Titik lompat Ukur Elevasi

1
4 3 2 1 A B C 4 3 2 1 R2 VENDOR DESAIN & REVISIONS REV. NO DESCRIPTION DATE LEGEND : INSTAL DUAL DATA CENTER PT BANK NEGARA INDONESIA, (PERSERO) Tbk 20-01-2014 R0 PRE DESIGN R1 DETAIL DESIGN 11-08-2014 R2 ISSUED FOR APPROVAL 27.10.2014 IBM/BNIDC/DD/RAF-201 1 : 150 LAYOUT HL (2ND - 5TH FLOOR) RAISED FLOOR

description

Titik lompat Ukur Elevasi

Transcript of Titik lompat Ukur Elevasi

  • 43

    2

    1

    A B C

    4

    3

    2

    1

    R2

    VENDOR DESAIN &

    REVISIONSREV. NO DESCRIPTION DATE

    LEGEND :

    INSTAL DUAL DATA CENTER

    PT BANK NEGARA INDONESIA, (PERSERO) Tbk

    20-01-2014R0 PRE DESIGN

    R1 DETAIL DESIGN 11-08-2014R2 ISSUED FOR APPROVAL 27.10.2014

    IBM/BNIDC/DD/RAF-201

    1 : 150

    LAYOUT HL(2ND - 5TH FLOOR)

    RAISED FLOOR