(Title) – Concept Design Review (CDR)

17
D-ES-x-xxx Rev A 5/17/10 1 of 17 (Title) – Concept Design Review (CDR) (name) PI (name) PA Date of Review First Use Acknowledgements Image of diagnostic LLE Will Complete after the review Enter number of pages – required for PDM submittal Update logo from: /View/Master/Slide Master Establish Key Contacts Update Date from: /View/Master/Slide Master

description

(Title) – Concept Design Review (CDR). Update logo from: /View/Master/Slide Master. Date of Review First Use Acknowledgements Image of diagnostic. Establish Key Contacts. (name) PI (name) PA. LLE Will Complete after the review. Update Date from: /View/Master/Slide Master. - PowerPoint PPT Presentation

Transcript of (Title) – Concept Design Review (CDR)

Page 1: (Title) – Concept Design Review (CDR)

D-ES-x-xxx Rev A 5/17/10 1 of 17

(Title) – Concept Design Review (CDR)

(name) PI

(name) PA

Date of Review

First Use

Acknowledgements

Image of diagnostic

LLE Will Complete after the review

Enter number of pages – required for PDM submittal

Update logo from: /View/Master/Slide Master

Establish Key Contacts

Update Date from: /View/Master/Slide Master

Page 2: (Title) – Concept Design Review (CDR)

D-ES-x-xxx Rev A 5/17/10 2 of 17

Overview - Motivation

-Summarize Scope-Summarize Motivation

Campaign Details:EP or Omega Or Joint Shot?;Campaign Type? Side Lighter/ Back Lighter?What TIM’s or Fixed?

Page 3: (Title) – Concept Design Review (CDR)

D-ES-x-xxx Rev A 5/17/10 3 of 17

Requirements

List RequirementsMechanical - PositioningPerformanceAccuracy

Page 4: (Title) – Concept Design Review (CDR)

D-ES-x-xxx Rev A 5/17/10 4 of 17

Target Diagnostic Check List

(Diagnostics Only) – Disclose Equipment Requirements

Double Click and Edit; Items marked “Y” should show up on a slide in the presentation

# Description Y/N Comment1 TIM Based N2 Trigger Y See Cable Diagram3 Power Y See Cable Diagram <= Voltage Level4 Optical Fiducial N5 Fiber Optic Cables N6 Computer Network Y Existing7 Dark Room N8 Setup Calibration Space N9 Space for Support Y S Morse Addressing Storage Location?10 Data Acquisition Equipment Y Existing11 HV Safety Interlocks N12 OIP Interface Y Existing13 Cooling Water N14 Gas Requirements N <= Type & Pressure15 Other N

Page 5: (Title) – Concept Design Review (CDR)

D-ES-x-xxx Rev A 5/17/10 5 of 17

Design Concepts

Approaches

Issues Options Trade offs

Target Diagnostic Check List Items

Page 6: (Title) – Concept Design Review (CDR)

D-ES-x-xxx Rev A 5/17/10 6 of 17

P &ID – Tutorial Located on LLE Web Site

240 psi

240 psi

240 psi

pump

Page 7: (Title) – Concept Design Review (CDR)

D-ES-x-xxx Rev A 5/17/10 7 of 17

P510 Green Fiducial

Om

ega

Las

er P

uls

e

LaCave

PhotoDiode

TDS-694

To 15V

To Scope

Bias “T” Details

Cabling/Connection Overview

Cu Foil

527 nm

15Vdc Power

N-Type

Page 8: (Title) – Concept Design Review (CDR)

D-ES-x-xxx Rev A 5/17/10 8 of 17

Space Claim – Floor Plan

Temporary Scopes and PS’s

Page 9: (Title) – Concept Design Review (CDR)

D-ES-x-xxx Rev A 5/17/10 9 of 17

Viewing/Editing SRA –

4)This button allows the SRA to be viewed/printed/saved – Save the SRA

2) Select SRA

1) Click on your project from the project status summary to get to the LLE Project Milestones page

3)Edit page, then Select Save & Print

5)Take a screen shot of the SRA and place in presentation

Page 10: (Title) – Concept Design Review (CDR)

D-ES-x-xxx Rev A 5/17/10 10 of 17

SRA

Page 11: (Title) – Concept Design Review (CDR)

D-ES-x-xxx Rev A 5/17/10 11 of 17

SE: Tim Duffy PI: C Stoeckl PDM: D-ES-X-417 Rev AHXRDREFURB Task ID: HXRDREFURBProject:

Line

#

Sys

tem

or

Sub

syst

em

Haz

ard

Cat

egor

y: P

or

E

Failu

re M

ode

Des

crip

tion

Cau

ses

(one

row

for

each

cau

se)

Effe

cts

on th

e

Sys

tem

/Per

son

Con

sequ

ence

Bef

ore

Miti

gatio

n

Pro

babi

lity

befo

re M

itiga

tion

Miti

gatio

n

Con

sequ

ence

Afte

r M

itiga

tion

Pro

babi

lity

Afte

r

Miti

gatio

nIm

plem

ente

d (Y

/N)

1 Ooperator Access/ EOperator damages cable when accessing the PMT

1) Poor Mechanical Design Damage the PMTs

3 2 1) Ensure the ME design provides the proper strain relief on the PMT connector

3 0 Y

2) Loss of balance, Lack of awareness

Damage the PMTs

3 2 2) Training & Procedures 3 1 Y

2 Alternate Configurations

POperator damages cable when installing PMT

Improper installation, ie clamping cable after installed

Damage the PMTs

3 2 Must Secure cable, prior to exposing connection to stress

3 0 Y

2 2 1)Tag-out prior to servicing 2 1 Y

2 2 2)Training & Procedures 2 1 Y4567891011

.0 2 4

None - 0 Marginal (minor injury) -2 Catastrophic ( Death) -4Imposible - 0 Remote (not expected) -2 Probable (Expected) -4

Minor-1Improbable-1

1 3Critical (Severe Injury) -3Infrequent (could happen once) -3

ValueHazard

Probablilty

HV is remote and may be on when servicing

Minor injury do to fall

1 Ooperator Access/ EOperator damages cable when accessing the PMT

3 HV POperator receives low current shock

FMEA – Each Entry on SRA requires an Entry on FMEA; additional entries can be made

Double Click & Edit

Enter the Line #’s into the SRA Form (Associated Risk) There must be a change in

one of these two columns (Before vs After)

Page 12: (Title) – Concept Design Review (CDR)

D-ES-x-xxx Rev A 5/17/10 12 of 17

Viewing EQC

2) Select EQC

1) Click on your project from the project status summary to get to the LLE Project Milestones page

3) Select “Save & Print Landscape”;

Take a screen shot of each page and put in presentation (two slides)

Page 13: (Title) – Concept Design Review (CDR)

D-ES-x-xxx Rev A 5/17/10 13 of 17

EQC

Page 14: (Title) – Concept Design Review (CDR)

D-ES-x-xxx Rev A 5/17/10 14 of 17

EQC

Page 15: (Title) – Concept Design Review (CDR)

D-ES-x-xxx Rev A 5/17/10 15 of 17

Issues - Risks

Page 16: (Title) – Concept Design Review (CDR)

D-ES-x-xxx Rev A 5/17/10 16 of 17

Who does What - Assignments

Resources –

Page 17: (Title) – Concept Design Review (CDR)

D-ES-x-xxx Rev A 5/17/10 17 of 17

Budget (LLE Reviews Only)