1
Tim Bowder-Ridger, RIBA
CEO | Senior Partner
Daniel Ritterband
Communications Director
Mike Hitchens
Divisional Director
5
12
2
6
3
5
4
Adjacent Development1. Denmark Place Development2. No1 Oxford Street Development3. Central St Giles4. Crossrail and Tube Canopy5. Tottenham Court Road 2-way traffic proposal6. 14-28 Oxford Street
1
2
3
5
4
12
Storeys 34Basement 2Height 120m Plan Dimension 43 x 18m Floor Space 27,000m2
1962 – Site Plan
92.370m
92.365m
92.360m
t-92.355m
- 92.350m
- 92.345m
- 92.340m
92.335m
92.330m
92.325m
92.320m
92.315m
92.310m
92.305m
92.300m
92.295m
92.290m
92.285m
. -
....._ ....._
-- ., I
I
11-- - I.........
---..I ....-
- -
I I
-- -92.280m
92.275m
92.270m
• 2.75 m thick piled raft • 128 No. under-reamed piles• Pile diameter: 915 mm with 1750 mm under-ream.• Pile length: approx. 16 m
Existing Building Developer: Architect:
Structural Engineer: Completion:
Harry Hyams Seifert and Partners
Pell Frischmann 1966
Storeys: Height:Plan dimension:
34117m43x18m (approx)
Project InformationC&P Scope:C&P Appointment:Construction Start:Completion:Procurement route:
Ground floor to roof 2011 Late 2014 2018D&B
--1
\I
I'
Typical Apartments
Penthouse Apartments
3 BED =198sqm
5 BED =400sqm
D5 BED =671sqm
1 BED = 69sqm
2 BED = 118sqm
2 BED = 113sqm
2 BED = 119sqm
3 BED = 153sqm
1BED
2BED
1BED
2BED
2BED
2BED
3BED
3BED
3BED
5 BED
D5BED
20
15
10
5
0
-5
-10
-14.0'C
-