• If a valid B-BBEE certificate, EME or QSE affidavit is attached and points are not claimed in terms of the MBD 6.1, it will be interpreted that the preference points for B-BBEE status level or contribution are not claimed.

2. Bidders Obligations:

2.1 Eligibility Criteria

Only bidders who satisfy the following criteria are eligible to submit an offer: (This is a requirement on submission).

2.1.1 Special Conditions of Quotation

In order to be considered for a contract in terms of this quotation, the bidder must fully complete the special conditions of quotation sheet and indicate whether the bidder complies or not.

2.1.2 Attendance of Compulsory Clarification Meeting

In order to be considered for a contract in terms of this quotation, bidders are obliged to attend the compulsory clarification meeting.

2.1.3 Public Liability Assurance

In order to be considered for a contract in terms of this quotation, the bidder must have access to public liability assurance of at least R 200,000.00. Proof thereof must accompany your Quotation.

2.1.4 Registered Herbicide Operator

In order to be considered for a contract in terms of this quotation, bidders must have access to the service of a qualified Herbicide Operator. A valid PCO Certificate from the Department of Agriculture, Forestry and Fisheries must accompany your Quotation.

2.1.5 Registered Horticulturist

In order to be considered for a contract in terms of this quotation, bidders must have Access to the service of a qualified Horticulturist. Proof thereof must accompany your Quotation.

3. The Employer’s Undertakings

3.1 Tests for Administrative Compliance

Bidders may be found non-compliant if, inter alia: (these documents may be requested) • The bidder has failed to complete and sign and attach requested information to all

schedules not excluded in responsiveness criteria; • The bidder has failed to submit the MBD 2, MBD 4, MBD 8 and MBD 9 forms; • The bidder has failed to submit a municipal account of where the head office of

the company is registered or in case where the premise is leased, the bidder has failed to provide a copy of the lease of the premise;

• The bidder has failed to submit a valid Tax Clearance Certificate or Pin, a valid Certificate or Pin may be requested; and

• The bidder has failed to submit a certified B-BBEE certificate, EME or QSE affidavit, whereas points were claimed and a copy of certificate or affidavit was supplied, a certified copy of the B-BBEE certificate, EME or QSE affidavit may be requested.

NB: No quotations will be considered from persons in the service of the state Failure to comply with these conditions may invalidate your offer.

Page 3: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

3

Yours faithfully

SIGNATURE DATE: 22 August 2019 SUPPLY CHAIN MANAGEMENT

TWK2

SCHEDULE OF SERVICES REQUIRED FOR VILLIERSDORP

Delivery Address: Theewaterskloof Municipality 53 Main Road

Villiersdorp 6848

NO. DESCRIPTION QUANTITY UNIT

PRICE PRICE

R c R c

1 Main Road in Front of First National Bank - Fell Dead Tree

1

2.1 Prins Albert Road - Prune 1 Oak Tree and Fell 1 Oak Tree

1

2.2 Prins Albert Road - Fell 1 Oak Tree

1

3 8 Voortrekker Street - Prune 1 Oak Tree

1

4 19A Voortrekker Street - Prune 1 Plane Tree

1

5 37 Unie Avenue - Prune 1 Plane Tree

1

6 10 van Riebeeck Road - Fell Oak Tree

1

7 Van Riebeeck at Church Building - Prune 1 Oak Tree

1

8 Buitekant street at Cul-De-Sac -Prune 10 Trees

10

9 20A van Riebeeck - Fell 1 Oak Tree

1

10 Malherbe Street at Church - Fell 2 Oak Trees

2

11

Buitenkant Street in front of Resource Center - Prune 1 Eucalyptus Tree hanging over Power Lines

1

Sub Total

15% VAT TOTAL

Page 4: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

4

I/We, the undersigned, do hereby declare that these are the properly priced Bill / Schedules of Quantities forming part of this Contract Document containing Pages in consecutive order upon which my/our Tender for Quotation No: EW 10/2019/20: PRUNNING AND FELLING OF TREES IN VILLIERSDORPhas been based.

My/our total Contract Price for this work and above items (Total I) is (in words)

.................................................................................................................................................................................... …………………………………………………………………………………………………………………………………….

SIGNED BY THE BIDDER: .....................................................................................................................................

Page 5: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

5

OCCUPATIONAL HEALTH AND SAFETY AGREEMENT (SECTION 37(2))

AGREEMENT MADE AND ENTERED INTO BETWEEN THE (HEREINAFTER CALLED THE “CLIENT”) AND

(Contractor/Mandatory/Company/CC Name)

IN TERMS OF SECTION 37(2) OF THE OCCUPATIONAL HEALTH AND SAFETY ACT, ACT No. 85 OF 1993 AS AMENDED.

I, ........................................................................................................................................ . , representing

, as an employer

in its own right, do hereby undertake to ensure, as far as is reasonably practicable, that all work will be performed, and all equipment, machinery or plant used in such a manner as to comply with the provisions of the Occupational Health and Safety Act (OHSA) and the Regulations promulgated there under. I furthermore confirm that I am/we are registered with the Compensation Commissioner and that all registration and assessment monies due to the Compensation Commissioner have been fully paid or that I/We are insured with an approved licensed compensation insurer. COID ACT Registration Number: OR Compensation Insurer: ........................................................ Policy No.: ..................................................... I undertake to appoint, where required, suitable competent persons, in writing, in terms of the requirements of OHSA and the Regulations and to charge him/them with the duty of ensuring that the provisions of OHSA and Regulations as well as the Council’s Special Conditions of Contract, Way Leave, Lock-Out and Work Permit Procedures are adhered to as far as reasonably practicable. I further undertake to ensure that any subcontractors employed by me will enter into an occupational health and safety agreement separately, and that such subcontractors comply with the conditions set. I hereby declare that I have read and understand the appended Occupational Health and Safety Conditions and undertake to comply therewith at all times. I hereby also undertake to comply with the Occupational Health and Safety Specification and Plan.

Signed at .......................................on the......................................day of....................................20….

_______________________ ____________________ Witness Mandatary Signed at ...................................... on the.....................................day of......................................20.... _______________________ ____________________ Witness for and on behalf of

Page 6: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

6

OCCUPATIONAL HEALTH AND SAFETY CONDITIONS

1. The Chief Executive Officer of the Contractor shall assume the responsibility in terms of Section 16(1) of the Occupational Health and Safety Act (as amended). Should the Contractor assign any duty in terms of Section 16(2), a copy of such assignment shall immediately be provided to the representative of the Employer as defined in the Contract.

2. All work performed on the Employer’s premises shall be performed under the supervision of the construction supervisor who understand the hazards associated with any work that the Contractor performs on the site in terms of Construction Regulations 2014.

3. The Contractor shall appoint a Competent Person who shall be trained on any occupational health and safety aspect pertaining to them or to the work that is to be performed.

4. The Contractor shall ensure that he familiarizes himself with the requirements of the Occupational Health and Safety Act and that he, his employees, and any sub-contractors, comply with them. 5. Discipline in the interests of occupational health and safety shall be strictly enforced.

6. Personal protective equipment shall be issued by the Contractor as required and shall be worn at all times where necessary.

7. Written safe work procedures and appropriate precautionary measures shall be available and enforced, and all employees shall be made conversant with the contents of these practices. 8. No substandard equipment/machinery/articles or substances shall be used on the site.

9. All incidents referred to in terms of Section 24 of the Occupational Health and Safety Act shall be reported by the Contractor to the Department of Labour and the Employer.

10 The Employer hereby obtains an interest in the issue of any formal inquiry conducted in terms of Section 32 of the Occupational Health and Safety Act and into any incident involving a Contractor and/or his employees and/or his sub-contractor/s.

11. No use shall be made of any of the Employer’s machinery / plant / equipment / substance / personal protective equipment or any other article without prior arrangement and written approval.

12. No alcohol or any other intoxicating substance shall be allowed on the site. Any person suspected of being under the influence of alcohol or any other intoxicating substance shall not be permitted access to, or allowed to remain on the site.

13. Prior to commencement of any work, verified copies of all documents mentioned in the agreement, must be presented to the Employer.

Page 7: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

7

Schedule 1

Public Liability

Page 8: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

8

Schedule 2

Registered Herbicide Operator and

Horticulturist

Page 9: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

9

(4) SPECIFICATION(S)

4.1 GENERAL

4.1.1. Although the specifications are directed at tree maintenance, a more holistic approach is advocated. The specifications are to be seen as the minimum requirements in terms of best practice with respect to tree management in the District

4.1.2. The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

edition (the text contains illustrations sourced from “Arboriculture”). This source, or later editions, may be consulted should further guidance be required.

4.1.3. In some instances it will be best practice to remove trees due to circumstance i.e. dead or dangerously overhanging branches ect. The specifications do not make provision for the replacement of these trees with suitable trees and the recommendations as to replacements shall be made in consultation with the Environmental Manager or his/her delegated person.

4.1.4. The specifications insist on the inclusion of all mandatory requirements with respect to tree maintenance and to adhere to any legislation that might have a direct influence on the activity. These requirements are indicated below, or relevant legislation is referred to.

4.1.5. The specifications insist on the use of the safest practice possible, with respect to personnel, personal, public, private and utility property. In some instances the safest practice possible would be to liaise with better qualified or equipped entities before attempting daunting tasks. This is encouraged, and is implicit to every function discussed within the specifications.

4.2. SCOPE OF WORK

Maintenance of trees will take place within various public open spaces, road reserves and cemeteries in Theewaterskloof Municipality as per the pricing schedule, on an as and when required basis and according to the following guidance:

SIZE OF TREES

Small Tree less than 3 meters above ground

Medium Tree > 3 – 7 meters above ground

Large Tree > 7 – 12 meters above ground;

Extra Large Tree > 12 meters above ground level

Cleaning of sites after the work has been completed would take place on the same day of operations and would be left free of any leaves, twigs, branches or debris. Dumping need to take place at any dedicated municipal dumpsite at the cost of the contractor.

The project manager will notify all affected residences in communities of maintenance programs before commencement of work.

Page 10: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

10

4.3. CONTACT DETAILS

4.3.1 Applicable Rules and Legislation

4.3.1.1. The Contractor shall conduct all work in terms of the applicable rules and legislation.

4.3.1.2. The onus for establishing the applicable rules and legislation rests with the Contractor.

4.3.1.3. The Occupational Health and Safety Act (latest amendment to be obtained from the Department of Labour) and associated Regulations promulgated in terms of the Occupational

4.3.1.4. Health and Safety Act are at all times applicable to all functions conducted in terms of this specification.

4.3.1.5. Rules unique to the Client are to be adhered to, to the extent that they do not clash or

contradict with any determinations in the Occupational Health and Safety Act and associated Regulations.

4.3.1.6. This specification is at all times subject to the requirements of the law as determined in the applicable legislation discussed above.

4.3.1.7. Where there is doubt on the part of the Contractor as to the application of Rules and Legislation there is a duty placed upon the Contractor to consult the parties listed in this specification – see Contact Details above.

4.3.2 Minimum Safe Working Procedures and Clearances

The contractor will ensure that when operating alongside roads and sidewalks, these sites be would be demarcated made safe. Warning signs must be erected as prescribed. Re-route traffic and pedestrians [Traffic department assist]. Complete HIRA risks assessment and finalize emergency plans. Competent personnel only to perform pruning duties

Assume that bare-conductor overhead LV conductors are still energised and / or not effectively earthed and accordingly hazardous to Contractors and their personnel. The following minimum working clearances shall be adhered to:

Condition Minimum Clearance (m)

Safety clearance phase-to-earth 0.54 m

Safety clearance phase-to-phase 0.61 m

Live-line phase-to-earth working

clearance

0.8 m

Live-line phase-to-phase working

clearance

1.1 m

Table 1: Minimum clearances where line energized and / or not earthed effectively

The information in Table 1 is obtained and / or adapted from SABS 0280, and in terms of this specification shall be relevant to voltage classes equivalent to, or lower than 400 volt only.

Page 11: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

11

4.4. DEFINITIONS

Anvil-type pruning tool: A pruning tool that has a straight sharp blade that cuts against a flat metal cutting surface, in contrast to a hook-and-blade-type pruning tool

Arborist: A professional who, through experience and related training, possesses the technical competence to provide for or supervise the management of trees and other woody plants in the residential, commercial, and public landscape.

Apical dominance: Inhibition of growth of lateral buds by the terminal bud.

Branch bark ridge: The raised area of bark in the branch crotch that marks where the branch wood and trunk wood meet.

Branch collar: The swollen area at the base of a branch.

Callus: Undifferentiated tissue formed by the cambium layer around a wound.

Cambium: The dividing layer of cells that forms sapwood (xylem) to the inside and inner bark (phloem) to the outside.

Cleaning: Selective pruning to remove one or more of the following parts: dead, diseased, and/or broken branches to reduce risk.

Climbing spurs: Sharp, pointed devices affixed to a climber’s boot used to assist in climbing trees. (syn.: gaffs, hooks, spurs, spikes, climbers).

Closure: The process of wound wood covering a cut or other tree injury.

Crown: The leaves and branches of a tree measured from the lowest branch on the trunk to the top of the tree.

Decay: The degradation of woody tissue caused by organisms.

Drop-crotch: reducing the height of a tree by thinning the terminal to a large lateral.

Espalier: The combination of pruning, supporting, and training branches to orient a plant in one plane.

Establishment: The point after planting when a tree’s root system has grown sufficiently into the surrounding soil to support shoot growth and anchor the tree.

Facility: A structure or equipment used to deliver or provide protection for the delivery of an essential service, such as electricity or communications.

Final cut: A cut that completes the removal or reduction of a branch or stub.

Frond: A leaf of a palm.

Heading: 1. Cutting a currently growing, or a 1-year-old shoot, back to a bud. 2. Cutting an older branch or stem back to a stub in order to meet a defined structural objective. 3. Cutting an older branch or stem back to a lateral branch not large enough to assume apical dominance in order to meet a defined structural objective. Heading may or may not be an acceptable pruning practice, depending on the application.

Hook-and-blade-type pruning tool: A hand pruner that has a curved, sharpened blade that overlaps a supporting hook; in contrast to an anvil-type pruning tool (syn.: by-pass pruner).

Horizontal plane: For palms: An imaginary level surface at the base of live frond petioles.

Included bark: bark enclosed between branches with narrow angles of attachment, forming a wedge between the branches.

Internodal cut: A cut located between lateral branches or buds.

Lateral branch: A shoot or stem growing from a parent branch or stem.

Leader: A dominant or co-dominant, upright stem.

Limb: A large, prominent branch.

Lion’s tailing: The removal of an excessive number of inner, lateral branches from parent branches. Lion’s tailing is not an acceptable pruning practice.

Page 12: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

12

Mechanical pruning: A utility pruning technique where larger-scale power equipment is used to cut back branches rapidly.

Parent branch or stem: A tree trunk, limb, or prominent branch from which shoots or stems grow.

Peeling: For palms: The removal of only the dead frond bases at the point they make contact with the trunk without damaging living trunk tissue. (syn.: shaving).

Petiole: A stalk of a leaf or frond.

Phloem: Inner bark conducting tissues that transport organic substances, primarily carbohydrates, from leaves and stems to other parts of the plant.

Pollarding: A specialty pruning technique used on some large-growing deciduous trees. Pollarding is initiated by making internodal cuts to head a young tree. Pollarding is maintained by removing or heading all water sprouts during the dormant season. Not recommended.

Precut: The two-cut process used to remove a branch portion before the final cut is made in order to prevent splitting or bark tearing in the parent stem.

Pruning: The removal of plant parts.

Qualified line-clearance tree worker: A tree worker who, through related training and on-the-job experience, is familiar with the techniques in line clearance and has demonstrated his/her ability in the performance of the special techniques involved. This qualified person may or may not be currently employed by a line-clearance contractor.

Qualified line-clearance tree worker trainee: A tree worker undergoing line-clearance tree trimming training, who, in the course of such training, is familiar with the techniques in line clearance and has demonstrated his/her ability in the performance of the special techniques involved. Such trainees shall be under the direct supervision of qualified personnel.

Qualified tree worker: A worker who, through related training and on-the-job experience, is familiar with the hazards of pruning, trimming, repairing, maintaining, or removing trees and with the equipment used in such operations, and has demonstrated ability in the performance of the special techniques involved.

Qualified tree worker trainee: A worker undergoing on-the-job training who, in the course of such training, is familiar with the hazards of pruning, trimming, repairing, maintaining, or removing trees and with the equipment used in such operations, and has demonstrated ability in the performance of the special techniques involved. Such trainees shall be under the direct supervision of a qualified tree worker or arborist.

Raising: Selective pruning to provide vertical clearance.

Reduction: Selective pruning to decrease height and/or spread.

Remote/rural areas: Locations associated with very little human activity, land improvement, or development.

Restoration: Selective pruning to improve the structure, form, and appearance of trees that have been severely headed, vandalized, or damaged.

Shall: As used in this standard, denotes a mandatory requirement.

Should: As used in this standard, denotes an advisory recommendation.

Stub: An undesirable short length of a branch remaining after a break or incorrect pruning cut is made.

Thinning: Selective pruning to reduce density of live branches or to increase light penetration

Throw-line: A small, lightweight line with a weighted end used to position a climber’s rope in a tree.

Topping: The reduction of a tree’s size using heading cuts that shorten limbs or branches back to a predetermined crown limit. Topping is not an acceptable pruning practice. Also referred to as topping.

Tracing: The reparation of a wound by removing loose bark from in and around the wound.

Page 13: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

13

Urban/residential areas: Locations, such as populated areas including public and private property, that are normally associated with human activity.

Utility: An entity that delivers a public service, such as electricity or communications.

Utility space: The physical area occupied by a utility’s facilities and the additional space required to ensure its operation.

Vista pruning: Selective pruning to allow a specific view.

Water sprouts: New stems originating from epicormic buds. (syn.: epicormic shoots).

Wound: An opening that is created when the bark of a live branch or stem is penetrated, cut, or removed.

Wound wood: Partially differentiated tissue responsible for closing wounds. Wound wood develops from callus associated with wounds.

Xylem: Wood tissue. Active xylem is sapwood; inactive xylem is heartwood.

Young tree: A tree young in age or a newly transplanted tree.

4.5 TREE INSPECTIONS

Before commencing work and while work is being performed, an arborist, qualified tree worker, or qualified tree worker trainee under direct supervision shall visually inspect each tree. If a condition is observed that requires additional attention, this condition should be brought to the attention of an immediate supervisor or the person responsible for authorizing the work.

4.6 TOOLS AND EQUIPMENT

4.6.1 Pruning tools used in making pruning cuts shall be sharp 4.6.2 Equipment and work practices that damage living tissue and bark beyond the scope of the work should be avoided. 4.6.3 Climbing spurs shall not be used when climbing and pruning trees, except on tree removals, or in

emergencies such as aerial rescue.

4.6.4 Climbing spurs may be used only when limbs are more than throw-line distance apart, when the bark is thick enough to prevent damage to the cambium, or when there is no other means of climbing the tree.

4.7 PRUNING CUTS

4.7.1 Pruning cuts shall be discretely placed for minimum visibility

4.7.2 A pruning cut that removes a branch at its point of origin shall be made close to the trunk or parent limb, without cutting into the branch bark ridge or collar, or leaving a stub.

4.7.3 A pruning cut that reduces the length of a branch or parent stem should bisect the angle between its branch bark ridge and an imaginary line perpendicular to the branch or stem.

4.7.4 The final cut shall result in a flat surface with adjacent bark firmly attached.

4.7.5 When removing a dead branch, the final cut shall be made just outside the collar of living tissue.

4.7.6 Tree branches shall be removed in such a manner so as not to cause damage to other parts of the tree or to other plants or property. Branches too large to support with one hand shall be pre- cut to avoid splitting of the wood or tearing of the bark. Where necessary, ropes or other equipment shall be used to lower large branches or portions of branches to the ground.

4.7.7 A final cut that removes a branch with a narrow angle of attachment should be made from the bottom of the branch to prevent damage to the parent limb.

Page 14: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

14

4.8 WOUND TREATMENT

4.8.1 Wound dressings should not be used to cover wounds or pruning cuts, except when recommended for disease, insect, mistletoe, or sprout control, or for cosmetic reasons.

4.8.2 Wound dressings shall not damage the tree.

4.8.3 When repairing bark wounds, only damaged or loose bark should be removed.

4.9 PRUNING PRACTICES

4.9.1. General

4.9.1.1 To obtain the defined objective, the growth cycles and structure of individual species and the type of pruning to be performed should be considered.

4.9.1.2 Not more than 25 percent of the foliage should be removed within an annual growing season. The percentage and distribution of foliage to be removed shall be adjusted according to the plant’s species, age, health, and site.

4.9.1.3 Not more than 25 percent of the foliage of a branch or limb should be removed when it is cut back to a lateral. That lateral should be large enough to assume apical dominance.

4.9.1.4 Heading should be considered an acceptable practice for shrub, specialty, or young tree pruning.

4.9.1.5 Topping and lion’s tailing shall be considered unacceptable pruning practices for trees.

4.9.1.6 Severed limbs shall be removed from the crown upon completion of the pruning, at times when the tree would be left unattended, or at the end of the workday.

4.9.2. Size specifications:

A minimum and/or maximum diameter of branches to be removed should be specified to establish the extent of pruning.

4.9.3. Pruning objectives:

Pruning objectives shall be established prior to beginning any pruning operation.

4.9.4. Pruning types:

Specifications for pruning should consist of, but are not limited to, one or more of the following types.

4.9.4.1 Clean: Cleaning shall consist of selective pruning to remove one or more of the following parts: dead, diseased, and/or broken branches to reduce risk.

Size range of parts, and location in tree, shall be specified

4.9.4.2 Thin: Thinning shall consist of selective pruning to reduce density of live branches or to increase light penetration.

a. Size range of parts, location in tree, and percentage of foliage to be removed shall be specified.

b. Not more than 25 percent of the crown should be removed within an annual growing season.

c. Thinning should result in an even distribution of branches on individual limbs and throughout the crown.

4.9.4.3 Raise: Raise shall consist of selective pruning to provide vertical clearance

d. Size range of parts, location in tree, and vertical clearance should be specified.

4.9.4.4 Reduce: Reduction shall consist of selective pruning to decrease height and/or spread.

e. Size range of parts, location in tree, and clearance should be specified.

f. Consideration shall be given to the ability of a species to tolerate this type of pruning.

Page 15: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

15

4.10 YOUNG TREE PRUNING

The reasons for young tree pruning may include, but are not limited to, reducing risk, maintaining or improving tree health and structure, improving aesthetics, or satisfying a specific need. Young trees with a potential to grow into a utility space should be removed or relocated.

4.10.1. AT PLANTING

Pruning should be limited to cleaning

Branches should be retained on the lower trunk.

4.10.2. ONCE ESTABLISHED

A central leader or leader(s) as appropriate should be developed.

A strong, properly spaced scaffold branch structure should be selected and maintained.

Rubbing and poorly attached branches should be removed.

Interfering branches should be reduced or removed.

Cleaning should be performed

4.10.3. SPECIALITY PRUNING TYPES

Consideration shall be given to the ability of a species to tolerate these types of pruning.

4.10.3.1. Espalier

Branches that extend outside the desired plane of growth shall be pruned or tied back.

Ties should be replaced as needed to prevent girdling the branches at the attachment site.

4.10.3.2. Pollarding

Consideration shall be given to the ability of the individual tree to respond to pollarding.

Management plans shall be made prior to the start of the pollarding process for routine removal of water sprouts.

Internodal cuts shall be made at specific locations to start the pollarding process. After the initial cuts are made, no additional internodal cut shall be made.

Water sprouts growing from the cut ends of branches (knuckles) should be removed annually during the dormant season.

4.10.3.3 Restoration

Restoration shall consist of selective pruning to improve the structure, form, and appearance of trees that have been severely headed, vandalized, or damaged.

Size range of parts, location in tree, and percentage of water sprouts to be removed should be specified.

4.10.3.4 Vista pruning

Vista pruning shall consist of selective pruning to allow a specific view.

Size range of parts, location in tree, and percentage of foliage to be removed should be specified.

4.10.4 PALM PRUNING

Palm pruning should be performed when fronds, fruit, or loose petioles may create a dangerous condition (can cause fire risk).

Page 16: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

16

Live healthy fronds, initiating at an angle of 45 degrees or greater from the horizontal plane, should not be removed.

Fronds removed should be severed close to the petiole base without damaging living trunk tissue.

Palm peeling (shaving) should consist of the removal of only the dead frond bases at the point they make contact with the trunk without damaging living trunk tissue.

The use of climbing spurs is prohibited as the spurs leave wounds in the palm tree trunk that never heal in time, and are susceptible to disease and other illnesses.

4.10.5 UTILITY PRUNING

4.10.5.1 General

The purpose of utility pruning is to prevent the loss of service, comply with mandated clearance laws, prevent damage to equipment, avoid access impairment, and uphold the intended usage of the facility/utility space.

4.10.5.2 Utility crown reduction pruning

A pruning cut that removes a branch at its point of origin shall be made close to the trunk or parent limb, without cutting into the branch bark ridge or collar, or leaving a stub.

A pruning cut that reduces the length of a branch or parent stem should bisect the angle between its branch bark ridge and an imaginary line perpendicular to the branch or stem.

The final cut shall result in a flat surface with adjacent bark firmly attached.

When removing a dead branch, the final cut shall be made just outside the collar of living tissue.

Tree branches shall be removed in such a manner so as not to cause damage to other parts of the tree or to other plants or property. Branches too large to support with one hand shall be pre-cut to avoid splitting of the wood or tearing of the bark. Where necessary, ropes or other equipment shall be used to lower large branches or portions of branches to the ground.

A final cut that removes a branch with a narrow angle of attachment should be made from the bottom of the branch to prevent damage to the parent limb.

A minimum number of pruning cuts should be made to accomplish the purpose of facility/utility pruning. The natural structure of the tree should be considered.

Trees directly under and growing into the facility/utility space should be removed or pruned. Such pruning should be done by removing entire branches or by removing branches that have laterals growing into (or once pruned, will grow into) the facility/utility space.

Trees growing along the side and growing into or toward the facility/utility space should be pruned by removing entire branches. Branches that, when cut, will produce water sprouts that would grow into facilities and/or utility space should be removed.

Branches should be cut to laterals or the parent branch and not at a pre-established clearing limit. If clearance limits are established, pruning cuts should be made at laterals or parent branches outside the specified clearance zone.

4.10.5.3 Mechanical pruning

Cuts should be made close to the main stem, outside of the branch bark ridge and branch collar. Precautions should be taken to avoid stripping or tearing of bark or excessive wounding.

Page 17: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

17

4.10.5.4 Lateral / Directional pruning

Involves the pruning of a leader back to a lower outward-growing limb (lateral).

For a tree growing directly under a power line the leader is drop-crotched to lower laterals. The top laterals are further pruned to direct subsequent growth away from the conductors.

Branches growing above the conductors are directed up and away from the conductors while those below are directed down and back. Plant growth regulators may be applied in applicable cases.

4.11 ACCEPTABLE PRUNING TECHNIQUES

The following figures have been reproduced from “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2

nd edition. Some of the figures

have been modified in the interests of clarity.

Heading back

Figure 1: Heading back

Heading back is defined as pruning to a stub (lower branch), a small lateral (trunk) or a bud (terminal on small lateral). Heading back affects both the appearance and the growth of the tree. New growth is usually vigorous, upright and dense.

The value of heading back is therefore questioned with respect to utility pruning.

Page 18: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

18

Thinning out

Figure 2: Thinning out

Thinning out is the removal of a lateral branch at its point of origin, or the shortening of a branch by cutting to a lateral large enough to assume the terminal role.

Reducing the height of a tree by thinning the terminal to a large lateral is also known as drop-crotching.

Drop-crotching is the preferred means of pruning.

The lateral to which a branch or trunk is cut should have at least one third to one half the diameter of the cut being made. Half is preferred.

Little or no stub remains.

The response to thinning is distributed more evenly throughout the plant than is the response to heading. The plant becomes more open but retains its natural form. Growth is less vigorous after thinning, compared to heading.

Pruning cuts

Figure 3: Pruning cuts

Flush cuts are not recommended due to their size and the resultant exposure of trunk tissue to the possibility of decay.

Page 19: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

19

Natural target pruning (NTP) is the preferred means.

Pruning cuts are made close to, but beyond the bark ridge and the collar at the base of the branch.

With respect to Figure 3:

a) Left figure

Applied when the location of the branch bark ridge (A) and bark collar (B) are readily located.

Remove the limb by making the final cut (A-B) just to the outside of the branch bark ridge and collar.

b) Centre figure

Applied where the branch collar is not visible or the position of the collar needs to be verified.

2 methods to estimate the cut:

i. Estimate line (A-B) which is parallel to the branch to be removed, estimate the line of the bark ridge (A-C) – the angle formed between the lines (A-B) and (A-C) equals the angle of the line (A-E) with respect to line (A-C). [Alternatively, angle BAC should equal angle CAE].

ii. Obtain the line of the bark ridge (A-C), estimate the path of the imaginary vertical line (A-D) from point A – the angle formed between the imaginary line (A-D) and line (A-C) of the bark ridge equals the angle between the imaginary line (A-D) and the proposed cut-line (A-E). [Alternatively angle CAD should equal angle DAE].

The pruning cuts are made just outside the bark ridge and branch collar.

If the remaining stub is longer than wanted and / or the final pruning cut with a chain saw must be upwards because of the angle of the cut, the pruning cut can be made outside the branch ridge through the branch collar.

c) Right figure

Relevant to drop-crotching

The final cut is to be made along line (A-C).

Locate the branch bark ridge (A-D) and the line perpendicular to the branch to be removed by the cut (A-B).

Line (A-C) bisects the angle formed by the lines (A-D) and (A-B).

If in doubt, cut closer to line (A-B) than line (A-D). Cutting too close to (A-D) will weaken the remaining limb or branch attachment.

Page 20: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

20

Application of hook-and-blade shears

Figure 4: application of hook-and-blade shears to small branches

Close cuts can be made by placing the blade against the bark ridge of the limb to be removed. A closer cut is achieved by placing the blade against the trunk, branch or limb that is to remain.

Close cuts reduce the number of shoots that may grow near the pruning cut.

To avoid splitting out when thinning a terminal to a lateral – leave a short stub and cut upwards.

Avoid crushing plant tissue with the anvil of the shears by ensuring the blade is keen, and utilising the correct cutting procedures.

With respect to Figure 4 – less effort is required when the blade cuts up (left pane) or diagonally (center pane), instead of down. Diagonal cuts must be 5 mm above the bud (right pane, indicated by the red arrow).

Figure 5: Application of hook-and-blade shears when cutting back to laterals.

With respect to Figure 5, place the anvil of the shears in the crotch and cut up parallel to the direction of the lateral. The blade of the shears should be keen. Leave a short stub so that the branch bark ridge of the lateral is not injured or cut. The correct procedure is indicated in the left pane with the affirming tick .

Failure to adhere to this technique will usually result in tragedy (right pane).

Page 21: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

21

Hiding pruning cuts

Figure 6: Hiding pruning cuts from view

Attempts should be made in all cases to hide pruning cuts from view. This can be achieved by angling the cuts away from the direction of most frequent observation – typically pedestrian traffic or location-specific infrastructure.

Removal of large limbs

Figure 7: removal of limbs larger than 50 mm in 3 steps

This technique should be considered for branches larger than 25 mm, and is mandatory for branches larger than 50 mm in diameter.

The first cut is made on the underside of the branch approximately 300 mm from the crotch. The depth of the cut shall be 25% of the branch diameter. The second cut is then made within 25 mm of the first cut, on the top side of the limb – until the limb falls off. The second cut must be made further along the branch (further from the crotch) than the first cut – will prevent splitting.

The 3rd

cut neatens matters, and is placed just beyond the branch bark ridge – as discussed in pruning above.

Page 22: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

22

Removal large branch: sharp angle of attachment

Figure 8: removal of a large branch with a sharp angle of attachment

The final point of attachment must be determined (A) and the cut must slope at approximately 40 to 50 degrees from the horizontal. The branch and the trunk are not united between (A) and (B).

Removal of dead branch stubs

Figure 9: Removal of dead branch stubs

A dead branch stub that has a collar of live wood should be cut just at the outer edge of the collar.

Page 23: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

23

Shoot removal (sharp angle of attachment)

Figure 10: Shoot removal

On young trees, shoots with sharp angles of attachment or included bark should be pruned off when they are 150-200 mm long. A second bud will usually form a shoot with less vigour than the more upright shoots, and will grow at a wider angle free of included bark.

Temporary branches as protection

Figure 11: Temporary branches as protection

Branches below the lowest permanent branch will strengthen and protect the trunk. When young trees have not yet reached the desired height of the lowest scaffold, treat laterals as temporary branches. Remove vigorous laterals if less vigorous laterals can be selected.

Page 24: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

24

The laterals can protect the trunk from the effects of the sun, shade and nourish the trunk. Bark on younger trees can be protected in this way and the damage in the right pane (Figure 11) can be avoided or reduced to a considerable degree.

The temporary branches can be reduced as the young tree develops and the trunk becomes more supportive.

Removal of water sprouts

Figure 12: Removal of young upright branches (water sprouts)

Occasionally a young vigorous branch will grow more upright than others and will compete with the leader. Unless the sector is devoid of other limbs, the upright branch should be removed.

Vertical and radial spacing of scaffold branches

Figure 13: Vertical and radial spacing of scaffold branches

On large-growing trees, the permanent scaffold branches should be well spaced vertically and radially.

Avoid one limb growing directly above another – this interferes in the nourishment of the higher limb, and the higher limb can unduly shade the lower limb.

Page 25: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

25

Proper radial distribution of limbs

Figure 14: Proper radial distribution of limbs

Proper radial distribution of limbs will allow limbs adequate space for development.

Obtaining lateral branches

Figure 15: Obtaining lateral branches from vigorous growing young trees with strong apical dominance

Vigorous young trees with strong apical dominance may grow 2 m with no lateral branches forming (D). If the leader is pinched during the growing season when the terminal is 50-100 mm above the height desired for the first scaffold (A), two or more shoots may be encouraged to grow. Select a second one as a lateral and head it lightly if required. Head the others more severely (B). Repeat the process as long as the vigorously growing leader can be selected (C).

Page 26: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

26

Upright growth of horizontal branch

Figure 16: Training a horizontal branch to grow upright

In contrast to upright branches, horizontal branches exhibit less vigour. To cause a horizontal branch to grow more upright, prune it back to an upright lateral (C), or cut it back to an upright facing bus (B ), or cut it back near the top of an arch (A) .

Obtaining better symmetry from wind-deformed tree

Figure 17: better symmetry from a wind-deformed tree

In windy sites, the top of the tree can be opened up by removing moderate sized branches. This will reduce the trees wind resistance, and accordingly the stress exhibited on the trunk and limbs.

A tree deformed by the wind can be made more symmetrical if branches on the windward side are headed back to a lateral or a bud pointing into the wind, if the leader is thinned to a more upright lateral, and if some of the downwind branches are shortened.

Page 27: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

27

Selection of alternate leaders

Figure 18: the selection of alternate leaders

When a leader has been outgrown by one or more laterals, thin the leader back to one of its most vigorous and upright laterals. This lateral will then become the leader.

Maintenance of leaders by cutting-back

Figure 19: Maintenance of leaders by cutting back

Leaders can be maintained by heading back any laterals that may compete with it (A). Prune these laterals fairly severely if they are temporary (B). The tree will grow taller (C) than if it had not been pruned (D).

Page 28: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

28

Removal of low spreading branch

Figure 20: Removal of a low spreading branch

If there is a suitable branch above, completely remove a low spreading branch (red arrow) instead of pruning it back to less drooping laterals. Beware of increasing trunk stress in the process.

Use of lower natural crown to lower tree height

Figure 21: Lowering tree height to lower natural crown

The major advantage of this procedure is that the tree will usually appear unpruned. In some instances the height of the tree can be lowered to below the height of the lower natural crown if there are adequate branches available.

Page 29: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

29

Pruning-back for room

Figure 22: Pruning back closely spaced trees in order to create room

Crowded trees can become mishappen and their branches weakened by shading and rubbing. In some instances the smaller, or more deformed, or less desirably located trees should be removed. The remaining trees will grow into the new space with improved health and appearance.

Trees are often planted closer together than will be desirable when they reach mature size. As these trees begin to crowd, the less desirable ones should be pruned back more severely each year until they are removed (B).

This will allow proper development of the more permanent trees while retaining the value of the temporary trees.

Lateral / directional pruning

Figure 23: Lateral / directional pruning in proximity to utility services

Lateral or directional pruning involves pruning the leader back to a lower outward-growing limb (lateral). Examples are given in Figure 23.

Page 30: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

30

5.12 REMOVAL OF TREES

5.12.1 No street trees or any other municipal trees are to be removed unless authorized by the relevant Manager.

5.12.2 Where trees are to be removed the stumps are to be cut to at least 150 mm below general ground level.

5.12.3 Where living trees are removed suitable chemical shall be applied to stumps to prevent re-growth.

5.13 REMOVAL OF DROPPED BRANCHES

5.13.1 The removal of dropped branches will have to be treated as an emergency

5.13.2 The clearing of road/pedestrian ways will be regarded as a matter of urgency

5.13.3 Areas to be left only after all rubble, twigs and saw dust were cleared and removed

5.14 STUMP REMOVAL

5.14.1 Manual removal only to be done on the instruction of Theewaterskloof Municipal’ representative.

5.14.2 The relevant department to obtain any way-leaves prior to the manual removal process.

5.14.3 Where stumps are not to be removed, it will be cut manually or mechanically to at least 150 mm below general ground level.

5.14.4 Sites to be left with surface levelled and compacted to the same level as the rest of the site.

5.15 DUMPING OF BRANCHES

All branches to be dumped at registered disposal sites- dumping at any other site will not be allowed and action taken as per Council’s by-laws

5.16 IMPORTANT CONSIDERATIONS

5.16.1 Where a servitude / way-leave agreement makes reference to a specific width within which no trees may be deliberately grown, then this restriction width shall apply.

5.16.2 Trees, shrubs, grass, natural features and topsoil that are not removed shall be protected from damage during operations. Scalping of the earth or any unnecessary disturbance shall not be allowed in any clearing operation.

5.16.3 Rivers, water courses and other water bodies shall be kept clear of felled trees, bush cuttings and debris. The integrity of river banks shall be maintained and shall be dealt with in accordance with the provisions of clauses 4 and 6 above, if they are disturbed or damaged.

5.16.4 Burning or the lighting of fires is not permitted to dispose of removed vegetation. Vegetation must be removed to registered disposal sites.

5.17 INDIGENOUS BUSH AND TREES

5.17.1 Various species of indigenous trees and bush are protected by law (Forest Act No 122 of 1984) and Provincial Nature Conservation Ordinances in terms of which it is necessary to obtain a permit from the Forestry Section of the Department of Agriculture and Forestry to cut and remove them. Provincial ordinances and relevant legislation shall be adhered to where it is absolutely essential to cut protected indigenous trees.

5.17.2 The necessary permits shall be obtained prior to commencement of any work.

5.17.3 Where there is any doubt as to whether a tree species is protected or not, the Department of Water Affairs and Forestry or the Environmental Manager shall be consulted.

Page 31: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

31

5.18 NATURAL HERITAGE SITES AND AREAS OF CONSERVATIONAL

INTEREST

These sites shall be identified and the special conditions as prescribed shall be adhered to in the control of vegetation on these sites.

5.19 WARRANTIES

A warranty shall be obtained from the contractor that:

5.19.1 Knows and understands the dangers involved in cleaning bush in or around power lines.

5.19.2 is able to and shall comply with all legislation pertaining to the nature of work to be done and all things incidental thereto.

5.19.3 Will provide proof of his/ her public liability insurance to the minimum value of R20m

SPECIAL CONDITIONS OF QUOTATION

Please indicate YES / NO in the right column to ensure your company complies with the special conditions of quotation or not. If the bidder fails to clearly indicted YES / NO, it will

be interpreted that the bidder does not comply with the special conditions of quotation.

SPECIAL CONDITIONS OF QUOTATION Yes / No

All staff must wear Protective Clothing at all time.

All chainsaw operating personnel must have the necessary protective

clothing and safety gear on cite ( PPE )

Road safety signs on site at all time.

Ensure that the work area is clean after work is done.

Invoicing must be submitted at the end of work completed

Vegetation where possible must not be cut higher than 10 cm above

the ground.

Larger trees with large stem diameter must be cut down to not more

than 20cm above ground

All cut stumps must be treated with the following active ingredient

herbicide: Triclopyr 360 gram per liter

Contractors need to comply to the occupational health and safety act

(OHS Act 85 of 1993)

In terms of Section 80(3) of the Act, an employer is obliged to register

with the Compensation Fund within seven (7) days from date on which

the first employee(s) was/were appointed. If the bidder is the

successful bidder, Theewaterskloof Municipality needs to ensure

compliance with section 80(3).

Page 32: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

32

Methodology

• Only trees and bushes as shown out must be cut and felled and or pruned; • All vegetation and street trees must be cut pruned or felled on a horticulture recognized

method; • Stems of all vegetation must always be cut as low as possible; • Vegetation where possible must not be cut higher than 10 cm above the ground. • Larger trees with large stem diameter must be cut down to not more than 20cm above

ground; • All chainsaw operating personnel must have the necessary protective clothing and safety

gear on cite ( PPE ); • Contractors need to comply to the occupational health and safety act (OHS Act 85 of

1993); • All cut stumps must be treated with the following active ingredient herbicide: Triclopyr

360 gram per liter; • Contractor’s Arboriculture tools and equipment must be available for pre-inspection;

Failure of above specifications will lead to immediate termination of contract; All plant material shall be removed from site by the contractor.

Page 33: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

33

PART A

INVITATION TO BID

YOU ARE HEREBY INVITED TO BID FOR REQUIREMENTS OF THE THEEWATERSKLOOF MUNICIPALITY

Bid Number: EW 10/2019/20 Closing Date: 06 September 2019 Closing Time: 12:00

Description: PRUNNING AND FELLING OF TREES IN VILLIERSDORP

THE SUCCESSFUL BIDDER WILL BE REQUIRED TO FILL IN AND SIGN A WRITTEN CONTRACT FORM (CONTRACT FOR THE RENDERING OF SERVICES)

Bid Response Documents may be Deposited in the Bid Box NO. 2 situated at:

MUNICIPAL HEAD OFFICE

06 PLEIN STREET

CALEDON

7230

SUPPLIER INFORMATION

NAME OF BIDDER

POSTAL ADDRESS

STREET ADDRESS

TELEPHONE NUMBER CODE NUMBER

CELLPHONE NUMBER

FACSIMILE NUMBER CODE NUMBER

E-MAIL ADDRESS

VAT REGISTRATION NUMBER

TAX COMPLIANCE STATUS TCS PIN: OR CSD No:

B-BBEE STATUS LEVEL VERIFICATION CERTIFICATE [TICK APPLICABLE BOX]

Yes

No

B-BBEE STATUS LEVEL SWORN AFFIDAVIT

Yes

No [A B-BBEE STATUS LEVEL VERIFICATION CERTIFICATE/ SWORN AFFIDAVIT (FOR EMES & QSEs) MUST BE SUBMITTED IN ORDER TO QUALIFY FOR PREFERENCE POINTS FOR B-BBEE]

1. ARE YOU THE ACCREDITED REPRESENTATIVE IN SOUTH AFRICA FOR THE GOODS /SERVICES /WORKS OFFERED?

Yes No [IF YES ENCLOSE PROOF]

2. ARE YOU A FOREIGN BASED SUPPLIER FOR THE GOODS /SERVICES /WORKS OFFERED?

Yes No [IF YES, ANSWER PART B:3 ]

3. TOTAL NUMBER OF ITEMS OFFERED 4. TOTAL BID PRICE R

5. SIGNATURE OF BIDDER ……………………………… 6. DATE

7. CAPACITY UNDER WHICH THIS BID IS SIGNED

BIDDING PROCEDURE ENQUIRIES MAY BE DIRECTED TO: TECHNICAL INFORMATION MAY BE DIRECTED TO:

DEPARTMENT SCM CONTACT PERSON Eslin Wentzel

CONTACT PERSON Anarood Plaatjies TELEPHONE NUMBER 028 840 1130

TELEPHONE NUMBER 028 214 3300 FACSIMILE NUMBER N/A

FACSIMILE NUMBER 028 212 1229 E-MAIL ADDRESS [email protected]

E-MAIL ADDRESS [email protected]

Page 34: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

34

PART B

TERMS AND CONDITIONS FOR BIDDING

1. BID SUBMISSION:

1.1. BIDS MUST BE DELIVERED BY THE STIPULATED TIME TO THE CORRECT ADDRESS. LATE BIDS WILL NOT BE ACCEPTED FOR CONSIDERATION.

1.2. ALL BIDS MUST BE SUBMITTED ON THE OFFICIAL FORMS PROVIDED–(NOT TO BE RE-TYPED) OR ONLINE

1.3. THIS BID IS SUBJECT TO THE PREFERENTIAL PROCUREMENT POLICY FRAMEWORK ACT AND THE PREFERENTIAL PROCUREMENT REGULATIONS, 2017, THE GENERAL CONDITIONS OF CONTRACT (GCC) AND, IF APPLICABLE, ANY OTHER SPECIAL CONDITIONS OF CONTRACT.

2. TAX COMPLIANCE REQUIREMENTS

2.1 Bidders must ensure compliance with their tax obligations.

2.2 Bidders are required to submit their unique personal identification number (pin) issued by sars to enable the organ of state to view the taxpayer’s profile and tax status.

2.3 Application for the tax compliance status (tcs) certificate or pin may also be made via e-filing. In order to use this provision, taxpayers will need to register with sars as e-filers through the website www.sars.gov.za.

2.4 Foreign suppliers must complete the pre-award questionnaire in part b:3.

2.5 Bidders may also submit a printed tcs certificate together with the bid.

2.6 In bids where consortia / joint ventures / sub-contractors are involved, each party must submit a separate tcs certificate / pin / csd number.

2.7 Where no tcs is available but the bidder is registered on the central supplier database (csd), a csd number must be provided.

3. QUESTIONNAIRE TO BIDDING FOREIGN SUPPLIERS

3.1. IS THE ENTITY A RESIDENT OF THE REPUBLIC OF SOUTH AFRICA (RSA)? YES NO

3.2. DOES THE ENTITY HAVE A BRANCH IN THE RSA? YES NO

3.3. DOES THE ENTITY HAVE A PERMANENT ESTABLISHMENT IN THE RSA? YES NO

3.4. DOES THE ENTITY HAVE ANY SOURCE OF INCOME IN THE RSA? YES NO

3.5. IS THE ENTITY LIABLE IN THE RSA FOR ANY FORM OF TAXATION? YES NO

IF THE ANSWER IS “NO” TO ALL OF THE ABOVE, THEN IT IS NOT A REQUIREMENT TO REGISTER FOR A TAX COMPLIANCE STATUS SYSTEM PIN CODE FROM THE SOUTH AFRICAN REVENUE SERVICE (SARS) AND IF NOT REGISTER AS PER 2.3 ABOVE.

NB: FAILURE TO PROVIDE ANY OF THE ABOVE PARTICULARS MAY RENDER THE BID INVALID. NO BIDS WILL BE CONSIDERED FROM PERSONS IN THE SERVICE OF THE STATE. SIGNATURE OF BIDDER: ……………………………………………

CAPACITY UNDER WHICH THIS BID IS SIGNED: ……………………………………………

Page 35: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

MBD 2

TAX CLEARANCE CERTIFICATE REQUIREMENTS AND APPLICATION FORM

It is a condition of bid that the taxes of the successful bidder must be in order, or that satisfactory arrangements have been made with South African Revenue Services (SARS) to meet the obligations. 1. In order to meet this requirement, bidders are required to complete in full the TCC 0001 form,

the website www.sars.gov.za. The Tax Clearance Certificate Requirements are also applicable to foreign bidders / individuals who wish to submit bids. 2. Applications for the Tax Clearance Certificates may also be made via e-Filing. In order to use this provision, taxpayers will need to register with SARS as e-Filers through the website www.sars.gov.za 3. SARS will then furnish the bidder with a Tax Clearance Certificate that will be valid for a period of 1 (one) year from the date of approval. 4. In bids where Consortia / Joint Ventures / Sub-Contractors are involved, each party must submit a separate Tax Clearance Certificate. 5. Tax Compliance Status (TCS) Pin as of 18 April 2016

a. In terms of the new Tax Compliance Status System implemented by SARS on 18 April 2016, taxpayers are now able to issue the municipality with a TCS Pin which can be used to verify a

-filing. b. The taxpayer must issue the municipality with the following:

Bidders who are not in possession of an original Tax Clearance Certificate must provide at least 2 of the 3 numbers listed below in order to verify the Tax Clearance Certificate via SARS e-filing. 1. Tax Reference Number 2. Tax Compliance Status Pin 3. Tax Clearance Certificate Number:

c. If a bidder is registered on the Theewaterskloof Municipality is already in possession of an original tax clearance certificate which is valid on closing date of bid, it MUST be indicated as such on this page, whereby the attaching of a new tax clearance certificate to this page will not be needed. 6. Should a Tax Clearance Certificate not be verifiable on the SARS e-filing system, the bidder will be afforded an opportunity to submit a valid, verifiable Tax Clearance Certificate. It will result in the invalidation of the bid, should the bidder fail to provide a valid, verifiable Tax Clearance Certificate.

Page 36: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

� � �������

������� �� ����������

���� ������������� ������������������������������� ��������������������� ���� �������� ������� �� �������� ���� �������� ��� ���� ����� �� ��� ���� ������� �� ������ �� �����

������������������������������������������������������������������������������������������������������������� ������������� ������ ���� �������������� ��� ����� ��������� ���������� ����������� ���� ������������������������������������� ���������������� ��� ����� ����������� ������������������������������������������������ ����������������������������������������������!��"��� ������������������

��� ������������������������������������ �������!!�"����#$�%����������&$%�������&'!���������

%$�&������"�����������(��

#����$���������������������������������������������%&&&&&&&&&&&&&&&&&�����

#�������������������%�&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&����� #�#��'��������� �������������(�������)���� �����������������������*+%&&&&&&&&&�����

#�,��(�������-������������������%�&&&&&&&&&&&&&&&&&&&&&&&&����

#�.��/�0�-������ ��������%&&&&&&&&&&&&&&&&&&&&&&&&&&&&���

#�1��2�/�-������������������%���&&&&&&&&&&&&&&&&&&&&&&&&&&���

#�3��/������������������ �����!����������!���������������������������������������������������������������������������������������������� ������������������,������

�#�4�������������������������������� ��������������5�����������������������������������������������������)���*�� �

�#�4������������������������� ������&�&&&&&&&&&&&&&&&&&&&&&&&�

�&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&���

�+67(6�-���������%�8������������ ��������������9�������������:�)�+� ������������:�

)�+� �������� ���� ��� �;�)��+� ���������� ������������;����)���+� �����������������������������������(��� ����������� ��;��

)�+� ����������������������������� ���������������� ����������;�) +� ������� �������������� �������������� ����������;�)�+� ����������������������������������� �������������������������������� ������� �����������

��������������������������������������������������'��� �$���� ��6����������� ����<<<�)� �����������<<<+;�

)�+� ����������������� ������������������������������������������ ������� �������;����)�+� ��������������'�������������������� ��������������

�*�7���������9������������������������������������� ��������������� ��������������������������������������� ������������������������0�� ����� ��������������� ��������

������

Page 37: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

�#�<�����=������������������������� ���������������������������������������5�&&&)���*�� �

�� #�<������������������������� �����&&&&&&&&&���&&&&&&&&&&&&&&������ ��������������&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&����

#��>���?���������������������������)��������������������+��������������� ������������ ������������������������������������������� �����������������������"��� �����������������5�&&&&&&&&&&&&&��)���*�� �

�� � � #��>������������������������� ������

� &&&&&&&&&&&&&&&&&&&&&&&&&&&&&&�� � &&&&&&&&&&&&&&&&&&&&&&&&&&&&&&��

�#����������������������������������������)��������������������+���������� ��������������������������������������������� �������������������� ������������������������������������������"��� �����������������5����������������)���*�� � �

�#���������������������������� �����

&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&�&&&&&&&&&&&&�&&��������������������������������������������������������������

�#��������������������� ������@������ ���������������������������

���� ��������������������������������������� ��������������5�������������������������)���*�� ��

� � #���������������������������� ������� � &&&&&&&&&&&&&&&&&&&&&&&&&&&&&&��� � &&&&&&&&&&&&&&&&&&&&&&&&&&&&&&���

#��#������������������� ��������������������� ������@������ ��������������� ������������������������ ��������������������������������

�������� ��������������5����������������������������������������������������������������������������������������)���*�� ��� � #��#������������������������� ������

&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&��&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&��

�#��,���?������������������������ ���������������������������

���� ���������������������������������������� ��������������������������������������������� �������������������������������������������������������������� ����� �����������������������������������)���*�� �

�#��,������������������������� ����%�

&&&&&&&&&&&&&&&&&&&&&&&&&&&&&���&&&&&&&&&&&&&&&&&&&&&&&&&&&&&���

���

Page 38: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

� ��

��,�� $���������������� �����!����������!���������!���������������

�$!!���&�� �������,��$&���� �������&'!�,����$&����

� � ��

� � ��

��

� �

��

� �

��

� �

��

� �

��

� �

��

� �

��

� �

��

�� &&&&&&&&&&&&&��� ��������������������������&&&&&&&&&&&&&&���

� �����������������������$������������������������������������������������������������������������������

� &&&&&&&&&&&&&�� ������������������������&&&&&&&&&&&&&&&�� ������������������'����,�����������������������������������������������������������������&����������������

Page 39: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

� � � � ���������

��� �������� �������������������������������� ��������������������

��

���������������� � ������ ���������������������������������������������� ������������������������ ��� �������������������������������������������� ���� ����� ������������������� �������!���������������� ���� ��������������������������������������������

���������������������������� ���������� ��������� ������� ����������� �������������������� �����

�������������������

���� ����� ����������

"�"� ���������������������������#��� ����������������������������$�

�� ����%&'(&��#��� ������)���� �����������*�����������������*+&�&&&�&&&�������������������,�����������-�����

�� ���� .&'"&� �#��� � ��� ��)���� ��������� ��*��� ������ ������*+&� &&&� &&&� ������������������,��������������

"�(� ������������ ��������� ������� ����� �������,�����*+&�&&&�&&&� ���������������� ��,����������������������������%&'(&����������������#��� ����������������������

"�/� 0������������������������������������$��

����0����-����

������������������ �������!�����������

"�1� ���� �,� � ������������������������������������������$�

� �������

�� � %&�

������������������� ��������� (&�

�� !"�#�$% &�'�(��($)*�!%+������,-& �%� �*.)**+�

����

"�+� 2������� �� ���� ����� �� �� ������� ��� ��� ��� ����� �� �������������� ������ �� ��������������������������������3����������������������� ���������������������������������������������������������������������� ����

"�4� ��������������������������������������)���������������3�������������������������5����������������#��� �������)����#3�����������������#����� ����������������������3����#� ������)�������#����������������

� �

Page 40: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

0��������/�

��� �����������

����0����1� �������������������������� ���� ����� ���������������������"����������������������������� ���� ����� ���6��-�

���� 7�����& ! -&�"*2*"��'�)�% ($3- �(1� ������������������������������#������ ���� �� ����� �� ����� ��������� �� ������ ���� ��� � ����� ��3� ������� �� ��� �� ���������.�"������������������������������ ���� ����� ���6��-�

���� 03$+1� ���� �� ������� ���� �� �� ����������� ��� ����������� �� � �� �������� ��� ������������#���������������������������������������������������3� ��������������)��������3�������������� ��������������������������������������-��

����0�(�!+��!&*+� �"!)4� )�%�,$)� ,#�5*(,*% � �) 1� ���� ���� ���������������������� ���� ����� ���6��3�(&&/��6���8���+/���(&&/�-�

���� �0�1� �������,� �����9�������������������� ���������������������������������������� ���� ����� ��������������� �����������.��"������������������������������ ���� ����� ���6��-�

��� �0'-%) $�%!"$ 61� ���� ���� ������#� �� �� �������� ��� �������� ������ ��� ��������� ��������������������������������������������������������� �����

���� �0#($)*&1��������������������������,�������������������������������-���

����0#(��'��'������& ! -&�"*2*"��'�)�% ($3- �(1� ���$�

�7� ���������������������������������������#����������:������#���������-�

�7� 6�����������������������������#������������!�������;����0�������-�

87� 6#���������)���� ������������������� ���������������6��-�

���� 09�1� ������)����#���� ��������������������������� ���������������������������������������� ���� ����� ��������������� �����������.��"������������������������������ ���� ����� ���6��-��

���� 0(!%+�2!"-*1� ������������������ �������������������������*��3��������������������� ����������������3�����������������������������,��-��

8�� ��������:��������� �

/�"� ���;�<������ ��������������

� 6� �,� � ���%&������������������������������������������������$��

;�<���

��

���

� ���

���

�����

����� �

� <�����

� 0�� =� 0��������������������������������������������

� 0�� =� 0����������������������������

� 0 �� =� 0�����������������������������

� �

Page 41: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

0����8���/�

=�� ��������:�������������������������� ���������

1�"� �� ��� �� �� *��������� 4� �(�� ��� >� �(�� �� ���� 0���������� 0������ ��� *���������3���������������� �����������������������������������������������������������������������������������������������������������$�

������ ! -&��*2*"��'� �% ($3- �(�

�-,3*(��'�#�$% &�

>;�<���&6& *,7�

"� (&�

(� "%�

/� "1�

1� "(�

+� %�

4� 4�

>� 1�

%� (�

8���� �����������������

&�

/�� ����� ��������

+�"� �������� ���� ���� � ������ �� �������� �� ������� ������� ����� �� !���������� ������ �����������������$�

��� ������������������� ��������� ���������������������������=�����=����

4�"� �������������� �������!���������$???�������=�����???� �,� � ���(&��������

�0����� ���� ��� �� �������� �� ���������� >�"� ���� ��� �� ���������� ����� ���� ��������������� �� ���������� 1�"� ��� ���� ��� ������������� �#� �������� ����� �� ����������������������������������

��� ���� ���� �����

>�"� <�����#��������������������������������������@���

��������������������

A��� � 8B� ��

>�"�"� ��#��3��������$�

��� <������������������������������������������������������������?????�????C�

���� ����� ���������������������??????????????????????�������� ���������������������������������������������������������������������������������?????������� <�������������������������������9�����D���

������������������

A��� � 8B� ���� �����#3��#��������������������������,3�������������������������������������� ��

��0����������0������ ���*���������3(&">$��

� � �

Page 42: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

0����=���/�

�*&$?%! *+��(�-#���%����(�9��5@$)@�$&�! �"!& �/�A��5%*+�36��

��B�

9��B�

������������� � �

���������������������#����� � �

����������������������� �� � �

������������������������������� � �

�������������������������������������������������������������� � �

!�����������������#�������������� � �

��������������������� ������#��������� � �

��6#��9��� � �

6#�D��� � �

��%�� � ��������:����������� ������<����

%�"� 8� ����

�� ��#'�� $?????????????????????????????��

%�(� E6��������������

� ���$???????????????�?????????????�

%�/� !� ��#�������������

� ���$?????�?????????�???????????��

%�1� �A0��B2�!B9068A'�2�*9�

�� 0���������'F����E������'�!������� �

�� B���������������'�������������#�

�� !����������������

�� !� ��#�

�� �0�#�� � �����G��!H�600 �!6� ���BIJ�

%�+� K��!*����0*�8!�06 ��L��8����6!��E������

??????????????????????????????????????

??????????????????????????????????????

??????????????????????????????????????

??????????????????????????????????????�

%�4� !B9068A�! 6���2�!6��B8�

�� 9����������

�� ���������

�� 0���������������������������

�� B����������������������3����������������3������G���������� ����J���

%�>� ���� ����������������

�-%$)$#!"$ 6�5@*(*�3-&$%*&&�$&�&$ -! *+��CCCCCCCCCCCCCCCCCC��

*?$& *(*+��))�-% ��-,3*(��CCCCCCCCCC��

� !%+��-,3*($??????????????????��

�%�%� ������� ������#����������� ��#'�� ������������������$???????????�

Page 43: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

0����/���/�

%�.� �'��3� ���� ���������3� ���� ��� '� ���� ���#� ����������� ��� ��� ��� �� ������ �� ����

�� ��#'�� 3� �����#� ����� ���� ������ ���� ��3� ������ �� ���� ������ ������� ������ ��

���������������������������������"�1����4�"�������������������������3�)������������

�� ��#'��� ������������������������������'�������������������$�

��� ������� �������������������������������-�

���� ����������������������� ����������������������������;������!��������������������������������"���������� -�

����� ������������������������������������������������������������ ������������������������"�1����4�"3� �������������� �#���� ��)������ ��� ���������� ����#����������������������������������������������������� �������������-��

���� �� ���� ������� ������� ������ �� ����������� ���� ���� ���� ��� ��� �������� �� ����������� ��������� �#��� ���� ����������� �������� �������� ���� �������3� �������������� �#3���������������#��������� ��#���� �#������M�

����� ���)����#������������� �������������������-�

���� �������������3� ������������ ����� ������� ������������������������������������������N��������-�

���� ������������������������� ��#��� ������������������������������������������������ ������������������������� ��������������������������-�

���� ���� ��� ����� ���� ������� ��� ���������3� ���� ������������� ������������3� ��� ��#� ���� ������������� ��� �������������� ������ �� ����������� �����3� ��� ����������� �#� ���� 8������� �������#� �� ��������� �������� �� � �#� ����� �� ������ ��� �� ������� ����,�������"&�#����3������������������������������������������������������������������������-����

���� ����������� ������������ ����������������

���

???????????????����;86�L*�����B2���KK�*�����

�K6��$� � ?????????????���

6KK*���� ?????????????���

� � ?????????????���

� ?????????????���

<��8�������"�� ??????????????���

(�� ??????????????��

Page 44: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

������

������������ �������������������������

���������������������

�� ������ ������������ ���������������������������������������

�� ��� ����� �� ���� �������� ���������������� ������ ������� ���� ������ ��

����������������������������� �������������� ���� �����������������������

��!������ ���������������������������� ����������������������

"� �����������������������������#� ���������������� ���������������� ��������$�

��� ������ ���� ��� �����%� &� ��� ���� �����%� ������ ���� �����������

�������� �������������������� ���� ���������������� ������'�

��� ����� ��� ����������������� �������������������������������'�

�� ��������� ����� ��� � �������� ��� ��� ������ ��� ������ ���� ���� ���������� �

��� ����������������� �� ���� ����� ������������������������'����

��� ����������������(�������������������������������������� �����)��������

*�������������+�����������+�������, �����, ��-.���������//01��

�� ��� ������ ��� ����� � �!�� ��� �"�� #$���%� �"�� �&&�'���� ()�*�����#���� +)*�� $��

!�+,&�����#���*)$+������'��"��"��$��-�

���+� .)�*����� ��*� ��

0��� ��������������������������� ����������������.��������������%������������(��� ����2���������

���������������������������������������������������� �� ���3�

-+�������������������������������������������������������������������

������� �����������, �������4�� ��&,��������������������������������������

���� ��������������������������������������������1��

�"���#�#$#*��� ���*���!�����),,&���*���'���*���*�����"��#����#&����#*)�/�*�

'�$*���0����������������5�1�#���!#��$��#!!�**���$/�!&�!2���������*�&��2�#���"��

$����+�� ��"��"�+��,#��-��

6��

.��

0����� ���� ����������� ����$�

0��� ��������������������������� ����������������(�����������������������������

��������� �����)��������*�������������+�����������+�������, �����, ��-.�����

����//013��

�"������*���� ������������ #)&���*�!#��$��#!!�**�������"��#����#&����#*)�/�*�

'�$*����0'''-���#*)�/-���-3#1�$/�!&�!2���������*�&��2�#���"��$����+�� ��"��"�+��

,#��-��

6��

.��

0����� ���� ����������� ����$�

0�"� 7��������������������������� ���� ��� ��������� ������������-� �������� ��������

��������������(����� ����2�����,�� �1�������������� ���������������������������

����3�

6��

.��

Page 45: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

0�"��� ���� ����������� ����$�

���+� .)�*����� ��*� ��

0�0� ����������������������������� ��������������� ���������������8�����

��� ���� ���������������� ������&���� ��������� �������������������� ������

&���� ��������� �����������������������������������������3�

6��

.��

0�0��� ���� ����������� ����$�

0�9� 7������ ����� ������������������������������� ������&���� �����������������

��������������������������������������������������������� ������������������

�������������� �������������� ����� �3�

6��

.��

0�:��� ���� ����������� ����$�

������������

�%���������������0��������1��4444--44444444444--44�

� ����������������������������������������

� ����������������������������-�

� �� ������� ����%� �� ������� �� ���������� �� �� ������%�

����� ���� �� ��5�� ������� ��� ������ ����� ����������

��6���� �������-�

� 444444444444444---� � � 4444444444--�

� ����#�)���� � � � � � � �#���

� 444444444444444-� � � 4444444444--�

� ��*������� � � � � � � #+��� � ������� � � � � � � � � � � � ;"<:�7�

� �

Page 46: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

� �

������

�������� ���������������������� ��

�� ����������� ���������������������������������������� ���������������

�� ������ ����������������������!����������"��#���$%�����%%$&����������&�������������

������������'��&�������������������(&������&��������������(����������������

�����&� ��� ��� ��� ���'��� �������� �� �� ����)��� � �� ��������� ��� ��� ��� ��� ���� � ������

�����������������������*�!� �����������������������������������������������������

���+���������������(���������

,� ������ ����� (�-��� �����,$� �������������� ����������� (���������������� �(������ ����������������� ���� ���� �������� ��� ������ ��� ���� ���� (� ��������������(����&������������ �������������������&������������&���.�

���� ��/��� �������� ���������������������������0�

���� ��+��� ������������(�������� ��� ����������������(���� ������������������������ ����

���� (���������������(�������� ���������� ��(���������� �����(������������������(������������������� �������������(����0����

��� �� � �� ������ �'������ ��� �� ������ ��� ���� ������ ��������� �(� ������� ���

������ ��������������������������������������1����������������������

� ����� ���� ������� ��� �� ���������� ��� �� ������� ����� '�� �� ��� ����� �(� ����������� ���

����������&�'��������������������&�������� ��������������/�������������(������

������2���������

3� 4���������������������������������&�������������!����������������������������������

%������������� ������������������'�����������.�

�������������� ���������������������������������������������������������

���������������������������������������������������������������������������������������������������������������������

����� ��� ���������������� �� �������� ������������������� ���� ������������ �� �������� ���������������������� ���

������������������������������������������������������������

��

Page 47: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

� �

������

�������� ���������������������� ���

4&��������������&����������������������(������.�

�������������������������������������������������������������������������

�����#��������������������

��

��������������������������������������������(��

�������������������������������������������������������������������������������

�#������������� ��(�5������� �6���(��

��������(���/�������� �'������������������4������(������������������ ����������(���������

4������(&������� ����������������������������������������������������������������.�

�#���������������

��� 4��������������4����������������������������!���������0�

��� 4������������������������(�������'� �������7�� ��������������!���������������������

����������������� ����������(�������0�

,�� 4�����������)����(� ����������� ������� �����!���������&���� ���������� ���������(���

���&������� ���������������0�

�� 6���������'���������������������������������(����������������������)����(�

�����������������������������������&����������&��������&������� ���������������0�

3�� 8��� ���� ��������� ��� ����� !���������� ��� ���� �����(��� ���&� 4� ��������� ����� ����

'���� 9���������:� ��� � � ���� �(� �������� � ��� �����)����&� ������ ���� ���� ������&�

'����������������� ������'��������������&�'��.�

����� ����������7�����������������������������������������������������0�

����� �� ��������� (��������������������������������������������&���������

������7�� ��������&���� ����������1������0����

��� ���������������������������������������������������5�����������������

����������������������������

Page 48: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

� �

������

��

;�� ���� ������� ���� �������� ��� ���� �����(��� ���� �������� (� ����&� ��� '�������

��� �����&����������&�����������������������'�����(������������<�'�����

�������������'���������������+���������������������� �'� ���������������

���� ��������������

=�� �4������� ��&�'������� ������� ��������� ��(���������������;������&� ����������������

��� �����&����������&�����������������������'�����(�������������������.�

���� �����0�������

���� ���������� � ����� '����� ������� ��� ������� '� � ��� �������� ����/���

� ���������

���� �������&���������������� ������������ � ���������0�

���� �����������������������������������������������&������0��

���� ����� ���������� ��� �� ���� '���� ����� ��� ����� ���� ������������ ���

������������������0����

������������������'���������������������'�����������

$�� 4� �������&� ������ ����� ���� �� ��� ������&� ����������&� ���������� ���

����������� '���� �(� ���������� ��������� ���� 7�� ��(&� 7�����(&� ������������ ���

������������� ����(������� ������� ��������������������������'���� ��������� ���������

�� ������

%�� ���� ������ ��� ���� �����(��� ���� ����� ��� ���&� ���'� � ��� ��&� ��� ����� �(� ����

������&������ (���� ������ (&� ����(����������&������� ��� �������������������� ���������� �

���������������������'��������������������

!"�������������#����������������������������������������������������������������������������������������������$���

���$�����������������������������������������������

Page 49: (This is a - TWK.GOV.ZA 10-2019-20.… · The prime literature source is “Arboriculture: Integrated Management of Landscape Trees, Shrubs, and Vines” by Richard W. Harris, 2nd

� �

������

�>����4� ��� �'���� ����&� �� �������� ��� '������� ���+����� ��� �(� ������ �����(� ��������� ���

�������(���������������������� ����������������������&�������������������������

'� ��������������������!����������!���������������������������������� ������������

�������������������� ����������������������3%��������!����������"��#��$%�����%%$�

��� ��� ��(� ��� ��������� ��� ���� #����� � ?��������� "�������(� �#?"�� ���� ����� �

��������������������(����������������������������������'����������� ��������

�����������������1�����������>��(��������������������?�����������!�����������

!�������"���������"���#���������>> �����(���������� ��� �� ���� ������

�@@@@@@@@@@@@@@@@@@@� � � @@@@@@@@@@@@@�

��������� � � � � � � � �����

@@@@@@@@@@@@@@@@@@@�� � � @@@@@@@@@@@@@�

?�������� � � � � � � � #��������������

A�%� �'� �