5/29/12 TIMBERLAND POWERSYSTEMS
PREPAID POWER DISTRIBUTION
SYSTEM IN RAJASTHAN
Rakshit KumarS. VenkateswaranRushikesh Malaviya
TIMBERLAND POWERSYSTEMS
TIMBERLAND POWER SYSTEMS PVT.
LTD.
-
7/31/2019 Timberland Power Distribution_MCOM
2/27
5/29/12 TIMBERLANDPOWER SYSTEMS
Contents
1. INTRODUCTION
2. STATEMENT OF NEED
3. PROJECT DESCRIPTION
3.1 TIMBERLAND PREPAID PDS
4. PROJECT MANAGEMENT
4.1 PROJECT SCHEDULE OF JHUNJHUNU
5. BUDGET & QUALIFICATIONS
6. CONCLUSIONS
5/29/12 TIMBERLANDPOWER SYSTEMS
22
-
7/31/2019 Timberland Power Distribution_MCOM
3/27
5/29/12 TIMBERLANDPOWER SYSTEMS
1. INTRODUCTIONElectrical distribution systems have seen
enormous changes since the early days of power
generation.
At present the demand & supply gap is
increasing exponentially.
Depleting natural resources and increasing
population pose greatest challenge.
-
5/29/12 TIMBERLANDPOWER SYSTEMS
33
-
7/31/2019 Timberland Power Distribution_MCOM
4/27
5/29/12 TIMBERLANDPOWER SYSTEMS
Contd
Timberland Power Distribution Systems Pvt.Ltd. has developed - prepaid power
distribution system.
A win-win situation for both: power
generating companies & consumers.
This system is approved by Government of
India.
5/29/12 TIMBERLANDPOWER SYSTEMS
44
-
7/31/2019 Timberland Power Distribution_MCOM
5/27
5/29/12 TIMBERLANDPOWER SYSTEMS
Contd This system employs cutting edge software
system
System alarms for any theft of electricity in thegrid
It has low cost of implementation
Prepaid meter and IT infrastructure to be setup
Customers purchases rupee amount of electrical
units
5/29/12 TIMBERLANDPOWER SYSTEMS
55
-
7/31/2019 Timberland Power Distribution_MCOM
6/27
5/29/12 TIMBERLANDPOWER SYSTEMS
ContdSystem will be implemented in state of Rajasthan:
one district at a time (Jhunjhunu district has 6towns, 250 villages)
Approximately 7000lacs units per annum
There is a huge loss of25-30% due to theft ofelectricity
Contractual agreement with Government ofRajasthan for 15% of profit
This project will be a prototype model for
5/29/12 TIMBERLANDPOWER SYSTEMS
66
-
7/31/2019 Timberland Power Distribution_MCOM
7/27
5/29/12 TIMBERLANDPOWER SYSTEMS
Contd
5/29/12 TIMBERLANDPOWER SYSTEMS
77
Graphicalrepresentation ofRevenue model
-
7/31/2019 Timberland Power Distribution_MCOM
8/27
5/29/12 TIMBERLANDPOWER SYSTEMS
2. STATEMENT OF NEED At present 25-30% is lost due to line-tapping in
Rajasthan
10% of electricity shortage
5-8% of unpaid bills
Transmission Loss 15%
Overhead expenses
Collection & verification employees
5/29/12
88
TIMBERLANDPOWER SYSTEMS
-
7/31/2019 Timberland Power Distribution_MCOM
9/27
5/29/12 TIMBERLANDPOWER SYSTEMS
istribution of electricity usag
5/29/12
99
TIMBERLANDPOWER SYSTEMS
Contd
Current PowerDistribution
-
7/31/2019 Timberland Power Distribution_MCOM
10/27
5/29/12 TIMBERLAND POWERSYSTEMS
3. Project description
POWER DISTRIBUTION OVERVIEW
5/29/12
1010
TIMBERLAND POWERSYSTEMS
-
7/31/2019 Timberland Power Distribution_MCOM
11/27
5/29/12 TIMBERLANDPOWER SYSTEMS
3.1 Timberland Prepaid PDS
Proposed plan to the government in the month ofSeptember, 2010
Obtained approval for the same from government
Our work include:
Installation of prepaid meters
Sale of prepaid packages to customers
Following up and maintenance of the installedsystems with Electricity Board
Handing over the collected revenue to Electricity
5/29/12
1111
TIMBERLANDPOWER SYSTEMS
-
7/31/2019 Timberland Power Distribution_MCOM
12/27
5/29/12 TIMBERLANDPOWER SYSTEMS
4. Project managementThree Level Structure for a
District
5/29/12
1212
TIMBERLANDPOWER SYSTEMS
For central hub station
-Station manager-Manager-Senior Engineer-Junior Engineer-PRO (Public RelationsOfficer)-Legal Advisor IT-Support staff-Electrician-Help boys-Collection agent
Centralhub
stationin
Jhunjhunu
district
Sub-hub
station
Sub-hub
station
Sub-hub
station
Sub-hub
station
Sub-hub
station
Sub-hub
station
2nd LevelTowns
1st LevelDistrict
50 village-hub stations, each station will cater to 5 villages intotal 250 villages
(ratio of 1:5)3rd LevelVillages
For Sub-hub station
(total 6 stations)-Station manager-Junior Engineer-IT support staff-Electrician-Help boys-Collection agent
For Village hub station
(50 centers for 250villages)-Collection agent-Security personnel
-
7/31/2019 Timberland Power Distribution_MCOM
13/27
5/29/12 TIMBERLANDPOWER SYSTEMS
Contd(reporting structure)
5/29/12
1313
TIMBERLANDPOWER SYSTEMS
CEO
CFO StationManager( District)
LegalAdviser
Junior
Engineers
Senior
Engineers
Manager(Central
Hub)
Security
Personn
Electricians
Help
Boys
ITStaff
PRO
Junior
Engineers
SeniorEngineers
Manager(Sub Hub)
Security
Personn
Electricians
Help
Boys
ITStaff
Collection
Agent
-
7/31/2019 Timberland Power Distribution_MCOM
14/27
5/29/12 TIMBERLANDPOWER SYSTEMS
Contd
Processors and software packages for stations willbe sourced from IBM India
Prepaid Meters will be purchased from EngineeringWing ofBangladesh University of Engineering andTechnology (BUET)
Computers in the respective Electricity Board officeswill be used
Remaining computers will be purchased from local
vendors
5/29/12
1414
TIMBERLANDPOWER SYSTEMS
-
7/31/2019 Timberland Power Distribution_MCOM
15/27
5/29/12 TIMBERLANDPOWER SYSTEMS
4.1 project schedule for jhunjhunuPhase 1 (Dec 1, 2010 to Dec 11, 2010)
Installation in Central Hub Station (Jhunjhunu)
Phase 2 (Dec 12, 2010 to Dec 25, 2010)
Installation in two sub-hub stations (Chirawa & Khetri)
Phase 3 (Dec 26, 2010 to Jan 09, 2011)
Installation in two sub-hub stations (Buhana & NawalGarh)
Phase 4 (Jan 10, 2011 to Jan 23, 2011)
Installation in sub-hub stations (Udaipurwati & Pilani)
Phase 5 (Jan 24, 2011 to Feb 06, 2011)
Installation in 25 village-hub stations.
Phase 6 (Feb 07, 2011 to Feb 21, 2011)
Installation & implementation in next 25 village-hub
5/29/12
1515
TIMBERLANDPOWER SYSTEMS
-
7/31/2019 Timberland Power Distribution_MCOM
16/27
5/29/12 TIMBERLANDPOWER SYSTEMS
5. Budget & qualifications Budget include costs to be incurred in Jhunjhunu
District
IT Infrastructure
Installation Charge
Operating expenses General operating expenses
5/29/12
1616
TIMBERLANDPOWER SYSTEMS
-
7/31/2019 Timberland Power Distribution_MCOM
17/27
5/29/12 TIMBERLANDPOWER SYSTEMS
Contd (IT Infrastructure cost)
5/29/12
1717
TIMBERLANDPOWER SYSTEMS
-
7/31/2019 Timberland Power Distribution_MCOM
18/27
5/29/12 TIMBERLANDPOWER SYSTEMS
Contd (installation charge)
5/29/12
1818
TIMBERLANDPOWER SYSTEMS
-
7/31/2019 Timberland Power Distribution_MCOM
19/27
5/29/12 TIMBERLANDPOWER SYSTEMS
Contd (General expenses)
5/29/12
1919
TIMBERLANDPOWER SYSTEMS
-
7/31/2019 Timberland Power Distribution_MCOM
20/27
5/29/12 TIMBERLANDPOWER SYSTEMS
Contd (operating expenses)
5/29/12
2020
TIMBERLANDPOWER SYSTEMS
-
7/31/2019 Timberland Power Distribution_MCOM
21/27
5/29/12 TIMBERLANDPOWER SYSTEMS
Contd (operating expenses)
5/29/12
2121
TIMBERLANDPOWER SYSTEMS
5/29/12TIMBERLAND 5/29/12TIMBERLAND
-
7/31/2019 Timberland Power Distribution_MCOM
22/27
5/29/12 TIMBERLANDPOWER SYSTEMSContd (REVENUE MODEL,
ESTIMATED)
5/29/12
2222
TIMBERLANDPOWER SYSTEMS
S.No. Description Lac Unit**
(based on 2009-2010figures)
Rate perunit in Rs
Total in Rsx 1,00,000
1Total ElectricityConsumptions in Units
7177.68
2 Household Use 991.37 4.5 4461.165
3 Commercial and Tempuse
1576.97
5.25
8279.0925
4 Industrial Use 1627.04 5.75 9355.48
5 Public Lighting Use 920.53 5 4602.65
6 Irrigation Use 880.15 3.75 3300.5625
7 Public WaterDistribution Use
1091.49
4
4365.96
8 Other use 90.13 3 270.39
TOTAL 34635.3
**data source: Central Electricity Regulatory CommissionTotal Revenue generated : 346 crore Rs.
Profit for Government (30%) : 103.9 crores Rs.
Income for Timberland Power Systems (15%): 15.5 crores Rs.
5/29/12 TIMBERLAND 5/29/12 TIMBERLAND
-
7/31/2019 Timberland Power Distribution_MCOM
23/27
5/29/12 TIMBERLANDPOWER SYSTEMS
QualificationS Timberland power Distribution System Pvt. Ltd. Is
incorporated in April, 2010
Owners:
Mr. Mohan Lal Ahluwalia
Mr. Shyam Prasad Members of the board and advisory committee of
the company
Experience: Around 20 years of experience in NHPC(National Hydro Power Corporation) .
A core team of 15 employees who have an averageexperience of8-10 years in electricity generationprojects.
5/29/12
2323
TIMBERLANDPOWER SYSTEMS
5/29/12 TIMBERLAND 5/29/12 TIMBERLAND
-
7/31/2019 Timberland Power Distribution_MCOM
24/27
5/29/12 TIMBERLANDPOWER SYSTEMS
Contd
Details of CEO and CFO for companies operationsin State of Rajasthan:
Chief Executive Officer (CEO):Mr. Arun Kumar
Professional record:
B.Tech. -May-1986 (IIT Chennai)
M.B.A. -June-1988 (IIM Ahmedabad)
Bharat Heavy Electric Machine: General Manager June-1988 toDec-1997.
Larsen & Tubro: Vice President Jan-1998 to Aug-2010
Chief Financial Officer (CFO):Mr. Ram Sharma
Professional Record
M.Com.-May 1986 (M.S. University, Vadodara)
5/29/12
2424
TIMBERLANDPOWER SYSTEMS
5/29/12 TIMBERLAND 5/29/12 TIMBERLAND
-
7/31/2019 Timberland Power Distribution_MCOM
25/27
5/29/12 TIMBERLANDPOWER SYSTEMS
6. conclusions
Prepaid distribution systems benefits forPower distribution companies
Better forecasting of revenues
Greater cost controls
Reduced resource needs for collection &verification
Reduced power related consumer incidences &unnecessary overheads
Prepaid distribution system benefits forconsumers
Better management of finances
Greater visibility into costs and energy use
Greater predictability
5/29/12
2525
TIMBERLANDPOWER SYSTEMS
5/29/12 TIMBERLAND 5/29/12 TIMBERLAND
-
7/31/2019 Timberland Power Distribution_MCOM
26/27
5/29/12 TIMBERLANDPOWER SYSTEMS
Contd
Support from the Government of India and
Rajasthan.
Company is going to setup this system in theState of Rajasthan district wise (Planned for next3 years)
Company is looking for Rs. 10.6 crores for capital
investment
We welcome you to visit our pilot project atRewari.
5/29/12
2626
TIMBERLANDPOWER SYSTEMS
5/29/12 TIMBERLAND 5/29/12 TIMBERLAND
-
7/31/2019 Timberland Power Distribution_MCOM
27/27
5/29/12 TIMBERLANDPOWER SYSTEMS
Thank You
Companys offices address:
Timberland Power Distribution Systems Pvt. Ltd.
Plot # 52,
Malviya Nagar, Near Ahinsa Circle
Jaipur (Rajasthan)
India 302005
5/29/12
2727
TIMBERLANDPOWER SYSTEMS