Introduction

Introducing TİTAŞ

Field of Operations

About Us

Ongoing Projects

Key Completed Road

Construction Projects

Road Construction

Photos

Key Completed Project

- Aliağa Natural Gas

Combined Cycle

Power Plant

Projects List

3 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50

Web: http://www.titastoprak.com.tr/ E-mail: [email protected]

Since its foundation in 1974, Titaş has completed many

road construction, infrastructural piping, petroleum piping,

drilling, blasting, dam and concrete structures, excavation

and hauling works and has undertaken all import and export

work of related materials and equipment to those projects.

For infrastructure work, Titaş has increased its annual

earthmoving capacity to more than 12 million cubic meters.

Many municipal domestic water distribution networks,

housing waste water networks, collectors, roads,

pavements, energy, communication, natural gas, complex

power plant infrastructure works, heating-cooling networks

for university campuses, industrial and public housing

complex projects have been completed before their

scheduled contract deadlines.

In a highly competitive environment, Titaş commits the

rationalization of its projects through strict standards by

achieving optimal cost efficiency.

Titaş believes that health, safety and environment (HSE) at

work have fundamental importance. It is Titaş’s policy to

take into account the requirements of all relevant HSE laws,

in all of its activities. Titaş provides all preventative

measures, such as HSE trainings, HSE forums with all of its

levels of personnel and precise instructions for health,

safety & environment in its projects. In recent projects, Titaş

has been working with world class oil and gas HSE

standards.

Additionally team spirit is a rational combination of the latest

engineering technology and experience is the key factor

that has made Titaş a preferred company in the fields of

infrastructure, earthwork and quarry works, drilling and

blasting works, complex infrastructural projects, oil and gas

industry.

4 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50

Web: http://www.titastoprak.com.tr/ E-mail: [email protected]

Includes;

Equipment Supply

Complex Infrastructure Works

Surface and Drainage Works

Piping Works (Concrete, HDPE, PVC,

Cast Iron, CLDI, Ductile Iron, GRP, PEHD)

Excavation, Backfilling and Compaction Works

Quarry Operations

Drilling and Blasting Works

Prefabricated elements for infrastructure works

5 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]

Vision & Values

TİTAŞ’s vision is to provide total solutions to our clients, whilst encouraging and harnessing the individual

potential of our employees, acting responsibly towards the enviroment and society. TİTAŞ’s vision and values

determine everything from employment to operation at home and abroad.

Excellence

While using the latest in engineering and management sciences always ensures the highest quality, TİTAŞ’s

standards are also based on internationally acknowledged procedures. TİTAŞ, as part of ENKA, is pertaining to

quality, which are also endorsed by ENKA’s standards, such as the British Standards Institution, include Quality

Management System ISO 9001:2008, Environmental Management System ISO 14001:2004 and Occupational

Health and Safety System OHSAS 18001:2007.

From engineering design through to commissioning, TİTAŞ interprets and complies with all quality management

requirements. Additionally, the continually revised work processes ensure that current best practices are

incorporated into the execution plan, the procedures, the specifications and the design guidelines of all work.

Innovation

Every engineering-related detail in completed and ongoing projects is constantly questioned and re-examined.

Also innovative engineering solutions are being continually researched and developed for better and more

efficient results.

Speed

Enhancing existing technologies in search of developing more and more rapid means of mobilization and project

completion methods is the desire of each and every project - execution group.

6 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]

Safety

"Zero Accident" policy is both a goal and achievement at TİTAŞ. Continuously implementing ENKA’s

comprehensive Health Safety and Environment (HSE) policy to protect all employees and associates working

at TİTAŞ offices, construction sites and related facilities. It is including protection from every kind of pollution,

hazard and accident that may result from its business.

Being a good member of the community

Acting as a contractor and/or subcontractor for construction and operation of industrial, commercial and

infrastructure facilities at home and abroad, TİTAŞ's mission requires that it must be involved in, and

continuously increase its contribution to the communities where it works. Management of social impact

includes the process of identifying, monitoring and managing the intended and unintended social

consequences of a project. Its aim is to bring about a more sustainable and fair environment.

Its people

TİTAŞ adopts, in all its offices and construction sites, the most recent labor policies and up-to-date working

conditions, enabling its employees to achieve the company's objectives in a comfortable, healthy and safe

environment. It is TİTAŞ's unwavering belief that its highly skilled staff and workforce is one of its most

significant competitive advantages. Also recognizing that training is an essential element in improving the

performance of individuals, which also translates into producing a successful project that both TİTAŞ together

with ENKA and its clients can be proud of.

7 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]

25 projects in 13 countries

• Turkey • Russia • Kazakhstan

• Georgia • Kosovo • Croatia

• Albania • Iraq • Algeria

• Mali • Sierra Leone • Cameroon

• Ukranie

8 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50

Web: http://www.titastoprak.com.tr/ E-mail: [email protected]

Early Works and Facilities Construction for South

Caucasus Pipeline Expansion Project, Georgia

(Between 2014 – today)

SCPX Early Works & Facilities Construction – Bechtel

ENKA Joint Venture (BEJV)

The existing 690 km South Caucasus Pipeline is 42"

diameter and transports gas from the Sangachal

Terminal in Azerbaijan to markets in Georgia and

Turkey. It has a system design capacity of 7.4 bcma. As

a result of the extra gas arising horn the Shah Deniz 2

Project there is a requirement to increase the capacity of

the SCP system. This is called the South Caucasus

Pipeline Expansion (SCPX). SCPX will increase the

capacity of the existing system by approximately 16

bcma.

This expansion will be provided by a new 48" diameter

pipeline, which will run in parallel with the existing SCP

from KP 23 in Azerbaijan to the Georgian Border and a

further 63km into Georgia making a total length of 487

km.

In addition SCPX requires two new Compressor Stations

plus an expansion of an existing Pressure Reducing and

Metering Station, all situated in Georgia. The Early

Works that are associated to construction of these

Stations are the subject of this work, which will be

carried out by Titaş.

Key Project Features Realized by Titaş:

- 15 km asphalt road construction, Drilling and Blasting

works, Excavation and Filling Works, Drainage Works,

Gabion Walls, Gutter works, Quarry operations, Crusher

operations, Paving works

9 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]

Prishtine – Hani I Elezit (Route No:6) Motorway,

Kosovo (Between 2010-2013)

Bechtel ENKA General Partners (BEGP)

Motorway is beginning from Morine in the Albania border

then going through Prizren, Suhareke, Duhel, Malisheve,

Arlatte, Komorane, Sllatina and reaching Prishtina. It is

curving around Prishtina and ending in Besi small town on

the north of Prishtina.

Titaş helped BEGP to build 77 km of this route that total

length is 89 km. Motorway is 28 meters wide which has 2

circular strips of 3.75 meters with an emergency lane of

2.5 meters and the green belt in median width between 3-4

meters.

Project includes 22 bridges, 61 underpass/overpasses and

9 interchanges construction. Project team executed 20

million cubic meters excavation, 13 million cubic meters

embankment fill, 200,000 meters drainage pipe

installation, 265,000 cubic meters concrete and over 1

million tones asphalt works in 42 months. Motorway

opened to traffic as planned on November 2013.

Works, which has started in 2010, on the Morine-Merdare Motorway Project in Kosovo continued until 2013.

A total of 77-kilometer of the motorway was completed and opened for transportation on November 26, 2013.

Titaş, as an earthwork, drilling and blasting subcontractor feels proud of excavation-backfilling works with

approximately 7 million cubic meters earthmoving, construction of various size reinforced concrete vents and

culverts along a part of 20-kilometers of the opened 60-kilometer highway, was completed in 2012 by Titaş.

As of the end of 2013, Titaş had more than 200 employees and achieved ‘zero accident’.

Motorway is the biggest investment and infrastructure project ever done in Kosovo. The motorway project

Morine - Prizren - Prishtina, helps New Europeans that will be created by the new possibilities of free

movement, and integrates powerful country in the region of Kosovo. Moreover this motorway connected

Kosovo to Albania, Albania to Kosovo.

Key Project Features Realized by Titaş:

Drilling and Blasting works, Excavation and Filling works, Drainage works

10 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]

Rreshen - Kalimash Motorway, Albania (Between 2007 – 2009)

Albania Motorway Project Rreshen to Reps & Quarry Operations - Bechtel ENKA Joint Venture (BEJV)

The Project was a key connection between Durnes Port, Albania's primary harbor on the Adriatic Sea and

Kosovo. In addition to the great amount of travel time saved, which will be 2 hours instead of 6 hours, this

new route served to stimulate the economy in Albania's northeastern region.

The first section of the 61 km long highway is the 18 km long stretch from Rreshen to Reps. The 27 km

Section 2 is from Reps to Thirra. 15 km long Section 3 is between Thirra and Kolshi where Mount Runes,

at an altitude of 1,858 m, will be crossed with a 5.5 km, double bore tunnel. All construction works

excluding one tube of the tunnel was completed in June 2009.

The Motorway was designed as dual carriageways of 2 X 3.75 m, supplemented with 2.0 m emergency

shoulder lanes. The major work items comprised 21 million cubic meters of excavation, 8.5 million cubic

meters of earth filling, 0.6 million cubic meters of concrete and shotcrete, 1.0 million tones of sub base

and cement treated base and 0.45 million tones of asphalt for the construction of the motorway of 61 km

long with all bridges, viaducts and two tubes each of 5.5 km in length, on the challenging topography of

the Albania mountains terrain at an altitude over 1,000 m.

Titaş undertook the Quarry Operations for material needs for the motorway project. As of the end of 2009,

Titaş had 118 employees and achieved ‘zero accident’ during the project.

Key Project Features Realized by Titaş:

- Drilling and Blasting works, Drainage works, Crusher operations, Quarry operations, Excavation and

Filling Works

11 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]

Bregana-Zagreb, Dubrovnik Motorway, Croatia (Between 2003 – 2004)

Drainage Works at Section B&C of the Bregana Zagreb Dubrovnik Motorway Project – Bechtel ENKA

Joint Venture (BEJV). Titaş, with ENKA and Bechtel (BEJV), undertook the turn-key construction of the

Croatian motorway in 2003.

The motorway project having a total length of 156 km, consisted of two independent sections. Section 1,

the 13 km Bregana-Jankomir motorway, the four-lane link from the capital city Zagreb to the border of

Croatia and Slovenia was opened to traffic in December 2000 and the other Section, the 143 km

Bosiljevo-Svetirok motorway from central Croatia towards the Dalmatian Coast was opened in July 2004.

The project was completed 14 months ahead of schedule with 4,000 workers employed at the peak of the

construction. The project has won the 2004 Croatian Contractor Safety Award as it was successfully

realized without any compromise in quality or safety.

The motorway was considered to be of vital importance as it provides the principal link between the

Zagreb region in central Croatia and the Dalmatian coast. With this motorway, Croatia’s Dalmatian coast

is integrated into the central and western European motorway network.

Throughout the construction, 21 million cubic meters of earth was excavated, 0.65 million cubic meters of

concrete was poured, 18 million cubic meters of fill material had been used, 5.1 million tones of sub-

base and cement treated base and 1.18 million tones of asphalt were laid down. The project also included

the construction of bridges and viaducts, having a total length of 7,500 m.

Key Project Features Realized by Titaş:

- Main Body Drainage and Surface Drainage Works, manholes, inlets, outlets, absorption wells

12 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]

Ankara - Gerede Highway, Turkey

ENKA and Bechtel began the design and construction of the motorway in 1987. The 120 km Gerede -

Ankara section is a 2x3 lane motorway, and the 110 km Ankara peripheral section is a 2x4 lane motorway.

There are six interchanges on the Gerede - Ankara section and 14 interchanges on the Ankara Ring road

section, as well as 22 viaducts, 3 bridges, 63 under and overpasses.

It is one of the most significant motorway projects in the world, involving 166 million cubic meters of

excavation, 22 million tones of paving and 1.5 million cubic meters of concrete. At the peak of construction,

a workforce of 6,300 was employed.

The Gerede - Ankara section of the project was opened to traffic on October 28, 1992. The Ankara Ring

road was completed on May 31, 1999.

13 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]

DRILLING AND BLASTING WORKS

14 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]

DRILLING AND BLASTING WORKS

15 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]

EXCAVATION WORKS

16 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]

EXCAVATION WORKS

17 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]

EXCAVATION WORKS

18 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]

FILLING WORKS

19 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]

FILLING WORKS

20 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]

GABION – STONE WALLS

21 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]

GABION – STONE WALLS

22 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]

GABION – STONE WALLS

23 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]

GABION – STONE WALLS

24 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]

INTRODUCTION

Following a build-own-operate (BOO) tender in 1997, the InterGen – ENKA partnership was awarded the

right to build, own and operate the Gebze Power Plant with a nominal capacity of 1,554 MW, the Adapazarı

Power Plant with a nominal capacity of 777 MW and the İzmir Power Plant with a nominal capacity of 1,523

MW, respectively. ENKA and Bechtel joint venture was the turnkey EPC contractor for all three plants.

Each power island in these natural gas-fired combined cycle power plants consisted of two combustion

turbines/generators, two-heat recovery steam generators and one steam turbine/generator. In the Gebze

and Adapazarı power plants, natural draft dry cooling towers serve each power island, whereas in the İzmir

plant, low-profile forced draft wet cooling towers were built, using seawater as a cooling medium.

The combustion turbine generators were supplied by General Electric (USA), the steam turbine generators

by Alstom Power (Germany), the closed cooling system by EGI (Hungary), the heat-recovery steam

generators by CMI (Belgium), the switchyards by Siemens (Turkey-Germany), the main and auxiliary

transformers by Alstom (Turkey), the water treatment plant by Aquatech – ENKA Teknik (USA-Turkey), the

gas RMS systems by ENKA Teknik (Turkey) and the DCS control systems by ABB-Bailey (USA).

At various times during construction, approximately 12,000 workers were employed at all three plants. The

Gebze and Adapazarı power plants were completed in 2002 and the İzmir plant in 2003.

ALIAGA IZMIR / TURKEY – NATURAL GAS CCPP

25 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]

INTRODUCTION

During the commercial operations of plants, with their

annual generation capacity of 32 billion KWh, ENKA has

achieved high levels of availability and generated over

350 billion kWh from its three power plants, supplying

14% of Turkey’s electricity demand.

In that period, meticulous planning and close supervision

have enabled ENKA to successfully complete planned

maintenance in the shortest time yet achieved for GE

9FA +e machines.

Adapazarı plant achieved 99.8% availability, nearly 7

percentage points higher than the industry average, and

noted to be a global record in F-class gas turbine

technology. Considering that performance, Power

Magazine selected the Adapazarı plant as one of the

award-winning gas-fired top plants in 2011.

Key Project Features Realized by Titaş:

- Excavation, filling works, piping works, small

concrete structure works, road construction works

ALIAGA IZMIR / TURKEY – NATURAL GAS CCPP

26 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]

ALIAGA IZMIR / TURKEY - NATURAL GAS CCPP

PROJECT MAIN KEY QUANTITIES

EXCAVATION FILLING WORKS

Plant area general excavation 170.000 m3

Plant area general fill 360.000 m3

Foundation excavation 72.000 m3

Foundation backfill 82.000 m3

Sea water intake structure rock excavation 11.200 m3

27 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]

PIPING WORKS

DN800-1000 HDPE pipe 7.450 m

Make-up, blowdown Sea water system

DN180 HDPE pipe 5.950 m

Make-up, blowdown Sea water system

DN300 - 800 Reinforced concrete pipe

980 m

Stormwater system

DN150 PVC pipe 1.350 m

Chemical waste water system

DN63-1000 HDPE pipe 7.470 m

Fire protection system

DN63-800 HDPE pipe 3.250 m

Raw water, domestic water, demin water

DN 150-350 CLDI pipe 170 m

HRSG foundation embedded piping

DN63-200 PVC pipe 1.800 m

Waste water

DN 100-150 Cast iron pipe 1.210 m

Potable water

ALIAGA IZMIR / TURKEY - NATURAL GAS CCPP

PROJECT MAIN KEY QUANTITIES

28 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]

ALIAGA IZMIR / TURKEY - NATURAL GAS CCPP

PROJECT MAIN KEY QUANTITIES

DN-2200 PIPING WORKS

DN2200 Pre-stressing concrete pipe with steel sleeve 390 m Circulating sea water as cooling

water system

29 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]

ALIAGA IZMIR / TURKEY - NATURAL GAS CCPP

PROJECT MAIN KEY QUANTITIES

DUCT BANK WORKS

DN50-150 PVC Pipe 28.000 m Electrical & control system duct bank

DN 50-150 Galvanized Pipe 2.400 m Electrical & control system duct bank

30 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]

ALIAGA IZMIR / TURKEY - NATURAL GAS CCPP

PROJECT MAIN KEY QUANTITIES

CONCRETE WORKS

Sea water intake rock jetty construction 13.000 ton

Minor concrete structures 12.000 m3

31 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]

ALIAGA IZMIR / TURKEY - NATURAL GAS CCPP

PROJECT MAIN KEY QUANTITIES

ASPHALT WORKS

Facility roads asphalt 9.000 ton

Facility road subbase & base 19.000 ton

32 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]

ALIAGA IZMIR / TURKEY - NATURAL GAS CCPP

PROJECT MAIN KEY QUANTITIES

OTHER WORKS Valve / air release / wash out 366 ea Misc.

Fire hydrant 42 ea Fire protection system

Fiber optic cable installation 19.250 m

Medium voltage cable installation 27.000 m

33 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]

No Project Title Detailed Project Description Scope of Work

Detailed

Project Category Country Location Client Start Date Finish Date Main Key Quantities

25 Early Works and Facilities

Construction for South Caucasus

Pipeline Expansion Project,

Georgia

Equipment supply and construction of 15km 6mt. width asphalt

road and Compressor Station in CSG2 area substructure,

Temporary Facilities substructure, Camp Areas substructure.

Quarry Operations for material needs for the motorway together

with Bilgin İnş. as subcontractor. Scope of Work includes

Blasting, Gabion Walls and Drainage Works. Unit price contract,

supply for machinery and equipment, complete asphalt road

construction, excavation and compaction of Temporary

Facilities, Camp Areas, Compressor Station substructures, and

Quarry Operations.

Engineering +

Procurement +

Construction + Quarry

Operations

Compressor Station

substructure,

complete 15km.

Asphalt Road

Georgia Tsalka ENKA-Bechtel JV 13.05.2014 31.12.2016 1.063.804 m3 Excavation,

655.760 m3 Compaction Fill,

314.344 m3 Topsoil Removal

24 Morine to Pristina North Junction,

Section 1 Prishtine – Hani I Elezit

(Route No:6) Motorway

Equipment supply and construction of 77km of total 89km

motorway, which is beginning from Morine in the Albania border

then going through Prizren, Suhareke, Duhel, Malisheve, Arlatte,

Komorane, Sllatina and reaching Prishtina. It is curving around

Prishtina and ending in Besi small town on the north of

Prishtina.Motorway is 28 meters wide which has 2 circular strips

of 3.75 meters with an emergency lane of 2.5 meters and the

green belt in median width between 3-4 meters. Unit price

contract, supply for machinery and equipment, construction,

excavation, and compaction of 77km road substructure, up to

asphalt level.

Excavation +

Compaction +

Engineering +

Procurement +

Construction

77km of Motorway

substructure

Kosovo Prizren-Prishtine ENKA-Bechtel JV 28.05.2010 01.12.2013 6.000.000 m3 Excavation-

Backfilling

23 Albania Motorway Project Rreshen

to Kalimash & Quarry Operations

Rreshen

Equipment supply and construction of 61km long highway, which

is the 18 km long stretch from Rreshen to Reps ,the 27 km

Section 2 is from Reps to Thirra , 15 km long Section 3 is

between Thirra and Kolshi with a 5.5 km, double bore tunnel.

Quarry Operations for material needs for the motorway together

with Pimtek A.Ş. as partners. Unit price contract, supply for

machinery and equipment, construction, excavation, and

compaction of 61km road substructure, up to asphalt level and

Quarry Operations.

Engineering +

Procurement +

Construction + Quarry

Operations

61km of Motorway

substructure, 5.5km

of Tunnel excavation

Albania Rreshen -

Kalimash

ENKA-Bechtel JV 05.04.2007 30.06.2009 21.000.000 m3 Excavation,

8.500.000 m3 Earth Filling

22 Drainage Works at Section B&C of

the Bregana Zagreb Dubrovnik

Motorway Project

Equipment supply and construction of the drainage works and

substructure works at Section B&C of the Bregana Zagreb

Dubrovnik Motorway Project. Unit price contract, supply for

machinery and equipment, construction, excavation, and

compaction of Drainage Works

Engineering +

Procurement +

Construction

Motorway Drainage

Works, Substructure

Works

Croatia Bregana-Zagreb-

Dubrovnik

ENKA-Bechtel JV 23.12.2003 30.09.2004 269.985 m3 Excavation,

120.677 m3 Compaction Fill

21 Sabancı University Infrastructure

Works

Earthmoving, Grading and Structural Backfill works of Sabancı

University Infrastructure Works/ Istanbul. Scope of work includes

all pipe laying, construction of a mini tunnel, construction of a

man-made pond, campus roads and asphalt works, construction

of some concrete buildings. Unit price contract, Earthwork,

Grading and Structural Backfill. Also, works include all pipe

laying, construction of a mini tunnel, construction of a man-made

pond, campus roads and asphalt works, construction of some

concrete buildings.

Excavation +

Compaction +

Engineering +

Procurement +

Construction

N/A Turkey İstanbul Koray Yapı

Endüstrisi ve Ticaret

A.S.

01.05.1998 31.08.2001

20 ENKA Country (ENÇA)

Infrastructure Works

Earthmoving, Grading and Structural Backfill works of ENKA

Country (ENÇA) Infrastructure Works Hereke / Izmit. Unit price

contract, Earthwork, Grading and Structural Backfill

Excavation +

Compaction +

Engineering +

Procurement +

Construction

N/A Turkey İzmit ENCA Konut Yapı

Kooperatifi

01.10.1999 30.09.2000

19 USA Istanbul Embassy

Infrastructure Works

Equipment supply and infrastructure works of USA Istanbul

Embassy. Equipment rental, supply for machinery and

equipment, construction, excavation, and compaction of USA

Istanbul Embassy infrastructure

Engineering +

Procurement +

Construction

N/A Turkey İstanbul Caddell Construction

Co.Inc.

01.01.2001 31.12.2001

18 Aliağa Natural Gas Combined

Cycle Power Plant

Earthmoving, Grading and Structural Backfill works of Aliağa

Natural Gas Combined Cycle Power Plant / Izmir. Scope of work

includes all substructure pipe laying, drainage system

earthworks, construction of cooling water system from sea level,

all asphalt roads within the site, building duct banks for electrical

power system. Unit price contract, Earthwork, Grading and

Structural Backfill Also, including all substructure pipe laying,

drainage system earthworks, construction of cooling water

system from sea level, all asphalt roads within the site, building

duct banks for electrical power system

Excavation +

Compaction +

Engineering +

Procurement +

Construction

N/A Turkey İzmir ENKA-Bechtel JV 01.01.2001 31.08.2002

17 Younde Embassy Infrastructure

Works

Equipment supply and infrastructure works of USA Cameroon /

Younde Embassy. Equipment rental, supply for machinery and

equipment, construction, excavation, and compaction of USA

Cameroon / Younde Embassy infrastructure

Engineering +

Procurement +

Construction

N/A Cameroon Younde Caddell Construction

Co.Inc.

01.01.2004 31.01.2006

16 Bamako Embassy Infrastructure

Works

Equipment supply and infrastructure works of USA Mali /

Bamako Embassy. Equipment rental, supply for machinery and

equipment, construction, excavation, and compaction of USA

Mali / Bamako Embassy infrastructure

Engineering +

Procurement +

Construction

N/A Mali Bamako Caddell Construction

Co.Inc.

01.07.2004 30.09.2006

15 Freetown Embassy Infrastructure

Works

Equipment supply and infrastructure works of USA Sierra Leone

/ Freetown Embassy. Equipment rental, supply for machinery and

equipment, construction, excavation, and compaction of USA

Sierra Leone / Freetown Embassy infrastructure

Engineering +

Procurement +

Construction

N/A Sierra Leone Freetown Caddell Construction

Co.Inc.

01.07.2004 01.09.2005

14 Oued Athmania Dam Project Equipment rental, supply for machinery and equipment for Oued

Athmania Dam Project

Engineering +

Procurement +

N/A Algeria Oued Athmania ENKA İnşaat ve

San.A.Ş.

01.02.2005 01.12.2006

34 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]

No Project Title Detailed Project Description Scope of Work

Detailed

Project Category Country Location Client Start Date Finish Date Main Key Quantities

13 SED New USA Embassy

Compound

Equipment rental, supply for machinery and equipment for SED

New USA Embassy Compound Project

Engineering +

Procurement +

N/A Algeria Alger ENKA İnşaat ve

San.A.Ş.

01.03.2005 01.01.2006

12 AGIP KCO North Caspian Sea

Exploration Project Quarry

Operations Construction of

Cuttings Pits Works

AGIP KCO North Caspian Sea Exploration Project Quarry

Operations Construction of Cuttings Pits Works / Kazakhstan –

Caspian Sea. Unit price contract, supply for machinery and

equipment, excavation, and Quarry Operations.

Engineering +

Procurement + Quarry

Operations

Quarry Operations Kazakhstan Caspian Sea ENKA İnşaat ve

San.A.Ş.

01.03.2005 01.01.2007

11 Uzel Tractor Factory Infrastructure

Works

Infrastructural Works; Drainage and Piping Works Engineering +

Procurement +

Infrastructure Turkey İstanbul ENKA İnşaat ve

San.A.Ş.

01.01.1999 01.01.2000

10 Bursa 1400 MW Natural Gas

CCPP

Scope of Works includes Topsoil Removal and Depositing,

Excavation, Backfilling, Culvert and Ditch Construction

Engineering +

Procurement +

CCPP Turkey Bursa / Orhaneli ENKA-Bechtel JV 01.01.1997 01.10.1997

9 Gerede-Ankara and Ankara Ring

Road under E+B Contract,

Substructure and Drainage Works

Equipment supply and construction of the drainage works and

substructure works at Gerede-Ankara and Ankara Peripheral

Motorway Project. Unit price contract, supply for machinery and

equipment, construction, excavation, and compaction of Gerede-

Ankara and Ankara Peripheral Motorway

Engineering +

Procurement +

Construction

Motorway Drainage

Works, Substructure

Works

Turkey Ankara ENKA-Bechtel JV 25.10.1991 31.12.1997 34.000 m3 Excavation, 22.500

m3 Compaction Fill, 26.833 m

Pipe Laying, 30.000 m3

Excavation, 20.000 m3

Compaction Fill, 15.950 m

Pipe Laying, 121.216 m3

Excavation, 22.216 m3

Compaction Fill, 118.843 m

Pipe Laying

8 Krasnodar Military Housing Project Infrastructural Works; Drainage and Piping Works Engineering +

Procurement +

Infrastructure Russia Krasnodar ENKA İnşaat ve

San.A.Ş.

01.02.1993 31.08.1994

7 Kahramanmaraş City, Construction

of Sewage System, Citywater

System, Road Construction

Kahramanmaraş City, Construction of Sewage System,

Citywater System, Road Construction. Unit price contract, supply

for machinery and equipment, construction, excavation,

compaction and drainage works of Kahramanmaraş City

Sewage and City Water Systems

Engineering +

Procurement +

Construction

N/A Turkey Kahramanmaraş Bank of Provinces

General Directorate /

Ankara

25.01.1984 16.01.1991 464.720 m Pipe Laying,

215.000 m Pipe Laying,

370.000 m Pipe Laying

6 Sakarya District, Sapanca

Municipality Sewage System

Construction and Urban Utility

Connections

Sakarya District, Sapanca Municipality Sewage System

Construction and Urban Utility Connections. Unit price contract,

supply for machinery and equipment, construction, excavation,

compaction and drainage works of Sakarya District / Sapanca

Municipality Sewage System

Engineering +

Procurement +

Construction

N/A Turkey Sakarya Bank of Provinces

General Directorate /

Ankara

03.11.1985 09.02.1989 37.000 m Pipe Laying

5 Ankara Municipality City Water

System Construction and Urban

Utility Connections

Ankara III.Step Dikmen Group / IV.Step Yenimahalle Group /

VI.Step Güzelyaka-Kaletepe Group / VI.Step Gaziosmanpaşa-

Kavaklıdere Group City Water System Construction and Urban

Utiliy Connections, C2 Main Water Line Construction, E3-2

1.Step Main Water Line Construction, Altındağ-Feridun Çelik

District Sewage System, Keçiören Municipality Yakacık District

Sewage System, 3.Step Darıdere Pump Station City Water

Urban Utility Connections. Unit price contract, supply for

machinery and equipment, construction, excavation, compaction

and drainage works of Ankara Municipality City Water System

Engineering +

Procurement +

Construction

N/A Turkey Ankara Ankara Municipality

ASKI General

Directorate

30.05.1988 25.12.1992 165.889,30 m Pipe Laying,

195.000,00 m Pipe Laying,

37.000,00 m Pipe Laying,

138.000,00 m Pipe Laying

4 Diyarbakır City, Construction of

Sewage System (including Urban

Utility Connections) and Discharge

Collector, Construction of City

Water System

Diyarbakır City, Construction of Sewage System (including

Urban Utility Connections) and Discharge Collector, Construction

of City Water System. Unit price contract, supply for machinery

and equipment, construction, excavation, compaction and

drainage works of Diyarbakır City Sewage and City Water

Systems

Engineering +

Procurement +

Construction

N/A Turkey Diyarbakır Bank of Provinces

General Directorate /

Ankara

02.02.1982 03.08.1992 65.000 m Pipe Laying, 17.000

m Pipe Laying, 91.000 m Pipe

Laying

3 Bursa Water and Sanitation

Project Water Supply and Sewage

Construction

Unit price contract, supply for machinery and equipment,

construction, excavation, compaction and drainage works of

Bursa Metropolitan Municipality City Sewage and City Water

Systems

Engineering +

Procurement +

Construction

N/A Turkey Bursa / Orhaneli Bursa Metropolitan

Municipality

06.02.1995 24.07.1997

2 Ankara Hippodrome Construction

of 4 Blocks of 24 Boxes Staples

Ankara Hippodrome Construction of 4 Blocks of 24 Boxes

Staples. Lump sum, supply for machinery and equipment,

construction, excavation, and compaction of 4 Blocks of 24

Boxes Staples at Ankara Hippodrome

Engineering +

Procurement +

Construction

N/A Turkey Ankara Turkey Jockey Club 03.06.1999 24.08.1999

1 Russian Natural Gas Pipeline,

BOTAŞ Ankara River Pass

Russian Natural Gas Pipeline,BOTAŞ Ankara River Pass. Unit

price contract, supply for machinery and equipment, construction,

excavation, and compaction of Natural Gas Pipeline.

Engineering +

Procurement +

Construction

Gas Pipeline Turkey Ankara ENKA-Spie-Capag

(France) Consortium

01.09.1986 31.08.1988

TİTAŞ Toprak İnşaat ve

Taahhüt A.Ş.

Balmumcu Mah. Zincirlikuyu Yolu

No: 3 Enka Dış İşleri Binası 3.Kat

34349 Beşiktaş – İstanbul

Web: http://www.titastoprak.com.tr/ E-mail: [email protected]

Tel: +90 (212) 376 11 70 Fax: +90 (212) 275 40 50