The very common question that we get from clients before pool construction is the amount of time needed for completion. But duration of any pool project varies depending upon the size of the project, associated landscaping and material required. Below is a basic list of stages with involved tasks:

• Planning (4-6 weeks approximately)• Structuring (3-4 weeks)• Final Stage• Curing

Page 3: Tips for Constructing Concrete Pools in Melbourne

Email Us: [email protected] Pool & Spa

• From the day you sign a contract to the day excavators arrive, the time needed for the whole process is generally 4-6 weeks.

• Engineering Plans, Working Drawings, Warranty Insurance and Building Permits are arranged during this time

• Contractors and Staffs are scheduled and in case if a Planning Permit is required, additional time is required

Planning (4-6 weeks approximately)

Page 4: Tips for Constructing Concrete Pools in Melbourne

Email Us: [email protected] Pool & Spa

• Pool location is marked using pegs, strings and paint

• After this, the excavator arrives to dig the pool• In the next week, drainage layer and in floor

cleaning pipes are installed• Structural stage in the second week involves

steel frames and formwork construction• Then, plumbing is done with pipes running back

to equipment areas• Final inspection and check is undertaken before

the concrete is sprayed in

Structuring (3-4 weeks)

Page 5: Tips for Constructing Concrete Pools in Melbourne

Email Us: [email protected] Pool & Spa

• All finishing work is done and the pool is filled with water and commissioned

• Waterline tile is installed to set the pool level before the coping goes on

• Pool fence is installed and inspected• Pool interior is done, followed by water filling• Pool Water is chemically treated and equipment

commissioned• The new pool is handed over to the client in the

end

Final Stage

Page 6: Tips for Constructing Concrete Pools in Melbourne

Email Us: [email protected] Pool & Spa

• When the concrete is installed, no further work can be done for almost a month until completion of curing process

• In this one month, commence the landscaping including paving slabs, retaining walls, etc. Even install the filtration and heating equipment

Curing

Lazaway Pools and Spa is a reputed name for constructing concrete pools in Melbourne. The team has specialist pool designers with comprehensive pool designing and construction services for both commercial and domestic clients.

Page 7: Tips for Constructing Concrete Pools in Melbourne

Email Us: [email protected] Pool & Spa

Address: 1a Burwood HWY, Wantirna VICCall On: 03 9837 6000E-mail At: [email protected]: http://www.lazaway.com.au/

Contact Us