THIS DOCUMENT HAS BEEN DEVELOPED BY ......EWS OR OP I N I ONS OF THE END CL I ENT, (DEPARTMENT OF...

7
REVISION NO. REVISION DESCRIPTION REVISION DATE BY: VERIFIED BY: APPROVED BY: DRAWN BY: TSHERING PENJOR VERIFIED BY: TSHERING PENJOR CHECKED BY: DINO L ANZELLOTTI APPROVED BY: SIGNED: TP SIGNED: TP SIGNED: DLA SIGNED: DATE: 10.06.2017 DATE: 12.06.2017 DATE: 12.06.2017 DATE: DRAWING TITLE: COVER DRAWING NUMBER: 000 REVISION: SCALE: NTS THIS DOCUMENT HAS BEEN DEVELOPED BY STUDENTS FROM THE UNIVERSITY OF SOUTH AUSTRALIA AS PART OF THE CIVIL ENGINEERING DESIGN PROJECT COURSE. THIS DOCUMENT AND ANY ASSOCIATED WORKS RELATING TO IT IS FOR THE PURPOSES OF ACADEMIC STUDY ONLY AND DOES NOT REPRESENT THE VIEWS OR OPINIONS OF THE END CLIENT, (DEPARTMENT OF PLANNING TRANSPORT AND INFRASTRUCTURE (DPTI) PROJECT: OAKLANDS PARK TRAIN GRADE SEPARATION - DIAGONAL AND MORPHETT ROADS THIS DOCUMENT HAS BEEN DEVELOPED BY STUDENTS FROM THE UNIVERSITY OF SOUTH AUSTRALIA AS PART OF THE CIVIL ENGINEERING DESIGN PROJECT COURSE. THIS DOCUMENT AND ANY ASSOCIATED WORKS RELATING TO IT IS FOR THE PURPOSES OF ACADEMIC STUDY ONLY AND DOES NOT REPRESENT THE VIEWS OR OPINIONS OF THE END CLIENT, (DEPARTMENT OF PLANNING TRANSPORT AND INFRASTRUCTURE (DPTI) PROJECT NUMBER: 0617-001 DRAWING NUMBER NAME OF DRAWING DRAWN BY 001 PLATFORM SHELTER PLAN VIEW YUXUAN DU 002 BARRIER LAYOUT, PLAN, ELEVATION & REINFORCEMENT DETAILS DINO L ANZELLOTTI 003 PLATFORM LAYOUT PLAN & LIGHTING POLE DETAILS RUP N GAUTAM 004 PLATFORM SHELTER LAYOUT AND ELEVATIONS YONGJI DUAN URBAN DEPARTMENT

Transcript of THIS DOCUMENT HAS BEEN DEVELOPED BY ......EWS OR OP I N I ONS OF THE END CL I ENT, (DEPARTMENT OF...

Page 1: THIS DOCUMENT HAS BEEN DEVELOPED BY ......EWS OR OP I N I ONS OF THE END CL I ENT, (DEPARTMENT OF PLANN I NG TRANSPORT AND INFRASTRUCTURE (DPTI) PROJECT NUMBER: 0617-001 DRAWING …

REVISION NO. REVISIONDESCRIPTION REVISION DATE BY: VERIFIED BY: APPROVED BY:

DRAWN BY: TSHERINGPENJOR

VERIFIED BY: TSHERINGPENJOR

CHECKED BY: DINO LANZELLOTTI

APPROVED BY:

SIGNED: TP

SIGNED: TP

SIGNED: DLA

SIGNED:

DATE: 10.06.2017

DATE: 12.06.2017

DATE: 12.06.2017

DATE:

DRAWING TITLE: COVER

DRAWING NUMBER: 000

REVISION:

SCALE: NTS

THIS DOCUMENT HAS BEEN DEVELOPED BY STUDENTS FROM THE UNIVERSITY OF SOUTH AUSTRALIA AS PART OF THE CIVIL ENGINEERING DESIGN PROJECT COURSE. THIS DOCUMENT AND ANY ASSOCIATED WORKS RELATING TO IT IS FOR THE PURPOSES OF ACADEMIC STUDY ONLY AND DOES NOT REPRESENT THE VIEWS OR OPINIONS OF THE END CLIENT, (DEPARTMENT OF PLANNING TRANSPORT AND INFRASTRUCTURE (DPTI)

PROJECT:

OAKLANDS PARK TRAINGRADE SEPARATION -

DIAGONAL ANDMORPHETT ROADSTH

IS D

OCUM

ENT

HAS

BEEN

DEV

ELOP

ED B

Y ST

UDEN

TS F

ROM

THE

UNIV

ERSI

TY O

F SO

UTH

AUST

RALIA

AS

PART

OF

THE

CIVI

L ENG

INEE

RING

DES

IGN

PROJ

ECT

COUR

SE. T

HIS

DOCU

MENT

AND

ANY

ASS

OCIA

TED

WOR

KS R

ELAT

ING

TO IT

IS F

OR T

HE P

URPO

SES

OF A

CADE

MIC

STUD

Y ON

LY A

ND D

OES

NOT

REPR

ESEN

T TH

EVI

EWS

OR O

PINI

ONS

OF T

HE E

ND C

LIENT

, (DE

PART

MENT

OF

PLAN

NING

TRA

NSPO

RT A

ND IN

FRAS

TRUC

TURE

(DPT

I)

PROJECT NUMBER: 0617-001

DRAWING NUMBER NAME OF DRAWING DRAWN BY

001 PLATFORM SHELTER PLAN VIEW YUXUAN DU

002 BARRIER LAYOUT, PLAN, ELEVATION &REINFORCEMENT DETAILS DINO L ANZELLOTTI

003 PLATFORM LAYOUT PLAN & LIGHTINGPOLE DETAILS RUP N GAUTAM

004 PLATFORM SHELTER LAYOUT AND ELEVATIONS YONGJI DUAN

URBAN DEPARTMENT

Page 2: THIS DOCUMENT HAS BEEN DEVELOPED BY ......EWS OR OP I N I ONS OF THE END CL I ENT, (DEPARTMENT OF PLANN I NG TRANSPORT AND INFRASTRUCTURE (DPTI) PROJECT NUMBER: 0617-001 DRAWING …

Physical Structure Zone

Physical Structure ZoneClear Circulation Zone

Clear Circulation Zone

95409500 20000200002000015438200002000020000

PLATFORM SHELTER PLAN VIEW

700

2400

2600

747

840

2600

19920

1000 2000

200

240

30

20000

700

820

20000

1000 2000

STEEL COLUMN 80 X 40 X 20

TOP VIEW

FRONT VIEW

SIDE VIEW

REVISION NO. REVISIONDESCRIPTION REVISION DATE BY: VERIFIED BY: APPROVED BY:

DRAWN BY: YUXUAN DU

VERIFIED BY: TSHERINGPENJOR

CHECKED BY: DINO LANZELLOTTI

APPROVED BY:

SIGNED: YD

SIGNED: TP

SIGNED: DLA

SIGNED:

DATE: 10.06.2017

DATE: 12.06.2017

DATE: 12.06.2017

DATE:

DRAWING TITLE: PLATFORM SHELTER LAYOUTAND ELEVATIONS

DRAWING NUMBER: 001

REVISION:

SCALE: AS SHOWN

THIS DOCUMENT HAS BEEN DEVELOPED BY STUDENTS FROM THE UNIVERSITY OF SOUTH AUSTRALIA AS PART OF THE CIVIL ENGINEERING DESIGN PROJECT COURSE. THIS DOCUMENT AND ANY ASSOCIATED WORKS RELATING TO IT IS FOR THE PURPOSES OF ACADEMIC STUDY ONLY AND DOES NOT REPRESENT THE VIEWS OR OPINIONS OF THE END CLIENT, (DEPARTMENT OF PLANNING TRANSPORT AND INFRASTRUCTURE (DPTI)

PROJECT:

OAKLANDS PARK TRAINGRADE SEPARATION -

DIAGONAL ANDMORPHETT ROADSTH

IS D

OCUM

ENT

HAS

BEEN

DEV

ELOP

ED B

Y ST

UDEN

TS F

ROM

THE

UNIV

ERSI

TY O

F SO

UTH

AUST

RALIA

AS

PART

OF

THE

CIVI

L ENG

INEE

RING

DES

IGN

PROJ

ECT

COUR

SE. T

HIS

DOCU

MENT

AND

ANY

ASS

OCIA

TED

WOR

KS R

ELAT

ING

TO IT

IS F

OR T

HE P

URPO

SES

OF A

CADE

MIC

STUD

Y ON

LY A

ND D

OES

NOT

REPR

ESEN

T TH

EVI

EWS

OR O

PINI

ONS

OF T

HE E

ND C

LIENT

, (DE

PART

MENT

OF

PLAN

NING

TRA

NSPO

RT A

ND IN

FRAS

TRUC

TURE

(DPT

I)

PROJECT NUMBER: 0617-001

ALL DIMENSIONS IN MM

PLATFORM SHELTER PLAN VIEW

SCALE: 1:15000

TOP, FRONT AND SIDE VIEWS OF SHELTER

SCALE: 1:2000

Page 3: THIS DOCUMENT HAS BEEN DEVELOPED BY ......EWS OR OP I N I ONS OF THE END CL I ENT, (DEPARTMENT OF PLANN I NG TRANSPORT AND INFRASTRUCTURE (DPTI) PROJECT NUMBER: 0617-001 DRAWING …

Physical Structure Zone

Physical Structure ZoneClear Circulation Zone

Clear Circulation Zone

WHOLE PLATFORM LENGTH

BARRIERS

@ 4M APART

BARRIERS @ 4 M APART

15018

LAP 440MM

2400

440

774

CONCRETE

COLUMN

GLASS

3MM GLASS PANEL

350MM CONCRETE

BARRIER COLUMN

2400

FL

FL

4025

350MM

BARRIER COLUMNL

2 TIES (STIRRUPS)FOR

TOP OF CRANKED COLUMN BAR

EXTEND & COG ENDS

TO FULLY ENGAGE STEEL

FIRST STIR-UP

75MM FROM TOP FACE

REINFORCEMENT DETAILSFOR BARRIER COLUMN

ELEVATION

PLAN VIEW

REVISION NO. REVISIONDESCRIPTION REVISION DATE BY: VERIFIED BY: APPROVED BY:

DRAWN BY: DINO LANZELLOTTI

VERIFIED BY: TSHERINGPENJOR

CHECKED BY: DINO LANZELLOTTI

APPROVED BY:

SIGNED: DLA

SIGNED: TP

SIGNED: DLA

SIGNED:

DATE: 10.06.2017

DATE: 12.06.2017

DATE: 12.06.2017

DATE:

DRAWING TITLE: BARRIER LAYOUT, PLAN, ELEVATION & REINFORCEMENT DETAILS

DRAWING NUMBER: 002

REVISION:

SCALE: AS SHOWN

THIS DOCUMENT HAS BEEN DEVELOPED BY STUDENTS FROM THE UNIVERSITY OF SOUTH AUSTRALIA AS PART OF THE CIVIL ENGINEERING DESIGN PROJECT COURSE. THIS DOCUMENT AND ANY ASSOCIATED WORKS RELATING TO IT IS FOR THE PURPOSES OF ACADEMIC STUDY ONLY AND DOES NOT REPRESENT THE VIEWS OR OPINIONS OF THE END CLIENT, (DEPARTMENT OF PLANNING TRANSPORT AND INFRASTRUCTURE (DPTI)

PROJECT:

OAKLANDS PARK TRAINGRADE SEPARATION -

DIAGONAL ANDMORPHETT ROADSTH

IS D

OCUM

ENT

HAS

BEEN

DEV

ELOP

ED B

Y ST

UDEN

TS F

ROM

THE

UNIV

ERSI

TY O

F SO

UTH

AUST

RALIA

AS

PART

OF

THE

CIVI

L ENG

INEE

RING

DES

IGN

PROJ

ECT

COUR

SE. T

HIS

DOCU

MENT

AND

ANY

ASS

OCIA

TED

WOR

KS R

ELAT

ING

TO IT

IS F

OR T

HE P

URPO

SES

OF A

CADE

MIC

STUD

Y ON

LY A

ND D

OES

NOT

REPR

ESEN

T TH

EVI

EWS

OR O

PINI

ONS

OF T

HE E

ND C

LIENT

, (DE

PART

MENT

OF

PLAN

NING

TRA

NSPO

RT A

ND IN

FRAS

TRUC

TURE

(DPT

I)

PROJECT NUMBER: 0617-001

PLATFORM BARRIER LAYOUT

SCALE: 1:5000

ALL DIMENSIONS IN MM

BARRIER ELEVATION, PLAN & RIO. DETAILS

SCALE: 1:1000

Page 4: THIS DOCUMENT HAS BEEN DEVELOPED BY ......EWS OR OP I N I ONS OF THE END CL I ENT, (DEPARTMENT OF PLANN I NG TRANSPORT AND INFRASTRUCTURE (DPTI) PROJECT NUMBER: 0617-001 DRAWING …

Physical Structure Zone

Physical Structure ZoneClear Circulation Zone

Clear Circulation Zone

PLATFORM LIGHT LAYOUT AT 5M APART

BOTH SIDE OF THE PLATFORM

15000

15000

1250

5360

700

300

GL

1500

LIGHTING POLE

REVISION NO. REVISIONDESCRIPTION REVISION DATE BY: VERIFIED BY: APPROVED BY:

DRAWN BY: RUP NGAUTAM

VERIFIED BY: TSHERINGPENJOR

CHECKED BY: DINO LANZELLOTTI

APPROVED BY:

SIGNED: RNG

SIGNED: TP

SIGNED: DLA

SIGNED:

DATE: 10.06.2017

DATE: 12.06.2017

DATE: 12.06.2017

DATE:

DRAWING TITLE: PLATFORM LAYOUT PLAN &LIGHTING POLE DETAILS

DRAWING NUMBER: 003

REVISION:

SCALE: AS SHOWN

THIS DOCUMENT HAS BEEN DEVELOPED BY STUDENTS FROM THE UNIVERSITY OF SOUTH AUSTRALIA AS PART OF THE CIVIL ENGINEERING DESIGN PROJECT COURSE. THIS DOCUMENT AND ANY ASSOCIATED WORKS RELATING TO IT IS FOR THE PURPOSES OF ACADEMIC STUDY ONLY AND DOES NOT REPRESENT THE VIEWS OR OPINIONS OF THE END CLIENT, (DEPARTMENT OF PLANNING TRANSPORT AND INFRASTRUCTURE (DPTI)

PROJECT:

OAKLANDS PARK TRAINGRADE SEPARATION -

DIAGONAL ANDMORPHETT ROADSTH

IS D

OCUM

ENT

HAS

BEEN

DEV

ELOP

ED B

Y ST

UDEN

TS F

ROM

THE

UNIV

ERSI

TY O

F SO

UTH

AUST

RALIA

AS

PART

OF

THE

CIVI

L ENG

INEE

RING

DES

IGN

PROJ

ECT

COUR

SE. T

HIS

DOCU

MENT

AND

ANY

ASS

OCIA

TED

WOR

KS R

ELAT

ING

TO IT

IS F

OR T

HE P

URPO

SES

OF A

CADE

MIC

STUD

Y ON

LY A

ND D

OES

NOT

REPR

ESEN

T TH

EVI

EWS

OR O

PINI

ONS

OF T

HE E

ND C

LIENT

, (DE

PART

MENT

OF

PLAN

NING

TRA

NSPO

RT A

ND IN

FRAS

TRUC

TURE

(DPT

I)

PROJECT NUMBER: 0617-001

PLATFORM LIGHTING LAYOUT

SCALE: 1:5000

ALL DIMENSIONS IN MM

LIGHTING POLE DETAILS

SCALE: 1:1000

Page 5: THIS DOCUMENT HAS BEEN DEVELOPED BY ......EWS OR OP I N I ONS OF THE END CL I ENT, (DEPARTMENT OF PLANN I NG TRANSPORT AND INFRASTRUCTURE (DPTI) PROJECT NUMBER: 0617-001 DRAWING …

Physical Structure Zone

Physical Structure ZoneClear Circulation Zone

Clear Circulation Zone

PLATFORM BENCH PLAN VIEW

· SPACING BETWEEN EACH BENCH IS 6M

· SPACING OF BENCH FOR THE EDGE OF

THE PLATFORM IS 4M

154917

620

620

70

1980

320

BENCH TOP & SIDE & FRONT VIEWS

540

TOP VIEW

FRONT VIEW

SIDE VIEW

REVISION NO. REVISIONDESCRIPTION REVISION DATE BY: VERIFIED BY: APPROVED BY:

DRAWN BY: YONGJI DUAN

VERIFIED BY: TSHERINGPENJOR

CHECKED BY: DINO LANZELLOTTI

APPROVED BY:

SIGNED: YD

SIGNED: TP

SIGNED: DLA

SIGNED:

DATE: 10.06.2017

DATE: 12.06.2017

DATE: 12.06.2017

DATE:

DRAWING TITLE: PLATFORM SHELTER LAYOUTAND ELEVATIONS

DRAWING NUMBER: 004

REVISION:

SCALE: AS SHOWN

THIS DOCUMENT HAS BEEN DEVELOPED BY STUDENTS FROM THE UNIVERSITY OF SOUTH AUSTRALIA AS PART OF THE CIVIL ENGINEERING DESIGN PROJECT COURSE. THIS DOCUMENT AND ANY ASSOCIATED WORKS RELATING TO IT IS FOR THE PURPOSES OF ACADEMIC STUDY ONLY AND DOES NOT REPRESENT THE VIEWS OR OPINIONS OF THE END CLIENT, (DEPARTMENT OF PLANNING TRANSPORT AND INFRASTRUCTURE (DPTI)

PROJECT:

OAKLANDS PARK TRAINGRADE SEPARATION -

DIAGONAL ANDMORPHETT ROADSTH

IS D

OCUM

ENT

HAS

BEEN

DEV

ELOP

ED B

Y ST

UDEN

TS F

ROM

THE

UNIV

ERSI

TY O

F SO

UTH

AUST

RALIA

AS

PART

OF

THE

CIVI

L ENG

INEE

RING

DES

IGN

PROJ

ECT

COUR

SE. T

HIS

DOCU

MENT

AND

ANY

ASS

OCIA

TED

WOR

KS R

ELAT

ING

TO IT

IS F

OR T

HE P

URPO

SES

OF A

CADE

MIC

STUD

Y ON

LY A

ND D

OES

NOT

REPR

ESEN

T TH

EVI

EWS

OR O

PINI

ONS

OF T

HE E

ND C

LIENT

, (DE

PART

MENT

OF

PLAN

NING

TRA

NSPO

RT A

ND IN

FRAS

TRUC

TURE

(DPT

I)

PROJECT NUMBER: 0617-001

ALL DIMENSIONS IN MM

TOP, FRONT AND SIDE VIEWS OF BENCHES

SCALE: 1:500

PLATFORM SHELTER PLAN VIEW

SCALE: 1:15000

Page 6: THIS DOCUMENT HAS BEEN DEVELOPED BY ......EWS OR OP I N I ONS OF THE END CL I ENT, (DEPARTMENT OF PLANN I NG TRANSPORT AND INFRASTRUCTURE (DPTI) PROJECT NUMBER: 0617-001 DRAWING …

REVISION NO. REVISIONDESCRIPTION

REVISION DATE BY: VERIFIED BY: APPROVED BY:

VERIFIED BY: JOEL

CHECKED BY: TSHERINGPENJOR

APPROVED BY:

SIGNED: TP

SIGNED: JOEL

SIGNED: TP

SIGNED:

DATE: 10.06.2017

DATE: 10.06.2017

DATE: 10.06.2017

DATE:

DRAWING TITLE: COVER

DRAWING NUMBER: 000

REVISION:

SCALE: NTS

THIS DOCUMENT HAS BEEN DEVELOPED BY STUDENTS FROM THE UNIVERSITY OF SOUTH AUSTRALIA AS PART OF THE CIVIL ENGINEERING DESIGN PROJECT COURSE. THIS DOCUMENT AND ANY ASSOCIATED WORKS RELATING TO IT IS FOR THE PURPOSES OF ACADEMIC STUDY ONLY AND DOES NOT REPRESENT THE VIEWS OR OPINIONS OF THE END CLIENT, (DEPARTMENT OF PLANNING TRANSPORT AND INFRASTRUCTURE (DPTI)

PROJECT:

OAKLANDS PARK TRAINGRADE SEPARATION -

DIAGONAL ANDMORPHETT ROADSTH

IS D

OCUM

ENT

HAS

BEEN

DEV

ELOP

ED B

Y ST

UDEN

TS F

ROM

THE

UNIV

ERSI

TY O

F SO

UTH

AUST

RALIA

AS

PART

OF

THE

CIVI

L ENG

INEE

RING

DES

IGN

PROJ

ECT

COUR

SE. T

HIS

DOCU

MENT

AND

ANY

ASS

OCIA

TED

WOR

KS R

ELAT

ING

TO IT

IS F

OR T

HE P

URPO

SES

OF A

CADE

MIC

STUD

Y ON

LY A

ND D

OES

NOT

REPR

ESEN

T TH

EVI

EWS

OR O

PINI

ONS

OF T

HE E

ND C

LIENT

, (DE

PART

MENT

OF

PLAN

NING

TRA

NSPO

RT A

ND IN

FRAS

TRUC

TURE

(DPT

I)

DRAWN BY: TSHERING

PENJOR PROJECT NUMBER:

0617-001

ENVIRONMENTAL DEPARTMENT

DRAWING NUMBER NAME OF DRAWING DRAWN BY

001 TREE PLANTATION PLAN MALIHA SAEEDI

Page 7: THIS DOCUMENT HAS BEEN DEVELOPED BY ......EWS OR OP I N I ONS OF THE END CL I ENT, (DEPARTMENT OF PLANN I NG TRANSPORT AND INFRASTRUCTURE (DPTI) PROJECT NUMBER: 0617-001 DRAWING …

0.50

Lift andStair

Lift and Stair

Urban Team can

use this part of

Adventure park

Emergency vehicles only

Toilet

Wheelchair

WheelchairWheelchair

Emergency vehicles only

WheelchairWheelchair

Wheelchair

WheelchairWheelchair

Wheelchair

Wheelchair

Wheelchair

Exit

Exit

Exit

Wheelchair Wheelchair

Wheelchair Wheelchair

Wheelchair Wheelchair

Wheelchair Wheelchair

Wheelchair

Exit

Keep Clear

Give W

ay

Give W

ay

Give W

ay

Give W

ay

Give W

ay

Give W

ay

Give W

ay

Give Way

Give Way

Give Way

Give Way

Give Way

Give Way

Give Way

Give Way

Give W

ay

Give W

ay

Give W

ay

Give W

ay

Give Way

Give W

ay

Give W

ay

Give Way

Give Way

Give Way

Give Way

REVISION NO. REVISIONDESCRIPTION

REVISION DATE BY: VERIFIED BY: APPROVED BY:

VERIFIED BY: JOEL

CHECKED BY: TSHERINGPENJOR

APPROVED BY:

SIGNED: SM

SIGNED:

SIGNED: TP

SIGNED:

DATE: 08.06.2017

DATE:

DATE: 10.06.2017

DATE:

DRAWING TITLE: TREE PLANTATION PLAN

DRAWING NUMBER: 001

REVISION:

SCALE: AS SHOWN

THIS DOCUMENT HAS BEEN DEVELOPED BY STUDENTS FROM THE UNIVERSITY OF SOUTH AUSTRALIA AS PART OF THE CIVIL ENGINEERING DESIGN PROJECT COURSE. THIS DOCUMENT AND ANY ASSOCIATED WORKS RELATING TO IT IS FOR THE PURPOSES OF ACADEMIC STUDY ONLY AND DOES NOT REPRESENT THE VIEWS OR OPINIONS OF THE END CLIENT, (DEPARTMENT OF PLANNING TRANSPORT AND INFRASTRUCTURE (DPTI)

PROJECT:

OAKLANDS PARK TRAINGRADE SEPARATION -

DIAGONAL ANDMORPHETT ROADSTH

IS D

OCUM

ENT

HAS

BEEN

DEV

ELOP

ED B

Y ST

UDEN

TS F

ROM

THE

UNIV

ERSI

TY O

F SO

UTH

AUST

RALIA

AS

PART

OF

THE

CIVI

L ENG

INEE

RING

DES

IGN

PROJ

ECT

COUR

SE. T

HIS

DOCU

MENT

AND

ANY

ASS

OCIA

TED

WOR

KS R

ELAT

ING

TO IT

IS F

OR T

HE P

URPO

SES

OF A

CADE

MIC

STUD

Y ON

LY A

ND D

OES

NOT

REPR

ESEN

T TH

EVI

EWS

OR O

PINI

ONS

OF T

HE E

ND C

LIENT

, (DE

PART

MENT

OF

PLAN

NING

TRA

NSPO

RT A

ND IN

FRAS

TRUC

TURE

(DPT

I)

Notes:Japanese Elm trees have been planted along the edge of the road between thefootpath and carpark.

Jacaranda Trees have been planted inside the carpark.

Zoysia Macrantha grass has been planted inside the carpark.

DRAWN BY: SAEEDI, MALIHA

TREE PLANTATION PLAN SCALE: 1:20000

PROJECT NUMBER:

0617-001