To Enhance Your Webinar Experience Teleconference info:Teleconference info: Call-in: (888)...
-
Upload
makenzie-homewood -
Category
Documents
-
view
212 -
download
0
Transcript of To Enhance Your Webinar Experience Teleconference info:Teleconference info: Call-in: (888)...
To Enhance Your Webinar Experience
• Teleconference info:
• Call-in: (888) 394-8197
• Passcode: 793682#
• Phone lines are automatically muted once connected.
• Use the Q&A panel (not Chat) in WebEx anytime during presentation; questions will be addressed as appropriate.
• Thank you for joining today! We will begin shortly.
1
ITS Technical Presentation Series
Automated Signal Performance Measures
ITE Webinar Series Review
October 22, 2014
Jamie Archambeau, PE, PTOEWhitney Nottage, PE, IMSA II
2
Jamie Archambeau, PE, PTOE
• Graduated from Michigan Technological University
• 11 years with Atkins• Experience includes traffic
engineering and transportation planning
• Registered PE in Colorado and New Mexico
• Current position: Project Manager
Whitney Nottage, PE, IMSA II
• Graduated from the University of Central Florida
• 6 years with Atkins• Experience includes ITS/ATMS
design, traffic engineering and operations
• Registered PE in Florida, Georgia, and Alabama• Current position: Corridor manager for GDOT’s RTOP
Items to be Covered
• What are Automated Signal Performance Measures (SPMs)?
• History of SPMs
• Planning benefits
• Operations benefits
• Design benefits
• How to get Automated SPMs
• Summary
All graphics and data presented today are pulled from the ITE Automated SPM webinar series presentations and the TIG website
5
What are Automated Signal Performance Measures?
6
What are Automated SPMs?
• Advanced data displays
• Asset management tool
• Eases field maintenance
• Aids timing and coordination
• Assists planning
7
What is high-resolution data?
8
Research for developing new
performance measures
Enumeration definitions for
controller events developed
Data was characterized as “High-Resolution
Data”
High-Resolution data collection• Controllers capable of high-resolution data logging
*Manual data collection can be done if communications not available
9
Events are
logged
Data files are retrieve
d*
Data is translat
ed
Interpretation
Analysis
Data is archive
d
History of SPMs
History of SPMs
• Used by INDOT, UDOT, MNDOT
• NCHRP accepted
• 2013 focus technology
• More high-resolution data capable controllers
• National Traffic Signal Report Card scoring
11
History of SPMs
12
Planning benefits
Planning Benefits
• Prioritize signal timing
• Executive reporting
• Justify investments
14
Planning Benefits
Planning Benefits
Planning Benefits
Planning Benefits
Planning Benefits
Operations Benefits
Data analysis options
• Phase termination charts
• Coordination diagrams
• Approach speed diagrams
• Turning movement counts
21
Operations benefits
• Identifying equipment issues
• Verifying / addressing complaints
22
Operations Benefits• EXAMPLE: Identifying broken equipment
23
Phases maxing out in the middle of the night
Metric: Purdue Phase Termination
Operations Benefits• COMPLAINT: Cycle is too long
24
Metric: Split Monitor
Operations Benefits• COMPLAINT: Not enough green time
25
Metric: Split Monitor
Design Benefits
Design benefits• Calculating clearance intervals
• TOD schedule
• Calculate splits
• Fine-tuning plans
27
Design Benefits• Calculating clearance intervals
28
Metric: Approach speed chart
Design Benefits• Determining TOD schedule
29
Metric: Turning movement counts
Design Benefits• Calculating splits with lane-by-lane turning movement
counts
30
Metric: Turning movement counts
Design Benefits• Fine-tuning new coordination plans
31
Metric: Arrivals on Red
Mainline turns green
Mainline turns yellow, then red
How to get Automated Signal Performance Measures
Infrastructure Required
• Controller
• Communication
• Network equipment
• Detection
33
Infrastructure Required
34
Infrastructure Required• Communications network
• Interconnect• A server
• A website or interface
35
Get .dat files
Translate .dat files
to .csv
Store and
archive data in a database
Infrastructure Required
36
Summary
37
Summary
• Learn More• Complete system audits• Maintenance• Timing prioritization• Performance reports
38
Whitney [email protected](678) 247-2417(407) 506-2565
For more information please contact
39
Jamie [email protected](720) 475-7097(303) 345-8738
Or visithttp://tig.transportation.orghttp://udottraffic.utah.gov/signalperformancemetricshttp://dotapp7.dot.state.mn.ushttp://docs.lib.purdue.edu/jtrpaffdocs/3/