D/2
(See table for tie-bar size)
Epoxy coated tie bar at 3’-0" c/c
1’-6"1’-6"
TIE-BAR SIZES FOR LONGITUDINAL JOINT
Pavement Thickness, D
D
Single pass saw cut (Depth = D/3)
TRANSVERSE SECTION THROUGH PCCP
Less than or equal to 9"
Greater than 9"
#5
#6
Tie-Bar Size
INDIANA DEPARTMENT OF TRANSPORTATION
STANDARD DRAWING NO.
DATECHIEF ENGINEER
DATESUPERVISOR, ROADWAY STANDARDS
LONGITUDINAL JOINT
SEPTEMBER 2012
E 503-CCPJ-02
STATE OF
No.
AADIN I N
PR
OFE
S
OIS
N LANE
I
G
EN
RE
RGEISTER
DE
RIC
HA
RD L. VanCLE
AVE
9750
/s/ Richard L. VanCleave 09/04/12
09/04/12/s/ Mark A. Miller
-
DESIGN STANDARDS ENGINEER
CHIEF HIGHWAY ENGINEER DATE
DESIGN STANDARDS ENGINEER
DATEDESIGN STANDARDS ENGINEER
CHIEF HIGHWAY ENGINEER DATE
DESIGN STANDARDS ENGINEER
DATE
-
DESIGN STANDARDS ENGINEER
CHIEF HIGHWAY ENGINEER DATE
DESIGN STANDARDS ENGINEER
DATEDESIGN STANDARDS ENGINEER
CHIEF HIGHWAY ENGINEER DATE
DESIGN STANDARDS ENGINEER
DATE
-
DESIGN STANDARDS ENGINEER
CHIEF HIGHWAY ENGINEER DATE
DESIGN STANDARDS ENGINEER
DATEDESIGN STANDARDS ENGINEER
CHIEF HIGHWAY ENGINEER DATE
DESIGN STANDARDS ENGINEER
DATE
-
E503-CCPJ-01E503-CCPJ-02E503-CCPJ-03BACK
E503-CCPJ-04BACK
E503-CCPJ-05BACK
E503-CCPJ-06BACK
E503-CCPJ-07BACK
E503-CCPJ-08