M: 0770 288 4405

Lambert Smith Hampton T: 01908 604 630

A Development by

C O N T A C T

S T E V E N A G EF O R G E E X C H A N G E A N D W O R K S O F F I C E S P A C E