This Powerpoint is a follow-up from the 2/21/2013 C 2 Cohort.

19
This Powerpoint is a follow-up from the 2/21/2013 C2 Cohort. Pictures of activities and resources from Panel Presenters are included as support for your capacity building.

description

This Powerpoint is a follow-up from the 2/21/2013 C 2 Cohort. Pictures of activities and resources from Panel Presenters are included as support for your capacity building. Link to share Immersion Video. http://www.youtube.com/watch?v=I6Y0HAjLKYI. Underperforming Subgroups Part II. - PowerPoint PPT Presentation

Transcript of This Powerpoint is a follow-up from the 2/21/2013 C 2 Cohort.

Page 1: This  Powerpoint  is a follow-up from the 2/21/2013 C 2  Cohort.

• This Powerpoint is a follow-up from the 2/21/2013 C2 Cohort.

• Pictures of activities and resources from Panel Presenters are included as support for your capacity building.

Page 2: This  Powerpoint  is a follow-up from the 2/21/2013 C 2  Cohort.

Link to share Immersion Video

• http://www.youtube.com/watch?v=I6Y0HAjLKYI

Underperforming Subgroups Part II

Page 3: This  Powerpoint  is a follow-up from the 2/21/2013 C 2  Cohort.

Teambuilding Activity:Marshmallow Challenge

Page 4: This  Powerpoint  is a follow-up from the 2/21/2013 C 2  Cohort.

Goal Setting!

Page 5: This  Powerpoint  is a follow-up from the 2/21/2013 C 2  Cohort.

Problem-Solving!

Page 6: This  Powerpoint  is a follow-up from the 2/21/2013 C 2  Cohort.

Collaboration!

Page 7: This  Powerpoint  is a follow-up from the 2/21/2013 C 2  Cohort.

Team Work!

Page 8: This  Powerpoint  is a follow-up from the 2/21/2013 C 2  Cohort.

The Winning Team!

Page 9: This  Powerpoint  is a follow-up from the 2/21/2013 C 2  Cohort.

Intervention Versus Resources

What is an intervention/resource?Are there a differences?Are there similarities?

Page 10: This  Powerpoint  is a follow-up from the 2/21/2013 C 2  Cohort.

What’s the Difference?

ResourcesIntervention

TimeClose The Gap

Strategies

Page 11: This  Powerpoint  is a follow-up from the 2/21/2013 C 2  Cohort.
Page 12: This  Powerpoint  is a follow-up from the 2/21/2013 C 2  Cohort.

Academic Resource Pyramid

Page 13: This  Powerpoint  is a follow-up from the 2/21/2013 C 2  Cohort.

Behavioral Resource Pyramid

Page 14: This  Powerpoint  is a follow-up from the 2/21/2013 C 2  Cohort.

ELL Resource Pyramid

Page 15: This  Powerpoint  is a follow-up from the 2/21/2013 C 2  Cohort.

SummaryProblem Solving

Flow Chart

Identify the replacement

behavior

Determine current, expected, and peer

levels of performance

Conduct a gap analysis to determine if Tier I instruction

or the target student should be the focus of problem analysis

Develop hypothesis, prediction statements,

and assessment questions

Collect ICEL/RIOT data to verify/reject

hypothesis

Develop intervention plan(s) for verified hypothesis including:

*Interventions that are evidence based and feasible to implement

* A description of who will do what and when AND

* How support will be provided to the individuals implementing the intervention

Implement the intervention plan(s) and collect data to

document the degree to which the intervention plan(s) were

implemented with fidelity

Collect progress monitoring data and make decisions about student RtI:

*Positive: Continue intervention until benchmark attainment

* Questionable: Modify or increase existing intervention

* Poor: Return to problem solving

Page 16: This  Powerpoint  is a follow-up from the 2/21/2013 C 2  Cohort.

Panel PresentersStacy Keaveny – Guidance

Erica Cole- Guidance

Ken Lyford – Guidance

East Ridge High School

East Ridge Middle School

Clermont Elementary School

Page 17: This  Powerpoint  is a follow-up from the 2/21/2013 C 2  Cohort.

MTSS/RtI Panel Presentions

• E:\ERMS C2 Cohort MTSS Panel 2 20 13.pptx

• E:\Clermont Elementary RtI One-FCIM.pptx

Page 18: This  Powerpoint  is a follow-up from the 2/21/2013 C 2  Cohort.

• E:\Resource Handout.docx

• E:\2013 ELL Resources.docx

Winning Resources

Page 19: This  Powerpoint  is a follow-up from the 2/21/2013 C 2  Cohort.

1. Make Predictions2. Test Hypothesis3. Set Goals4. Monitor Progress

…and don’t forget the “marshmallow”!

GO FORTH AND BE A PROBLEM SOLVER