This manual applies to the following North American … Automotive_20cb1.… · Supplier Quality...

344
Supplier Quality Manual Main Screen Main Screen Table of Contents Forms New Model General Information Mass Production Reference SQM Master List 04-01-2016 Revision Information Quality Control Regulations and Minimum Quality System Requirements Market Country Regulations Click a tab to begin navigation This manual applies to the following North American Honda Facilities AEP - ELP - HCM - HDM - HMA - HMIN - HPE - HPPG - HSC - HTM - IPS -MAP Honda Company Principle Maintaining a global viewpoint, we are dedicated to supplying products of the highest quality yet at a reasonable price for worldwide customer satisfaction. • A key to Honda acronyms can be found in the Definitions document in the Reference section. • For the best results please use Adobe Acrobat 7.0 or higher to view this manual. Click on a tab to select This on-line manual is the official version of the Honda Supplier Quality Manual. Your access is your implied permission to download and print a working copy for your business. It is your responsibility to use the most current version posted on this web site.

Transcript of This manual applies to the following North American … Automotive_20cb1.… · Supplier Quality...

  • Supplier Quality Manual

    Main Screen

    MainScreen

    Table of Contents Forms

    New Model

    General Information

    Mass Production

    Reference SQM Master List 04-01-2016 Revision Information

    Quality Control Regulations and Minimum Quality System Requirements

    Market

    CountryRegulations

    Click a tab to begin navigation

    This manual applies to the following North American Honda Facilities

    AEP - ELP - HCM - HDM - HMA - HMIN - HPE - HPPG - HSC - HTM - IPS -MAP

    Honda Company PrincipleMaintaining a global viewpoint, we are dedicated to supplying products of the highest quality yet at a reasonable

    price for worldwide customer satisfaction.

    A key to Honda acronyms can be found in the Definitions document in the Reference section. For the best results please use Adobe Acrobat 7.0 or higher to view this manual.

    Click on a tab to select

    This on-line manual is the official version of the Honda Supplier Quality Manual. Your access is your implied permission to download and print a working copy for your business. It is your responsibility to use the most

    current version posted on this web site.

    vc037429Typewritten Text

    vc037429Typewritten Text

  • Supplier Quality Manual

    Main Screen

    CoverPage

    Table of Contents Forms

    New Model

    General Information

    Mass Production

    ReferenceQuality Control Regulations and Minimum Quality System Requirements

    Market

    CountryRegulations

    Forms 5P CRF IPPAAR/IPP

    Inspection Fixture

    Lot Control and Traceability PAC-VData MPR

    Tool TrialPQCT PV Testing SpeCla Tool Trial History

    Forms - Blank Clicking on a black tab will open the form, but it may cause the SQM to close.WARNING

    Click on a tab to select

    Lot Control

    SQM Master List 04-01-2016 Revision Information

    vc037429Typewritten Text Initial Production Parts Quality Assurance Declaration

    vc037429Typewritten Text

    vc037429Typewritten Text

    VC037429Typewritten Text

  • Supplier Quality Manual

    Main Screen

    CoverPage

    Table of Contents Forms

    New Model

    General Information

    Mass Production

    Reference SQM Master ListQuality Control Regulations and Minimum Quality System Requirements04-01-2016 Revision

    Information

    Market

    CountryRegulations

    Forms5P CRF IPPAAR/IPP

    Inspection Fixture

    Lot Control and Traceabilit PAC-VData MPR

    Tool Trial

    Clicking on a black tab will open the form but it may cause the SQM to closeWARNING

    PV Testing SpeCla Tool Trial HistoryPQCT

    Forms - Blank

    Clicking on a black tab will open the form, but it may cause the SQM to close.

    To open or download this form inside the manual, please return to the Forms Screen (page 3) and follow the instructions.

    CRF FormsCRF Operation

    StandardCRF Blank and Numbered Form

    (matches the Operation Standard)

    Click on a tab to select

    ( p )

    vc037429Typewritten Text Initial Production Parts Quality Assurance Declaration

    VC037429Typewritten Text

  • Supplier Quality Manual

    Main Screen

    CoverPage

    Table of Contents Forms

    New Model

    General Information

    Mass Production

    Reference SQM Master ListQuality Control Regulations and Minimum Quality System Requirements04-01-2016 Revision

    Information

    Market

    CountryRegulations

    Forms5P CRF IPPAAR/IPP

    Inspection Fixture

    Lot Control and Traceability PAC-VData MPR

    Tool Trial

    WARNING Clicking on a black tab will open the form but it may cause the SQM to close

    PV Testing SpeCla Tool Trial HistoryPQCT

    Forms - Blank

    Clicking on a black tab will open the form, but it may cause the SQM to close.

    To open or download this form inside the manual, please return to the Forms Screen (page 3) and follow the instructions.

    Receiving Inspection - Blank Regulation Data - Blank

    Data Forms

    Inspection Data - Blank

    Click on a tab to select

    vc037429Typewritten Text Initial Production Parts Quality Assurance Declaration

  • Supplier Quality Manual

    Main Screen

    CoverPage

    Table of Contents Forms

    New Model

    General Information

    Mass Production

    Reference SQM Master ListQuality Control Regulations and Minimum Quality System Requirements04-01-2016 Revision

    Information

    Market

    CountryRegulations

    Forms5P CRF IPPAAR/IPP

    Inspection Fixture

    Lot Control and Traceability PAC-VData MPR

    Tool Trial

    WARNING Clicking on a black tab will open the form but it may cause the SQM to close

    PV Testing SpeCla Tool Trial HistoryPQCT

    Forms - Blank

    Clicking on a black tab will open the form, but it may cause the SQM to close.

    To open or download this form inside the manual, please return to the Forms Screen (page 3) and follow the instructions.

    Supplier Inspection Fixture Concept

    Gage R&R (Long Method) Blank

    Gage R&R (Short Method) - Blank

    Inspection Fixture FormsSupplier Inspection

    Fixture

    Click on a tab to select

    Fixture Concept Method) Blank Method) BlankFixture

    vc037429Typewritten Text Initial Production Parts Quality Assurance Declaration

  • Supplier Quality Manual

    Main Screen

    CoverPage

    Table of Contents Forms

    New Model

    General Information

    Mass Production

    Reference SQM Master ListQuality Control Regulations and Minimum Quality System Requirements04-01-2016 Revision

    Information

    Market

    CountryRegulations

    Forms5P CRF IPPAAR/IPP

    Inspection Fixture

    Lot Control and Traceability PAC-VData MPR

    Tool Trial

    WARNING Clicking on a black tab will open the form but it may cause the SQM to close

    PV Testing SpeCla Tool Trial HistoryPQCT

    Forms - Blank

    Clicking on a black tab will open the form, but it may cause the SQM to close.

    To open or download this form inside the manual, please return to the Forms Screen (page 3) and follow the instructions.

    IPPAAR Form**

    IPPAAR Operation Standard

    IPP Tag**

    IPP Tag Operation Standard

    IPPAAR/IPP Forms

    Click on a tab to select

    ** IPPAAR and IPP forms are created in the Honda Supply Team Portal / Change Point Control Application.

    Tag Standard

    vc037429Typewritten Text Initial Production Parts Quality Assurance Declaration

  • Supplier Quality Manual

    Main Screen

    CoverPage

    Table of Contents Forms

    New Model

    General Information

    Mass Production

    Reference SQM Master ListQuality Control Regulations and Minimum Quality System Requirements04-01-2016 Revision

    Information

    Market

    CountryRegulations

    Forms5P CRF IPPAAR/IPP

    Inspection Fixture

    Lot Control and Traceability PAC-VData MPR

    Tool Trial

    WARNING Clicking on a black tab will open the form but it may cause the SQM to close

    PV Testing SpeCla Tool Trial HistoryPQCT

    Forms - Blank

    Clicking on a black tab will open the form, but it may cause the SQM to close.

    To open or download this form inside the manual, please return to the Forms Screen (page 3) and follow the instructions.

    LNDD- Blank and Operation Standard

    Lot Control Notification Example

    Process Display Form (PDF) -Blank and Op Std.

    Lot Control and Traceability

    Click on a tab to select

    pp p

    vc037429Typewritten Text Initial Production Parts Quality Assurance Declaration

  • Supplier Quality Manual

    Main Screen

    CoverPage

    Table of Contents Forms

    New Model

    General Information

    Mass Production

    Reference SQM Master ListQuality Control Regulations and Minimum Quality System Requirements04-01-2016 Revision

    Information

    Market

    CountryRegulations

    Forms5P CRF IPPAAR/IPP

    Inspection Fixture

    Lot Control and Traceability PAC-VData MPR

    PV Testing SpeCla Tool Trial HistoryPQCT

    Forms - Blank

    WARNING Clicking on a black tab will open the form, but it may cause the SQM to close. To open or download this form inside the manual, please return to the Forms

    Screen (page 3) and follow the instructions.

    History

    MPR Checksheets (MPR Matrix)Casting Injection Molding

    Label

    Torque

    WeldFl id Fill

    Part Marking

    Heat Treatment

    Hot Plate Welding

    Label

    Machining

    Painting

    Printed Circuit Board Sonic / Ultrasonic /

    Vibration / Friction Welding

    Stamping

    WeldFluid Fill

    Error Proofing

    Note the MPRs linked here are the most current version and must be used for the next

    Wire Harness

    Click on a tab to select

    Note the MPRs linked here are the most current version and must be used for the next Request For Quote (RFQ). They must also be applied when the supplier has a part issue

    that the MPR will countermeasure.

    MPR Procedure Leak Test

    vc037429Typewritten Text Initial Production Parts Quality Assurance Declaration

  • Supplier Quality Manual

    Main Screen

    CoverPage

    Table of Contents Forms

    New Model

    General Information

    Mass Production

    Reference SQM Master ListQuality Control Regulations and Minimum Quality System Requirements04-01-2016 Revision

    Information

    Market

    CountryRegulations

    Forms5P CRF IPPAAR/IPP

    Inspection Fixture

    Lot Control and Traceability PAC-VData MPR

    Tool Trial

    WARNING Clicking on a black tab will open the form but it may cause the SQM to close

    PV Testing Tool Trial HistoryPQCT

    Forms - Blank

    Clicking on a black tab will open the form, but it may cause the SQM to close.

    To open or download this form inside the manual, please return to the Forms Screen (page 3) and follow the instructions.

    PV Testing and PV Testing Risk Analysis Form

    PV Testing Risk Analysis Numbered (matches the Operation Standard)

    PV Testing Risk Analysis Blank

    Click on a tab to select

    PV Testing Schedule and Results Summary Form Operation Standard

    PV Testing Blank and Numbered (matches the Operation Standard)

    SpeCla

    vc037429Typewritten Text

    vc037429Typewritten Text Initial Production Parts Quality Assurance Declaration

  • Supplier Quality Manual

    Main Screen

    CoverPage

    Table of Contents Forms

    New Model

    General Information

    Mass Production

    Reference SQM Master ListQuality Control Regulations and Minimum Quality System Requirements04-01-2016 Revision

    Information

    Market

    CountryRegulations

    Forms5P CRF IPPAAR/IPP

    Inspection Fixture

    Lot Control and Traceability PAC-VData MPR

    Tool Trial

    WARNING Clicking on a black tab will open the form but it may cause the SQM to close

    PV Testing SpeCla Tool Trial HistoryPQCT

    Forms - Blank

    Clicking on a black tab will open the form, but it may cause the SQM to close.

    To open or download this form inside the manual, please return to the Forms Screen (page 3) and follow the instructions.

    SpeCla Forms

    Electrode Review - Blank

    Texture Indication Map (TIM) - Blank and Op Std.

    Click on a tab to select

    Appearance Part and Tool Detail

    vc037429Typewritten Text Initial Production Parts Quality Assurance Declaration

  • Supplier Quality Manual

    Main Screen

    CoverPage

    Table of Contents Forms

    New Model

    General Information

    Mass Production

    Reference SQM Master ListQuality Control Regulations and Minimum Quality System Requirements04-01-2016 Revision

    Information

    Market

    CountryRegulations

    Forms5P CRF IPPAAR/IPP

    Inspection Fixture

    Lot Control and Traceability PAC-VData MPR

    Tool Trial

    WARNING Clicking on a black tab will open the form but it may cause the SQM to close

    PV Testing SpeCla Supply Tool Trial HistoryPQCT

    Forms - Blank

    Clicking on a black tab will open the form, but it may cause the SQM to close.

    To open or download this form inside the manual, please return to the Forms Screen (page 3) and follow the instructions.

    Supply Part Forms

    Click on a tab to select

    Standard

    vc037429Typewritten Text Initial Production Parts Quality Assurance Declaration

  • Supplier Quality Manual

    Main Screen

    CoverPage

    Table of Contents Forms

    New Model

    General Information

    Mass Production

    Reference SQM Master ListQuality Control Regulations and Minimum Quality System Requirements04-01-2016 Revision

    Information

    Market

    CountryRegulations

    Click on a tab to select

  • Supplier Quality Manual

    Main Screen

    Quality Control Regulations and Minimum Quality System Requirements

    CoverPage

    Table of Contents Forms

    New Model

    General Information

    Mass Production

    Reference SQM Master List 04-01-2016 Revision Information

    Market

    CountryRegulations

    F t G t S li Q lit

    General Information

    Factory Guest Engineer

    Supplier Quality Performance Rating

    Click on a tab to select

  • Supplier Quality Manual

    Main Screen

    CoverPage

    Table of Contents Forms

    New Model

    General Information

    Mass Production

    Reference SQM Master ListQuality Control Regulations and Minimum Quality System Requirements04-01-2016 Revision

    Information

    Market

    CountryRegulations

    New ModelBar Code Standard CRF Data

    Limit Sample

    Inspection Fixture Design

    Master Sample Part Part Maturation Part QualityNM Receiving

    Gloss Meter Correlation Requirements

    Master Sample Development MPR

    Part Approval

    Part Maturation Expectations

    Part Quality Standard PFMEA

    PQCT PV Testing SAP SpeCla TPR Traceability and Lot Control

    PAC-VNM Receiving Inspection

    Click on a tab to select

  • Supplier Quality Manual

    Main Screen

    CoverPage

    Table of Contents Forms

    New Model

    General Information

    Mass Production

    Reference SQM Master List 07-01-2015 Revision InformationQuality Control Regulations and

    Minimum Quality System Requirements

    Market

    CountryRegulations

    New Model

    Bar Code Standard CRF Data

    Limit Sample

    Inspection Fixture Design

    Master Sample Part Part Maturation Part QualityNM Receiving

    Gloss Meter Correlation Requirements

    Master Sample Development MPR

    Part Approval

    Part Maturation Expectations

    Part Quality Standard PFMEA

    PQCT PV Testing SAP SpeCla TPR Traceability and Lot Control

    PAC-VNM Receiving Inspection

    MPR ProceduresMPR ProcedureLink to MPR Checksheet Page

    Note the MPRs linked here are the most current version and must be used for the next Request For Quote (RFQ). They must also be applied when the supplier has a part issue

    that the MPR will countermeasure.

    Click on a tab to select

  • Supplier Quality Manual

    Main Screen

    CoverPage

    Table of Contents Forms

    New Model

    General Information

    Mass Production

    Reference SQM Master List 04-01-2016 Revision InformationQuality Control Regulations and

    Minimum Quality System Requirements

    Market

    CountryRegulations

    New ModelBar Code Standard CRF Data

    Limit Sample

    Inspection Fixture Design

    Master Sample Part Part Maturation Part QualityNM Receiving

    Gloss Meter Correlation Requirements

    Master Sample Development MPR

    Part Approval

    Part Maturation Expectations

    Part Quality Standard PFMEA

    PQCT PV Testing SAP SpeCla TPR Traceability and Lot Control

    PAC-VNM Receiving Inspection

    PV TestingPV Testing Procedure PV Test Risk Analysis Form Guidelines

    Click on a tab to select

  • Supplier Quality Manual

    Main Screen

    CoverPage

    Table of Contents Forms

    New Model

    General Information

    Mass Production

    Reference SQM Master List 04-01-2016 Revision InformationQuality Control Regulations and

    Minimum Quality System Requirements

    Market

    CountryRegulations

    New ModelBar Code Standard CRF Data

    Limit Sample

    Inspection Fixture Design

    Master Sample Part Part Maturation Part QualityNM Receiving

    Gloss Meter Correlation Requirements

    Master Sample Development MPR

    Part Approval

    Part Maturation Expectations

    Part Quality Standard PFMEA

    PQCT PV Testing SAP SpeCla TPR Traceability and Lot Control

    PAC-VNM Receiving Inspection

    Forms - Blank

    WARNING Clicking on a black tab will open the form, but it may cause the SQM to close.

    To open or download this form inside the manual, please return to the Forms Screen (page 3) and follow the instructions.

    SAP (Specified Action Plan) SAP Procedure SAP ExampleSAP Components

    Click on a tab to select

    pp

  • Supplier Quality Manual

    Main Screen

    CoverPage

    Table of Contents Forms

    New Model

    General Information

    Mass Production

    Reference SQM Master List 04-01-2016 Revision InformationQuality Control Regulations and

    Minimum Quality System Requirements

    Market

    CountryRegulations

    New ModelBar Code Standard CRF Data

    Limit Sample

    Inspection Fixture Design

    Master Sample Part Part Maturation Part QualityNM Receiving

    Gloss Meter Correlation Requirements

    Master Sample Development MPR

    Part Approval

    Part Maturation Expectations

    Part Quality Standard PFMEA

    PQCT PV Testing SAP SpeCla TPR Traceability and Lot Control

    PAC-VNM Receiving Inspection

    SpeCla Minimum Tooling Specifications f S Cl P tSpeCla Procedure for SpeCla PartsSpeCla Procedure

    Click on a tab to select

  • Supplier Quality Manual

    Main Screen

    CoverPage

    Table of Contents Forms

    New Model

    General Information

    Mass Production

    Reference SQM Master List 04-01-2016 Revision InformationQuality Control Regulations and

    Minimum Quality System Requirements

    Market

    CountryRegulations

    Change Point Control(IPPAAR / IPP)

    Honda Supply Parts Trouble Controlled

    5P

    Mass Production

    Gloss Meter Correlation

    Index System

    Nonconforming Product

    pp yManagement (DSPS/JSPS)Containment

    IdentificationControl

    Sort LabelRequirements

    Minimum Test Requirements (MTR)

    Non-Destructive Testing (NDT) Requirements

    Click on a tab to select

  • Supplier Quality Manual

    Main Screen

    CoverPage

    Table of Contents Forms

    New Model

    General Information

    Mass Production

    Reference SQM Master List 04-01-2016 Revision InformationQuality Control Regulations and

    Minimum Quality System Requirements

    Market

    CountryRegulations

    Mass ProductionChange Point Control

    (IPPAAR / IPP)

    Honda Supply Parts Trouble Controlled Sort

    5P

    Gloss Meter Correlation

    Index System

    Regular Lot Control

    Nonconforming Product

    Management (DSPS/JSPS)Containment

    IdentificationControl

    Label Requirements

    Minimum Test Requirements (MTR)

    Non-Destructive Testing (NDT) Requirements

    Supply Parts (DSPS/JSPS)DSPS Flow

    JSPS Flow

    Honda Supply Parts Trouble Management Flow FlowTrouble Management

    Click on a tab to select

  • Supplier Quality Manual

    Main Screen

    CoverPage

    Table of Contents Forms

    New Model

    General Information

    Mass Production

    Reference SQM Master List 04-01-2016 Revision InformationQuality Control Regulations and

    Minimum Quality System Requirements

    Market

    CountryRegulations

    Mass ProductionChange Point Control

    (IPPAAR / IPP)

    Honda Supply Parts Trouble M t (DSPS/JSPS)

    Controlled C t i t S t L b l

    5P

    Gloss Meter Correlation R i tl

    Index System

    Regular Lot Control

    Nonconforming Product

    Management (DSPS/JSPS)Containment

    IdentificationControl

    Sort Label Requirements

    Minimum Test Requirements (MTR)

    Non-Destructive Testing (NDT) Requirements

    Minimum Test Requirements (MTR)MTR

    SRS AssembliesMTR

    ProcedureMTR Suspension

    Damper AssembliesMTR Electro Mechanical and

    Mechanical AssembliesMTR Electronic

    Assemblies

    Click on a tab to select

  • Supplier Quality Manual

    Main Screen

    CoverPage

    Table of Contents Forms

    New Model

    General Information

    Mass Production

    Reference SQM Master List 04-01-2016 Revision InformationQuality Control Regulations and

    Minimum Quality System Requirements

    Market

    CountryRegulations

    Market Related Mass Production Procedures

    Ch P i t C t l I d N f iC t ll d El t i

    Market

    Change Point Control(IPPAAR / IPP)

    Index System

    Nonconforming Product

    Controlled Containment

    ElectronicSort Label5P MTR

    Challenge Quality (CQ) Process Overview

    Click on a tab to select

  • Supplier Quality Manual

    Main Screen

    CoverPage

    Table of Contents Forms

    New Model

    General Information

    Mass Production

    Reference SQM Master List 04-01-2016 Revision InformationQuality Control Regulations and

    Minimum Quality System Requirements

    Market

    CountryRegulations

    Reference

    Acronyms and Definitions

    HSQM Continuous Improvement Flow

    Supplier Part SchedulePlantCodes

    Click on a tab to select

  • Supplier Quality Manual

    Main Screen

    CoverPage

    Table of Contents Forms

    New Model

    General Information

    Mass Production

    Reference SQM Master List 04-01-2016 Revision InformationQuality Control Regulations and

    Minimum Quality System Requirements

    Market

    CountryRegulations

    Country Regulations

    China Compulsory Certification (CCC)

    Click on a tab to select

  • Supplier Quality Manual Table of Contents

    HSQM-TOC Page 1/4 07/01/2015

    Forms (Blank Form, Completion Operation Standards and Examples)

    5P (5 Principles for Problem Solving) CRF (Countermeasure Request Form)

    Data Sheets Inspection Data Receiving Inspection Data Regulation Data Inspection Fixture

    Gage R&R Worksheet Long Method Gage R&R Worksheet Short Method Supplier Inspection Fixture Concept Supplier Inspection Fixture IPPAAR/IPP (Initial Production Parts Advance Approval Request/ Initial Production Parts) IPPAAR IPP Tag Lot Control and Traceability LNDD (Lot Number Display Detail) LNDD Operation Standard Lot Control Notification Example PDF (Process Display Form) MPR (Minimum Process Requirements) Checksheets Casting Error Proofing Fluid Fill Heat Treatment Hot Plate Welding Injection Molding Label Machining Painting Part Marking PCB Sonic / Vibration / Friction Welding Stamping

    Torque Weld Wire Harness PAC-V (Process Assurance Capability Verification) SheetLeak Test

    MA04922Text Box Main Menu Previous Menu

  • Supplier Quality Manual Table of Contents

    HSQM-TOC Page 2/4 07/01/2015

    Forms (Blank Form, Completion Operation Standards and Examples) (continued)

    PV (Part Validation) Testing PV Testing Blank and Numbered PV Testing Risk Analysis PV Testing Schedule and Results Summary Form Operation Standard Styling Parts Guideline (SpeCla) Electrode Review Texture Indication Map Tool Trial History Sheet

    General Information FGE (Factory Guest Engineer)

    Supplier Quality Performance Rating

    New Model Bar Code Standard CRF (Countermeasure Request Form)

    Data E-Requirements Gloss Meter Correlation Requirements

    Inspection Fixture Design Guideline Limit Sample Master Sample Development Minimum Process Requirements Procedure New Model Receiving Inspection PAC-V (Process Assurance Capability Verification) Part Approval Part Maturation Expectations Part Quality Standard PFMEA (Process Failure Mode and Effect Analysis) PQCT (Process Quality Control Table) PV (Part Validation) Testing PV (Part Validation) Testing Procedure PV Test Risk Analysis Form Guidelines

    SAP (Specified Action Plan) SAP Components SAP Procedure SAP Example

    PFMEA (Process Failure Mode and Effect Analysis) PFMEA Operation Standard PQCT (Process Quality Control Table)

    MA04922Text Box Main Menu Previous Menu

  • Supplier Quality Manual Table of Contents

    HSQM-TOC Page 3/4 07/01/2015

    Mass Production

    5P (5 Principles for Problem Solving) Change Point Control (IPPAAR/IPP) Controlled Containment Sort Label Forms Ordering IPP and Lot Control Gloss Meter Correlation Requirements Honda Supply Parts Trouble Management Honda Supply Parts Trouble Management DSPS Flow JSPS Flow Identification Control Index System

    MTR (Minimum Test Requirement) MTR (Minimum Test Requirement) Procedure Minimum Test Requirements Electro-Mechanical and Mechanical Assemblies Minimum Test Requirements Electronic Assemblies Minimum Test Requirements SRS Assemblies Minimum Test Requirements Suspension Damper Assemblies Nonconforming Product Non-Destructive Testing (NDT) Requirements

    Market

    Challenge Quality (CQ) Process Overview Quality Control Regulations and Minimum Quality System Requirements

    Quality Control Regulations and Minimum Quality System Requirements Procedure Corrective Action System Operation Standards, Training, and Process Job Qualification Process Control Change Point Control Supplier Management Lot Control and Traceability Inspection, Test, and Calibration Suspect and Nonconforming Part and Abnormal Process Organization Quality Systems and Policies Preventive Maintenance

    New Model (continued) SpeCla

    SpeCla Procedure Minimum Tooling Specifications for SpeCla Parts

    TPR (Technical Part Review) Traceability and Lot Control

    MA04922Text Box Main Menu Previous Menu

  • Supplier Quality Manual Table of Contents

    HSQM-TOC Page 4/4 07/01/2015

    Acronyms and Definitions

    HSQM Continuous Improvement Flow

    Supplier Part Schedule (SPS) Procedure

    Main Menu Previous Menu Language Screen

    Plant Codes

    Country Regulations

    China Compulsory Certification (CCC)

    Reference

    MA04922Text Box Main Menu Previous Menu

  • Technical Part Review ______________________________________________________________________________

    HSQM-0052

    Background The Technical Part Review is an enhanced version of the part maturation

    process. The target for these reviews are to reduce the amount of market claims that have resulted from the plant and supplier not properly identifying the critical control points from the designers perspective. The overall concept is to identify all of the critical control points from the design and confirm they have been guaranteed through the suppliers process quality control plan. This can be confirmed through capability studies, poka-yokes in place, QA equipment, etc.

    Scope The scope of the Technical Part Review is divided into three phases that

    cover the development timeframe of a new model project.

    No. Phase Who Objective

    1

    Design and Process Planning Review

    Honda Plant Quality, Supplier, R&D and other support groups

    Understand the technology parts and processes Identify part and process change points Review past problem history (PPH) items Understand critical part/CBU characteristics Identify critical control points Develop process control plan

    2 Process Maturation Verify critical control points Participate in tool/equipment trials

    3

    Process Verification and Stabilization

    Confirm parts meet specification Confirm process capability Investigate and summarize path forward for any

    non-confirming product produced Verify process stability Feedback/countermeasure market concerns

    Part Selection Hondas new model management team selects the parts that are evaluated.

    Part selection is based on, but not limited to the following criteria: New model part rank New supplier to Honda New technology/feature

    New material New manufacturing process New system

    High warranty Supplier black box design Suppliers are notified at the beginning of the project if their parts are selected for a technical part review.

    MA04922Text Box Main Menu Previous Menu

  • Technical Part Review ______________________________________________________________________________

    HSQM-0052

    Timing and

    Reviews At the beginning of each project, the Honda new model team reviews the project schedule and determines the timing for the three phases, and when each review will occur. The Technical Part Review timing aligns with and feeds into the suppliers New Model Review (NMR). A document detailing part number(s) and Technical Part Review specifics for the project will be sent to suppliers selected for TPR activity.

    General Activity Details

    The following table may be used as a general guideline for new model development activities applied to a part selected for TPR.

    TPR Phase 1 2 3

    Design & Process Planning Review Process Maturation Process Verification & Stabilization

    Cat

    egor

    y

    Des

    ign

    Stud

    y/Pa

    rt

    Acc

    urac

    y

    Review part DCS, part concept or data/drawing for change points and concerns

    Review past development history Design/usage intent CCPs & datum structure Review/Submit CRFs as needed Inspection fixture concept review

    Review design changes and CRFs made since TPR-1

    Confirm D/C tracking Update CCPs as needed based on any

    change points Review event part accuracy Confirm inspection fixture meets

    requirements

    Review design changes made since TPR-2

    Review trial event data and part approval

    Confirm inspection fixture meets requirements

    Determine MP readiness

    Proc

    ess

    Dev

    elop

    men

    t

    DFMEA/FTA > PFMEA correlation Confirm appropriate equipment

    controls are planned Review PACV/PPH items Confirm sub-supplier development

    requirements and strategy Trial event process and part data plan

    All concerns that could not be designed out have process controls in place

    PQCT complete & ready for use Confirm PACV items Trial event data requirements are

    clear Sub-supplier development on track

    Confirm PACV results Confirm PFMEA, PQCT, Operation

    Standards, and Actual Process match Confirm process readiness for MP Review sub-supplier development

    results

    PV T

    est

    Plan

    DV test status and results PV test plan review Joint testing plan in place

    Confirm plan still captures all requirements

    PV test status and timing review Joint testing status and results

    Review PV test results, regulation items, certification reports

    If needed, confirm risk assessment details

    Joint testing results

    Tra

    ce-

    abili

    ty Traceability expectations are clear

    Critical data for each process identified

    System requirements understood

    Traceability system in place Control method meets requirements LNDD complete

    Confirm traceability results

    MA04922Text Box Main Menu Previous Menu

  • Supplier Quality Performance Rating

    HSQM-0010

    Background Honda Purchasing and/or Quality groups go through the process of measuring suppliers' quality performance. This process has two parts - forming the ratings and Honda subsequent actions. Note - this is the "Q" rating in Honda's SQCDM process for the maker layout selection process.

    Forming the Ratings

    The table below shows how the ratings are formed.

    Stage Description

    1

    IPM$ (Index Per Million Dollars of Parts Received) is calculated using this formula Dollar Value of Parts Received = Purchased Value - Honda Supplied Parts Value QIPM$ = Quality Index / Dollar Value of Parts Received X 1,000,000 W$PM$= WRP + CQ + Recall + PUD divided by sales multiplied by 1,000,000

    2

    Suppliers are grouped into type categories

    AP - Assembler/Painter/Processor CA - Casting CC - Complex Component CS - Complex Stamping EL - Electrical F - Fasteners FF Forged/Formed MC - Machining PA - Plastic Appearance PNA - Plastic Non-Appearance R - Rubber SC - Simple Component SS - Simple Stamping ST - Soft Trim

    Note Each supplier is assigned a commodity/category by CPG. Each supplier is placed in one category only. The category placement is by the six-digit supplier number.

    MA04922Text Box Main Menu Previous Menu

  • Supplier Quality Performance Rating

    HSQM-0010

    Stage Class Ranking calculation Description

    3

    QIPM$ Calculate the average QIPM$ for each category Better than half the average - tend to be Class 1 Worse than twice the average - tend to be Class 3 WIPM$ Warranty Index divided by sales multiplied by 1,000,000 Warranty Index class ranking. < half the mean is a class 1, = or > half of mean but

    not to exceed 2X mean is a class 2, > two times the mean is a class 3 W$PM$ Warranty dollars recovered (CQ+WRP+ Recall + PUD) divided by sales multiplied

    by1,000,000 Warranty $ class ranking. $0 = Class 1, = or < mean Class 2, > mean class 3 Supplier warranty class rank will be the worst of the two, WIPM$ or W$PM$ Note - it is possible for a category to have all suppliers rated as the same class.

    4

    Honda management reviews the supplier's quality and warranty performance for the last 12 months. Honda senior management may change a supplier's rating based on actual performance (e.g. move from a class 2 to class 3). Performance factors include Failure to meet Minimum Process Requirements (MPR) Response speed Cooperation Total impact Other (e.g. NM development)

    5 Purchasing makes final approval of the rating list and distributes to purchasing and quality departments throughout Honda.

    MA04922Text Box Main Menu Previous Menu

  • Supplier Quality Performance Rating

    HSQM-0010

    Honda Subsequent Actions

    Honda uses the supplier quality and warranty performance rating information to make decisions to initiate supplier improvement actions. Decisions to initiate actions are based on available information and management judgment. Actions are initiated by individual Honda facilities as appropriate. PH Division also considers Delivered Quality and Warranty supplier class ranking when awarding business. Class 1 - consider primary for additional business Class 2 - consider for continued business. Requires additional

    documentation for expanding business. Class 3 - consider for reduction in business. Requires documented

    justification for continued or increased business. Negotiate fundamental business system improvements and resources.

    MA04922Text Box Main Menu Previous Menu

  • Supplier Part Schedule (SPS)

    HSQM - Reference

    Background Suppliers are responsible to document and communicate NM part development schedules to Honda PH. This is required for all new or changed parts that apply from the launch of a new model.

    Responsibilities Honda PH communicates the project requirements to the supplier, coordinates

    supplier feedback, evaluates supplier feedback against the NM project targets and negotiates any necessary schedule adjustments. Suppliers complete and submit the schedules according to the requirements.

    Two Documents

    The SPS is comprised of two documents. Tool Summary Sheet Summarizes the critical path lead time for a purchased part Identifies high level change points to tooling, equipment and process Tracks the impact of each design change on tool maturation - by event Note - Honda PH issues a project specific version of the tool summary sheet for each NM project Gantt Chart Summarizes, in detail, all activities the supplier undertakes to ensure the

    timely development of a part Content requirements - The schedule must explain plan vs. actual activity

    for each exclusive tool, piece of equipment, process and testing associates with the part. Honda PH provides a summary of development targets via the NMR process. Ideally the supplier's schedule incorporates all the NMR items.

    The format is flexible. However, Honda PH suggests suppliers use Microsoft Project to create the Gantt chart.

    Timing A completed SPS is due from the supplier to the responsible Honda PH (NM)

    contact within 14 calendar days of the tool release Within 14 calendar days of receiving a new drawing or data - in order to

    quickly communicate the impact of each design change Once per month after tooling release until the part receives full approval

    from Honda PH - in order to report the progress of the part's development

    MA04922Text Box Main Menu Previous Menu

  • Supplier Part Schedule (SPS)

    HSQM - Reference

    Tooling Terms The list below explains Honda's tooling terms

    Term Explanation

    Go 1-1 Honda PH's authorization for the supplier to begin tool design

    Go 1-2 Honda PH's authorization for the supplier to purchase long lead raw material for a tool OR to begin rough cutting Go 2-2 Honda PH's authorization for the supplier to begin tool manufacture

    MP In part maturation codes this code indicates the part's tooling and production process are MP ready

    Related Documents and Activities

    The table below lists related documents and activities

    Document /

    Activity Description

    Design Change Instruction Sheet

    A document issued with each design change from the Final Prototype Drawing issue that authorizes the supplier to implement a design change within a specified timeframe. The supplier pulls information from the Design Change Instruction Sheet, in order to complete the design change impact to tooling section of the Tool Summary Sheet.

    NMR

    A process by which Honda PH reviews the development progress of select suppliers to ensure that the project is progressing satisfactorily. Suppliers are selected for reviews based on a calculated part rank. S and A rank part suppliers are required to present a SAP as part of the NMR process.

    Start-up Plan

    A document issued by Honda PH prior to event order activity that communicates general event requirements and timing. In early development, the supplier uses the delivery date information from the Start-up plan to establish the tool maturation plan, for each event, on the Tool Summary Sheet

    Supplier NM Development Status Summary Sheet

    A document used in the NMR process to report the suppliers progress for each part against measurable project targets. The targets established on this form for each model drive the SPS Gantt chart content.

    Tool Maturation Definitions

    A document that explains what tooling and process criteria a part must meet in order to satisfy a specific maturation code (can be found in the appendix of this manual).

    Tool Release A process by which Honda PH authorizes suppliers to proceed with tooling and equipment development. The information the supplier provides on the Tool Summary Sheet is used to determine the tool release requirement for each part.

    Trial Matrix

    A document issued by Honda PH to suppliers during the event order phase to communicate detailed trial event requirements and timing. Later in development, the supplier refers to the Trial Matrix to establish the supplier tool maturation plan for each event, on the Tool Summary Sheet.

    MA04922Text Box Main Menu Previous Menu

  • This page intentionally left blank

    MA04922Text Box Main Menu Previous Menu

  • This page intentionally left blank

    MA04922Text Box Main Menu Previous Menu

  • 06/03/02HSQM - Reference 1

    PROGRESS TRACKINGGANTT CHART

    ID Task Name Baseline D Baseline Sta Baseline Fin1 4 DOOR TRIALS 0 wk Wed 8/15 Wed 8/152 2 DOOR TRIALS 0 wk Wed 8/15 Wed 8/153 SPEC. MATURATION 1 wk Wed 8/15 Tue 8/21/4 Design/Specification 1 wk Wed 8/15 Tue 8/215 TOOLING 26 wk Wed 8/15 Tue 2/12/6 Tooling #1 - 2 molds 4 cavity 18.4 wk Wed 8/15 Thu 12/207 Go-1 to Go-2 3 wks Wed 8/15 Tue 9/4/8 Tool design 3 wk Wed 8/15 Tue 9/4/9 Raw Material order 3 wk Wed 8/15 Tue 9/4/10 G0-2 to T1 13.4 wk Wed 9/5/ Thu 12/6/11 Cut Die Holder 25 day Wed 9/5/ Tue 10/912 Cut Electrode 10 day Wed 9/5/ Tue 9/1813 CMM Carbon Electrode 2 day Wed 9/19 Thu 9/2014 EDM Cavity 4 day Fri 9/21/ Wed 9/2615 CMM Cavity 2 day Thu 9/27 Fri 9/28/16 Finish Die cutting ~ Polish / 4 day Mon 10/1 Thu 10/417 Make / install cores and slid 10 day Fri 10/5/ Thu 10/1818 Polish die 6 day Fri 10/19 Fri 10/2619 Install water / electric lines 4 day Mon 10/29 Thu 11/120 Try 1 da Fri 11/2/ Mon 11/521 T1 - T3 2 wks Fri 12/7/ Thu 12/2022 Part Accuracy changes 1 wk Tue 11/6 Mon 11/1223 Process changes 1 wk Tue 11/13 Mon 11/1924 Boat Ship tool from Japan 4 wk Tue 11/20 Mon 12/1725 Set up 1 wk Tue 12/18 Wed 12/1926 Try 2 day Thu 12/20 Thu 12/2027 T-3 to T-4 3.4 wk Mon 1/21/ Tue 2/12/

    8/15

    8/15

    mit CRF

    G0-1

    G0-2 T1

    d/c R4Y-2-1234 Delayed go 2 by 2 weeks.

    expedite to make up for late Go-2

    expedite to make up for late Go-2

    expedite to make up for late Go-2

    T3

    T4

    EG UF-1 Dankaku QC

    29 5 12 19 26 2 9 16 23 30 7 14 21 28 4 11 18 25 2 9 16 23 30 6 13 20 27 3 10 17 24 3 10 17 24 31 7 14 21 28 5 12 19 26 2 9 16 23 30August September October November December January February March April May June Jul

    Milestones

    Plan vs Actual

    % Progress Completion

    Task from Job Tree

    Example

    MA04922Text Box Main Menu Previous Menu

  • SpeCla

    HSQM-0075 Page 1/4 04/01/15

    Purpose Develop tooling that will be used to manufacture appearance parts

    Scope Outline the steps required to input essential information and track status

    of appearance part tooling maturation.

    IS this a SpeClapart?

    End of ProcessNo

    Complete steps 1-4

    Does this part

    require texture?

    Yes

    No End of Process

    Yes

    Complete steps 5-8 End of Process

    Forms Appearance Part Tooling Detail (APTD)

    Texture Indication Map (TIM).

    Reference Document

    Minimum Tooling Specifications for SpeCla Parts.

    MA04922Text Box Main Menu Previous Menu

  • SpeCla

    HSQM-0075 Page 2/4 04/01/15

    Step 1 Honda will determine the list of SpeCla parts.

    Step 2 For each designated SpeCla part, the supplier must adhere to the Minimum

    Tooling Specifications for tooling development. Deviations from the Minimum Tooling Specifications must be negotiated with Honda.

    Step 3 Determine if Honda part will require an APTD Form

    The drawing and / or Honda will determine if part is a Specla Part that will require the supplier to fill out an APTD.

    a) If No Process Complete b) If Yes Supplier / Honda must complete the procedure and

    workflow for appearance part development. Submit APTD Document to Honda.

    Step 4 Appearance Part Tooling Detail (APTD) Completion

    Honda notifies the supplier of specla parts that require an APTD.

    The supplier completes the APTD as required and submits to Honda no later than the due date.

    Honda quality rep reviews the APTD for the required content and either accepts or rejects the document.

    Accept : If the document is accepted, the Honda Quality Rep will sign the document and notify the supplier Reject: If the document is rejected, it will be returned to the supplier with the concerns outlined. The supplier is responsible to update the document with the required changes and resubmit to Honda within 3 working days.

    ___________________________________________________________________________________________

    Step 5 Determine if part will require texture

    The drawing and / or Honda will determine if part is a texture part.

    a.) If No Process complete b.) If Yes Supplier / Honda must complete the procedure and

    workflow for texture development

    MA04922Text Box Main Menu Previous Menu

  • SpeCla

    HSQM-0075 Page 3/4 04/01/15

    Step 6

    Texture Indication Map Completion Honda notifies the suppliers of texture parts that require a

    TextureIndication Map (TIM)

    The supplier completes the TIM as required and submits to Honda no later than the due date. Grain orientation is dictated by Honda.

    Honda Quality Rep reviews the TIM for the required content and either accepts or rejects.TIM

    Accept: If the document is accepted, the Honda Quality Rep will notify the supplier. Reject: If the document is rejected, it will be returned with the concerns outlined and the supplier is responsible to update with the required changes and re-submit to Honda no later than 3 days from the document being rejected.

    The supplier provides a T-3 level part and TIM to the specified texture source. The texture source will fill in the detail of the TIM and mark the T-3 part with grain depth and direction per the surface condition drawing or 3D Annotation, and draft analysis. The TIM and marked part are reviewed and approved by Honda, supplier and texture source indicating agreement with content of map and marked part.

    Step 7

    Texture Go - A T3 part is submitted to Honda to be reviewed for Texture Go . Accept : Honda notifies the supplier the part has texture go. The signed / approved TIM forTexture Go is sent to the tier 1 part who then facilitates the tool texture activity.

    Reject: If the T3 part is rejected, the Honda Quality Rep. notifies the supplier with the concern items. The supplier must submit another part with the concerns counter measured to meet the required MP quality maturation level

    MA04922Text Box Main Menu Previous Menu

  • SpeCla

    HSQM-0075 Page 4/4 04/01/15

    Step 8

    Texture Approval The tool is textured and sample parts are run at rate in the mass production equipment / location. The supplier will submit a T4 Level partfor each cavity for texture approval by Honda Quality rep. The part will also be reviewed at the CBU color / texture / gloss harmony review meeting with Honda Styling associate at Honda Specified event timing.

    Accept: If the T4 part is acceptable, then the Honda Quality Rep. will notify the supplier that their part has texture approval with a signed TIM

    The approved texture map is sent to the supplier and a copy is put into the part file. Reject: If the T4 part is rejected, the Honda Quality Rep. notifies the supplier with the concern items. The supplier must submit another improved part with the concerns items counter measured to meet the required MP quality maturation level

    Note Honda sites may require additional detail.

    MA04922Text Box Main Menu Previous Menu

  • Specified Action Plan (SAP)

    HSQM-0015 Page 1/1 06/03/02

    Background The SAP is used to Establish goals Break the goals into tasks or jobs Define when to do the tasks Assign responsibility for completing tasks Track and evaluate progress of each step

    Application Although used primarily for New Model development activity the SAP

    concept can be used for any activity that requires a schedule to achieve a defined goal. The complexity of the SAP will of course vary from project to project.

    Requirement Suppliers are required to create a SAP for each new model project. Based on

    part rank and each plants requirements; suppliers may be required to periodically submit the SAP to Honda for review.

    Format Honda does not have a specific format for the SAP. Honda does however

    require that certain components be a part of whatever new model development process a supplier uses. Goal setting Job tree Progress tracking Organization Evaluation process SAP within the supplier's organization The following pages contain reference material explaining the components of the SAP process.

    MA04922Text Box Main Menu Previous Menu

  • 06/03/02HSQM-0016 1

    Components of the Specified Action Plan ProcessJOB TREE: (why, how, what) PROGRESS TRACKING: (what, who, when)

    ORGANIZATION:

    APQP DEFICIENCY:

    EVALUATION PROCESS: SAP WITHIN THE SUPPLIER ORG:

    EVIDENCE JUSTIFYING STATUS: VISUAL MANAGEMENT AND REPORTING:

    Q

    Dev

    Del

    Model QCDDM

    Supplier Goals

    Supplier S/A

    InterimTargets

    ActivityThemes Tasks

    Create Gantt chart based on job tree breakdown of tasks:

    Plan:

    Actual:

    T1 T2 T3

    T1 T2 T3

    Go-2

    Go-2

    HP LZUAYZ

    Honda03M

    Eng Qlty Mfg P.C.

    Top Mgmt

    Project Leader

    Resp. Dept.

    Resp.Assoc.

    Guided by NMR Interim TargetsGuarantee execution of SAPConduct a pre Honda NMR evaluationTop Management evaluate; use P-D-C-A approachDocument supplier top management comments from pre reviewControl Gap; make countermeasure plan; forecast next event situationState readiness to Honda - should not ask Are We Ready?Utilize go/no go judgment criteria at each stage (outside of NMR as well)

    Top Management criteria: provide the vision, decision maker, allocates resource, etc.Dedicated New Model resources should be considered if past new model start-up performance did not meet plan

    Goals not linked to tasksDoesnt require progress management. Only requires management to milestones.

    Wall chart with green, yellow, red status or on-line system Visual mgmt not possible if project mgmt system is only on-lineInvolve all members of new model organization in the report to Honda. Use the expert.

    ClearR&R

    Daily new model management documents at the supplier should be used for justification of status; or a review of the actual situation.Organized to support an efficient presentation. (not audit style, pre-prepared report style)

    Pres/VP

    PL

    Eng Qlty Mfg PC

    Track plan vs actualMonitor % completion

    Evaluate at milestones(Interim Targets)

    Assoc.

    Schedule based on Honda New Model Project requirements

    GOAL SETTING:Honda

    SQCDDMProject Goals

    Supplier previous model reflections

    Supplier personalized project goals

    SpecificMeasurableAttainableRelevantTime Bound

    HondaProject Schedule& Requirements

    SAP FORMAT:Honda is not dictating a specific style of SAP, but these components must be part of your project management process.

    MA04922Text Box Main Menu Previous Menu

  • 06/03/02HSQM-0016 2

    SAP FORMAT:Honda is not dictating a specific style of SAP, but these components must be part of your project management process.

    JOB TREE: (why, how, what) PROGRESS TRACKING: (what, who, when)

    ORGANIZATION:

    APQP DEFICIENCY:

    EVALUATION PROCESS: SAP WITHIN THE SUPPLIER ORG:

    EVIDENCE JUSTIFYING STATUS: VISUAL MANAGEMENT AND REPORTING:

    Q

    Dev

    Del

    Model QCDDM

    Supplier Goals

    Supplier S/A

    InterimTargets

    ActivityThemes Tasks

    Create Gantt chart based on job tree breakdown of tasks:

    Plan:

    Actual:

    T1 T2 T3

    T1 T2 T3

    Go-2

    Go-2

    HP LZUAYZ

    Honda03M

    Eng Qlty Mfg P.C.

    Top Mgmt

    Project Leader

    Resp. Dept.

    Resp.Assoc.

    Top Management criteria: provide the vision, decision maker, allocates resource, etc.Dedicated New Model resources should be considered if past new model start-up performance did not meet plan

    Goals not linked to tasksDoesnt require progress management. Only requires management to milestones.

    Wall chart with green, yellow, red status or on-line system Visual mgmt not possible if project mgmt system is only on-lineInvolve all members of new model organization in the report to Honda. Use the expert.

    ClearR&R

    Daily new model management documents at the supplier should be used for justification of status; or a review of the actual situation.Organized to support an efficient presentation. (not audit style, pre-prepared report style)

    Pres/VP

    PL

    Eng Qlty Mfg PC

    Track plan vs actualMonitor % completion

    Evaluate at milestones(Interim Targets)

    Assoc.

    Schedule based on Honda New Model Project requirements

    Components of the Specified Action Plan ProcessGOAL SETTING:

    HondaSQCDDM

    Project Goals

    Supplier previous model reflections

    Supplier personalized project goals

    SpecificMeasurableAttainableRelevantTime Bound

    HondaProject Schedule& Requirements

    Guided by NMR Interim TargetsGuarantee execution of SAPConduct a pre Honda NMR evaluationTop Management evaluate; use P-D-C-A approachDocument supplier top management comments from pre reviewControl Gap; make countermeasure plan; forecast next event situationState readiness to Honda - should not ask Are We Ready?Utilize go/no go judgment criteria at each stage (outside of NMR as well)

    MA04922Text Box Main Menu Previous Menu

  • 06/03/02HSQM-0016 3

    Safety Comply with all safety and environmental regulationsSame

    Quality Achieve Top of Class IQS II Reduce Warranty Claim occurrence rate

    Reduction in IQS related problems 50% Reduction of warranty claim occurrences from 99M Acura TL 0 A Rank Problems 20% Reduction in quality index spikerate increase from 01M Civic 100% Part Approval by sellable units

    CostAchieve P2 Cost target(piece price, investment, and expense)

    Achieve piece price and investment target Control D/C compensation expense No unplanned cost for Japan Air Freight

    DeliveryDevelopment

    Meet Trial event requirements Meet MP ramp up plan Meet production lost targets during trial events Meet Maturation and lead-time requirements

    100% on time delivery with the correct d/c level No short parts Capacity = 1.2 amortized rate Achieve Event Maturation Targets

    Morale Enhance communication Increase Self Reliance Provide training

    Establish clear internal and external communication routes Establish clear project roles and responsibilities. Top Management involvement Meet training plans

    Project Goals

    Honda Goal Supplier GoalSEPA

    Supplier Specific Goal

    MA04922Text Box Main Menu Previous Menu

  • 06/03/02HSQM-0016 4

    GOAL SETTING:Honda

    SQCDDMProject Goals

    Supplier previous model reflections

    Supplier personalized project goals

    SpecificMeasurableAttainableRelevantTime Bound

    HondaProject Schedule& Requirements

    PURCHASING / SUPPLIER BASIC SCHEDULE

    TOOLING MATURATION REQUIREMENTS / AVAILABLE LEADTIME

    START-UP PLAN (Trial schedule, quantity, delivery dates, maturation by commodity)

    MASS PRODUCTION RAMP-UP PLAN

    PQ NMR TIMING FLOW

    PQ & SUPPLIER DEVELOPMENT ACTIVITY

    PQ PARTS APPROVAL SUBMISSION REQUIREMENTS

    TECHNICAL PART REVIEW STRATEGY

    SPECIFICATION / DRAWING MATURATION REQUIREMENTS

    NEW MODEL REVIEW ACTIVITY SCHEDULE

    NEW MODEL REVIEW INTERIM TARGETS

    Inputs from Honda (see documents titled as follows in this packet):

    HONDA PROJECT SCHEDULES & REQUIREMENTS - SEPA PROJECT SPECIFIC

    MA04922Text Box Main Menu Previous Menu

  • 06/03/02HSQM-0016 5

    SUPPLIER PREVIOUS MODEL REFLECTIONSSITUATION ANALYSIS

    Identify Gap

    Gather gap items for a specified time period

    Perform Why-Why or Cause analysis of gap

    Step 1

    Step 2

    Step 3

    Summarize root causes and perform

    Why-Why

    Step 4

    Propose C/M forroot causes

    Step 5

    Input C/M plan to next new model SAP

    Step 6

    Gap Avoidance

    Sources of Gap

    Method

    External Feedback*Quality Index*Delivery Index*Past Problem History

    Internal Data*Rejects*OEE*Scrap Rate*Rework %*Unplanned Overtime*Expedited freight*Down Time

    *Ask WHY until you can no longer answer becauseor What causes (this problem or gap)?

    *1st 3 months NM MP*Last fiscal year

    *Add tasks to New Modeljob tree

    *Analysis why root cause can occur to lead to C/M

    *Mgmt check/supportof C/M idea

    MA04922Text Box Main Menu Previous Menu

  • 06/03/02HSQM-0016 6

    Problem / Symptom

    Why Why Why Why Why Root Cause

    Hard

    Soft

    Important step: To assure the root cause is identified, each why / why box must be supported with quantifiable data.

    Individual Problem

    Multiple Issues: Take the root cause of several single issues and put them into like categories. Each like category then should have another why/why analysis completed to determine the system issues.

    Why Why Why Why Why Root Cause

    Hard

    Soft

    Grouping Like Problems

    Define problem from root cause anddevelop improvement themes with a Job tree,

    measurable targets, and a SAP

    SUPPLIER PREVIOUS MODEL REFLECTIONSRoot Cause Analysis Methods

    Why-Why Analysis: An effective tool for identifying a root cause of a single part problem as well as an overall system issue. Each problem is typically a symptom of a deeper rooted problem. The deeper root issues can be discovered by developing a why / why analysis study.

    MA04922Text Box Main Menu Previous Menu

  • 06/03/02HSQM-0016 7

    SUPPLIER PERSONALIZED PROJECT GOALSNariyuki

    Explain how the goal can be achieved comparing the current situation to the future goal

    70%

    Efficiency Improvement Plan

    +5%

    +3%

    +2%

    Design Improvement

    Process Layout Change

    Equipment change

    +5% 85%

    PURPOSE:

    Add associate

    Each improvement plan item should have an individual action plan

    Current Model New ModelTarget Achievement

    MA04922Text Box Main Menu Previous Menu

  • 06/03/02HSQM-0016 8

    SAP FORMAT:Honda is not dictating a specific style of SAP, but these components must be part of your project management process.

    GOAL SETTING:Honda

    SQCDDMProject Goals

    Supplier previous model reflections

    Supplier personalized project goals

    SpecificMeasurableAttainableRelevantTime Bound

    HondaProject Schedule& Requirements

    JOB TREE: (why, how, what) PROGRESS TRACKING: (what, who, when)

    ORGANIZATION:

    APQP DEFICIENCY:

    EVALUATION PROCESS: SAP WITHIN THE SUPPLIER ORG:

    EVIDENCE JUSTIFYING STATUS: VISUAL MANAGEMENT AND REPORTING:

    Q

    Dev

    Del

    Model QCDDM

    Supplier Goals

    Supplier S/A

    InterimTargets

    ActivityThemes Tasks

    Create Gantt chart based on job tree breakdown of tasks:

    Plan:

    Actual:

    T1 T2 T3

    T1 T2 T3

    Go-2

    Go-2

    HP LZUAYZ

    Honda03M

    Eng Qlty Mfg P.C.

    Top Mgmt

    Project Leader

    Resp. Dept.

    Resp.Assoc.

    Top Management criteria: provide the vision, decision maker, allocates resource, etc.Dedicated New Model resources should be considered if past new model start-up performance did not meet plan

    Goals not linked to tasksDoesnt require progress management. Only requires management to milestones.

    Wall chart with green, yellow, red status or on-line system Visual mgmt not possible if project mgmt system is only on-lineInvolve all members of new model organization in the report to Honda. Use the expert.

    ClearR&R

    Daily new model management documents at the supplier should be used for justification of status; or a review of the actual situation.Organized to support an efficient presentation. (not audit style, pre-prepared report style)

    Pres/VP

    PL

    Eng Qlty Mfg PC

    Track plan vs actualMonitor % completion

    Evaluate at milestones(Interim Targets)

    Assoc.

    Schedule based on Honda New Model Project requirements

    Components of the Specified Action Plan Process

    Guided by NMR Interim TargetsGuarantee execution of SAPConduct a pre Honda NMR evaluationTop Management evaluate; use P-D-C-A approachDocument supplier top management comments from pre reviewControl Gap; make countermeasure plan; forecast next event situationState readiness to Honda - should not ask Are We Ready?Utilize go/no go judgment criteria at each stage (outside of NMR as well)

    MA04922Text Box Main Menu Previous Menu

  • 06/03/02HSQM-0016 9

    GOAL TO TASK LINKBREAKDOWN USING JOB TREE

    SUPPLIERGOALS

    HONDA N.M.PROJECT GOALS

    SUPPLIERSPECIFIC GOALS

    DETAILEDTASKS

    RESP.PERSON

    RESP.DEPT.

    Purpose of aJob Tree

    1. To expand thinking from theoretical planning to specific actions.

    2. To illustrate the real level of complexity necessary to achieve a goal.

    3. To check the logic and completeness of a plan at all levels.

    4. To link detailed tasks to high level goals.

    5. To clearly assign responsibility for tasks that contribute to the achievement of the goal.

    6. To gain ownership from team members through creation of the tree.

    MA04922Text Box Main Menu Previous Menu

  • 06/03/02HSQM-0016 10

    SAP FORMAT:Honda is not dictating a specific style of SAP, but these components must be part of your project management process.

    GOAL SETTING:Honda

    SQCDDMProject Goals

    Supplier previous model reflections

    Supplier personalized project goals

    SpecificMeasurableAttainableRelevantTime Bound

    HondaProject Schedule& Requirements

    JOB TREE: (why, how, what) PROGRESS TRACKING: (what, who, when)

    ORGANIZATION:

    APQP DEFICIENCY:

    EVALUATION PROCESS: SAP WITHIN THE SUPPLIER ORG:

    EVIDENCE JUSTIFYING STATUS: VISUAL MANAGEMENT AND REPORTING:

    Q

    Dev

    Del

    Model QCDDM

    Supplier Goals

    Supplier S/A

    InterimTargets

    ActivityThemes Tasks

    Create Gantt chart based on job tree breakdown of tasks:

    Plan:

    Actual:

    T1 T2 T3

    T1 T2 T3

    Go-2

    Go-2

    HP LZUAYZ

    Honda03M

    Eng Qlty Mfg P.C.

    Top Mgmt

    Project Leader

    Resp. Dept.

    Resp.Assoc.

    Top Management criteria: provide the vision, decision maker, allocates resource, etc.Dedicated New Model resources should be considered if past new model start-up performance did not meet plan

    Goals not linked to tasksDoesnt require progress management. Only requires management to milestones.

    Wall chart with green, yellow, red status or on-line system Visual mgmt not possible if project mgmt system is only on-lineInvolve all members of new model organization in the report to Honda. Use the expert.

    ClearR&R

    Daily new model management documents at the supplier should be used for justification of status; or a review of the actual situation.Organized to support an efficient presentation. (not audit style, pre-prepared report style)

    Pres/VP

    PL

    Eng Qlty Mfg PC

    Track plan vs actualMonitor % completion

    Evaluate at milestones(Interim Targets)

    Assoc.

    Schedule based on Honda New Model Project requirements

    Components of the Specified Action Plan Process

    Guided by NMR Interim TargetsGuarantee execution of SAPConduct a pre Honda NMR evaluationTop Management evaluate; use P-D-C-A approachDocument supplier top management comments from pre reviewControl Gap; make countermeasure plan; forecast next event situationState readiness to Honda - should not ask Are We Ready?Utilize go/no go judgment criteria at each stage (outside of NMR as well)

    MA04922Text Box Main Menu Previous Menu

  • 06/03/02HSQM-0016 11

    Supplier Specific Goals

    Supplier Goals

    (Interim Target)

    Task Resp.Person

    Resp.Dept.

    Task Resp.Person

    Resp.Dept.

    Schedule

    Management review of progress*

    Project Goals

    LINK GOALS TO SPECIFIC TASKS AND SCHEDULE

    GOAL TO TASK LINK WITH SCHEDULE

    MA04922Text Box Main Menu Previous Menu

  • 06/03/02HSQM-0016 12

    PROGRESS TRACKINGGANTT CHART

    ID Task Name Baseline D Baseline Sta Baseline Fin1 4 DOOR TRIALS 0 wk Wed 8/15 Wed 8/152 2 DOOR TRIALS 0 wk Wed 8/15 Wed 8/153 SPEC. MATURATION 1 wk Wed 8/15 Tue 8/21/4 Design/Specification 1 wk Wed 8/15 Tue 8/215 TOOLING 26 wk Wed 8/15 Tue 2/12/6 Tooling #1 - 2 molds 4 cavity 18.4 wk Wed 8/15 Thu 12/207 Go-1 to Go-2 3 wks Wed 8/15 Tue 9/4/8 Tool design 3 wk Wed 8/15 Tue 9/4/9 Raw Material order 3 wk Wed 8/15 Tue 9/4/10 G0-2 to T1 13.4 wk Wed 9/5/ Thu 12/6/11 Cut Die Holder 25 day Wed 9/5/ Tue 10/912 Cut Electrode 10 day Wed 9/5/ Tue 9/1813 CMM Carbon Electrode 2 day Wed 9/19 Thu 9/2014 EDM Cavity 4 day Fri 9/21/ Wed 9/2615 CMM Cavity 2 day Thu 9/27 Fri 9/28/16 Finish Die cutting ~ Polish / 4 day Mon 10/1 Thu 10/417 Make / install cores and slid 10 day Fri 10/5/ Thu 10/1818 Polish die 6 day Fri 10/19 Fri 10/2619 Install water / electric lines 4 day Mon 10/29 Thu 11/120 Try 1 da Fri 11/2/ Mon 11/521 T1 - T3 2 wks Fri 12/7/ Thu 12/2022 Part Accuracy changes 1 wk Tue 11/6 Mon 11/1223 Process changes 1 wk Tue 11/13 Mon 11/1924 Boat Ship tool from Japan 4 wk Tue 11/20 Mon 12/1725 Set up 1 wk Tue 12/18 Wed 12/1926 Try 2 day Thu 12/20 Thu 12/2027 T-3 to T-4 3.4 wk Mon 1/21/ Tue 2/12/

    8/15

    8/15

    mit CRF

    G0-1

    G0-2 T1

    d/c R4Y-2-1234 Delayed go 2 by 2 weeks.

    expedite to make up for late Go-2

    expedite to make up for late Go-2

    expedite to make up for late Go-2

    T3

    T4

    EG UF-1 Dankaku QC

    29 5 12 19 26 2 9 16 23 30 7 14 21 28 4 11 18 25 2 9 16 23 30 6 13 20 27 3 10 17 24 3 10 17 24 31 7 14 21 28 5 12 19 26 2 9 16 23 30August September October November December January February March April May June Jul

    Milestones

    Plan vs Actual

    % Progress Completion

    Task from Job Tree

    *A Gantt Chart without a job tree will not suffice as an SAP.

    MA04922Text Box Main Menu Previous Menu

  • 06/03/02HSQM-0016 13

    LINK SUPPLIER GANTT TO HONDA NEW MODEL DEVELOPMENT SCHEDULE

    Tool

    ing

    Go

    Tim

    ing

    Des

    ign

    Mat

    urat

    ion

    Tim

    ing

    Tria

    l Eve

    nt P

    arts

    PV T

    estin

    g

    Supplier Specified Action Plan must correlate with Honda New Model Development Schedule N

    MR

    Pla

    n

    Specification Maturation

    Tooling Leadtime Negotiation

    Supplier trial parts manufacturing plan

    PV Test planStart/StopNew Model

    Review

    Honda R&D Development Lots

    Honda Mfg. Trial Lots

    HONDA GENERAL SCHEDULE

    SUPPLIER ACTIVITY SCHEDULE

    MA04922Text Box Main Menu Previous Menu

  • 06/03/02HSQM-0016 14

    SAP FORMAT:Honda is not dictating a specific style of SAP, but these components must be part of your project management process.

    GOAL SETTING:Honda

    SQCDDMProject Goals

    Supplier previous model reflections

    Supplier personalized project goals

    SpecificMeasurableAttainableRelevantTime Bound

    HondaProject Schedule& Requirements

    PROGRESS TRACKING: (what, who, when)Create Gantt chart based on job tree breakdown of

    tasks:

    Plan:

    Actual:

    T1 T2 T3

    T1 T2 T3

    Go-2

    Go-2

    Track plan vs actualMonitor % completion

    Evaluate at milestones(Interim Targets)

    Schedule based on Honda New Model Project requirements

    Components of the Specified Action Plan ProcessJOB TREE: (why, how, what)

    ORGANIZATION:

    APQP DEFICIENCY:

    EVALUATION PROCESS: SAP WITHIN THE SUPPLIER ORG:

    EVIDENCE JUSTIFYING STATUS: VISUAL MANAGEMENT AND REPORTING:

    Q

    Dev

    Del

    Model QCDDM

    Supplier Goals

    Supplier S/A

    InterimTargets

    ActivityThemes Tasks

    HP LZUAYZ

    Honda03M

    Eng Qlty Mfg P.C.

    Top Mgmt

    Project Leader

    Resp. Dept.

    Resp.Assoc.

    Top Management criteria: provide the vision, decision maker, allocates resource, etc.Dedicated New Model resources should be considered if past new model start-up performance did not meet plan

    Goals not linked to tasksDoesnt require progress management. Only requires management to milestones.

    Wall chart with green, yellow, red status or on-line system Visual mgmt not possible if project mgmt system is only on-lineInvolve all members of new model organization in the report to Honda. Use the expert.

    ClearR&R

    Daily new model management documents at the supplier should be used for justification of status; or a review of the actual situation.Organized to support an efficient presentation. (not audit style, pre-prepared report style)

    Pres/VP

    PL

    Eng Qlty Mfg PC

    Assoc.

    Guided by NMR Interim TargetsGuarantee execution of SAPConduct a pre Honda NMR evaluationTop Management evaluate; use P-D-C-A approachDocument supplier top management comments from pre reviewControl Gap; make countermeasure plan; forecast next event situationState readiness to Honda - should not ask Are We Ready?Utilize go/no go judgment criteria at each stage (outside of NMR as well)

    MA04922Text Box Main Menu Previous Menu

  • 06/03/02HSQM-0016 15

    ORGANIZATIONORGANIZATION

    * Clearly defined & documented organization by project* Roles and Responsibilities defined & documented* All members of the team identified* Defined reporting flow* Top Management participation:

    Agrees with the project plan Planned periodic reviews with evaluation purpose

    ORGANIZATION

    Pres/VP

    Project Manager

    Quality Engineering Manufacturing Prod. Control Design Overseas Support

    Specific Individual Associate Names

    MA04922Text Box Main Menu Previous Menu

  • 06/03/02HSQM-0016 16

    SAP FORMAT:Honda is not dictating a specific style of SAP, but these components must be part of your project management process.

    GOAL SETTING:Honda

    SQCDDMProject Goals

    Supplier previous model reflections

    Supplier personalized project goals

    SpecificMeasurableAttainableRelevantTime Bound

    HondaProject Schedule& Requirements

    PROGRESS TRACKING: (what, who, when)Create Gantt chart based on job tree breakdown of

    tasks:

    Plan:

    Actual:

    T1 T2 T3

    T1 T2 T3

    Go-2

    Go-2

    Track plan vs actualMonitor % completion

    Evaluate at milestones(Interim Targets)

    Schedule based on Honda New Model Project requirements

    Components of the Specified Action Plan ProcessJOB TREE: (why, how, what)

    ORGANIZATION:

    APQP DEFICIENCY:

    SAP WITHIN THE SUPPLIER ORG:

    EVIDENCE JUSTIFYING STATUS: VISUAL MANAGEMENT AND REPORTING:

    Q

    Dev

    Del

    Model QCDDM

    Supplier Goals

    Supplier S/A

    InterimTargets

    ActivityThemes Tasks

    HP LZUAYZ

    Honda03M

    Eng Qlty Mfg P.C.

    Top Mgmt

    Project Leader

    Resp. Dept.

    Resp.Assoc.

    Top Management criteria: provide the vision, decision maker, allocates resource, etc.Dedicated New Model resources should be considered if past new model start-up performance did not meet plan

    Goals not linked to tasksDoesnt require progress management. Only requires management to milestones.

    Wall chart with green, yellow, red status or on-line system Visual mgmt not possible if project mgmt system is only on-lineInvolve all members of new model organization in the report to Honda. Use the expert.

    ClearR&R

    Daily new model management documents at the supplier should be used for justification of status; or a review of the actual situation.Organized to support an efficient presentation. (not audit style, pre-prepared report style)

    Pres/VP

    PL

    Eng Qlty Mfg PC

    Assoc.

    EVALUATION PROCESS:Guided by NMR Interim TargetsGuarantee execution of SAPConduct a pre Honda NMR evaluationTop Management evaluate; use P-D-C-A approachDocument supplier top management comments from pre reviewControl Gap; make countermeasure plan; forecast next event situationState readiness to Honda - should not ask Are We Ready?Utilize go/no go judgment criteria at each stage (outside of NMR as well)

    MA04922Text Box Main Menu Previous Menu

  • 06/03/02HSQM-0016 17

    SUPPLIER INTERNAL NEW MODEL EVALUATION PROCESSHonda is not checking all aspects of a suppliers preparation. Based on the potential impact to trials and MP, Honda is prioritizingthe items and the depth of the review. The supplier must evaluate all of the items that Honda is not reviewing.

    NMR Check Points

    Supplier evaluation

    Items

    Planning E0 E1 E2 E3

    Supplier Top Mgmt Evaluation

    With defined judgment items and criteria

    Trial~MP Go / No Go judgment

    Desig

    n/Spe

    cifica

    tion

    Tool

    Leve

    l

    Inspe

    ction

    Fixtu

    reMa

    chine

    Manu

    factur

    ing Fi

    xture

    In-lin

    e QA

    Devic

    e

    Maint

    enan

    ceRe

    pair

    EPA

    Perm

    its

    Build

    Ass

    ociat

    e/Man

    powe

    r

    Prod

    uctio

    n Mate

    rial

    Hand

    work

    Line S

    peed

    /Cyc

    le Tim

    e

    Asso

    ciate

    Train

    ing

    PFME

    APQ

    CTLo

    t Con

    trol

    Even

    t Part

    Acc

    uracy

    Even

    t Part

    Des

    ign Le

    vel

    Hond

    a Situ

    ation

    Con

    firmati

    on

    Prod

    uct V

    alida

    tion T

    estin

    g

    Bill o

    f Mate

    rial

    Pack

    aging

    Sub-s

    uppli

    er Re

    adine

    ss

    Deliv

    erySa

    fety/E

    rgono

    mics

    Cost

    Moral

    eOt

    her

    Depth of

    Review

    MA04922Text Box Main Menu Previous Menu

  • 06/03/02HSQM-0016 18

    SUPPLIER TRIAL EVENT GO / NO GO JUDGMENT CHECKSHEET (Example)TRIAL

    DANKAKU QC VC 200 PC / 2 HPLAN/ FORE- Top Mgmt PLAN/ FORE- Top Mgmt PLAN/ FORE- Top Mgmt PLAN/ FORE-

    CAT. ITEM REQ'T CAST ACTUAL GAP Judgment REQ'T CAST ACTUAL GAP Judgment REQ'T CAST ACTUAL GAP Judgment REQ'T CAST ACTUAL

    Safety Eqpt "interlocks" O

    Quality Part Maturation O Raw Material O PPA or MP parts (I/H parts) O Prod. Location O N.A. Jpn JpnO/S parts PPAP/receiving inspection results OScrap Rate O OReject Rate O ODesign Change No. OPQCT-Process Status OPart Accuracy OHandwork/part OInspection Fixture OColor Match OLot Control/FIFO OTest Results OQA Machine-Dummy/Pole Yoke parts fix OCpK OFMEA re-check w/CpK O

    Development OEE/Cycle Time ODowntime Plan (production schedule adjusted) O

    Delivery Packaging Available OTier 2 (dom.) parts rec'd OHAM DSPS / JSP rec'd ODelivery plan (ttl sch. clear) O

    CostHAM trial piece price fixed OTier-2 fixed Oexpedite expense O

    Mgmt Associate Training OManpower (MP vs NM) O

    OtherCustomer P.O. vs run plan clear OProblem Tracking Chart (PTC) O System ready O Last trial PTC status OBOM Accuracy O

    MfgFinal Assy plan (on/off-line) OOperation Standards complete (to req'd level) O

    Inpu

    t

    Dur

    ing

    Out

    put

    TOP MANAGEMENT SHOULD JUDGE GO / NO GO BEFORE EACH KEY ACTIVITY.

    THE JUDGMENT CRITERIA SHOULD BE COMMUNICATED TO THE TEAM IN ADVANCE.

    THE TREND SHOULD BE TRACKED FROM EVENT TO EVENT AND RESOURCES ALLOCATED

    APPROPRIATELY TO GUARANTEE A SMOOTH MP START UP.

    THE PROJECT TEAM SHOULD ACTIVELY MANAGE TRIAL EVENT GAP ITEMS AND THEIR

    COUNTERMEASURES.

    MA04922Text Box Main Menu Previous Menu

  • 06/03/02HSQM-0016 19

    GOAL SETTING:Honda

    SQCDDMProject Goals

    Supplier previous model reflections

    Supplier personalized project goals

    SpecificMeasurableAttainableRelevantTime Bound

    HondaProject Schedule& Requirements

    PROGRESS TRACKING: (what, who, when)Create Gantt chart based on job tree breakdown of

    tasks:

    Plan:

    Actual:

    T1 T2 T3

    T1 T2 T3

    Go-2

    Go-2

    Track plan vs actualMonitor % completion

    Evaluate at milestones(Interim Targets)

    Schedule based on Honda New Model Project requirements

    Components of the Specified Action Plan ProcessJOB TREE: (why, how, what)

    ORGANIZATION:

    APQP DEFICIENCY:

    EVALUATION PROCESS: SAP WITHIN THE SUPPLIER ORG:

    EVIDENCE JUSTIFYING STATUS: VISUAL MANAGEMENT AND REPORTING:

    Q

    Dev

    Del

    Model QCDDM

    Supplier Goals

    Supplier S/A

    InterimTargets

    ActivityThemes Tasks

    HP LZUAYZ

    Honda03M

    Eng Qlty Mfg P.C.

    Top Mgmt

    Project Leader

    Resp. Dept.

    Resp.Assoc.

    Top Management criteria: provide the vision, decision maker, allocates resource, etc.Dedicated New Model resources should be considered if past new model start-up performance did not meet plan

    Goals not linked to tasksDoesnt require progress management. Only requires management to milestones.

    Wall chart with green, yellow, red status or on-line system Visual mgmt not possible if project mgmt system is only on-lineInvolve all members of new model organization in the report to Honda. Use the expert.

    ClearR&R

    Daily new model management documents at the supplier should be used for justification of status; or a review of the actual situation.Organized to support an efficient presentation. (not audit style, pre-prepared report style)

    Pres/VP

    PL

    Eng Qlty Mfg PC

    Assoc.

    SAP FORMAT:Honda is not dictating a specific style of SAP, but these components must be part of your project management process.

    Guided by NMR Interim TargetsGuarantee execution of SAPConduct a pre Honda NMR evaluationTop Management evaluate; use P-D-C-A approachDocument supplier top management comments from pre reviewControl Gap; make countermeasure plan; forecast next event situationState readiness to Honda - should not ask Are We Ready?Utilize go/no go judgment criteria at each stage (outside of NMR as well)

    MA04922Text Box Main Menu Previous Menu

  • 06/03/02HSQM-0016 20

    LEVELS OF A SPECIFIED ACTION PLANLEVELS OF A SPECIFIED ACTION PLAN

    ALL NEW MODEL Top Mgmt

    CONTROLLEVEL

    FY 2003Link to Corporate Business Plan

    03M AccordEACH PROJECT

    EACH DEPT

    EACH GROUP/ASSOC.

    Project Mgr

    Dept Mgr

    Report to HONDA

    Eng PC

    Qlty Mfg

    DEEPER BREAKDOWN

    OF TASKS

    MA04922Text Box Main Menu Previous Menu

  • 06/03/02HSQM-0016 21

    SAP FORMATSAP FORMATMONTH 4 5 6 7 8 9 10 11 12 1 2 3 4

    START-UP SCHEDULE

    ZONE PURPOSE TARGET METHOD RESP. SCHEDULE / METHOD

    CM/L SETTING

    * M/L FIX BY P2 * M/L SET WITHIN 10 DAYS OF DWG ISSUE * NO SHORT / LATE PARTS DUE TO M/L DELAY

    * BOM MATURATION SYSTEM (EXCL) * M/L SETTING SHEET TRACKING SYSTEM

    * TEAM CONSENSUS OF M/L DECISION PRIOR TO GO RELEASE

    * (NEW ) M/L REVIEW MEETING * NEW SUPPLIER QAV

    * CPG * PH/PQ

    QTOOL &

    EQUIPMENT MATURATION

    * TOOL / PROCESS MATURATION TARGETS MET

    * DESIGN FIX PLANNING MEETING * ONE PACK / GO RELEASE PROCEDURES * (REV) SUPPLIER PART SCHEDULE * PH MAINFRAME TOOLING TRACKING SYSTEMS

    PROCESS MATURATION

    * TOOL / PROCESS MATURATION TARGETS MET

    * QUALITY STANDARD * FMEA * PQCT * LNDD * PROCESS INSPECTION STANDARD

    M/L SETTING, RFQ

    4DR

    C1DEVELOPMENT

    SCHEDULE

    FIX CHANGE PTS. , MANAGE PENDING ITEMS

    LIN

    E 1

    4 D

    OO

    R

    4DR DRW FPD MPD

    DAN- 1(T1)

    W/B (4 DOOR)

    SET GO PLAN

    B RANK

    S-J

    T- 1 T- 3T- 2

    SE

    LT

    FIX

    DAN- 1 DAN- 2

    C RANK

    C1

    P2

    E- 1E- 0

    STUDY

    * CPG

    * NMDADVANCE

    IMAGE QC VC / PP / MP

    M/L REVIEW MTGS / NEW SUPPLIER QAV

    TEXTURE

    A RANK

    PENDING GO MTGS

    * TEAM

    * NMD

    * NMD

    * NMD

    * S/D

    * S/D

    B RANK T- 1 T- 2

    C RANK

    A RANK

    T- 3

    COMPLETE BY GO

    COMPLETE BY EVENT

    * PAST PROBLEM C/M CONFRMED* QUALITY STANDARD ISSUED* QA EQUIPMENT PLAN COMPLETE* INSPECTION FIXTURE CONCEPT COMPLETE* LOT CONTROL REQ'T DECIDED

    * PFMEA APPROVED* PQCT DRAFT COMPLETE* INSPECTION FIXTURE ACCURACY VERIFIED* INSPECTION DATA SHEET APPROVED* LNDD DOCS. COMPLETE* PROCESS INSPECTION STD COMPLETE* SUPPLIER TRAINING PLAN CONFIRMED

    * PQCT CONFIRMED TO PROC* QA EQUIPMENT CONFIRMED* CONFIRM PART ACCURACY* CONFIRM LOT CONTROL AT * SUPPLIER HIRING / TRAININGCONFIRMED* PTC/QSS C/M COMPLETE* PROCESS CAPABILITY CONF* OPS STD VERIFIED* SAMPLING PLAN COMPLETE* REPAIR PLAN COMPLETE

    * AQ* PQ* PQ* PQ* PQ

    * PQ* PH* NMD

    Honda schedule

    High level goal

    Q,C,D,D,MSpecific Target

    Project reviews

    Task milestones

    Responsible individual/dept

    (SAP or JobTree)

    NMR gap worksheet(s) will be used by the supplier to summarize project status during periodic reviews with

    Honda

    Milestones should match Honda interim

    target timingDetailed Tasks

    (EXAMPLE)

    MA04922Text Box Main Menu Previous Menu

  • 06/03/02HSQM-0016 22

    Interactive Assessment of the SAPInteractive Assessment of the SAP

    COLLECT INFO.

    COMMON STRATEGY AND INFO INTO S.A.P., JAPAN & U.S.COMMON STRATEGY AND INFO INTO S.A.P., JAPAN & U.S.COMMUNICATION REINFORCEMENT BETWEEN MOTHER & DAUGHTER SUPPLIER.COMMUNICATION REINFORCEMENT BETWEEN MOTHER & DAUGHTER SUPPLIER.

    Tool development issues Process Plans Quality Plans

    Manufacturing Capabilities / Constraints Past Problem Concerns Unique N.A. Characteristics

    MA04922Text Box Main Menu Previous Menu

  • 06/03/02HSQM-0016 23

    GOAL SETTING:Honda

    SQCDDMProject Goals

    Supplier previous model reflections

    Supplier personalized project goals

    SpecificMeasurableAttainableRelevantTime Bound

    HondaProject Schedule& Requirements

    PROGRESS TRACKING: (what, who, when)Create Gantt chart based on job tree breakdown of

    tasks:

    Plan:

    Actual:

    T1 T2 T3

    T1 T2 T3

    Go-2

    Go-2

    Track plan vs actualMonitor % completion

    Evaluate at milestones(Interim Targets)

    Schedule based on Honda New Model Project requirements

    Components of the Specified Action Plan ProcessJOB TREE: (why, how, what)

    ORGANIZATION:

    APQP DEFICIENCY:

    EVALUATION PROCESS: SAP WITHIN THE SUPPLIER ORG:

    EVIDENCE JUSTIFYING STATUS: VISUAL MANAGEMENT AND REPORTING:

    Q

    Dev

    Del

    Model QCDDM

    Supplier Goals

    Supplier S/A

    InterimTargets

    ActivityThemes Tasks

    HP LZUAYZ

    Honda03M

    Eng Qlty Mfg P.C.

    Top Mgmt

    Project Leader

    Resp. Dept.

    Resp.Assoc.

    Top Management criteria: provide the vision, decision maker, allocates resource, etc.Dedicated New Model resources should be considered if past new model start-up performance did not meet plan

    Goals not linked to tasksDoesnt require progress management. Only requires management to milestones.

    Wall chart with green, yellow, red status or on-line system Visual mgmt not possible if project mgmt system is only on-lineInvolve all members of new model organization in the report to Honda. Use the expert.

    ClearR&R

    Daily new model management documents at the supplier should be used for justification of status; or a review of the actual situation.Organized to support an efficient presentation. (not audit style, pre-prepared report style)

    Pres/VP

    PL

    Eng Qlty Mfg PC

    Assoc.

    SAP FORMAT:Honda is not dictating a specific style of SAP, but these components must be part of your project management process.

    Guided by NMR Interim TargetsGuarantee execution of SAPConduct a pre Honda NMR evaluationTop Management evaluate; use P-D-C-A approachDocument supplier top management comments from pre reviewControl Gap; make countermeasure plan; forecast next event situationState readiness to Honda - should not ask Are We Ready?Utilize go/no go judgment criteria at each stage (outside of NMR as well)

    MA04922Text Box Main Menu Previous Menu

  • Honda Supplier Quality Manual Revision Information List Content Revision 04/01/2016 Issued by North American Supplier QD

    Revision Information Page1/1 04/01/2016

    The Honda Supplier Quality Manual applies to all North American Honda plants and their suppliers. Controlled Documents

    Document Name Control Number Approval Date Change Description

    Index System HSQM-0008 04/01/2016 INI Reports Update Bar Code Standard HSQM-0030 04/01/2016 2D, QR & Linear Updates Controlled Containment HSQM-0061 04/01/2016 Under Honda actions: Changed holds to hold Minimum Process Requirements Procedure HSQM-0060 04/01/2016 Revised E1 & E2 to PA2, PA3, PA4 or PA5 PV Testing Risk Analysis Procedure HSQM-0071 04/01/2016 Revised E1 to PA3/PA4, E2 to PA5 Process Assurance Capability Verification (PAC-V) HSQM-0094 04/01/2016 CpK changed to PpK Minimum Process Requirements Part Marking Check Sheet HSQM-0114 04/01/2016 DPM Update Minimum Process Requirements Leak Test Check Sheet HSQM-0123 04/01/2016 Initial Issue Plant Codes HSQM-Ref. 04/01/2016 Added PMC & RLC

    MA04922Text Box Main Menu Previous Menu

  • This page intentionally left blank

    MA04922Text Box Main Menu Previous Menu

  • This page intentionally left blank

    MA04922Text Box Main Menu Previous Menu

  • Quality Control Regulations and Minimum Quality System Requirements __________________________________________________________________

    HSQM-0002 1/17