Background
• Comparing the overall CTS budget between FY 2003/04 and FY 2009/10, total spend is nearly equal at $30.4M
• CTS FTEs have decreased during this period from 190 to 166 offsetting inflation, salary and benefit increases
• The TIF for FY 2009/10 represents approximately $14.1M • The TIF elements represent one of three components of the CTS
operation– Voice services – Directly billed services– Technology Infrastructure Fee components
3
Technology Infrastructure Fee
• Campus Backbone and Internet connectivity – 32%• Maintaining the campus’ low voltage wiring infrastructure 22%• Set of BOL services – 16%• TIER funding – 15%• Campus Exchange services – 10%• Wireless services – 3%• 800 MHz services - 2%• General assignment classroom networking – 0%
4
Technology Infrastructure FeeAllocation Methodology
• Charged to all FTEs excluding work study
• Technology Infrastructure Fee rate history– FY 2006/07 - $39.00– FY 2007/08 - $40.75– FY 2008/09 - $40.75– FY 2009/10 - $40.75
• Prior to the TIF approximately $.9M was charged to C&G accounts as combined telephone and technology services
5
Allocation of TIF Dollars
$2,500,000 , 18%
$11,340,000 , 80%
$260,000 , 2%
Contract & Grantaccounts
Non-C&G accounts
ASUCLA
Prior to the TIF, approximately $.9M was charged to C&G accounts as combined telephone and technology services
6
Campus Backbone and Internet Connectivity - 32%
• $4.5 M of the overall $14.1M TIF budget• Proposed data gathering
– # of backbone connections – Bandwidth utilization – Segregate traffic flows between campus and off campus activity
7
Maintaining the low voltage wiring infrastructure – 22%
• $3.1M of the overall $14.1M TIF budget• Set of services includes management of:
– Inter- and Intra-building wiring– Building entry rooms– Campus’ LVW manhole system– LVW construction and renovation activity – Adds, moves and changes for LVW
• What’s not included:– Medical Enterprise off campus building connectivity
• Proposed data gathering – # of buildings, hub rooms, projects, etc
8
BOL set of services – 16%
• $2.2M of the overall $14.1M TIF budget• Three cost centers
– Email storage and supporting systems– Legacy Modem pool – BOL set of services and help desk support
• Managing Abuse @ UCLA• Managing user accounts• Help desk support for email • Help desk support for wireless
• Proposed data gathering – Services, help desk calls, etc
• By faculty, students and staff where possible
9
TIER funding – 15%
• $2.1M of the overall $14.1M TIF budget• Funds are focused on supporting campus infrastructure projects
such as data centers and NGN or Next Generation Network projects
10
Campus Exchange services – 10%
• $1.4M of the overall $14.1M TIF budget • Currently supports >12,000 accounts of the anticipated 20,000+
accounts• What’s not included:
– Medical Enterprise set of Exchange Services• Proposed data gathering
– # of clients, services, projected savings– Benchmark data
• UC providers, Microsoft, Gartner best-in-class
11
Wireless, General Assignment Classroom Networking and 800 MHz emergency radio services - 5%
• $0.8M of the overall $14.1M TIF budget
• What’s not included:– Bruin Alert System infrastructure and support
• Proposed data gathering – # of clients, services, number of buildings, etc