TKahn Portfolio

20
Tamara Kahn | University of Edinburgh MArch Applicaon

description

 

Transcript of TKahn Portfolio

Page 1: TKahn Portfolio

Tamara Kahn | University of Edinburgh MArch Application

Page 2: TKahn Portfolio

Architectural ExperienceHonours and Awards

Duke of Edinburgh Award: Gold2010

LanguagesEnglish (mother tongue) Luxembourgish (mother tongue) Hebrew (mother tongue) French (fluent)German (fluent)

SoftwaresArchiCAD (strong) Photoshop, InDesign, Illustrator (strong) AutoCAD (strong) Revit (good) SketchUp (good)3D Studio Max (good)Vectorworks (basic)

European Biennial of Landscape Architecture in Barcelona2012 | My project ‘Landscape’ had been selected to be shown at the exhibition in Barcelona

KSCV Gold+ Award (Kent Student Certificate for Volunteering)2013 | over 200 hours of volunteering in one year

‘Festival des Cabanes 2013’ | 1st Prize2013 | Design competition for a Bus Shelter followed by project management until completion

Education

Athénée de Luxembourg2003 -2010 | Grade : ‘Very Good’ | Final Year Subjects : Maths, Chemistry, Physics, Economics, English, German, Philosophy

University of Kent2010 -2013 | BA Hons Architecture | RIBA Part 1 | Grade: 1st Class Honours

Skills & Expertise

Tamara Kahn

Fabeck Architectes 2013-2014 |6 months | www.fabeck.lu

Bruck und Weckerle2011|4 weeks| www.bruck-weckerle.com

G+P Müller2012|3 weeks|www.mullerarchitectes.lu

Graham Wright Architect2013 | RIBA Mentoring Scheme

Curriculum Vitae

Current Position Volunteering with the Shelter Research Unit of the International Red Cross since March 2014

Email [email protected]

Home Address 60, rue de la Gare | L-4999 Sprinkange | Luxembourg

Mobile [00352] 691 826 189 |[0044] 7774 257 465

Page 3: TKahn Portfolio

Vice President for Article 25 Student Chapter2012 - 2013 | Organising and Leading Events in a Group of +-15 Volunteers to raise money and awareness for Article 25

Scouts LeaderSeptember 2006 - September 2010 | Once a week | Organising and Leading activities for 6-8 year olds in a group of 4-6 volunteers

Keith BothwellSenior Lecturer at the University of Kent | [email protected]

Tatiana FabeckDirector and Founder of Fabeck Architectes | [email protected]

Organising activities for defavorised children in RomaniaJuly 2012 | 2 weeks | Understanding the needs of the children and organising activities that would benefit them best

Volunteer Experience

Reference

Employment

Guardian LuxguardJuly 2007

IEEJuly 2008

Municipality of Dippach : Summer SchoolJuly 2009

Municipality of Mamer : Summer SchoolJuly 2011

Other

Qualified Activity Leader for Children2009 | Formation over 2 years that allows me to be in charge of a group of children

Driving Licence2008 | Clean

Further InterestsDance (shows and competitions)Playing percussion instruments ScoutsTravelling

Page 4: TKahn Portfolio

The creation of spaces where people can prosper is one of the most demanding, yet rewarding challenges. Taking part in the design of new architectural spaces has always tempted me, the confluence of technical and artistic issues being particularly appealing. Yet it was not until completing my Bachelor and throughout my year-out that I gained a full understanding of how architecture engages with all aspects of human life. I see architecture as a comprehensive problem solving exercise where the right balance between artistic, structural and functional qualities has to be found.

I am strongly drawn to the MArch course at the Edinburgh College of Art because of its innovative educational methodology offering a choice of thought provoking themes and a large range of research opportunities, hence enabling individuals to pursue self-driven architectural interests. The strong studio culture at ESALA allowing interactions with students of various academic fields, such as landscape architecture, urban design and architectural conservation is a further important asset the cutting edge architectural education.

Throughout my MArch I wish to pursue my research into city regeneration. During my first year-out placement, I was part of a winning competition team in charge of a 17ha regeneration masterplan, a highly instructive challenge. I learned to understand the value of land ownership and building phases, allowing different parts of a city to be built independently, as well as the importance of existing axes and structures.

The differences in society and culture that shape the buildings and the layout of a city are a further architectural field

Tamara KahnPersonal Statement

Page 5: TKahn Portfolio

were awarded the first prize and were hence in charge of following the project through all work stages to completion. This had been a unique educative experience where I learned the importance of good communication within a project team.

After completion of my master’s degree I aspire to become a fully qualified architect specialising in regeneration and reconstruction projects in cities either hit by disasters or that have become derelict over time. I feel that your course would be the perfect opportunity to pursue this career in a well-structured academic environment.

that I am particularly keen to continue discovering. Speaking five languages fluently and having visited and lived in various societies, I have gained a deep understanding of different cultures. Having written my bachelor degree dissertation on ‘Providing Shelter after Natural Disasters’, I was able to secure a 6-month internship at the Shelter Research Unit of the Red-Cross where I am in charge of carrying out a housing development project, 4 months of which I will spend in Senegal. This internship is a great learning opportunity where I am becoming familiar with adobe construction, as well as gaining a deep insight into Senegalese culture and architectural background.

Being a determined person, I enjoy planning and making projects come to reality. This does not solely refer to architecture, but also to various aspects of my free time. Whilst in the 2nd and 3rd year of my Bachelor, I was part of the Kent Article 25 Student Chapter, first as treasurer, then as vice-president raising over £4000 in two years. Moreover, during my final BA year, I participated with another architecture student in a competition to design a bus shelter in Luxembourg. We

Page 6: TKahn Portfolio

Desig

n of

an

Urb

an C

ultu

re C

entr

e in

Lill

e |

BA P

roje

ct |

201

3

South Elevation

West Elevation

South Elevation

West Elevation

Study Models | Wood, Paper, Cardboard Elevation Studies | Hand Drawing, Photoshop

Page 7: TKahn Portfolio

Section| Revit, 3D Studio Max , Photoshop

Elevations | Revit, 3D Studio Max , Photoshop Interior Perspective | Revit, Photoshop

West Elevation 1:200

Tamara Kahn ¦ Urban ¦ Maison du Hip Hop

Perspective in Atrium Site Plan 1:1000

Tamara Kahn ¦ Urban ¦ Maison du Hip HopTamara Kahn ¦ Urban ¦ Maison du Hip HopTamara Kahn ¦ Urban ¦ Maison du Hip HopTamara Kahn ¦ Urban ¦ Maison du Hip HopTamara Kahn ¦ Urban ¦ Maison du Hip Hop

Tamara Kahn ¦ Urban ¦ Maison du Hip HopSection B 1:200

South Elevation 1:200

The ‘Maison du Hip Hop’ is a cultural urban centre for music, dance and art learning and performance facilities. It is characterised with a flexibility in use and a conglomerate approach to internal materials expressing the experimental nature of Hip Hop.

Page 8: TKahn Portfolio

WestElevation

SouthElevation

Winter Facade MeshThe copper expanded mesh pannels regulate the sunlight that penetrates the building.

Insummertheglazedsouthernfacadeisshadedbythemeshbecausethesunrayshitthemeshinananglethatonlyallowsreflectedlighttopernetratetheglass.Thereforethebuildingispreventedfromoverheating.

Inwinterthesunangleislowerandthereforedirectsunrayscanhittheglassandthebuildingcanbenefitfromsolar gain.

VI. E

nvel

ope

Blockwork

Paint

RigidFoamInsulation

Vapour Proof Layer

Glass-Fibre Panel

Waterproof Membrane

Timber Flooring

Plywood

RigidFoamInsulation

Timber Joist

TimberBatten

SteelBeam

Stainless Steel Pole

Stainless Steel Scerws

Detaild¦IsometricProjection

ExpandedMeshCopperPannels2400x1800

Summer Facade Mesh

Expanded Mesh Copper Pannels 2400 x 1800

Site Plan | Revit, 3D Studio Max , Photoshop Detail in Isometric Projection | AutoCAD, 3D Studio Max

Page 9: TKahn Portfolio

Floor Plans| Revit, 3D Studio Max , Photoshop

Facade Detail| AutoCAD

V.Con

stuctio

nan

dAcou

stics

BoxinBoxConstruction

GypsumPlasterBoard

Gravel

The main hall is equipped with retractable seats. These fold into eachotherandenable thespace tobemultifunctional.Thehallcanactasaperformanceareaforastandingorsittingcrowd(con-certs,danceshows,DJsets,…),aswellasforapartyoranexhibi-tionwithpaidentrance.Theacousticpanelsareadjustableaswelltofacevariousdirectionsinordertocaterforthevarietyofuses.

The acoustic controlof the building is very important both for the interior sound and to not disturb the neigh-boors. The recording studio consists of a box in box construc-tionandthemusicstu-dios are insulated with acousticfoam.

Soil and Drainage Layer for Sedum

DPM

Insulation

Metal Deck

SteelBeam

Vapour Control

In-Situ Concrete

SteelStudsandInsulation

Void for Services

Blockwork

RigidFoamInsulation

Glass-Fibre Panel

Timber Flooring

Plywood

RigidFoamInsulation

Timber Joist

Steel Primary Member

DoubleGlazingWindow

Window Sill

ExpandedMeshCopperPannels2400x1800

Concrete Floor

Stainless Steel Fixing Joint

Insulation

Stainless Steel Pole

Stainless Steel Pole

Basement

DPM

3272,60

3558,60

539,99

300,05

306,38

2103

2103;2109

158

159

20.35

20.14

-

-

2

a

b

d

c

Detaila¦1:20

Detailc¦1:20

Detailb¦1:20

SectionD-MainHallusedasanAuditorium¦1:200

MainHallusedasanopenHall¦1:200

1st Floor Plan

Flat Offices

Recording Studio

Music Studio

ArtistsSpace

Private Entrance Auditorium Storage

Services

WC Graffiti

Graffiti

Dance

Music StudioControl Room

D

D

2nd Floor 1:250

3rd Floor 1:250

4th Floor 1:250Perspecti ve in Exterior Performance space

Perspecti ve in Atrium

West Elevati on 1:100

Site Plan 1:500

Tamara Kahn ¦ Urban ¦ Maison du Hip Hop

Exterior Perfor-mance

Exterior Perfor-mance

Music Studio

Dance Studio

Music Studio

Music Studio

Control Room

Control Room

Recording

2nd Floor 1:250

3rd Floor 1:250

4th Floor 1:250Perspecti ve in Exterior Performance space

Perspecti ve in Atrium

West Elevati on 1:100

Site Plan 1:500

Tamara Kahn ¦ Urban ¦ Maison du Hip Hop

Exterior Perfor-mance

Exterior Perfor-mance

Music Studio

Dance Studio

Music Studio

Music Studio

Control Room

Control Room

Recording

Ground Floor 1:250

Basement 1:250

1st Floor 1:250Secti on A 1:100

Perspecti ve in Bar during Performance Exploded Axonometric

Secti on B 1:100

Recepti on Cloakroom & Tickets

Auditorium Storage

Graffi ti

Exterior Graffi ti

Services

Graffi ti

Atrium and Exhibiti on Space

Public Cafe

Arti st’ s Space

Dance Studio

Auditorium/ Salle Diff usion

Bar/ Informal Performance Area

/ Social Area

A

B

A

B

Ground Floor

1st Floor

2nd Floor

3rd Floor

4th Floor

20

Tamara Kahn ¦ Urban ¦ Maison du Hip Hop

Ground Floor 1:250

Basement 1:250

1st Floor 1:250Secti on A 1:100

Perspecti ve in Bar during Performance Exploded Axonometric

Secti on B 1:100

Recepti on Cloakroom & Tickets

Auditorium Storage

Graffi ti

Exterior Graffi ti

Services

Graffi ti

Atrium and Exhibiti on Space

Public Cafe

Arti st’ s Space

Dance Studio

Auditorium/ Salle Diff usion

Bar/ Informal Performance Area

/ Social Area

A

B

A

B

Ground Floor

1st Floor

2nd Floor

3rd Floor

4th Floor

20

Tamara Kahn ¦ Urban ¦ Maison du Hip Hop

Interior Perspective | Revit, Photoshop

Ground Floor 1st Floor 2nd Floor 3rd Floor

Page 10: TKahn Portfolio

Rene

wab

le E

nerg

y Ce

ntre

and

Lan

dsca

pe D

esig

n |

BA P

roje

ct |

201

2

Perspective in Summer | ArchiCAD, 3D Studio Max, Photoshop

Page 11: TKahn Portfolio

39

Plan in Winter | ArchiCAD, 3D Studio Max, Photoshop

This module consisted of designing landscape interventions which improve the permeability of a north entrance to the heart of Canterbury and integrate the design of a small museum/cafe building within the site. Key aspects to this design were: accessibility, historical context, renewable energy and sustainability.

Water Amphitheater for Educational Purposes| ArchiCAD, 3D Studio Max, Photoshop

Massing Model| ArchiCAD, 3D Studio Max, Photoshop

Page 12: TKahn Portfolio

Isometric View in Summer | Hand Sketch, ArchiCAD, AutoCADThe Gateway to Canterbury | ArchiCAD, 3D Studio Max, Photoshop

Page 13: TKahn Portfolio

Hidden walkway in Solley’s Orchard | ArchiCAD, 3D Studio Max, Photoshop

North-South Site Section | ArchiCAD, 3D Studio Max, Photoshop

Page 14: TKahn Portfolio

Massing Plan| AutoCAD, Illustrator

1st P

rize :

Rege

nera

tion M

aste

rpla

n | Ye

ar-o

ut : F

abec

k Arc

hite

ctes

| 201

3

Final Masterplan of Mersch, Luxembourg| AutoCAD, Photoshop

Page 15: TKahn Portfolio

Perspective of the New Connection to the Park| SketchUp, Photoshop

Circulation Diagram| AutoCAD, Photoshop, IllustratorFacade Studies| AutoCAD, PhotoshopMassing Plan| AutoCAD, Illustrator

My Tasks within the Group Work:-Participating in group discussions concerning the whole urban tissue with architects and engineers and developing the plans accordingly-Developing several zones into detail (AutoCAD, Hand sketches)-Staying on top of all required numeric details, i.e. number of units and surfaces, ratios (Excel)Illustrating explanation diagrams (Illustrator, Photoshop)-Building a digital 3D model of the entire site (SketchUp)-Final layout for the presentation (InDesign)

MER CH1

CONSULTATION RÉMUNÉRÉE «CENTRE DE MERSCH»CONCEPT URBANISTIQUE GÉNÉRAL

Parc

Amphithéâtre

Pétanque

Jardin du pavillonbaroque

Aire de jeux

Aire de jeux

Zone sportive

Piazza Marisca

Place Saint-Michel

Place Faber

Place Pavillon baroque

Parc Emmanuel Servais

I

II

IV

I

IV

IV

IIIIII

IV V

II

Quartier Rive gauche

Quartier HoffmannQuartier du centre

Quartier historique

Quartier sportQuartier Faber

Quartier Lentz

Quartier Eisch

Nouveau bâti en relation avec le bâti existant

Places publiques Espaces loisirs

Phasage Composition des quartiers

Création d’ilôts

Plan masse 1/1000

PARC

PETANQUE

AMPH

ITHE

ÂTRE

KIOSQUEGLACES

PAVILLON DE L’EAU

PRESBYTERE

PLACE SAINT-MICHEL

CHÂT

EAU

ECOLE PRECOCE

MARISCETTE

HALL

DE

SPORT

EISCH

ALZETTE

MAMER

PAVILLON DE L’EAU

IV

IV

I

IV

IV

IV

IV

III

III

III

III

III

III

III

III

III

III

III

III

III

III

III

III

III

III

III

III

III

IIIIII

III

IV

III

I

II

III

I

PIAZZ

AMARISC

A

PAVIL

LON

CULTUREL

PLACE MARIE ASTRID

MUSEE

LYCE

E TE

CHNIQUE

CLOCHER

ECOLE

NIC

WEL

TER

ECOLE ALB

ERT ELS

EN

MERSCH, MARISCA VILLE D’EAU

Mersch jouit d’une situation centrale au cœur du Grand-Duché de Luxembourg. Sa position géographique stratégique constitue un atout majeur pour le développement de la commune. Afin de soutenir cette dynamique, il convient de requalifier le centre de Mersch pour lui conférer une nouvelle image.

Mersch fait partie des rares villes à Luxembourg où il existe une confluence de 3 rivières. Marisca voulant dire marécage renvoie à l’origine même de la Ville. Le concept se caractérise dans une redécouverte des rives de la Mamer, de l’Eisch et de l’Alzette, d’ouvrir la Ville vers l’eau et de faire sentir l’eau dans la ville.

Pour redynamiser le centre de Mersch, il est essentiel de renforcer la mixité fonctionnelle et d’apporter de nouvelles fonctions au sein des lieux décisifs de la ville: commerces, établissements pour activités artisanales et professions libérales. Une valorisation du pôle culturel existant est bénéfique pour redonner à Mersch une attractivité touristique de premier ordre. En ouvrant la Ville vers ses cours d’eau, la Ville se redynamise en bénéficiant d’espaces plus agréables au point de vue loisirs, communication, cadre naturel. La Ville, au lieu d’être refermée sur elle-même et être perçue comme Ville de passage, s’ouvre vers son entourage.

L’enjeu de la requalification du centre-ville de Mersch est bel et bien de créer des liens et d’établir des connexions entre les différents quartiers dans le but de les faire dialoguer entre eux. Les espaces constitutifs du centre doivent être interdépendants : c’est à cette condition que le centre-ville de Mersch acquiert sa cohérence.

Dans le but de créer un échange social, les espaces publics sont mis en valeur. Leur importance est soulignée et accentuée, car ce sont bien eux qui ont la capacité de créer des liens et à offrir une plateforme de communication. Du point de vue urbanistique nous avons procédé à continuer la Ville de la manière la plus harmonieuse possible en créant des îlots qui s’insèrent de la manière la plus harmonieuse dans le contexte.

Le centre de Mersch sera constitué de plusieurs quartiers dont les caractéristiques sont présentées ci-après.

Page 16: TKahn Portfolio

Ener

gy-e

ffice

nt T

ownh

ouse

s |

Year

-out

: Fa

beck

Arc

hite

ctes

| 2

014

Developed Plans| RevitInitial Proposal Sketches| Hand Sketches, Photoshop

Site Plan | AutoCAD

1716151413121110987654321

1716151413121110987654321

1716151413121110987654321

1716151413121110987654321

161514131211109876

16151413121110987

161514131211109876

16151413121110987

1716151413121110987654321

1716151413121110987654321

1716151413121110987654321

1716151413121110987654321

3,1 m²

Escalier00-04-A

5,1 m²

Hall00-01-A

18,9 m²

Garage00-05-A

18,9 m²

Garage00-05-B

10,1 m²

Veranda00-03-A

10,1 m²

Veranda00-03-B

36,6 m²

Séjour Cuisine00-02-B

5.11-B 5.11-C 5.11-D

5,2 m²

Hall00-01-B

3,0 m²

Escalier00-04-B

-

N.F. +0,000 N.F. +0,000

18,9 m²

Garage00-05-C

18,9 m²

Garage00-05-D

128126200 144 60

216101 54 25

216253 70

216253 25 54 161 144

126200 256

126200 144 161 54 25

216253 70

216253 25 54

216101 204

126200 128

35,4 m²

Séjour Cuisine02-04-C

36,9 m²

Séjour02-04-B

5,2 m²

Hall00-01-D

5,2 m²

Hall00-01-C

10,1 m²

Veranda00-03-C

10,1 m²

Veranda00-03-E

35,1 m²

Séjour Cuisine00-02-A

11,9 m²

Chambre 101-03-A

11,9 m²

Chambre 201-04-A

19,3 m²

Vide sur rezA

2,1 m²

WC01-05-A

7,8 m²

Bains01-01-A

487

11,9 m²

Chambre 101-03-B

2,1 m²

WC01-05-B

8,2 m²

Bains01-01-B11,9 m²

Chambre 201-04-B

-

62

20,2 m²

Vide sur rezB

395,5 113,5 100 11,5 322 37 322 11,5 100 113,5 416 37 416 113,5 100 11,5 322 37 322 11,5 100 113,5 395,5

9,8 m²

Hall01-06-A

9,9 m²

Hall01-06-B

20,2 m²

Vide sur rezC

8,2 m²

Bains01-01-C

11,9 m²

Chambre 101-03-D

11,9 m²

Chambre 101-03-C

9,9 m²

Hall01-06-D

9,9 m²

Hall01-06-C

2,1 m²

WC01-05-C 2,1 m²

WC01-05-D

7,8 m²

Bains01-01-D

N.F. +287,950 N.F. +288,950 N.F. +288,950N.F. +287,950

11,9 m²

Chambre 201-04-C

11,9 m²

Chambre 201-04-D

19,2 m²

Vide sur rezD

12812680 184 80

12680 138

126180 80 100 80

126180 138

12680 80 184

12680 128 128

12680 184 80

12680 138

126180 80 100 80

126180 138

12680 80 184

12680 128

392 558 100 558 784 558 100 558 392

128156180 245

21680 86

156180 202

156180 86

21680 245

156180 256

156180 245

21680 86

156180 202

156180 86

21680 245

156180 128

800

50

105

18,8 m²

Room02-01

4,1 m²

Room2664,1 m²

Bains02-02-A

17,7 m²

Chambre 102-01-A

16,5 m²

Grenier02-04-A

2,9 m²

Penderie02-03-A 2,9 m²

Room271

16,5 m²

Grenier02-05-B

Gre

nier

-

1000 1000 1000 1000

95215200 567

21678,5 59,5 59,5

21678,5 582,5

215200 170,5

215200

2024

3

20H100 A+BN.F. +285,000

20H100 A+BN.F. +285,000

20H101 A+BN.F. +287,950

20H101 A+BN.F. +287,950

20H102 A+BN.F. +290,900

20H102 A+BN.F. +290,900

20H103 A+BN.F. +293,910

20H103 A+BN.F. +293,910

Lim

ite p

arce

lle

Lim

ite p

arce

lle

260

4036

035

80

947

263

684

Lim

ite tr

otto

ir

Rue

Veranda20H100 C+D

N.F. +286,00020H100 C+DN.F. +286,000

20H101 C+DN.F. +288,950

20H101 C+DN.F. +288,950

20H102 C+DN.F. +291,900

20H102 C+DN.F. +291,900

20H103 C+DN.F. +294,960

20H103 C+DN.F. +294,960

N.F. +285,000

N.F. +0,000

20H100 A+BN.F. +285,000

20H100 A+BN.F. +285,000

20H101 A+BN.F. +287,950

20H101 A+BN.F. +287,950

20H102 A+BN.F. +290,900

20H102 A+BN.F. +290,900

20H103 A+BN.F. +293,910

20H103 A+BN.F. +293,910

Lim

ite p

arce

lle

20H100 C+DN.F. +286,000

20H100 C+DN.F. +286,000

20H101 C+DN.F. +288,950

20H101 C+DN.F. +288,950

20H102 C+DN.F. +291,900

20H102 C+DN.F. +291,900

20H103 C+DN.F. +294,960

20H103 C+DN.F. +294,960

3326

035

260

3525

546

5.11-00F01 1120

F03

Nor

d-O

uest

5.11-00F014

20F02 Nord-Est

1287

,580

037

7,5

1019

441,5 1000 1000 1000 1000

1057

,5

413,5

383,5 4000 811

414

445,5 35

0 318

1134

1172

,5

12111249

1095

,538

2

980,5

286

90°

A B C D- -

--

Elévation 2 - a

--

NPHASE DU PROJETTITRE DU PLAN

NUMÉRO DU PLAN

NOM DU PROJET

MAÎTRE DE L'OUVRAGE

FICHIER

ÉCHELLE FORMATDATE DE CRÉATION

Ce plan ne peut être transmis à un tiers, ni être reproduit, même partiellement, sous quelque forme que ce soit sans l'autorisation écrite de l'auteur.Chaque révision annule et remplace les plans précédents. Toutes les cotes sont à contrôler par l'entreprise, toute différence est à signaler sans délais à l'architecte.

Indice Description des modifications Date Dessin Vérif.

Indice Description des modifications Date Dessin Vérif.

FABECK ARCHITECTESARCHITECTURE ET URBANISME1, RUE DU CHÂTEAULU-8385 KOERICH

T. (+352) 26 30 80F. (+352) 28 30 54 81

[email protected]

ARCHITECTE

INDICE

Energy Box Concept16, Grand RueL-4132 Esch-sur-Alzette

T. (+352) 26 53 11 28F. (+352)26 53 11 29

[email protected]

Ingénieur

SIGNATURE DE L'ARCHITECTE SIGNATURE DU MAÎTRE DE L'OUVRAGE SIGNATURE BUREAU DE CONTRÔLE SIGNATURE AUTRE INTERVENANT

INDICE

STADEPHASE

VARIANTE

3

I:\Fabeck\13_0322_NR_TRR' - Lotissement Croix-St-Pierre à Rodange\2_Plans\2-2_APD\2-2-6_REVIT\Lot 5.11\TRR'_APD_LOT-5.11.rvt

3 1 : 100

11/02/2014

11/02/2014Ajouter Grenier; Enlever WC au RDC; Agrandir séjour

Rodange Lotissement S.A

Lotissement à la Croix Saint-PierreRodange

TRR'_APD_5.11-00H00_IND3

TFATKA

APDTRR'_ APD_ 5.11-00H00Plans + Coupes Lot 5.11

29/01/14

Z.I. ROHLACH LU-5280 SANDWEILER T. (+352) 26 58 60 1 F. (+352) 26 58 34 16 [email protected]

A0

AVANT PROJET DETAILLE

Echelle: 1 : 100

Plan du ez-de-chaussée1

Echelle: 1 : 100

20H101 A+B2

Echelle: 1 : 100

20H102 A+B3Echelle: 1 : 100

20V01 Coupe transversale A+B4

Echelle: 1 : 100

20V02 Coupe longitudinale5

Surface Subventionnable

Maison Etage Surface subventionnable

Maison A et D 20H100 A+B 53,1 m²Maison A et D 20H101 A+B 50,9 m²Maison A et D 20H102 A+B 31,3 m²Maison A et D 135,3 m²

Maison B et C 20H100 A+B 54,8 m²Maison B et C 20H101 A+B 52,0 m²Maison B et C 20H102 A+B 33,2 m²Maison B et C 140,0 m²

Echelle: 1 : 100

Plan du ez-de-chaussée6

3 Ajouter Grenier; Enlever WC au RDC; Agrandir séjour 11/02/2014 TKA TFA2 Revision surfaces 28/01/2014 TKA TFA1 Création du plan 23/01/2014 TKA TFA

1716151413121110987654321

1716151413121110987654321

1716151413121110987654321

1716151413121110987654321

161514131211109876

16151413121110987

161514131211109876

16151413121110987

1716151413121110987654321

1716151413121110987654321

1716151413121110987654321

1716151413121110987654321

3,1 m²

Escalier00-04-A

5,1 m²

Hall00-01-A

18,9 m²

Garage00-05-A

18,9 m²

Garage00-05-B

10,1 m²

Veranda00-03-A

10,1 m²

Veranda00-03-B

36,6 m²

Séjour Cuisine00-02-B

5.11-B 5.11-C 5.11-D

5,2 m²

Hall00-01-B

3,0 m²

Escalier00-04-B

-

N.F. +0,000 N.F. +0,000

18,9 m²

Garage00-05-C

18,9 m²

Garage00-05-D

128126200 144 60

216101 54 25

216253 70

216253 25 54 161 144

126200 256

126200 144 161 54 25

216253 70

216253 25 54

216101 204

126200 128

35,4 m²

Séjour Cuisine02-04-C

36,9 m²

Séjour02-04-B

5,2 m²

Hall00-01-D

5,2 m²

Hall00-01-C

10,1 m²

Veranda00-03-C

10,1 m²

Veranda00-03-E

35,1 m²

Séjour Cuisine00-02-A

11,9 m²

Chambre 101-03-A

11,9 m²

Chambre 201-04-A

19,3 m²

Vide sur rezA

2,1 m²

WC01-05-A

7,8 m²

Bains01-01-A

487

11,9 m²

Chambre 101-03-B

2,1 m²

WC01-05-B

8,2 m²

Bains01-01-B11,9 m²

Chambre 201-04-B

-

62

20,2 m²

Vide sur rezB

395,5 113,5 100 11,5 322 37 322 11,5 100 113,5 416 37 416 113,5 100 11,5 322 37 322 11,5 100 113,5 395,5

9,8 m²

Hall01-06-A

9,9 m²

Hall01-06-B

20,2 m²

Vide sur rezC

8,2 m²

Bains01-01-C

11,9 m²

Chambre 101-03-D

11,9 m²

Chambre 101-03-C

9,9 m²

Hall01-06-D

9,9 m²

Hall01-06-C

2,1 m²

WC01-05-C 2,1 m²

WC01-05-D

7,8 m²

Bains01-01-D

N.F. +287,950 N.F. +288,950 N.F. +288,950N.F. +287,950

11,9 m²

Chambre 201-04-C

11,9 m²

Chambre 201-04-D

19,2 m²

Vide sur rezD

12812680 184 80

12680 138

126180 80 100 80

126180 138

12680 80 184

12680 128 128

12680 184 80

12680 138

126180 80 100 80

126180 138

12680 80 184

12680 128

392 558 100 558 784 558 100 558 392

128156180 245

21680 86

156180 202

156180 86

21680 245

156180 256

156180 245

21680 86

156180 202

156180 86

21680 245

156180 128

800

50

105

18,8 m²

Room02-01

4,1 m²

Room2664,1 m²

Bains02-02-A

17,7 m²

Chambre 102-01-A

16,5 m²

Grenier02-04-A

2,9 m²

Penderie02-03-A 2,9 m²

Room271

16,5 m²

Grenier02-05-B

Gre

nier

-

1000 1000 1000 1000

95215200 567

21678,5 59,5 59,5

21678,5 582,5

215200 170,5

215200

2024

3

20H100 A+BN.F. +285,000

20H100 A+BN.F. +285,000

20H101 A+BN.F. +287,950

20H101 A+BN.F. +287,950

20H102 A+BN.F. +290,900

20H102 A+BN.F. +290,900

20H103 A+BN.F. +293,910

20H103 A+BN.F. +293,910

Lim

ite p

arce

lle

Lim

ite p

arce

lle

260

4036

035

80

947

263

684

Lim

ite tr

otto

ir

Rue

Veranda20H100 C+D

N.F. +286,00020H100 C+DN.F. +286,000

20H101 C+DN.F. +288,950

20H101 C+DN.F. +288,950

20H102 C+DN.F. +291,900

20H102 C+DN.F. +291,900

20H103 C+DN.F. +294,960

20H103 C+DN.F. +294,960

N.F. +285,000

N.F. +0,000

20H100 A+BN.F. +285,000

20H100 A+BN.F. +285,000

20H101 A+BN.F. +287,950

20H101 A+BN.F. +287,950

20H102 A+BN.F. +290,900

20H102 A+BN.F. +290,900

20H103 A+BN.F. +293,910

20H103 A+BN.F. +293,910

Lim

ite p

arce

lle

20H100 C+DN.F. +286,000

20H100 C+DN.F. +286,000

20H101 C+DN.F. +288,950

20H101 C+DN.F. +288,950

20H102 C+DN.F. +291,900

20H102 C+DN.F. +291,900

20H103 C+DN.F. +294,960

20H103 C+DN.F. +294,960

3326

035

260

3525

546

5.11-00F01 1120

F03

Nor

d-O

uest

5.11-00F014

20F02 Nord-Est

1287

,580

037

7,5

1019

441,5 1000 1000 1000 1000

1057

,5

413,5

383,5 4000 811

414

445,5 35

0 318

1134

1172

,5

12111249

1095

,538

2

980,5

286

90°

A B C D- -

--

Elévation 2 - a

--

NPHASE DU PROJETTITRE DU PLAN

NUMÉRO DU PLAN

NOM DU PROJET

MAÎTRE DE L'OUVRAGE

FICHIER

ÉCHELLE FORMATDATE DE CRÉATION

Ce plan ne peut être transmis à un tiers, ni être reproduit, même partiellement, sous quelque forme que ce soit sans l'autorisation écrite de l'auteur.Chaque révision annule et remplace les plans précédents. Toutes les cotes sont à contrôler par l'entreprise, toute différence est à signaler sans délais à l'architecte.

Indice Description des modifications Date Dessin Vérif.

Indice Description des modifications Date Dessin Vérif.

FABECK ARCHITECTESARCHITECTURE ET URBANISME1, RUE DU CHÂTEAULU-8385 KOERICH

T. (+352) 26 30 80F. (+352) 28 30 54 81

[email protected]

ARCHITECTE

INDICE

Energy Box Concept16, Grand RueL-4132 Esch-sur-Alzette

T. (+352) 26 53 11 28F. (+352)26 53 11 29

[email protected]

Ingénieur

SIGNATURE DE L'ARCHITECTE SIGNATURE DU MAÎTRE DE L'OUVRAGE SIGNATURE BUREAU DE CONTRÔLE SIGNATURE AUTRE INTERVENANT

INDICE

STADEPHASE

VARIANTE

3

I:\Fabeck\13_0322_NR_TRR' - Lotissement Croix-St-Pierre à Rodange\2_Plans\2-2_APD\2-2-6_REVIT\Lot 5.11\TRR'_APD_LOT-5.11.rvt

3 1 : 100

11/02/2014

11/02/2014Ajouter Grenier; Enlever WC au RDC; Agrandir séjour

Rodange Lotissement S.A

Lotissement à la Croix Saint-PierreRodange

TRR'_APD_5.11-00H00_IND3

TFATKA

APDTRR'_ APD_ 5.11-00H00Plans + Coupes Lot 5.11

29/01/14

Z.I. ROHLACH LU-5280 SANDWEILER T. (+352) 26 58 60 1 F. (+352) 26 58 34 16 [email protected]

A0

AVANT PROJET DETAILLE

Echelle: 1 : 100

Plan du ez-de-chaussée1

Echelle: 1 : 100

20H101 A+B2

Echelle: 1 : 100

20H102 A+B3Echelle: 1 : 100

20V01 Coupe transversale A+B4

Echelle: 1 : 100

20V02 Coupe longitudinale5

Surface Subventionnable

Maison Etage Surface subventionnable

Maison A et D 20H100 A+B 53,1 m²Maison A et D 20H101 A+B 50,9 m²Maison A et D 20H102 A+B 31,3 m²Maison A et D 135,3 m²

Maison B et C 20H100 A+B 54,8 m²Maison B et C 20H101 A+B 52,0 m²Maison B et C 20H102 A+B 33,2 m²Maison B et C 140,0 m²

Echelle: 1 : 100

Plan du ez-de-chaussée6

3 Ajouter Grenier; Enlever WC au RDC; Agrandir séjour 11/02/2014 TKA TFA2 Revision surfaces 28/01/2014 TKA TFA1 Création du plan 23/01/2014 TKA TFA

1716151413121110987654321

1716151413121110987654321

1716151413121110987654321

1716151413121110987654321

161514131211109876

16151413121110987

161514131211109876

16151413121110987

1716151413121110987654321

1716151413121110987654321

1716151413121110987654321

1716151413121110987654321

3,1 m²

Escalier00-04-A

5,1 m²

Hall00-01-A

18,9 m²

Garage00-05-A

18,9 m²

Garage00-05-B

10,1 m²

Veranda00-03-A

10,1 m²

Veranda00-03-B

36,6 m²

Séjour Cuisine00-02-B

5.11-B 5.11-C 5.11-D

5,2 m²

Hall00-01-B

3,0 m²

Escalier00-04-B

-

N.F. +0,000 N.F. +0,000

18,9 m²

Garage00-05-C

18,9 m²

Garage00-05-D

128126200 144 60

216101 54 25

216253 70

216253 25 54 161 144

126200 256

126200 144 161 54 25

216253 70

216253 25 54

216101 204

126200 128

35,4 m²

Séjour Cuisine02-04-C

36,9 m²

Séjour02-04-B

5,2 m²

Hall00-01-D

5,2 m²

Hall00-01-C

10,1 m²

Veranda00-03-C

10,1 m²

Veranda00-03-E

35,1 m²

Séjour Cuisine00-02-A

11,9 m²

Chambre 101-03-A

11,9 m²

Chambre 201-04-A

19,3 m²

Vide sur rezA

2,1 m²

WC01-05-A

7,8 m²

Bains01-01-A

487

11,9 m²

Chambre 101-03-B

2,1 m²

WC01-05-B

8,2 m²

Bains01-01-B11,9 m²

Chambre 201-04-B

-

62

20,2 m²

Vide sur rezB

395,5 113,5 100 11,5 322 37 322 11,5 100 113,5 416 37 416 113,5 100 11,5 322 37 322 11,5 100 113,5 395,5

9,8 m²

Hall01-06-A

9,9 m²

Hall01-06-B

20,2 m²

Vide sur rezC

8,2 m²

Bains01-01-C

11,9 m²

Chambre 101-03-D

11,9 m²

Chambre 101-03-C

9,9 m²

Hall01-06-D

9,9 m²

Hall01-06-C

2,1 m²

WC01-05-C 2,1 m²

WC01-05-D

7,8 m²

Bains01-01-D

N.F. +287,950 N.F. +288,950 N.F. +288,950N.F. +287,950

11,9 m²

Chambre 201-04-C

11,9 m²

Chambre 201-04-D

19,2 m²

Vide sur rezD

12812680 184 80

12680 138

126180 80 100 80

126180 138

12680 80 184

12680 128 128

12680 184 80

12680 138

126180 80 100 80

126180 138

12680 80 184

12680 128

392 558 100 558 784 558 100 558 392

128156180 245

21680 86

156180 202

156180 86

21680 245

156180 256

156180 245

21680 86

156180 202

156180 86

21680 245

156180 128

800

50

105

18,8 m²

Room02-01

4,1 m²

Room2664,1 m²

Bains02-02-A

17,7 m²

Chambre 102-01-A

16,5 m²

Grenier02-04-A

2,9 m²

Penderie02-03-A 2,9 m²

Room271

16,5 m²

Grenier02-05-B

Gre

nier

-

1000 1000 1000 1000

95215200 567

21678,5 59,5 59,5

21678,5 582,5

215200 170,5

215200

2024

3

20H100 A+BN.F. +285,000

20H100 A+BN.F. +285,000

20H101 A+BN.F. +287,950

20H101 A+BN.F. +287,950

20H102 A+BN.F. +290,900

20H102 A+BN.F. +290,900

20H103 A+BN.F. +293,910

20H103 A+BN.F. +293,910

Lim

ite p

arce

lle

Lim

ite p

arce

lle

260

4036

035

80

947

263

684

Lim

ite tr

otto

ir

Rue

Veranda20H100 C+D

N.F. +286,00020H100 C+DN.F. +286,000

20H101 C+DN.F. +288,950

20H101 C+DN.F. +288,950

20H102 C+DN.F. +291,900

20H102 C+DN.F. +291,900

20H103 C+DN.F. +294,960

20H103 C+DN.F. +294,960

N.F. +285,000

N.F. +0,000

20H100 A+BN.F. +285,000

20H100 A+BN.F. +285,000

20H101 A+BN.F. +287,950

20H101 A+BN.F. +287,950

20H102 A+BN.F. +290,900

20H102 A+BN.F. +290,900

20H103 A+BN.F. +293,910

20H103 A+BN.F. +293,910

Lim

ite p

arce

lle

20H100 C+DN.F. +286,000

20H100 C+DN.F. +286,000

20H101 C+DN.F. +288,950

20H101 C+DN.F. +288,950

20H102 C+DN.F. +291,900

20H102 C+DN.F. +291,900

20H103 C+DN.F. +294,960

20H103 C+DN.F. +294,960

3326

035

260

3525

546

5.11-00F01 1120

F03

Nor

d-O

uest

5.11-00F014

20F02 Nord-Est

1287

,580

037

7,5

1019

441,5 1000 1000 1000 1000

1057

,5

413,5

383,5 4000 811

414

445,5 35

0 318

1134

1172

,5

12111249

1095

,538

2

980,5

286

90°

A B C D- -

--

Elévation 2 - a

--

NPHASE DU PROJETTITRE DU PLAN

NUMÉRO DU PLAN

NOM DU PROJET

MAÎTRE DE L'OUVRAGE

FICHIER

ÉCHELLE FORMATDATE DE CRÉATION

Ce plan ne peut être transmis à un tiers, ni être reproduit, même partiellement, sous quelque forme que ce soit sans l'autorisation écrite de l'auteur.Chaque révision annule et remplace les plans précédents. Toutes les cotes sont à contrôler par l'entreprise, toute différence est à signaler sans délais à l'architecte.

Indice Description des modifications Date Dessin Vérif.

Indice Description des modifications Date Dessin Vérif.

FABECK ARCHITECTESARCHITECTURE ET URBANISME1, RUE DU CHÂTEAULU-8385 KOERICH

T. (+352) 26 30 80F. (+352) 28 30 54 81

[email protected]

ARCHITECTE

INDICE

Energy Box Concept16, Grand RueL-4132 Esch-sur-Alzette

T. (+352) 26 53 11 28F. (+352)26 53 11 29

[email protected]

Ingénieur

SIGNATURE DE L'ARCHITECTE SIGNATURE DU MAÎTRE DE L'OUVRAGE SIGNATURE BUREAU DE CONTRÔLE SIGNATURE AUTRE INTERVENANT

INDICE

STADEPHASE

VARIANTE

3

I:\Fabeck\13_0322_NR_TRR' - Lotissement Croix-St-Pierre à Rodange\2_Plans\2-2_APD\2-2-6_REVIT\Lot 5.11\TRR'_APD_LOT-5.11.rvt

3 1 : 100

11/02/2014

11/02/2014Ajouter Grenier; Enlever WC au RDC; Agrandir séjour

Rodange Lotissement S.A

Lotissement à la Croix Saint-PierreRodange

TRR'_APD_5.11-00H00_IND3

TFATKA

APDTRR'_ APD_ 5.11-00H00Plans + Coupes Lot 5.11

29/01/14

Z.I. ROHLACH LU-5280 SANDWEILER T. (+352) 26 58 60 1 F. (+352) 26 58 34 16 [email protected]

A0

AVANT PROJET DETAILLE

Echelle: 1 : 100

Plan du ez-de-chaussée1

Echelle: 1 : 100

20H101 A+B2

Echelle: 1 : 100

20H102 A+B3Echelle: 1 : 100

20V01 Coupe transversale A+B4

Echelle: 1 : 100

20V02 Coupe longitudinale5

Surface Subventionnable

Maison Etage Surface subventionnable

Maison A et D 20H100 A+B 53,1 m²Maison A et D 20H101 A+B 50,9 m²Maison A et D 20H102 A+B 31,3 m²Maison A et D 135,3 m²

Maison B et C 20H100 A+B 54,8 m²Maison B et C 20H101 A+B 52,0 m²Maison B et C 20H102 A+B 33,2 m²Maison B et C 140,0 m²

Echelle: 1 : 100

Plan du ez-de-chaussée6

3 Ajouter Grenier; Enlever WC au RDC; Agrandir séjour 11/02/2014 TKA TFA2 Revision surfaces 28/01/2014 TKA TFA1 Création du plan 23/01/2014 TKA TFA

Maison A: 131.2 m² surface subventionnée

Rez-de-chauséeSéjour et cuisine : 33 m²Toilet: 2.4 m²Hall : 4.6 m²Garage : 16.5 m²Cave : 4.2 m²

Rez-de-chauséeSéjour et cuisine : 33.3 m²Toilet: 2.8 m²Hall : 5.7 m²Garage : 16.5 m²Cave : 4.2 m²

Rez-de-chauséeSéjour et cuisine : 33.3 m²Toilet: 2.6 m²Hall : 5.6 m²Garage : 16.5 m²Cave : 4.2 m²

Rez-de-chauséeSéjour et cuisine : 35.8 m²Hall : 4.9 m²Garage : 16.5 m²Cave : 4.2 m²

Maison B : 133.1 m² surface subventionné Maison C: 133.1 m² surface subventionnée Maison D : 128 m² surface subventionnée

Croix Saint-Pierre Rodange

APS

lot 5.11

18.11.2013

Rez-de-chausee 1/100

Etage 1Suite Parentale : 12 m²Dressing : 3.1 m²Salle de bain parentale: 4.5 m² Salle de bain : 5.5 m²Chambre 1 : 12.5 m²Chambre 2 : 12.5 m²Circulation : 9.9 m²

Etage 1Salle de bain : 6.2 m²Chambre 1 : 11 m²Chambre 2 : 11 m²Circulation : 9.2 m²Buanderie : 6.6 m²Stockage : 6.6 m²Technique : 6.6 m²

Etage 1Suite Parentale : 12 m²Dressing : 3.1 m²Salle de bain parentale: 2.6 m² Salle de bain : 5.9 m²Chambre 1 : 10.35 m²Chambre 2 : 10.35 m²Circulation : 9.9 m²

Etage 1Suite Parentale : 15 m²Salle de bain (douche) : 3.5 m² Salle de bain : 7.5 m²Chambre 1 : 10.35 m²Chambre 2 : 10.35 m²Circulation : 13.7 m²

Croix Saint-Pierre Rodange

APS

lot 5.11

18.11.2013

Etage 1 1/100

Maison A Maison B Maison C Maison D

Croix Saint-Pierre Rodange

APS

lot 5.11

18.11.2013

Etage 1Circulation : 9.9 m²Chambre/ bureau : 16.6 m²Buanderie: 6.6 m²Stockage : 6.6 m²Technique : 6.6 m²

Etage 1Circulation : 12 m²Chambre/ bureau : 13.4 m²Buanderie: 6.6 m²Stockage : 6.6 m²Technique : 6.6 m²

Etage 1Circulation : 8.4 m²Chambre/ bureau : 14.7 m²Buanderie: 3.4 m²Stockage : 6.9 m²Technique : 6.9 m²

Etage 1Suite Parentale : 12.8 m²Dressing : 3.2 m²Salle de bain parentale: 3.6 m²Circulation : 9.2 m²

Maison A Maison B Maison C Maison D

Etage 2 1/100

Ground Floor Ground Floor

1st Floor

1st Floor

2nd Floor 2nd Floor

Page 17: TKahn Portfolio

Front Facade | Revit

Facade Studies| Hand Sketches, Photoshop Garden Perspective| External 3D Visualisation

Croix Saint-Pierre Rodange

APS

lot 5.11

03.12.2013

Etude de façade

Croix Saint-Pierre Rodange

APS

lot 5.11

03.12.2013

Etude de façade

Croix Saint-Pierre Rodange

APS

lot 5.11

03.12.2013

Etude de façade

Whilst respecting a detailed master-plan in a Luxembourgish town, the office was appointed to develop 5 plots, each of slightly varying dimensions. The three-story townhouses were to be energy-efficient and individually sold. I was in charge of developing 3 plots with a total of 13 three-story houses from concept stage throughout to planning approval. Following client, consultant and authority meetings, the designs developed and adapted to the clients needs as well the constraints of budget and legislations.

Page 18: TKahn Portfolio

1st P

rize

: Fes

tival

des

Cab

anes

: Bu

s Sh

elte

r|w

ith T

hier

ry N

eu |

201

3

Photograph of Completed Bus Shelter

Front Elevation with Dimensions | Vectorworks, Photoshop

Page 19: TKahn Portfolio

1 7 3 7 1 3WettbeWerb 2 Dauerhafte hütte

‘Schinnen nei entdecken’Konzept

esch-sur-Alzette verbindet mAn oft mit der schwerindustrie und somit Auch mit dem bergbAu. in diesen bergwerKen, „minière” genAnnt, förderten die Arbeiter unter grossen Körperlichen Anstrengungen beinAhe täglich eisenerz zu tAge. es ist diese Art von Arbeit die dAs design der bushAltestelle verKörpert und zur schAu trägt.

beim besuch des “ellergronn” KAnn mAn noch heute viele Überreste dieser zeit entdecKen. oft KAnn mAn bei spAziergängen Alte gleise, loren oder gAr mineneingänge bestAunen. Auch dAs design der bushAltestelle bAut Auf diesen eindrÜcKen Auf. die beiden gleise, die zur hAltestelle hinfÜhren, weisen Auf die vergAngene zeit des AbbAus hin. der AufbAu soll den eindrucK erwecKen, dAss die schienen Aus dem boden Aufsteigen und eine hAltestelle formen.

die lAge vor einem mineneingAng bietet sich themAtisch fÜr diese hAltestelle An. die Ansicht Auf diesen eingAng sollte nicht durch die KonstruKtion verdecKt werden sondern hervorgehoben werden. Aus diesem grund wurde die hAltestelle zur strAsse und zum mineneingAng offen gelAssen.

die hAltestelle ist ÜberdAcht und schÜtzt die wArtenden vor jeglichen niederschlägen. der sitzplAtz bietet mehreren personen plAtz und stellt so eine gemÜtliche möglichKeit des AustAuschs unter den wArtenden personen dAr. schlussendlich bleibt noch zu erwähnen, dAss die grosszÜgige sitzgelegenheit plAtz fÜr eine grosse AnzAhl personen oder gAr Kleinere schulKlAssen bietet. sollten Alle sitzplätze belegt sein, so besteht weiterhin die möglichKeit sich An der dAfÜr vorgesehenen stelle Anzulehnen und unter dem dAch der hAltestelle zu wArten.

Auch die verwendeten mAteriAlien wurden bei der plAnung nicht dem zufAll ÜberlAssen. der stAhl erinnert An die bewegte vergAngenheit der minetteregion. dAs holz symbolisiert die nAtur, die sich im lAufe der zeit ihre gegend zurÜcKnimmt und stÜcK fÜr stÜcK Auch die letzten Überreste der eisenerzförderung Überwuchert.

budgetstAhlträger ipe 200*4950 träger ipe 200*3890träger ipe 200*2787träger ipe 200*3495träger ipe 200*4110träger ipe 200*1360sschnittKosten ipe 200 rechtecKr.sch.100X80X3*6050 schnittKosten 2X230 + 4X495 + 10X680 2X2270 + 1X2400 + 2X2110hAndlungsKostentrAnsport

pleXiglAs plAtte 54,63 eur/m2 | 11,88m2

holz 2400X50X50150 st.holz 4950X30X804 st.

beton plAtform 71.2 eur/m3

schrAubeninoX schrAuben 5X60mm13,24 eur/100 st.| 300 st. schlossschrAuben m8X100mm mit sechsKAntmuttern & vollgewinde108,00 eur/100 st.| 300 st.

totAl:

eur

432,63339,9960,9076,3789,8029,7272,00196,6084,00

5,0025,00

649,00

0,00

0,00

300,00

39,72

324,00

2933,08eur

1.50 plAn

1.20 KonstruKtionsdetAil

1.50 Ansicht

Konzept sKizzen

stAhlKonstruKtion im boden verAnKert

Aussicht Auf mine und strAsse

KonsruKtion erinnert An schienen &entwäscht der nAtur

1 7 3 7 1 3WettbeWerb 2 Dauerhafte hütte

‘Schinnen nei entdecken’Konzept

esch-sur-Alzette verbindet mAn oft mit der schwerindustrie und somit Auch mit dem bergbAu. in diesen bergwerKen, „minière” genAnnt, förderten die Arbeiter unter grossen Körperlichen Anstrengungen beinAhe täglich eisenerz zu tAge. es ist diese Art von Arbeit die dAs design der bushAltestelle verKörpert und zur schAu trägt.

beim besuch des “ellergronn” KAnn mAn noch heute viele Überreste dieser zeit entdecKen. oft KAnn mAn bei spAziergängen Alte gleise, loren oder gAr mineneingänge bestAunen. Auch dAs design der bushAltestelle bAut Auf diesen eindrÜcKen Auf. die beiden gleise, die zur hAltestelle hinfÜhren, weisen Auf die vergAngene zeit des AbbAus hin. der AufbAu soll den eindrucK erwecKen, dAss die schienen Aus dem boden Aufsteigen und eine hAltestelle formen.

die lAge vor einem mineneingAng bietet sich themAtisch fÜr diese hAltestelle An. die Ansicht Auf diesen eingAng sollte nicht durch die KonstruKtion verdecKt werden sondern hervorgehoben werden. Aus diesem grund wurde die hAltestelle zur strAsse und zum mineneingAng offen gelAssen.

die hAltestelle ist ÜberdAcht und schÜtzt die wArtenden vor jeglichen niederschlägen. der sitzplAtz bietet mehreren personen plAtz und stellt so eine gemÜtliche möglichKeit des AustAuschs unter den wArtenden personen dAr. schlussendlich bleibt noch zu erwähnen, dAss die grosszÜgige sitzgelegenheit plAtz fÜr eine grosse AnzAhl personen oder gAr Kleinere schulKlAssen bietet. sollten Alle sitzplätze belegt sein, so besteht weiterhin die möglichKeit sich An der dAfÜr vorgesehenen stelle Anzulehnen und unter dem dAch der hAltestelle zu wArten.

Auch die verwendeten mAteriAlien wurden bei der plAnung nicht dem zufAll ÜberlAssen. der stAhl erinnert An die bewegte vergAngenheit der minetteregion. dAs holz symbolisiert die nAtur, die sich im lAufe der zeit ihre gegend zurÜcKnimmt und stÜcK fÜr stÜcK Auch die letzten Überreste der eisenerzförderung Überwuchert.

budgetstAhlträger ipe 200*4950 träger ipe 200*3890träger ipe 200*2787träger ipe 200*3495träger ipe 200*4110träger ipe 200*1360sschnittKosten ipe 200 rechtecKr.sch.100X80X3*6050 schnittKosten 2X230 + 4X495 + 10X680 2X2270 + 1X2400 + 2X2110hAndlungsKostentrAnsport

pleXiglAs plAtte 54,63 eur/m2 | 11,88m2

holz 2400X50X50150 st.holz 4950X30X804 st.

beton plAtform 71.2 eur/m3

schrAubeninoX schrAuben 5X60mm13,24 eur/100 st.| 300 st. schlossschrAuben m8X100mm mit sechsKAntmuttern & vollgewinde108,00 eur/100 st.| 300 st.

totAl:

eur

432,63339,9960,9076,3789,8029,7272,00196,6084,00

5,0025,00

649,00

0,00

0,00

300,00

39,72

324,00

2933,08eur

1.50 plAn

1.20 KonstruKtionsdetAil

1.50 Ansicht

Konzept sKizzen

stAhlKonstruKtion im boden verAnKert

Aussicht Auf mine und strAsse

KonsruKtion erinnert An schienen &entwäscht der nAtur

Plan with Dimensions | Vectorworks, Photoshop Perspective of Bus Shelter for Competition| SketchUp, Artlantis, Photoshop

Front Elevation with Dimensions | Vectorworks, Photoshop

In a group of two architecture students we participated in a competition organised by the OAI (Ordre des Architectes et Ingénieures) and the SNJ (Service Nationale de la Jeunesse). The brief was to design a bus shelter for the nature reserve Ellergronn in Luxembourg, an area which is characterised by remains of the ore mining industry of the 19th and 20th century. The design is inspired by mine cart tracks that give the impression to rise from the ground and form the shelter.

Page 20: TKahn Portfolio

Tamara Kahn Thank you. Email [email protected] [00352] 691 826 189 | [0044] 7774 257 465