Supplier Quality Manual
Main Screen
MainScreen
Table of Contents Forms
New Model
General Information
Mass Production
Reference SQM Master List 04-01-2016 Revision Information
Quality Control Regulations and Minimum Quality System Requirements
Market
CountryRegulations
Click a tab to begin navigation
This manual applies to the following North American Honda Facilities
AEP - ELP - HCM - HDM - HMA - HMIN - HPE - HPPG - HSC - HTM - IPS -MAP
Honda Company PrincipleMaintaining a global viewpoint, we are dedicated to supplying products of the highest quality yet at a reasonable
price for worldwide customer satisfaction.
A key to Honda acronyms can be found in the Definitions document in the Reference section. For the best results please use Adobe Acrobat 7.0 or higher to view this manual.
Click on a tab to select
This on-line manual is the official version of the Honda Supplier Quality Manual. Your access is your implied permission to download and print a working copy for your business. It is your responsibility to use the most
current version posted on this web site.
vc037429Typewritten Text
vc037429Typewritten Text
-
Supplier Quality Manual
Main Screen
CoverPage
Table of Contents Forms
New Model
General Information
Mass Production
ReferenceQuality Control Regulations and Minimum Quality System Requirements
Market
CountryRegulations
Forms 5P CRF IPPAAR/IPP
Inspection Fixture
Lot Control and Traceability PAC-VData MPR
Tool TrialPQCT PV Testing SpeCla Tool Trial History
Forms - Blank Clicking on a black tab will open the form, but it may cause the SQM to close.WARNING
Click on a tab to select
Lot Control
SQM Master List 04-01-2016 Revision Information
vc037429Typewritten Text Initial Production Parts Quality Assurance Declaration
vc037429Typewritten Text
vc037429Typewritten Text
VC037429Typewritten Text
-
Supplier Quality Manual
Main Screen
CoverPage
Table of Contents Forms
New Model
General Information
Mass Production
Reference SQM Master ListQuality Control Regulations and Minimum Quality System Requirements04-01-2016 Revision
Information
Market
CountryRegulations
Forms5P CRF IPPAAR/IPP
Inspection Fixture
Lot Control and Traceabilit PAC-VData MPR
Tool Trial
Clicking on a black tab will open the form but it may cause the SQM to closeWARNING
PV Testing SpeCla Tool Trial HistoryPQCT
Forms - Blank
Clicking on a black tab will open the form, but it may cause the SQM to close.
To open or download this form inside the manual, please return to the Forms Screen (page 3) and follow the instructions.
CRF FormsCRF Operation
StandardCRF Blank and Numbered Form
(matches the Operation Standard)
Click on a tab to select
( p )
vc037429Typewritten Text Initial Production Parts Quality Assurance Declaration
VC037429Typewritten Text
-
Supplier Quality Manual
Main Screen
CoverPage
Table of Contents Forms
New Model
General Information
Mass Production
Reference SQM Master ListQuality Control Regulations and Minimum Quality System Requirements04-01-2016 Revision
Information
Market
CountryRegulations
Forms5P CRF IPPAAR/IPP
Inspection Fixture
Lot Control and Traceability PAC-VData MPR
Tool Trial
WARNING Clicking on a black tab will open the form but it may cause the SQM to close
PV Testing SpeCla Tool Trial HistoryPQCT
Forms - Blank
Clicking on a black tab will open the form, but it may cause the SQM to close.
To open or download this form inside the manual, please return to the Forms Screen (page 3) and follow the instructions.
Receiving Inspection - Blank Regulation Data - Blank
Data Forms
Inspection Data - Blank
Click on a tab to select
vc037429Typewritten Text Initial Production Parts Quality Assurance Declaration
-
Supplier Quality Manual
Main Screen
CoverPage
Table of Contents Forms
New Model
General Information
Mass Production
Reference SQM Master ListQuality Control Regulations and Minimum Quality System Requirements04-01-2016 Revision
Information
Market
CountryRegulations
Forms5P CRF IPPAAR/IPP
Inspection Fixture
Lot Control and Traceability PAC-VData MPR
Tool Trial
WARNING Clicking on a black tab will open the form but it may cause the SQM to close
PV Testing SpeCla Tool Trial HistoryPQCT
Forms - Blank
Clicking on a black tab will open the form, but it may cause the SQM to close.
To open or download this form inside the manual, please return to the Forms Screen (page 3) and follow the instructions.
Supplier Inspection Fixture Concept
Gage R&R (Long Method) Blank
Gage R&R (Short Method) - Blank
Inspection Fixture FormsSupplier Inspection
Fixture
Click on a tab to select
Fixture Concept Method) Blank Method) BlankFixture
vc037429Typewritten Text Initial Production Parts Quality Assurance Declaration
-
Supplier Quality Manual
Main Screen
CoverPage
Table of Contents Forms
New Model
General Information
Mass Production
Reference SQM Master ListQuality Control Regulations and Minimum Quality System Requirements04-01-2016 Revision
Information
Market
CountryRegulations
Forms5P CRF IPPAAR/IPP
Inspection Fixture
Lot Control and Traceability PAC-VData MPR
Tool Trial
WARNING Clicking on a black tab will open the form but it may cause the SQM to close
PV Testing SpeCla Tool Trial HistoryPQCT
Forms - Blank
Clicking on a black tab will open the form, but it may cause the SQM to close.
To open or download this form inside the manual, please return to the Forms Screen (page 3) and follow the instructions.
IPPAAR Form**
IPPAAR Operation Standard
IPP Tag**
IPP Tag Operation Standard
IPPAAR/IPP Forms
Click on a tab to select
** IPPAAR and IPP forms are created in the Honda Supply Team Portal / Change Point Control Application.
Tag Standard
vc037429Typewritten Text Initial Production Parts Quality Assurance Declaration
-
Supplier Quality Manual
Main Screen
CoverPage
Table of Contents Forms
New Model
General Information
Mass Production
Reference SQM Master ListQuality Control Regulations and Minimum Quality System Requirements04-01-2016 Revision
Information
Market
CountryRegulations
Forms5P CRF IPPAAR/IPP
Inspection Fixture
Lot Control and Traceability PAC-VData MPR
Tool Trial
WARNING Clicking on a black tab will open the form but it may cause the SQM to close
PV Testing SpeCla Tool Trial HistoryPQCT
Forms - Blank
Clicking on a black tab will open the form, but it may cause the SQM to close.
To open or download this form inside the manual, please return to the Forms Screen (page 3) and follow the instructions.
LNDD- Blank and Operation Standard
Lot Control Notification Example
Process Display Form (PDF) -Blank and Op Std.
Lot Control and Traceability
Click on a tab to select
pp p
vc037429Typewritten Text Initial Production Parts Quality Assurance Declaration
-
Supplier Quality Manual
Main Screen
CoverPage
Table of Contents Forms
New Model
General Information
Mass Production
Reference SQM Master ListQuality Control Regulations and Minimum Quality System Requirements04-01-2016 Revision
Information
Market
CountryRegulations
Forms5P CRF IPPAAR/IPP
Inspection Fixture
Lot Control and Traceability PAC-VData MPR
PV Testing SpeCla Tool Trial HistoryPQCT
Forms - Blank
WARNING Clicking on a black tab will open the form, but it may cause the SQM to close. To open or download this form inside the manual, please return to the Forms
Screen (page 3) and follow the instructions.
History
MPR Checksheets (MPR Matrix)Casting Injection Molding
Label
Torque
WeldFl id Fill
Part Marking
Heat Treatment
Hot Plate Welding
Label
Machining
Painting
Printed Circuit Board Sonic / Ultrasonic /
Vibration / Friction Welding
Stamping
WeldFluid Fill
Error Proofing
Note the MPRs linked here are the most current version and must be used for the next
Wire Harness
Click on a tab to select
Note the MPRs linked here are the most current version and must be used for the next Request For Quote (RFQ). They must also be applied when the supplier has a part issue
that the MPR will countermeasure.
MPR Procedure Leak Test
vc037429Typewritten Text Initial Production Parts Quality Assurance Declaration
-
Supplier Quality Manual
Main Screen
CoverPage
Table of Contents Forms
New Model
General Information
Mass Production
Reference SQM Master ListQuality Control Regulations and Minimum Quality System Requirements04-01-2016 Revision
Information
Market
CountryRegulations
Forms5P CRF IPPAAR/IPP
Inspection Fixture
Lot Control and Traceability PAC-VData MPR
Tool Trial
WARNING Clicking on a black tab will open the form but it may cause the SQM to close
PV Testing Tool Trial HistoryPQCT
Forms - Blank
Clicking on a black tab will open the form, but it may cause the SQM to close.
To open or download this form inside the manual, please return to the Forms Screen (page 3) and follow the instructions.
PV Testing and PV Testing Risk Analysis Form
PV Testing Risk Analysis Numbered (matches the Operation Standard)
PV Testing Risk Analysis Blank
Click on a tab to select
PV Testing Schedule and Results Summary Form Operation Standard
PV Testing Blank and Numbered (matches the Operation Standard)
SpeCla
vc037429Typewritten Text
vc037429Typewritten Text Initial Production Parts Quality Assurance Declaration
-
Supplier Quality Manual
Main Screen
CoverPage
Table of Contents Forms
New Model
General Information
Mass Production
Reference SQM Master ListQuality Control Regulations and Minimum Quality System Requirements04-01-2016 Revision
Information
Market
CountryRegulations
Forms5P CRF IPPAAR/IPP
Inspection Fixture
Lot Control and Traceability PAC-VData MPR
Tool Trial
WARNING Clicking on a black tab will open the form but it may cause the SQM to close
PV Testing SpeCla Tool Trial HistoryPQCT
Forms - Blank
Clicking on a black tab will open the form, but it may cause the SQM to close.
To open or download this form inside the manual, please return to the Forms Screen (page 3) and follow the instructions.
SpeCla Forms
Electrode Review - Blank
Texture Indication Map (TIM) - Blank and Op Std.
Click on a tab to select
Appearance Part and Tool Detail
vc037429Typewritten Text Initial Production Parts Quality Assurance Declaration
-
Supplier Quality Manual
Main Screen
CoverPage
Table of Contents Forms
New Model
General Information
Mass Production
Reference SQM Master ListQuality Control Regulations and Minimum Quality System Requirements04-01-2016 Revision
Information
Market
CountryRegulations
Forms5P CRF IPPAAR/IPP
Inspection Fixture
Lot Control and Traceability PAC-VData MPR
Tool Trial
WARNING Clicking on a black tab will open the form but it may cause the SQM to close
PV Testing SpeCla Supply Tool Trial HistoryPQCT
Forms - Blank
Clicking on a black tab will open the form, but it may cause the SQM to close.
To open or download this form inside the manual, please return to the Forms Screen (page 3) and follow the instructions.
Supply Part Forms
Click on a tab to select
Standard
vc037429Typewritten Text Initial Production Parts Quality Assurance Declaration
-
Supplier Quality Manual
Main Screen
CoverPage
Table of Contents Forms
New Model
General Information
Mass Production
Reference SQM Master ListQuality Control Regulations and Minimum Quality System Requirements04-01-2016 Revision
Information
Market
CountryRegulations
Click on a tab to select
-
Supplier Quality Manual
Main Screen
Quality Control Regulations and Minimum Quality System Requirements
CoverPage
Table of Contents Forms
New Model
General Information
Mass Production
Reference SQM Master List 04-01-2016 Revision Information
Market
CountryRegulations
F t G t S li Q lit
General Information
Factory Guest Engineer
Supplier Quality Performance Rating
Click on a tab to select
-
Supplier Quality Manual
Main Screen
CoverPage
Table of Contents Forms
New Model
General Information
Mass Production
Reference SQM Master ListQuality Control Regulations and Minimum Quality System Requirements04-01-2016 Revision
Information
Market
CountryRegulations
New ModelBar Code Standard CRF Data
Limit Sample
Inspection Fixture Design
Master Sample Part Part Maturation Part QualityNM Receiving
Gloss Meter Correlation Requirements
Master Sample Development MPR
Part Approval
Part Maturation Expectations
Part Quality Standard PFMEA
PQCT PV Testing SAP SpeCla TPR Traceability and Lot Control
PAC-VNM Receiving Inspection
Click on a tab to select
-
Supplier Quality Manual
Main Screen
CoverPage
Table of Contents Forms
New Model
General Information
Mass Production
Reference SQM Master List 07-01-2015 Revision InformationQuality Control Regulations and
Minimum Quality System Requirements
Market
CountryRegulations
New Model
Bar Code Standard CRF Data
Limit Sample
Inspection Fixture Design
Master Sample Part Part Maturation Part QualityNM Receiving
Gloss Meter Correlation Requirements
Master Sample Development MPR
Part Approval
Part Maturation Expectations
Part Quality Standard PFMEA
PQCT PV Testing SAP SpeCla TPR Traceability and Lot Control
PAC-VNM Receiving Inspection
MPR ProceduresMPR ProcedureLink to MPR Checksheet Page
Note the MPRs linked here are the most current version and must be used for the next Request For Quote (RFQ). They must also be applied when the supplier has a part issue
that the MPR will countermeasure.
Click on a tab to select
-
Supplier Quality Manual
Main Screen
CoverPage
Table of Contents Forms
New Model
General Information
Mass Production
Reference SQM Master List 04-01-2016 Revision InformationQuality Control Regulations and
Minimum Quality System Requirements
Market
CountryRegulations
New ModelBar Code Standard CRF Data
Limit Sample
Inspection Fixture Design
Master Sample Part Part Maturation Part QualityNM Receiving
Gloss Meter Correlation Requirements
Master Sample Development MPR
Part Approval
Part Maturation Expectations
Part Quality Standard PFMEA
PQCT PV Testing SAP SpeCla TPR Traceability and Lot Control
PAC-VNM Receiving Inspection
PV TestingPV Testing Procedure PV Test Risk Analysis Form Guidelines
Click on a tab to select
-
Supplier Quality Manual
Main Screen
CoverPage
Table of Contents Forms
New Model
General Information
Mass Production
Reference SQM Master List 04-01-2016 Revision InformationQuality Control Regulations and
Minimum Quality System Requirements
Market
CountryRegulations
New ModelBar Code Standard CRF Data
Limit Sample
Inspection Fixture Design
Master Sample Part Part Maturation Part QualityNM Receiving
Gloss Meter Correlation Requirements
Master Sample Development MPR
Part Approval
Part Maturation Expectations
Part Quality Standard PFMEA
PQCT PV Testing SAP SpeCla TPR Traceability and Lot Control
PAC-VNM Receiving Inspection
Forms - Blank
WARNING Clicking on a black tab will open the form, but it may cause the SQM to close.
To open or download this form inside the manual, please return to the Forms Screen (page 3) and follow the instructions.
SAP (Specified Action Plan) SAP Procedure SAP ExampleSAP Components
Click on a tab to select
pp
-
Supplier Quality Manual
Main Screen
CoverPage
Table of Contents Forms
New Model
General Information
Mass Production
Reference SQM Master List 04-01-2016 Revision InformationQuality Control Regulations and
Minimum Quality System Requirements
Market
CountryRegulations
New ModelBar Code Standard CRF Data
Limit Sample
Inspection Fixture Design
Master Sample Part Part Maturation Part QualityNM Receiving
Gloss Meter Correlation Requirements
Master Sample Development MPR
Part Approval
Part Maturation Expectations
Part Quality Standard PFMEA
PQCT PV Testing SAP SpeCla TPR Traceability and Lot Control
PAC-VNM Receiving Inspection
SpeCla Minimum Tooling Specifications f S Cl P tSpeCla Procedure for SpeCla PartsSpeCla Procedure
Click on a tab to select
-
Supplier Quality Manual
Main Screen
CoverPage
Table of Contents Forms
New Model
General Information
Mass Production
Reference SQM Master List 04-01-2016 Revision InformationQuality Control Regulations and
Minimum Quality System Requirements
Market
CountryRegulations
Change Point Control(IPPAAR / IPP)
Honda Supply Parts Trouble Controlled
5P
Mass Production
Gloss Meter Correlation
Index System
Nonconforming Product
pp yManagement (DSPS/JSPS)Containment
IdentificationControl
Sort LabelRequirements
Minimum Test Requirements (MTR)
Non-Destructive Testing (NDT) Requirements
Click on a tab to select
-
Supplier Quality Manual
Main Screen
CoverPage
Table of Contents Forms
New Model
General Information
Mass Production
Reference SQM Master List 04-01-2016 Revision InformationQuality Control Regulations and
Minimum Quality System Requirements
Market
CountryRegulations
Mass ProductionChange Point Control
(IPPAAR / IPP)
Honda Supply Parts Trouble Controlled Sort
5P
Gloss Meter Correlation
Index System
Regular Lot Control
Nonconforming Product
Management (DSPS/JSPS)Containment
IdentificationControl
Label Requirements
Minimum Test Requirements (MTR)
Non-Destructive Testing (NDT) Requirements
Supply Parts (DSPS/JSPS)DSPS Flow
JSPS Flow
Honda Supply Parts Trouble Management Flow FlowTrouble Management
Click on a tab to select
-
Supplier Quality Manual
Main Screen
CoverPage
Table of Contents Forms
New Model
General Information
Mass Production
Reference SQM Master List 04-01-2016 Revision InformationQuality Control Regulations and
Minimum Quality System Requirements
Market
CountryRegulations
Mass ProductionChange Point Control
(IPPAAR / IPP)
Honda Supply Parts Trouble M t (DSPS/JSPS)
Controlled C t i t S t L b l
5P
Gloss Meter Correlation R i tl
Index System
Regular Lot Control
Nonconforming Product
Management (DSPS/JSPS)Containment
IdentificationControl
Sort Label Requirements
Minimum Test Requirements (MTR)
Non-Destructive Testing (NDT) Requirements
Minimum Test Requirements (MTR)MTR
SRS AssembliesMTR
ProcedureMTR Suspension
Damper AssembliesMTR Electro Mechanical and
Mechanical AssembliesMTR Electronic
Assemblies
Click on a tab to select
-
Supplier Quality Manual
Main Screen
CoverPage
Table of Contents Forms
New Model
General Information
Mass Production
Reference SQM Master List 04-01-2016 Revision InformationQuality Control Regulations and
Minimum Quality System Requirements
Market
CountryRegulations
Market Related Mass Production Procedures
Ch P i t C t l I d N f iC t ll d El t i
Market
Change Point Control(IPPAAR / IPP)
Index System
Nonconforming Product
Controlled Containment
ElectronicSort Label5P MTR
Challenge Quality (CQ) Process Overview
Click on a tab to select
-
Supplier Quality Manual
Main Screen
CoverPage
Table of Contents Forms
New Model
General Information
Mass Production
Reference SQM Master List 04-01-2016 Revision InformationQuality Control Regulations and
Minimum Quality System Requirements
Market
CountryRegulations
Reference
Acronyms and Definitions
HSQM Continuous Improvement Flow
Supplier Part SchedulePlantCodes
Click on a tab to select
-
Supplier Quality Manual
Main Screen
CoverPage
Table of Contents Forms
New Model
General Information
Mass Production
Reference SQM Master List 04-01-2016 Revision InformationQuality Control Regulations and
Minimum Quality System Requirements
Market
CountryRegulations
Country Regulations
China Compulsory Certification (CCC)
Click on a tab to select
-
Supplier Quality Manual Table of Contents
HSQM-TOC Page 1/4 07/01/2015
Forms (Blank Form, Completion Operation Standards and Examples)
5P (5 Principles for Problem Solving) CRF (Countermeasure Request Form)
Data Sheets Inspection Data Receiving Inspection Data Regulation Data Inspection Fixture
Gage R&R Worksheet Long Method Gage R&R Worksheet Short Method Supplier Inspection Fixture Concept Supplier Inspection Fixture IPPAAR/IPP (Initial Production Parts Advance Approval Request/ Initial Production Parts) IPPAAR IPP Tag Lot Control and Traceability LNDD (Lot Number Display Detail) LNDD Operation Standard Lot Control Notification Example PDF (Process Display Form) MPR (Minimum Process Requirements) Checksheets Casting Error Proofing Fluid Fill Heat Treatment Hot Plate Welding Injection Molding Label Machining Painting Part Marking PCB Sonic / Vibration / Friction Welding Stamping
Torque Weld Wire Harness PAC-V (Process Assurance Capability Verification) SheetLeak Test
MA04922Text Box Main Menu Previous Menu
-
Supplier Quality Manual Table of Contents
HSQM-TOC Page 2/4 07/01/2015
Forms (Blank Form, Completion Operation Standards and Examples) (continued)
PV (Part Validation) Testing PV Testing Blank and Numbered PV Testing Risk Analysis PV Testing Schedule and Results Summary Form Operation Standard Styling Parts Guideline (SpeCla) Electrode Review Texture Indication Map Tool Trial History Sheet
General Information FGE (Factory Guest Engineer)
Supplier Quality Performance Rating
New Model Bar Code Standard CRF (Countermeasure Request Form)
Data E-Requirements Gloss Meter Correlation Requirements
Inspection Fixture Design Guideline Limit Sample Master Sample Development Minimum Process Requirements Procedure New Model Receiving Inspection PAC-V (Process Assurance Capability Verification) Part Approval Part Maturation Expectations Part Quality Standard PFMEA (Process Failure Mode and Effect Analysis) PQCT (Process Quality Control Table) PV (Part Validation) Testing PV (Part Validation) Testing Procedure PV Test Risk Analysis Form Guidelines
SAP (Specified Action Plan) SAP Components SAP Procedure SAP Example
PFMEA (Process Failure Mode and Effect Analysis) PFMEA Operation Standard PQCT (Process Quality Control Table)
MA04922Text Box Main Menu Previous Menu
-
Supplier Quality Manual Table of Contents
HSQM-TOC Page 3/4 07/01/2015
Mass Production
5P (5 Principles for Problem Solving) Change Point Control (IPPAAR/IPP) Controlled Containment Sort Label Forms Ordering IPP and Lot Control Gloss Meter Correlation Requirements Honda Supply Parts Trouble Management Honda Supply Parts Trouble Management DSPS Flow JSPS Flow Identification Control Index System
MTR (Minimum Test Requirement) MTR (Minimum Test Requirement) Procedure Minimum Test Requirements Electro-Mechanical and Mechanical Assemblies Minimum Test Requirements Electronic Assemblies Minimum Test Requirements SRS Assemblies Minimum Test Requirements Suspension Damper Assemblies Nonconforming Product Non-Destructive Testing (NDT) Requirements
Market
Challenge Quality (CQ) Process Overview Quality Control Regulations and Minimum Quality System Requirements
Quality Control Regulations and Minimum Quality System Requirements Procedure Corrective Action System Operation Standards, Training, and Process Job Qualification Process Control Change Point Control Supplier Management Lot Control and Traceability Inspection, Test, and Calibration Suspect and Nonconforming Part and Abnormal Process Organization Quality Systems and Policies Preventive Maintenance
New Model (continued) SpeCla
SpeCla Procedure Minimum Tooling Specifications for SpeCla Parts
TPR (Technical Part Review) Traceability and Lot Control
MA04922Text Box Main Menu Previous Menu
-
Supplier Quality Manual Table of Contents
HSQM-TOC Page 4/4 07/01/2015
Acronyms and Definitions
HSQM Continuous Improvement Flow
Supplier Part Schedule (SPS) Procedure
Main Menu Previous Menu Language Screen
Plant Codes
Country Regulations
China Compulsory Certification (CCC)
Reference
MA04922Text Box Main Menu Previous Menu
-
Technical Part Review ______________________________________________________________________________
HSQM-0052
Background The Technical Part Review is an enhanced version of the part maturation
process. The target for these reviews are to reduce the amount of market claims that have resulted from the plant and supplier not properly identifying the critical control points from the designers perspective. The overall concept is to identify all of the critical control points from the design and confirm they have been guaranteed through the suppliers process quality control plan. This can be confirmed through capability studies, poka-yokes in place, QA equipment, etc.
Scope The scope of the Technical Part Review is divided into three phases that
cover the development timeframe of a new model project.
No. Phase Who Objective
1
Design and Process Planning Review
Honda Plant Quality, Supplier, R&D and other support groups
Understand the technology parts and processes Identify part and process change points Review past problem history (PPH) items Understand critical part/CBU characteristics Identify critical control points Develop process control plan
2 Process Maturation Verify critical control points Participate in tool/equipment trials
3
Process Verification and Stabilization
Confirm parts meet specification Confirm process capability Investigate and summarize path forward for any
non-confirming product produced Verify process stability Feedback/countermeasure market concerns
Part Selection Hondas new model management team selects the parts that are evaluated.
Part selection is based on, but not limited to the following criteria: New model part rank New supplier to Honda New technology/feature
New material New manufacturing process New system
High warranty Supplier black box design Suppliers are notified at the beginning of the project if their parts are selected for a technical part review.
MA04922Text Box Main Menu Previous Menu
-
Technical Part Review ______________________________________________________________________________
HSQM-0052
Timing and
Reviews At the beginning of each project, the Honda new model team reviews the project schedule and determines the timing for the three phases, and when each review will occur. The Technical Part Review timing aligns with and feeds into the suppliers New Model Review (NMR). A document detailing part number(s) and Technical Part Review specifics for the project will be sent to suppliers selected for TPR activity.
General Activity Details
The following table may be used as a general guideline for new model development activities applied to a part selected for TPR.
TPR Phase 1 2 3
Design & Process Planning Review Process Maturation Process Verification & Stabilization
Cat
egor
y
Des
ign
Stud
y/Pa
rt
Acc
urac
y
Review part DCS, part concept or data/drawing for change points and concerns
Review past development history Design/usage intent CCPs & datum structure Review/Submit CRFs as needed Inspection fixture concept review
Review design changes and CRFs made since TPR-1
Confirm D/C tracking Update CCPs as needed based on any
change points Review event part accuracy Confirm inspection fixture meets
requirements
Review design changes made since TPR-2
Review trial event data and part approval
Confirm inspection fixture meets requirements
Determine MP readiness
Proc
ess
Dev
elop
men
t
DFMEA/FTA > PFMEA correlation Confirm appropriate equipment
controls are planned Review PACV/PPH items Confirm sub-supplier development
requirements and strategy Trial event process and part data plan
All concerns that could not be designed out have process controls in place
PQCT complete & ready for use Confirm PACV items Trial event data requirements are
clear Sub-supplier development on track
Confirm PACV results Confirm PFMEA, PQCT, Operation
Standards, and Actual Process match Confirm process readiness for MP Review sub-supplier development
results
PV T
est
Plan
DV test status and results PV test plan review Joint testing plan in place
Confirm plan still captures all requirements
PV test status and timing review Joint testing status and results
Review PV test results, regulation items, certification reports
If needed, confirm risk assessment details
Joint testing results
Tra
ce-
abili
ty Traceability expectations are clear
Critical data for each process identified
System requirements understood
Traceability system in place Control method meets requirements LNDD complete
Confirm traceability results
MA04922Text Box Main Menu Previous Menu
-
Supplier Quality Performance Rating
HSQM-0010
Background Honda Purchasing and/or Quality groups go through the process of measuring suppliers' quality performance. This process has two parts - forming the ratings and Honda subsequent actions. Note - this is the "Q" rating in Honda's SQCDM process for the maker layout selection process.
Forming the Ratings
The table below shows how the ratings are formed.
Stage Description
1
IPM$ (Index Per Million Dollars of Parts Received) is calculated using this formula Dollar Value of Parts Received = Purchased Value - Honda Supplied Parts Value QIPM$ = Quality Index / Dollar Value of Parts Received X 1,000,000 W$PM$= WRP + CQ + Recall + PUD divided by sales multiplied by 1,000,000
2
Suppliers are grouped into type categories
AP - Assembler/Painter/Processor CA - Casting CC - Complex Component CS - Complex Stamping EL - Electrical F - Fasteners FF Forged/Formed MC - Machining PA - Plastic Appearance PNA - Plastic Non-Appearance R - Rubber SC - Simple Component SS - Simple Stamping ST - Soft Trim
Note Each supplier is assigned a commodity/category by CPG. Each supplier is placed in one category only. The category placement is by the six-digit supplier number.
MA04922Text Box Main Menu Previous Menu
-
Supplier Quality Performance Rating
HSQM-0010
Stage Class Ranking calculation Description
3
QIPM$ Calculate the average QIPM$ for each category Better than half the average - tend to be Class 1 Worse than twice the average - tend to be Class 3 WIPM$ Warranty Index divided by sales multiplied by 1,000,000 Warranty Index class ranking. < half the mean is a class 1, = or > half of mean but
not to exceed 2X mean is a class 2, > two times the mean is a class 3 W$PM$ Warranty dollars recovered (CQ+WRP+ Recall + PUD) divided by sales multiplied
by1,000,000 Warranty $ class ranking. $0 = Class 1, = or < mean Class 2, > mean class 3 Supplier warranty class rank will be the worst of the two, WIPM$ or W$PM$ Note - it is possible for a category to have all suppliers rated as the same class.
4
Honda management reviews the supplier's quality and warranty performance for the last 12 months. Honda senior management may change a supplier's rating based on actual performance (e.g. move from a class 2 to class 3). Performance factors include Failure to meet Minimum Process Requirements (MPR) Response speed Cooperation Total impact Other (e.g. NM development)
5 Purchasing makes final approval of the rating list and distributes to purchasing and quality departments throughout Honda.
MA04922Text Box Main Menu Previous Menu
-
Supplier Quality Performance Rating
HSQM-0010
Honda Subsequent Actions
Honda uses the supplier quality and warranty performance rating information to make decisions to initiate supplier improvement actions. Decisions to initiate actions are based on available information and management judgment. Actions are initiated by individual Honda facilities as appropriate. PH Division also considers Delivered Quality and Warranty supplier class ranking when awarding business. Class 1 - consider primary for additional business Class 2 - consider for continued business. Requires additional
documentation for expanding business. Class 3 - consider for reduction in business. Requires documented
justification for continued or increased business. Negotiate fundamental business system improvements and resources.
MA04922Text Box Main Menu Previous Menu
-
Supplier Part Schedule (SPS)
HSQM - Reference
Background Suppliers are responsible to document and communicate NM part development schedules to Honda PH. This is required for all new or changed parts that apply from the launch of a new model.
Responsibilities Honda PH communicates the project requirements to the supplier, coordinates
supplier feedback, evaluates supplier feedback against the NM project targets and negotiates any necessary schedule adjustments. Suppliers complete and submit the schedules according to the requirements.
Two Documents
The SPS is comprised of two documents. Tool Summary Sheet Summarizes the critical path lead time for a purchased part Identifies high level change points to tooling, equipment and process Tracks the impact of each design change on tool maturation - by event Note - Honda PH issues a project specific version of the tool summary sheet for each NM project Gantt Chart Summarizes, in detail, all activities the supplier undertakes to ensure the
timely development of a part Content requirements - The schedule must explain plan vs. actual activity
for each exclusive tool, piece of equipment, process and testing associates with the part. Honda PH provides a summary of development targets via the NMR process. Ideally the supplier's schedule incorporates all the NMR items.
The format is flexible. However, Honda PH suggests suppliers use Microsoft Project to create the Gantt chart.
Timing A completed SPS is due from the supplier to the responsible Honda PH (NM)
contact within 14 calendar days of the tool release Within 14 calendar days of receiving a new drawing or data - in order to
quickly communicate the impact of each design change Once per month after tooling release until the part receives full approval
from Honda PH - in order to report the progress of the part's development
MA04922Text Box Main Menu Previous Menu
-
Supplier Part Schedule (SPS)
HSQM - Reference
Tooling Terms The list below explains Honda's tooling terms
Term Explanation
Go 1-1 Honda PH's authorization for the supplier to begin tool design
Go 1-2 Honda PH's authorization for the supplier to purchase long lead raw material for a tool OR to begin rough cutting Go 2-2 Honda PH's authorization for the supplier to begin tool manufacture
MP In part maturation codes this code indicates the part's tooling and production process are MP ready
Related Documents and Activities
The table below lists related documents and activities
Document /
Activity Description
Design Change Instruction Sheet
A document issued with each design change from the Final Prototype Drawing issue that authorizes the supplier to implement a design change within a specified timeframe. The supplier pulls information from the Design Change Instruction Sheet, in order to complete the design change impact to tooling section of the Tool Summary Sheet.
NMR
A process by which Honda PH reviews the development progress of select suppliers to ensure that the project is progressing satisfactorily. Suppliers are selected for reviews based on a calculated part rank. S and A rank part suppliers are required to present a SAP as part of the NMR process.
Start-up Plan
A document issued by Honda PH prior to event order activity that communicates general event requirements and timing. In early development, the supplier uses the delivery date information from the Start-up plan to establish the tool maturation plan, for each event, on the Tool Summary Sheet
Supplier NM Development Status Summary Sheet
A document used in the NMR process to report the suppliers progress for each part against measurable project targets. The targets established on this form for each model drive the SPS Gantt chart content.
Tool Maturation Definitions
A document that explains what tooling and process criteria a part must meet in order to satisfy a specific maturation code (can be found in the appendix of this manual).
Tool Release A process by which Honda PH authorizes suppliers to proceed with tooling and equipment development. The information the supplier provides on the Tool Summary Sheet is used to determine the tool release requirement for each part.
Trial Matrix
A document issued by Honda PH to suppliers during the event order phase to communicate detailed trial event requirements and timing. Later in development, the supplier refers to the Trial Matrix to establish the supplier tool maturation plan for each event, on the Tool Summary Sheet.
MA04922Text Box Main Menu Previous Menu
-
This page intentionally left blank
MA04922Text Box Main Menu Previous Menu
-
This page intentionally left blank
MA04922Text Box Main Menu Previous Menu
-
06/03/02HSQM - Reference 1
PROGRESS TRACKINGGANTT CHART
ID Task Name Baseline D Baseline Sta Baseline Fin1 4 DOOR TRIALS 0 wk Wed 8/15 Wed 8/152 2 DOOR TRIALS 0 wk Wed 8/15 Wed 8/153 SPEC. MATURATION 1 wk Wed 8/15 Tue 8/21/4 Design/Specification 1 wk Wed 8/15 Tue 8/215 TOOLING 26 wk Wed 8/15 Tue 2/12/6 Tooling #1 - 2 molds 4 cavity 18.4 wk Wed 8/15 Thu 12/207 Go-1 to Go-2 3 wks Wed 8/15 Tue 9/4/8 Tool design 3 wk Wed 8/15 Tue 9/4/9 Raw Material order 3 wk Wed 8/15 Tue 9/4/10 G0-2 to T1 13.4 wk Wed 9/5/ Thu 12/6/11 Cut Die Holder 25 day Wed 9/5/ Tue 10/912 Cut Electrode 10 day Wed 9/5/ Tue 9/1813 CMM Carbon Electrode 2 day Wed 9/19 Thu 9/2014 EDM Cavity 4 day Fri 9/21/ Wed 9/2615 CMM Cavity 2 day Thu 9/27 Fri 9/28/16 Finish Die cutting ~ Polish / 4 day Mon 10/1 Thu 10/417 Make / install cores and slid 10 day Fri 10/5/ Thu 10/1818 Polish die 6 day Fri 10/19 Fri 10/2619 Install water / electric lines 4 day Mon 10/29 Thu 11/120 Try 1 da Fri 11/2/ Mon 11/521 T1 - T3 2 wks Fri 12/7/ Thu 12/2022 Part Accuracy changes 1 wk Tue 11/6 Mon 11/1223 Process changes 1 wk Tue 11/13 Mon 11/1924 Boat Ship tool from Japan 4 wk Tue 11/20 Mon 12/1725 Set up 1 wk Tue 12/18 Wed 12/1926 Try 2 day Thu 12/20 Thu 12/2027 T-3 to T-4 3.4 wk Mon 1/21/ Tue 2/12/
8/15
8/15
mit CRF
G0-1
G0-2 T1
d/c R4Y-2-1234 Delayed go 2 by 2 weeks.
expedite to make up for late Go-2
expedite to make up for late Go-2
expedite to make up for late Go-2
T3
T4
EG UF-1 Dankaku QC
29 5 12 19 26 2 9 16 23 30 7 14 21 28 4 11 18 25 2 9 16 23 30 6 13 20 27 3 10 17 24 3 10 17 24 31 7 14 21 28 5 12 19 26 2 9 16 23 30August September October November December January February March April May June Jul
Milestones
Plan vs Actual
% Progress Completion
Task from Job Tree
Example
MA04922Text Box Main Menu Previous Menu
-
SpeCla
HSQM-0075 Page 1/4 04/01/15
Purpose Develop tooling that will be used to manufacture appearance parts
Scope Outline the steps required to input essential information and track status
of appearance part tooling maturation.
IS this a SpeClapart?
End of ProcessNo
Complete steps 1-4
Does this part
require texture?
Yes
No End of Process
Yes
Complete steps 5-8 End of Process
Forms Appearance Part Tooling Detail (APTD)
Texture Indication Map (TIM).
Reference Document
Minimum Tooling Specifications for SpeCla Parts.
MA04922Text Box Main Menu Previous Menu
-
SpeCla
HSQM-0075 Page 2/4 04/01/15
Step 1 Honda will determine the list of SpeCla parts.
Step 2 For each designated SpeCla part, the supplier must adhere to the Minimum
Tooling Specifications for tooling development. Deviations from the Minimum Tooling Specifications must be negotiated with Honda.
Step 3 Determine if Honda part will require an APTD Form
The drawing and / or Honda will determine if part is a Specla Part that will require the supplier to fill out an APTD.
a) If No Process Complete b) If Yes Supplier / Honda must complete the procedure and
workflow for appearance part development. Submit APTD Document to Honda.
Step 4 Appearance Part Tooling Detail (APTD) Completion
Honda notifies the supplier of specla parts that require an APTD.
The supplier completes the APTD as required and submits to Honda no later than the due date.
Honda quality rep reviews the APTD for the required content and either accepts or rejects the document.
Accept : If the document is accepted, the Honda Quality Rep will sign the document and notify the supplier Reject: If the document is rejected, it will be returned to the supplier with the concerns outlined. The supplier is responsible to update the document with the required changes and resubmit to Honda within 3 working days.
___________________________________________________________________________________________
Step 5 Determine if part will require texture
The drawing and / or Honda will determine if part is a texture part.
a.) If No Process complete b.) If Yes Supplier / Honda must complete the procedure and
workflow for texture development
MA04922Text Box Main Menu Previous Menu
-
SpeCla
HSQM-0075 Page 3/4 04/01/15
Step 6
Texture Indication Map Completion Honda notifies the suppliers of texture parts that require a
TextureIndication Map (TIM)
The supplier completes the TIM as required and submits to Honda no later than the due date. Grain orientation is dictated by Honda.
Honda Quality Rep reviews the TIM for the required content and either accepts or rejects.TIM
Accept: If the document is accepted, the Honda Quality Rep will notify the supplier. Reject: If the document is rejected, it will be returned with the concerns outlined and the supplier is responsible to update with the required changes and re-submit to Honda no later than 3 days from the document being rejected.
The supplier provides a T-3 level part and TIM to the specified texture source. The texture source will fill in the detail of the TIM and mark the T-3 part with grain depth and direction per the surface condition drawing or 3D Annotation, and draft analysis. The TIM and marked part are reviewed and approved by Honda, supplier and texture source indicating agreement with content of map and marked part.
Step 7
Texture Go - A T3 part is submitted to Honda to be reviewed for Texture Go . Accept : Honda notifies the supplier the part has texture go. The signed / approved TIM forTexture Go is sent to the tier 1 part who then facilitates the tool texture activity.
Reject: If the T3 part is rejected, the Honda Quality Rep. notifies the supplier with the concern items. The supplier must submit another part with the concerns counter measured to meet the required MP quality maturation level
MA04922Text Box Main Menu Previous Menu
-
SpeCla
HSQM-0075 Page 4/4 04/01/15
Step 8
Texture Approval The tool is textured and sample parts are run at rate in the mass production equipment / location. The supplier will submit a T4 Level partfor each cavity for texture approval by Honda Quality rep. The part will also be reviewed at the CBU color / texture / gloss harmony review meeting with Honda Styling associate at Honda Specified event timing.
Accept: If the T4 part is acceptable, then the Honda Quality Rep. will notify the supplier that their part has texture approval with a signed TIM
The approved texture map is sent to the supplier and a copy is put into the part file. Reject: If the T4 part is rejected, the Honda Quality Rep. notifies the supplier with the concern items. The supplier must submit another improved part with the concerns items counter measured to meet the required MP quality maturation level
Note Honda sites may require additional detail.
MA04922Text Box Main Menu Previous Menu
-
Specified Action Plan (SAP)
HSQM-0015 Page 1/1 06/03/02
Background The SAP is used to Establish goals Break the goals into tasks or jobs Define when to do the tasks Assign responsibility for completing tasks Track and evaluate progress of each step
Application Although used primarily for New Model development activity the SAP
concept can be used for any activity that requires a schedule to achieve a defined goal. The complexity of the SAP will of course vary from project to project.
Requirement Suppliers are required to create a SAP for each new model project. Based on
part rank and each plants requirements; suppliers may be required to periodically submit the SAP to Honda for review.
Format Honda does not have a specific format for the SAP. Honda does however
require that certain components be a part of whatever new model development process a supplier uses. Goal setting Job tree Progress tracking Organization Evaluation process SAP within the supplier's organization The following pages contain reference material explaining the components of the SAP process.
MA04922Text Box Main Menu Previous Menu
-
06/03/02HSQM-0016 1
Components of the Specified Action Plan ProcessJOB TREE: (why, how, what) PROGRESS TRACKING: (what, who, when)
ORGANIZATION:
APQP DEFICIENCY:
EVALUATION PROCESS: SAP WITHIN THE SUPPLIER ORG:
EVIDENCE JUSTIFYING STATUS: VISUAL MANAGEMENT AND REPORTING:
Q
Dev
Del
Model QCDDM
Supplier Goals
Supplier S/A
InterimTargets
ActivityThemes Tasks
Create Gantt chart based on job tree breakdown of tasks:
Plan:
Actual:
T1 T2 T3
T1 T2 T3
Go-2
Go-2
HP LZUAYZ
Honda03M
Eng Qlty Mfg P.C.
Top Mgmt
Project Leader
Resp. Dept.
Resp.Assoc.
Guided by NMR Interim TargetsGuarantee execution of SAPConduct a pre Honda NMR evaluationTop Management evaluate; use P-D-C-A approachDocument supplier top management comments from pre reviewControl Gap; make countermeasure plan; forecast next event situationState readiness to Honda - should not ask Are We Ready?Utilize go/no go judgment criteria at each stage (outside of NMR as well)
Top Management criteria: provide the vision, decision maker, allocates resource, etc.Dedicated New Model resources should be considered if past new model start-up performance did not meet plan
Goals not linked to tasksDoesnt require progress management. Only requires management to milestones.
Wall chart with green, yellow, red status or on-line system Visual mgmt not possible if project mgmt system is only on-lineInvolve all members of new model organization in the report to Honda. Use the expert.
ClearR&R
Daily new model management documents at the supplier should be used for justification of status; or a review of the actual situation.Organized to support an efficient presentation. (not audit style, pre-prepared report style)
Pres/VP
PL
Eng Qlty Mfg PC
Track plan vs actualMonitor % completion
Evaluate at milestones(Interim Targets)
Assoc.
Schedule based on Honda New Model Project requirements
GOAL SETTING:Honda
SQCDDMProject Goals
Supplier previous model reflections
Supplier personalized project goals
SpecificMeasurableAttainableRelevantTime Bound
HondaProject Schedule& Requirements
SAP FORMAT:Honda is not dictating a specific style of SAP, but these components must be part of your project management process.
MA04922Text Box Main Menu Previous Menu
-
06/03/02HSQM-0016 2
SAP FORMAT:Honda is not dictating a specific style of SAP, but these components must be part of your project management process.
JOB TREE: (why, how, what) PROGRESS TRACKING: (what, who, when)
ORGANIZATION:
APQP DEFICIENCY:
EVALUATION PROCESS: SAP WITHIN THE SUPPLIER ORG:
EVIDENCE JUSTIFYING STATUS: VISUAL MANAGEMENT AND REPORTING:
Q
Dev
Del
Model QCDDM
Supplier Goals
Supplier S/A
InterimTargets
ActivityThemes Tasks
Create Gantt chart based on job tree breakdown of tasks:
Plan:
Actual:
T1 T2 T3
T1 T2 T3
Go-2
Go-2
HP LZUAYZ
Honda03M
Eng Qlty Mfg P.C.
Top Mgmt
Project Leader
Resp. Dept.
Resp.Assoc.
Top Management criteria: provide the vision, decision maker, allocates resource, etc.Dedicated New Model resources should be considered if past new model start-up performance did not meet plan
Goals not linked to tasksDoesnt require progress management. Only requires management to milestones.
Wall chart with green, yellow, red status or on-line system Visual mgmt not possible if project mgmt system is only on-lineInvolve all members of new model organization in the report to Honda. Use the expert.
ClearR&R
Daily new model management documents at the supplier should be used for justification of status; or a review of the actual situation.Organized to support an efficient presentation. (not audit style, pre-prepared report style)
Pres/VP
PL
Eng Qlty Mfg PC
Track plan vs actualMonitor % completion
Evaluate at milestones(Interim Targets)
Assoc.
Schedule based on Honda New Model Project requirements
Components of the Specified Action Plan ProcessGOAL SETTING:
HondaSQCDDM
Project Goals
Supplier previous model reflections
Supplier personalized project goals
SpecificMeasurableAttainableRelevantTime Bound
HondaProject Schedule& Requirements
Guided by NMR Interim TargetsGuarantee execution of SAPConduct a pre Honda NMR evaluationTop Management evaluate; use P-D-C-A approachDocument supplier top management comments from pre reviewControl Gap; make countermeasure plan; forecast next event situationState readiness to Honda - should not ask Are We Ready?Utilize go/no go judgment criteria at each stage (outside of NMR as well)
MA04922Text Box Main Menu Previous Menu
-
06/03/02HSQM-0016 3
Safety Comply with all safety and environmental regulationsSame
Quality Achieve Top of Class IQS II Reduce Warranty Claim occurrence rate
Reduction in IQS related problems 50% Reduction of warranty claim occurrences from 99M Acura TL 0 A Rank Problems 20% Reduction in quality index spikerate increase from 01M Civic 100% Part Approval by sellable units
CostAchieve P2 Cost target(piece price, investment, and expense)
Achieve piece price and investment target Control D/C compensation expense No unplanned cost for Japan Air Freight
DeliveryDevelopment
Meet Trial event requirements Meet MP ramp up plan Meet production lost targets during trial events Meet Maturation and lead-time requirements
100% on time delivery with the correct d/c level No short parts Capacity = 1.2 amortized rate Achieve Event Maturation Targets
Morale Enhance communication Increase Self Reliance Provide training
Establish clear internal and external communication routes Establish clear project roles and responsibilities. Top Management involvement Meet training plans
Project Goals
Honda Goal Supplier GoalSEPA
Supplier Specific Goal
MA04922Text Box Main Menu Previous Menu
-
06/03/02HSQM-0016 4
GOAL SETTING:Honda
SQCDDMProject Goals
Supplier previous model reflections
Supplier personalized project goals
SpecificMeasurableAttainableRelevantTime Bound
HondaProject Schedule& Requirements
PURCHASING / SUPPLIER BASIC SCHEDULE
TOOLING MATURATION REQUIREMENTS / AVAILABLE LEADTIME
START-UP PLAN (Trial schedule, quantity, delivery dates, maturation by commodity)
MASS PRODUCTION RAMP-UP PLAN
PQ NMR TIMING FLOW
PQ & SUPPLIER DEVELOPMENT ACTIVITY
PQ PARTS APPROVAL SUBMISSION REQUIREMENTS
TECHNICAL PART REVIEW STRATEGY
SPECIFICATION / DRAWING MATURATION REQUIREMENTS
NEW MODEL REVIEW ACTIVITY SCHEDULE
NEW MODEL REVIEW INTERIM TARGETS
Inputs from Honda (see documents titled as follows in this packet):
HONDA PROJECT SCHEDULES & REQUIREMENTS - SEPA PROJECT SPECIFIC
MA04922Text Box Main Menu Previous Menu
-
06/03/02HSQM-0016 5
SUPPLIER PREVIOUS MODEL REFLECTIONSSITUATION ANALYSIS
Identify Gap
Gather gap items for a specified time period
Perform Why-Why or Cause analysis of gap
Step 1
Step 2
Step 3
Summarize root causes and perform
Why-Why
Step 4
Propose C/M forroot causes
Step 5
Input C/M plan to next new model SAP
Step 6
Gap Avoidance
Sources of Gap
Method
External Feedback*Quality Index*Delivery Index*Past Problem History
Internal Data*Rejects*OEE*Scrap Rate*Rework %*Unplanned Overtime*Expedited freight*Down Time
*Ask WHY until you can no longer answer becauseor What causes (this problem or gap)?
*1st 3 months NM MP*Last fiscal year
*Add tasks to New Modeljob tree
*Analysis why root cause can occur to lead to C/M
*Mgmt check/supportof C/M idea
MA04922Text Box Main Menu Previous Menu
-
06/03/02HSQM-0016 6
Problem / Symptom
Why Why Why Why Why Root Cause
Hard
Soft
Important step: To assure the root cause is identified, each why / why box must be supported with quantifiable data.
Individual Problem
Multiple Issues: Take the root cause of several single issues and put them into like categories. Each like category then should have another why/why analysis completed to determine the system issues.
Why Why Why Why Why Root Cause
Hard
Soft
Grouping Like Problems
Define problem from root cause anddevelop improvement themes with a Job tree,
measurable targets, and a SAP
SUPPLIER PREVIOUS MODEL REFLECTIONSRoot Cause Analysis Methods
Why-Why Analysis: An effective tool for identifying a root cause of a single part problem as well as an overall system issue. Each problem is typically a symptom of a deeper rooted problem. The deeper root issues can be discovered by developing a why / why analysis study.
MA04922Text Box Main Menu Previous Menu
-
06/03/02HSQM-0016 7
SUPPLIER PERSONALIZED PROJECT GOALSNariyuki
Explain how the goal can be achieved comparing the current situation to the future goal
70%
Efficiency Improvement Plan
+5%
+3%
+2%
Design Improvement
Process Layout Change
Equipment change
+5% 85%
PURPOSE:
Add associate
Each improvement plan item should have an individual action plan
Current Model New ModelTarget Achievement
MA04922Text Box Main Menu Previous Menu
-
06/03/02HSQM-0016 8
SAP FORMAT:Honda is not dictating a specific style of SAP, but these components must be part of your project management process.
GOAL SETTING:Honda
SQCDDMProject Goals
Supplier previous model reflections
Supplier personalized project goals
SpecificMeasurableAttainableRelevantTime Bound
HondaProject Schedule& Requirements
JOB TREE: (why, how, what) PROGRESS TRACKING: (what, who, when)
ORGANIZATION:
APQP DEFICIENCY:
EVALUATION PROCESS: SAP WITHIN THE SUPPLIER ORG:
EVIDENCE JUSTIFYING STATUS: VISUAL MANAGEMENT AND REPORTING:
Q
Dev
Del
Model QCDDM
Supplier Goals
Supplier S/A
InterimTargets
ActivityThemes Tasks
Create Gantt chart based on job tree breakdown of tasks:
Plan:
Actual:
T1 T2 T3
T1 T2 T3
Go-2
Go-2
HP LZUAYZ
Honda03M
Eng Qlty Mfg P.C.
Top Mgmt
Project Leader
Resp. Dept.
Resp.Assoc.
Top Management criteria: provide the vision, decision maker, allocates resource, etc.Dedicated New Model resources should be considered if past new model start-up performance did not meet plan
Goals not linked to tasksDoesnt require progress management. Only requires management to milestones.
Wall chart with green, yellow, red status or on-line system Visual mgmt not possible if project mgmt system is only on-lineInvolve all members of new model organization in the report to Honda. Use the expert.
ClearR&R
Daily new model management documents at the supplier should be used for justification of status; or a review of the actual situation.Organized to support an efficient presentation. (not audit style, pre-prepared report style)
Pres/VP
PL
Eng Qlty Mfg PC
Track plan vs actualMonitor % completion
Evaluate at milestones(Interim Targets)
Assoc.
Schedule based on Honda New Model Project requirements
Components of the Specified Action Plan Process
Guided by NMR Interim TargetsGuarantee execution of SAPConduct a pre Honda NMR evaluationTop Management evaluate; use P-D-C-A approachDocument supplier top management comments from pre reviewControl Gap; make countermeasure plan; forecast next event situationState readiness to Honda - should not ask Are We Ready?Utilize go/no go judgment criteria at each stage (outside of NMR as well)
MA04922Text Box Main Menu Previous Menu
-
06/03/02HSQM-0016 9
GOAL TO TASK LINKBREAKDOWN USING JOB TREE
SUPPLIERGOALS
HONDA N.M.PROJECT GOALS
SUPPLIERSPECIFIC GOALS
DETAILEDTASKS
RESP.PERSON
RESP.DEPT.
Purpose of aJob Tree
1. To expand thinking from theoretical planning to specific actions.
2. To illustrate the real level of complexity necessary to achieve a goal.
3. To check the logic and completeness of a plan at all levels.
4. To link detailed tasks to high level goals.
5. To clearly assign responsibility for tasks that contribute to the achievement of the goal.
6. To gain ownership from team members through creation of the tree.
MA04922Text Box Main Menu Previous Menu
-
06/03/02HSQM-0016 10
SAP FORMAT:Honda is not dictating a specific style of SAP, but these components must be part of your project management process.
GOAL SETTING:Honda
SQCDDMProject Goals
Supplier previous model reflections
Supplier personalized project goals
SpecificMeasurableAttainableRelevantTime Bound
HondaProject Schedule& Requirements
JOB TREE: (why, how, what) PROGRESS TRACKING: (what, who, when)
ORGANIZATION:
APQP DEFICIENCY:
EVALUATION PROCESS: SAP WITHIN THE SUPPLIER ORG:
EVIDENCE JUSTIFYING STATUS: VISUAL MANAGEMENT AND REPORTING:
Q
Dev
Del
Model QCDDM
Supplier Goals
Supplier S/A
InterimTargets
ActivityThemes Tasks
Create Gantt chart based on job tree breakdown of tasks:
Plan:
Actual:
T1 T2 T3
T1 T2 T3
Go-2
Go-2
HP LZUAYZ
Honda03M
Eng Qlty Mfg P.C.
Top Mgmt
Project Leader
Resp. Dept.
Resp.Assoc.
Top Management criteria: provide the vision, decision maker, allocates resource, etc.Dedicated New Model resources should be considered if past new model start-up performance did not meet plan
Goals not linked to tasksDoesnt require progress management. Only requires management to milestones.
Wall chart with green, yellow, red status or on-line system Visual mgmt not possible if project mgmt system is only on-lineInvolve all members of new model organization in the report to Honda. Use the expert.
ClearR&R
Daily new model management documents at the supplier should be used for justification of status; or a review of the actual situation.Organized to support an efficient presentation. (not audit style, pre-prepared report style)
Pres/VP
PL
Eng Qlty Mfg PC
Track plan vs actualMonitor % completion
Evaluate at milestones(Interim Targets)
Assoc.
Schedule based on Honda New Model Project requirements
Components of the Specified Action Plan Process
Guided by NMR Interim TargetsGuarantee execution of SAPConduct a pre Honda NMR evaluationTop Management evaluate; use P-D-C-A approachDocument supplier top management comments from pre reviewControl Gap; make countermeasure plan; forecast next event situationState readiness to Honda - should not ask Are We Ready?Utilize go/no go judgment criteria at each stage (outside of NMR as well)
MA04922Text Box Main Menu Previous Menu
-
06/03/02HSQM-0016 11
Supplier Specific Goals
Supplier Goals
(Interim Target)
Task Resp.Person
Resp.Dept.
Task Resp.Person
Resp.Dept.
Schedule
Management review of progress*
Project Goals
LINK GOALS TO SPECIFIC TASKS AND SCHEDULE
GOAL TO TASK LINK WITH SCHEDULE
MA04922Text Box Main Menu Previous Menu
-
06/03/02HSQM-0016 12
PROGRESS TRACKINGGANTT CHART
ID Task Name Baseline D Baseline Sta Baseline Fin1 4 DOOR TRIALS 0 wk Wed 8/15 Wed 8/152 2 DOOR TRIALS 0 wk Wed 8/15 Wed 8/153 SPEC. MATURATION 1 wk Wed 8/15 Tue 8/21/4 Design/Specification 1 wk Wed 8/15 Tue 8/215 TOOLING 26 wk Wed 8/15 Tue 2/12/6 Tooling #1 - 2 molds 4 cavity 18.4 wk Wed 8/15 Thu 12/207 Go-1 to Go-2 3 wks Wed 8/15 Tue 9/4/8 Tool design 3 wk Wed 8/15 Tue 9/4/9 Raw Material order 3 wk Wed 8/15 Tue 9/4/10 G0-2 to T1 13.4 wk Wed 9/5/ Thu 12/6/11 Cut Die Holder 25 day Wed 9/5/ Tue 10/912 Cut Electrode 10 day Wed 9/5/ Tue 9/1813 CMM Carbon Electrode 2 day Wed 9/19 Thu 9/2014 EDM Cavity 4 day Fri 9/21/ Wed 9/2615 CMM Cavity 2 day Thu 9/27 Fri 9/28/16 Finish Die cutting ~ Polish / 4 day Mon 10/1 Thu 10/417 Make / install cores and slid 10 day Fri 10/5/ Thu 10/1818 Polish die 6 day Fri 10/19 Fri 10/2619 Install water / electric lines 4 day Mon 10/29 Thu 11/120 Try 1 da Fri 11/2/ Mon 11/521 T1 - T3 2 wks Fri 12/7/ Thu 12/2022 Part Accuracy changes 1 wk Tue 11/6 Mon 11/1223 Process changes 1 wk Tue 11/13 Mon 11/1924 Boat Ship tool from Japan 4 wk Tue 11/20 Mon 12/1725 Set up 1 wk Tue 12/18 Wed 12/1926 Try 2 day Thu 12/20 Thu 12/2027 T-3 to T-4 3.4 wk Mon 1/21/ Tue 2/12/
8/15
8/15
mit CRF
G0-1
G0-2 T1
d/c R4Y-2-1234 Delayed go 2 by 2 weeks.
expedite to make up for late Go-2
expedite to make up for late Go-2
expedite to make up for late Go-2
T3
T4
EG UF-1 Dankaku QC
29 5 12 19 26 2 9 16 23 30 7 14 21 28 4 11 18 25 2 9 16 23 30 6 13 20 27 3 10 17 24 3 10 17 24 31 7 14 21 28 5 12 19 26 2 9 16 23 30August September October November December January February March April May June Jul
Milestones
Plan vs Actual
% Progress Completion
Task from Job Tree
*A Gantt Chart without a job tree will not suffice as an SAP.
MA04922Text Box Main Menu Previous Menu
-
06/03/02HSQM-0016 13
LINK SUPPLIER GANTT TO HONDA NEW MODEL DEVELOPMENT SCHEDULE
Tool
ing
Go
Tim
ing
Des
ign
Mat
urat
ion
Tim
ing
Tria
l Eve
nt P
arts
PV T
estin
g
Supplier Specified Action Plan must correlate with Honda New Model Development Schedule N
MR
Pla
n
Specification Maturation
Tooling Leadtime Negotiation
Supplier trial parts manufacturing plan
PV Test planStart/StopNew Model
Review
Honda R&D Development Lots
Honda Mfg. Trial Lots
HONDA GENERAL SCHEDULE
SUPPLIER ACTIVITY SCHEDULE
MA04922Text Box Main Menu Previous Menu
-
06/03/02HSQM-0016 14
SAP FORMAT:Honda is not dictating a specific style of SAP, but these components must be part of your project management process.
GOAL SETTING:Honda
SQCDDMProject Goals
Supplier previous model reflections
Supplier personalized project goals
SpecificMeasurableAttainableRelevantTime Bound
HondaProject Schedule& Requirements
PROGRESS TRACKING: (what, who, when)Create Gantt chart based on job tree breakdown of
tasks:
Plan:
Actual:
T1 T2 T3
T1 T2 T3
Go-2
Go-2
Track plan vs actualMonitor % completion
Evaluate at milestones(Interim Targets)
Schedule based on Honda New Model Project requirements
Components of the Specified Action Plan ProcessJOB TREE: (why, how, what)
ORGANIZATION:
APQP DEFICIENCY:
EVALUATION PROCESS: SAP WITHIN THE SUPPLIER ORG:
EVIDENCE JUSTIFYING STATUS: VISUAL MANAGEMENT AND REPORTING:
Q
Dev
Del
Model QCDDM
Supplier Goals
Supplier S/A
InterimTargets
ActivityThemes Tasks
HP LZUAYZ
Honda03M
Eng Qlty Mfg P.C.
Top Mgmt
Project Leader
Resp. Dept.
Resp.Assoc.
Top Management criteria: provide the vision, decision maker, allocates resource, etc.Dedicated New Model resources should be considered if past new model start-up performance did not meet plan
Goals not linked to tasksDoesnt require progress management. Only requires management to milestones.
Wall chart with green, yellow, red status or on-line system Visual mgmt not possible if project mgmt system is only on-lineInvolve all members of new model organization in the report to Honda. Use the expert.
ClearR&R
Daily new model management documents at the supplier should be used for justification of status; or a review of the actual situation.Organized to support an efficient presentation. (not audit style, pre-prepared report style)
Pres/VP
PL
Eng Qlty Mfg PC
Assoc.
Guided by NMR Interim TargetsGuarantee execution of SAPConduct a pre Honda NMR evaluationTop Management evaluate; use P-D-C-A approachDocument supplier top management comments from pre reviewControl Gap; make countermeasure plan; forecast next event situationState readiness to Honda - should not ask Are We Ready?Utilize go/no go judgment criteria at each stage (outside of NMR as well)
MA04922Text Box Main Menu Previous Menu
-
06/03/02HSQM-0016 15
ORGANIZATIONORGANIZATION
* Clearly defined & documented organization by project* Roles and Responsibilities defined & documented* All members of the team identified* Defined reporting flow* Top Management participation:
Agrees with the project plan Planned periodic reviews with evaluation purpose
ORGANIZATION
Pres/VP
Project Manager
Quality Engineering Manufacturing Prod. Control Design Overseas Support
Specific Individual Associate Names
MA04922Text Box Main Menu Previous Menu
-
06/03/02HSQM-0016 16
SAP FORMAT:Honda is not dictating a specific style of SAP, but these components must be part of your project management process.
GOAL SETTING:Honda
SQCDDMProject Goals
Supplier previous model reflections
Supplier personalized project goals
SpecificMeasurableAttainableRelevantTime Bound
HondaProject Schedule& Requirements
PROGRESS TRACKING: (what, who, when)Create Gantt chart based on job tree breakdown of
tasks:
Plan:
Actual:
T1 T2 T3
T1 T2 T3
Go-2
Go-2
Track plan vs actualMonitor % completion
Evaluate at milestones(Interim Targets)
Schedule based on Honda New Model Project requirements
Components of the Specified Action Plan ProcessJOB TREE: (why, how, what)
ORGANIZATION:
APQP DEFICIENCY:
SAP WITHIN THE SUPPLIER ORG:
EVIDENCE JUSTIFYING STATUS: VISUAL MANAGEMENT AND REPORTING:
Q
Dev
Del
Model QCDDM
Supplier Goals
Supplier S/A
InterimTargets
ActivityThemes Tasks
HP LZUAYZ
Honda03M
Eng Qlty Mfg P.C.
Top Mgmt
Project Leader
Resp. Dept.
Resp.Assoc.
Top Management criteria: provide the vision, decision maker, allocates resource, etc.Dedicated New Model resources should be considered if past new model start-up performance did not meet plan
Goals not linked to tasksDoesnt require progress management. Only requires management to milestones.
Wall chart with green, yellow, red status or on-line system Visual mgmt not possible if project mgmt system is only on-lineInvolve all members of new model organization in the report to Honda. Use the expert.
ClearR&R
Daily new model management documents at the supplier should be used for justification of status; or a review of the actual situation.Organized to support an efficient presentation. (not audit style, pre-prepared report style)
Pres/VP
PL
Eng Qlty Mfg PC
Assoc.
EVALUATION PROCESS:Guided by NMR Interim TargetsGuarantee execution of SAPConduct a pre Honda NMR evaluationTop Management evaluate; use P-D-C-A approachDocument supplier top management comments from pre reviewControl Gap; make countermeasure plan; forecast next event situationState readiness to Honda - should not ask Are We Ready?Utilize go/no go judgment criteria at each stage (outside of NMR as well)
MA04922Text Box Main Menu Previous Menu
-
06/03/02HSQM-0016 17
SUPPLIER INTERNAL NEW MODEL EVALUATION PROCESSHonda is not checking all aspects of a suppliers preparation. Based on the potential impact to trials and MP, Honda is prioritizingthe items and the depth of the review. The supplier must evaluate all of the items that Honda is not reviewing.
NMR Check Points
Supplier evaluation
Items
Planning E0 E1 E2 E3
Supplier Top Mgmt Evaluation
With defined judgment items and criteria
Trial~MP Go / No Go judgment
Desig
n/Spe
cifica
tion
Tool
Leve
l
Inspe
ction
Fixtu
reMa
chine
Manu
factur
ing Fi
xture
In-lin
e QA
Devic
e
Maint
enan
ceRe
pair
EPA
Perm
its
Build
Ass
ociat
e/Man
powe
r
Prod
uctio
n Mate
rial
Hand
work
Line S
peed
/Cyc
le Tim
e
Asso
ciate
Train
ing
PFME
APQ
CTLo
t Con
trol
Even
t Part
Acc
uracy
Even
t Part
Des
ign Le
vel
Hond
a Situ
ation
Con
firmati
on
Prod
uct V
alida
tion T
estin
g
Bill o
f Mate
rial
Pack
aging
Sub-s
uppli
er Re
adine
ss
Deliv
erySa
fety/E
rgono
mics
Cost
Moral
eOt
her
Depth of
Review
MA04922Text Box Main Menu Previous Menu
-
06/03/02HSQM-0016 18
SUPPLIER TRIAL EVENT GO / NO GO JUDGMENT CHECKSHEET (Example)TRIAL
DANKAKU QC VC 200 PC / 2 HPLAN/ FORE- Top Mgmt PLAN/ FORE- Top Mgmt PLAN/ FORE- Top Mgmt PLAN/ FORE-
CAT. ITEM REQ'T CAST ACTUAL GAP Judgment REQ'T CAST ACTUAL GAP Judgment REQ'T CAST ACTUAL GAP Judgment REQ'T CAST ACTUAL
Safety Eqpt "interlocks" O
Quality Part Maturation O Raw Material O PPA or MP parts (I/H parts) O Prod. Location O N.A. Jpn JpnO/S parts PPAP/receiving inspection results OScrap Rate O OReject Rate O ODesign Change No. OPQCT-Process Status OPart Accuracy OHandwork/part OInspection Fixture OColor Match OLot Control/FIFO OTest Results OQA Machine-Dummy/Pole Yoke parts fix OCpK OFMEA re-check w/CpK O
Development OEE/Cycle Time ODowntime Plan (production schedule adjusted) O
Delivery Packaging Available OTier 2 (dom.) parts rec'd OHAM DSPS / JSP rec'd ODelivery plan (ttl sch. clear) O
CostHAM trial piece price fixed OTier-2 fixed Oexpedite expense O
Mgmt Associate Training OManpower (MP vs NM) O
OtherCustomer P.O. vs run plan clear OProblem Tracking Chart (PTC) O System ready O Last trial PTC status OBOM Accuracy O
MfgFinal Assy plan (on/off-line) OOperation Standards complete (to req'd level) O
Inpu
t
Dur
ing
Out
put
TOP MANAGEMENT SHOULD JUDGE GO / NO GO BEFORE EACH KEY ACTIVITY.
THE JUDGMENT CRITERIA SHOULD BE COMMUNICATED TO THE TEAM IN ADVANCE.
THE TREND SHOULD BE TRACKED FROM EVENT TO EVENT AND RESOURCES ALLOCATED
APPROPRIATELY TO GUARANTEE A SMOOTH MP START UP.
THE PROJECT TEAM SHOULD ACTIVELY MANAGE TRIAL EVENT GAP ITEMS AND THEIR
COUNTERMEASURES.
MA04922Text Box Main Menu Previous Menu
-
06/03/02HSQM-0016 19
GOAL SETTING:Honda
SQCDDMProject Goals
Supplier previous model reflections
Supplier personalized project goals
SpecificMeasurableAttainableRelevantTime Bound
HondaProject Schedule& Requirements
PROGRESS TRACKING: (what, who, when)Create Gantt chart based on job tree breakdown of
tasks:
Plan:
Actual:
T1 T2 T3
T1 T2 T3
Go-2
Go-2
Track plan vs actualMonitor % completion
Evaluate at milestones(Interim Targets)
Schedule based on Honda New Model Project requirements
Components of the Specified Action Plan ProcessJOB TREE: (why, how, what)
ORGANIZATION:
APQP DEFICIENCY:
EVALUATION PROCESS: SAP WITHIN THE SUPPLIER ORG:
EVIDENCE JUSTIFYING STATUS: VISUAL MANAGEMENT AND REPORTING:
Q
Dev
Del
Model QCDDM
Supplier Goals
Supplier S/A
InterimTargets
ActivityThemes Tasks
HP LZUAYZ
Honda03M
Eng Qlty Mfg P.C.
Top Mgmt
Project Leader
Resp. Dept.
Resp.Assoc.
Top Management criteria: provide the vision, decision maker, allocates resource, etc.Dedicated New Model resources should be considered if past new model start-up performance did not meet plan
Goals not linked to tasksDoesnt require progress management. Only requires management to milestones.
Wall chart with green, yellow, red status or on-line system Visual mgmt not possible if project mgmt system is only on-lineInvolve all members of new model organization in the report to Honda. Use the expert.
ClearR&R
Daily new model management documents at the supplier should be used for justification of status; or a review of the actual situation.Organized to support an efficient presentation. (not audit style, pre-prepared report style)
Pres/VP
PL
Eng Qlty Mfg PC
Assoc.
SAP FORMAT:Honda is not dictating a specific style of SAP, but these components must be part of your project management process.
Guided by NMR Interim TargetsGuarantee execution of SAPConduct a pre Honda NMR evaluationTop Management evaluate; use P-D-C-A approachDocument supplier top management comments from pre reviewControl Gap; make countermeasure plan; forecast next event situationState readiness to Honda - should not ask Are We Ready?Utilize go/no go judgment criteria at each stage (outside of NMR as well)
MA04922Text Box Main Menu Previous Menu
-
06/03/02HSQM-0016 20
LEVELS OF A SPECIFIED ACTION PLANLEVELS OF A SPECIFIED ACTION PLAN
ALL NEW MODEL Top Mgmt
CONTROLLEVEL
FY 2003Link to Corporate Business Plan
03M AccordEACH PROJECT
EACH DEPT
EACH GROUP/ASSOC.
Project Mgr
Dept Mgr
Report to HONDA
Eng PC
Qlty Mfg
DEEPER BREAKDOWN
OF TASKS
MA04922Text Box Main Menu Previous Menu
-
06/03/02HSQM-0016 21
SAP FORMATSAP FORMATMONTH 4 5 6 7 8 9 10 11 12 1 2 3 4
START-UP SCHEDULE
ZONE PURPOSE TARGET METHOD RESP. SCHEDULE / METHOD
CM/L SETTING
* M/L FIX BY P2 * M/L SET WITHIN 10 DAYS OF DWG ISSUE * NO SHORT / LATE PARTS DUE TO M/L DELAY
* BOM MATURATION SYSTEM (EXCL) * M/L SETTING SHEET TRACKING SYSTEM
* TEAM CONSENSUS OF M/L DECISION PRIOR TO GO RELEASE
* (NEW ) M/L REVIEW MEETING * NEW SUPPLIER QAV
* CPG * PH/PQ
QTOOL &
EQUIPMENT MATURATION
* TOOL / PROCESS MATURATION TARGETS MET
* DESIGN FIX PLANNING MEETING * ONE PACK / GO RELEASE PROCEDURES * (REV) SUPPLIER PART SCHEDULE * PH MAINFRAME TOOLING TRACKING SYSTEMS
PROCESS MATURATION
* TOOL / PROCESS MATURATION TARGETS MET
* QUALITY STANDARD * FMEA * PQCT * LNDD * PROCESS INSPECTION STANDARD
M/L SETTING, RFQ
4DR
C1DEVELOPMENT
SCHEDULE
FIX CHANGE PTS. , MANAGE PENDING ITEMS
LIN
E 1
4 D
OO
R
4DR DRW FPD MPD
DAN- 1(T1)
W/B (4 DOOR)
SET GO PLAN
B RANK
S-J
T- 1 T- 3T- 2
SE
LT
FIX
DAN- 1 DAN- 2
C RANK
C1
P2
E- 1E- 0
STUDY
* CPG
* NMDADVANCE
IMAGE QC VC / PP / MP
M/L REVIEW MTGS / NEW SUPPLIER QAV
TEXTURE
A RANK
PENDING GO MTGS
* TEAM
* NMD
* NMD
* NMD
* S/D
* S/D
B RANK T- 1 T- 2
C RANK
A RANK
T- 3
COMPLETE BY GO
COMPLETE BY EVENT
* PAST PROBLEM C/M CONFRMED* QUALITY STANDARD ISSUED* QA EQUIPMENT PLAN COMPLETE* INSPECTION FIXTURE CONCEPT COMPLETE* LOT CONTROL REQ'T DECIDED
* PFMEA APPROVED* PQCT DRAFT COMPLETE* INSPECTION FIXTURE ACCURACY VERIFIED* INSPECTION DATA SHEET APPROVED* LNDD DOCS. COMPLETE* PROCESS INSPECTION STD COMPLETE* SUPPLIER TRAINING PLAN CONFIRMED
* PQCT CONFIRMED TO PROC* QA EQUIPMENT CONFIRMED* CONFIRM PART ACCURACY* CONFIRM LOT CONTROL AT * SUPPLIER HIRING / TRAININGCONFIRMED* PTC/QSS C/M COMPLETE* PROCESS CAPABILITY CONF* OPS STD VERIFIED* SAMPLING PLAN COMPLETE* REPAIR PLAN COMPLETE
* AQ* PQ* PQ* PQ* PQ
* PQ* PH* NMD
Honda schedule
High level goal
Q,C,D,D,MSpecific Target
Project reviews
Task milestones
Responsible individual/dept
(SAP or JobTree)
NMR gap worksheet(s) will be used by the supplier to summarize project status during periodic reviews with
Honda
Milestones should match Honda interim
target timingDetailed Tasks
(EXAMPLE)
MA04922Text Box Main Menu Previous Menu
-
06/03/02HSQM-0016 22
Interactive Assessment of the SAPInteractive Assessment of the SAP
COLLECT INFO.
COMMON STRATEGY AND INFO INTO S.A.P., JAPAN & U.S.COMMON STRATEGY AND INFO INTO S.A.P., JAPAN & U.S.COMMUNICATION REINFORCEMENT BETWEEN MOTHER & DAUGHTER SUPPLIER.COMMUNICATION REINFORCEMENT BETWEEN MOTHER & DAUGHTER SUPPLIER.
Tool development issues Process Plans Quality Plans
Manufacturing Capabilities / Constraints Past Problem Concerns Unique N.A. Characteristics
MA04922Text Box Main Menu Previous Menu
-
06/03/02HSQM-0016 23
GOAL SETTING:Honda
SQCDDMProject Goals
Supplier previous model reflections
Supplier personalized project goals
SpecificMeasurableAttainableRelevantTime Bound
HondaProject Schedule& Requirements
PROGRESS TRACKING: (what, who, when)Create Gantt chart based on job tree breakdown of
tasks:
Plan:
Actual:
T1 T2 T3
T1 T2 T3
Go-2
Go-2
Track plan vs actualMonitor % completion
Evaluate at milestones(Interim Targets)
Schedule based on Honda New Model Project requirements
Components of the Specified Action Plan ProcessJOB TREE: (why, how, what)
ORGANIZATION:
APQP DEFICIENCY:
EVALUATION PROCESS: SAP WITHIN THE SUPPLIER ORG:
EVIDENCE JUSTIFYING STATUS: VISUAL MANAGEMENT AND REPORTING:
Q
Dev
Del
Model QCDDM
Supplier Goals
Supplier S/A
InterimTargets
ActivityThemes Tasks
HP LZUAYZ
Honda03M
Eng Qlty Mfg P.C.
Top Mgmt
Project Leader
Resp. Dept.
Resp.Assoc.
Top Management criteria: provide the vision, decision maker, allocates resource, etc.Dedicated New Model resources should be considered if past new model start-up performance did not meet plan
Goals not linked to tasksDoesnt require progress management. Only requires management to milestones.
Wall chart with green, yellow, red status or on-line system Visual mgmt not possible if project mgmt system is only on-lineInvolve all members of new model organization in the report to Honda. Use the expert.
ClearR&R
Daily new model management documents at the supplier should be used for justification of status; or a review of the actual situation.Organized to support an efficient presentation. (not audit style, pre-prepared report style)
Pres/VP
PL
Eng Qlty Mfg PC
Assoc.
SAP FORMAT:Honda is not dictating a specific style of SAP, but these components must be part of your project management process.
Guided by NMR Interim TargetsGuarantee execution of SAPConduct a pre Honda NMR evaluationTop Management evaluate; use P-D-C-A approachDocument supplier top management comments from pre reviewControl Gap; make countermeasure plan; forecast next event situationState readiness to Honda - should not ask Are We Ready?Utilize go/no go judgment criteria at each stage (outside of NMR as well)
MA04922Text Box Main Menu Previous Menu
-
Honda Supplier Quality Manual Revision Information List Content Revision 04/01/2016 Issued by North American Supplier QD
Revision Information Page1/1 04/01/2016
The Honda Supplier Quality Manual applies to all North American Honda plants and their suppliers. Controlled Documents
Document Name Control Number Approval Date Change Description
Index System HSQM-0008 04/01/2016 INI Reports Update Bar Code Standard HSQM-0030 04/01/2016 2D, QR & Linear Updates Controlled Containment HSQM-0061 04/01/2016 Under Honda actions: Changed holds to hold Minimum Process Requirements Procedure HSQM-0060 04/01/2016 Revised E1 & E2 to PA2, PA3, PA4 or PA5 PV Testing Risk Analysis Procedure HSQM-0071 04/01/2016 Revised E1 to PA3/PA4, E2 to PA5 Process Assurance Capability Verification (PAC-V) HSQM-0094 04/01/2016 CpK changed to PpK Minimum Process Requirements Part Marking Check Sheet HSQM-0114 04/01/2016 DPM Update Minimum Process Requirements Leak Test Check Sheet HSQM-0123 04/01/2016 Initial Issue Plant Codes HSQM-Ref. 04/01/2016 Added PMC & RLC
MA04922Text Box Main Menu Previous Menu
-
This page intentionally left blank
MA04922Text Box Main Menu Previous Menu
-
This page intentionally left blank
MA04922Text Box Main Menu Previous Menu
-
Quality Control Regulations and Minimum Quality System Requirements __________________________________________________________________
HSQM-0002 1/17