TIMBER FRAMING - Sto...TIMBER FRAMING TO NZS 3604 H3.1 TIMBER CAVITY BATTENS @ 400mm MIN.CTRS...

4
SCALE 1:20 TIMBER FRAMING TO NZS 3604 H3.1 TIMBER CAVITY BATTENS @ 300mm MIN.CTRS STOLITE RENDER SYSTEM 8mm LEVELITE BASECOAT RENDER STOARMAT MESHED REINFORCED RENDER, STOPLEX W SEALER STOLIT K or MP COLOURED FINISHING RENDER 6mm FC SHEET INSTALL AS PER MANUFACTURERS INSTRUCTION STO uPVC CLIPON FOOT TRAY REMOVE BACK TAB IF REQUIRED uPVC VERMIN TRAY WITH 15mm MIN. DRIP EDGE WALL UNDERLAY MEETING REQUIREMENTS E2/AS1 CONCRETE FOUNDATION AS PER NZS3604 OR SPECIFIC ENGINEERING REQUIREMENTS MESH SHEET JOINT FIXINGS: 200mm on STUDS 150mm on TOP & BOTTOM PLATES 300mm on DWANGS SHEETS FIXED VERTICALLY The information contained on this page is based on our experience and research at the date of issue. The detail is for use by Registered Architects, Licensed Designers or Chartered Engineers to assist in developing project details using Sto Systems. Stoanz Ltd reserve the right to alter or update information at any time without prior notice and it is the responsibility of the designer, project manager or Sto contractor to insure they have and use the current Sto details and specifications on site. STOLITE SYSTEM STOLITE CONSTRUCTION SYSTEM CAVITY BATTEN SETOUT (600ctrs) - ISOMETRIC SL 100 2017

Transcript of TIMBER FRAMING - Sto...TIMBER FRAMING TO NZS 3604 H3.1 TIMBER CAVITY BATTENS @ 400mm MIN.CTRS...

  • SCALE 1:20

    TIMBER FRAMING

    TO NZS 3604

    H3.1 TIMBER CAVITY BATTENS

    @ 300mm MIN.CTRS

    STOLITE RENDER SYSTEM

    8mm LEVELITE BASECOAT

    RENDER

    STOARMAT MESHED REINFORCED

    RENDER, STOPLEX W SEALER

    STOLIT K or MP COLOURED

    FINISHING RENDER

    6mm FC SHEET INSTALL AS PER

    MANUFACTURERS INSTRUCTION

    STO uPVC CLIPON FOOT TRAY

    REMOVE BACK TAB IF

    REQUIRED

    uPVC VERMIN TRAY WITH 15mm

    MIN. DRIP EDGE

    WALL UNDERLAY MEETING

    REQUIREMENTS E2/AS1

    CONCRETE FOUNDATION AS PER NZS3604 OR

    SPECIFIC ENGINEERING REQUIREMENTS

    MESH SHEET JOINT

    FIXINGS:

    200mm on STUDS

    150mm on TOP & BOTTOM PLATES

    300mm on DWANGS

    SHEETS FIXED VERTICALLY

    The information contained on this page is based on our experience and research at the date of issue. The detail is for use by Registered

    Architects, Licensed Designers or Chartered Engineers to assist in developing project details using Sto Systems. Stoanz Ltd reserve the right to

    alter or update information at any time without prior notice and it is the responsibility of the designer, project manager or Sto contractor to insure

    they have and use the current Sto details and specifications on site.

    STOLITE

    SYSTEM

    STOLITE CONSTRUCTION SYSTEM

    CAVITY BATTEN SETOUT (600ctrs) - ISOMETRIC

    SL 100

    2017

  • SCALE 1:20

    TIMBER FRAMING

    TO NZS 3604

    H3.1 TIMBER CAVITY BATTENS

    @ 400mm MIN.CTRS

    STOLITE RENDER SYSTEM

    STO uPVC CLIPON FOOT TRAY

    REMOVE BACK TAB IF

    REQUIRED

    uPVC VERMIN TRAY WITH 15mm

    MIN. DRIP EDGE

    WALL UNDERLAY MEETING

    REQUIREMENTS E2/AS1

    CONCRETE FOUNDATION AS PER NZS3604 OR

    SPECIFIC ENGINEERING REQUIREMENTS

    8mm LEVELITE BASECOAT

    RENDER

    STOARMAT MESHED REINFORCED

    RENDER, STOPLEX W SEALER

    STOLIT K or MP COLOURED

    FINISHING RENDER

    6mm FC SHEET INSTALL AS PER

    MANUFACTURERS INSTRUCTION

    MESH SHEET JOINT

    FIXINGS:

    200mm on STUDS

    200mm on TOP & BOTTOM PLATES

    SHEETS FIXED VERTICALLY

    The information contained on this page is based on our experience and research at the date of issue. The detail is for use by Registered

    Architects, Licensed Designers or Chartered Engineers to assist in developing project details using Sto Systems. Stoanz Ltd reserve the right to

    alter or update information at any time without prior notice and it is the responsibility of the designer, project manager or Sto contractor to insure

    they have and use the current Sto details and specifications on site.

    STOLITE

    SYSTEM

    STOLITE CONSTRUCTION SYSTEM

    CAVITY BATTEN SETOUT (400 ctrs) - ISOMETRIC

    SL 101

    2017

  • SCALE 1:20

    STEEL FRAMING

    AS SPECIFIED

    H3.1 TIMBER CAVITY BATTENS

    @ 300mm MIN.CTRS

    STOLITE RENDER SYSTEM

    8mm LEVELITE BASECOAT

    RENDER

    STOARMAT MESHED REINFORCED

    RENDER

    STOLIT K or MP COLOURED

    FINISHING RENDER

    6mm FC SHEET INSTALL AS PER

    MANUFACTURERS INSTRUCTION

    STO uPVC CLIPON FOOT TRAY

    REMOVE BACK TAB IF

    REQUIRED

    uPVC VERMIN TRAY WITH 15mm

    MIN. DRIP EDGE

    WALL UNDERLAY MEETING

    REQUIREMENTS E2/AS1

    CONCRETE FOUNDATION AS PER NZS3604 OR

    SPECIFIC ENGINEERING REQUIREMENTS

    THERMAL BREAK STRIPS WITH A

    MIN. R VALUE of 0.3 TO ALL

    STEEL FRAMING

    MESH SHEET JOINT

    FIXINGS:

    AS PER SHEET MANUFACTURER

    INSTRUCTION

    SHEETS FIXED VERTICALLY

    The information contained on this page is based on our experience and research at the date of issue. The detail is for use by Registered

    Architects, Licensed Designers or Chartered Engineers to assist in developing project details using Sto Systems. Stoanz Ltd reserve the right to

    alter or update information at any time without prior notice and it is the responsibility of the designer, project manager or Sto contractor to insure

    they have and use the current Sto details and specifications on site.

    STOLITE

    SYSTEM

    STOLITE CONSTRUCTION SYSTEM

    CAVITY BATTEN SETOUT STEEL FRAME/THERMAL BREAK (600ctrs)

    SL 102

    2017

  • N.T.S

    300

    600

    5.4M MAX.

    DOORWINDOW

    VERTICAL CONTROL JOINTS

    AT 5.4M CTRS ON DOUBLE

    STUDS

    SHEET JOINTS 200mm

    PAST OPENINGS

    H3.1 TIMBER BATTENS FIXED

    OVER FRAME & BUILDING

    UNDERLAY

    H3.1 HORIZONTAL SPACERS x

    100mm LONG, FIX WITH ONE NAIL

    CENTERED. HORIZONTAL SPACERS

    MUST BE SET TO A FALL 5° MIN.

    NOTE:

    IF STUDS ARE PLACED AT 400 mm CTRS NO INTERMEDIATE

    BATTENS ARE REQUIRED. 100mm LONG SPACERS WILL BE

    REQUIRED ON BOTTOM PLATE & FIXINGS ARE ALL AT

    200mm CTRS

    2nd LEVEL

    INTERMEDIATE CAVITY BATTENS

    REQUIRED ON 600mm FRAMING

    The information contained on this page is based on our experience and research at the date of issue. The detail is for use by Registered

    Architects, Licensed Designers or Chartered Engineers to assist in developing project details using Sto Systems. Stoanz Ltd reserve the right to

    alter or update information at any time without prior notice and it is the responsibility of the designer, project manager or Sto contractor to insure

    they have and use the current Sto details and specifications on site.

    STOLITE

    SYSTEM

    STOLITE CONSTRUCTION SYSTEM

    CAVITY BATTEN LAYOUT (300 & 600 ctrs) ELEVATION

    SL 103

    2017

    SL-100-Cavity batten setout 600crs isometricSheets and ViewsCavity batten setout 600crs isometric

    SL-101-Cavity batten setout 400 crs isometricSheets and ViewsCavity batten setout 400 crs isometric

    SL-102-Cavity batten setout steel frameSheets and ViewsCavity batten setout steel frame

    SL-103-Cavity batten layout elevationSheets and ViewsCavity batten layout elevation