![Page 1: Third Karnaphuli Bridge - CBDG · Third Karnaphuli Bridge th fi t j bl t d b id i B l d hthe first major cable supported bridge in Bangladesh Fast Track Procurement 2001 Study concluded](https://reader031.fdocuments.in/reader031/viewer/2022041921/5e6c1ad5ba6b6e454f7cda0e/html5/thumbnails/1.jpg)
Third Karnaphuli Bridgethe first major cable supported bridge in Bangladeshthe first major cable supported bridge in Bangladesh
Presented by:David AstinManaging Consultant, High-Point Rendel
CBDG ConferenceThursday 7th July 2011Thursday, 7th July 2011St Hugh’s College, Oxford
![Page 2: Third Karnaphuli Bridge - CBDG · Third Karnaphuli Bridge th fi t j bl t d b id i B l d hthe first major cable supported bridge in Bangladesh Fast Track Procurement 2001 Study concluded](https://reader031.fdocuments.in/reader031/viewer/2022041921/5e6c1ad5ba6b6e454f7cda0e/html5/thumbnails/2.jpg)
Third Karnaphuli Bridgeth fi t j bl t d b id i B l d hthe first major cable supported bridge in Bangladesh
Fast Track Procurement
2001 Study concluded replacement bridge required
Decision to progress project on a D&B basis funded by KFAED andDecision to progress project on a D&B basis, funded by KFAED and Government of Bangladesh
Early 2005 Contractor Consortium Pre-QualifiedEarly 2005 Contractor Consortium Pre Qualified
August 2005 D&B Tenders Invited
July 2006, Tender awarded to MBEC-ACL-COPRI JV
July 2007 Construction Starty
July 2009 final stitch
Construction complete early 2010
![Page 3: Third Karnaphuli Bridge - CBDG · Third Karnaphuli Bridge th fi t j bl t d b id i B l d hthe first major cable supported bridge in Bangladesh Fast Track Procurement 2001 Study concluded](https://reader031.fdocuments.in/reader031/viewer/2022041921/5e6c1ad5ba6b6e454f7cda0e/html5/thumbnails/3.jpg)
Project Location
Proposed Intersection - 01(Chittagong end) at Bakulia
BAKULIA
MOYZZERTEK
SHIKALBAHAKOLARPOOL
Proposed Intersection - 02(Cox's bazar end) at Mozzartek
L
Location of the new bridge is 50m
BAY OF BENGAL
bridge is 50m upstream of the existing Shah Amanat Bridge
![Page 4: Third Karnaphuli Bridge - CBDG · Third Karnaphuli Bridge th fi t j bl t d b id i B l d hthe first major cable supported bridge in Bangladesh Fast Track Procurement 2001 Study concluded](https://reader031.fdocuments.in/reader031/viewer/2022041921/5e6c1ad5ba6b6e454f7cda0e/html5/thumbnails/4.jpg)
Functional Requirements
• Concrete structure with low maintenance• Design to AASHTO LRFD 2004/2006• Two full lanes + one narrow lane of traffic each carriageway
(AASHTO 6 lanes for design)• 200m spans with navigation clearance (4m depth at midspan)• 200m spans with navigation clearance (4m depth at midspan)• Resistant to seismic and ship impact forces• Cantilever deck construction (minimise works in river)• Large diameter bored pilesLarge diameter bored piles
![Page 5: Third Karnaphuli Bridge - CBDG · Third Karnaphuli Bridge th fi t j bl t d b id i B l d hthe first major cable supported bridge in Bangladesh Fast Track Procurement 2001 Study concluded](https://reader031.fdocuments.in/reader031/viewer/2022041921/5e6c1ad5ba6b6e454f7cda0e/html5/thumbnails/5.jpg)
Main Bridge Layout - Elevation
![Page 6: Third Karnaphuli Bridge - CBDG · Third Karnaphuli Bridge th fi t j bl t d b id i B l d hthe first major cable supported bridge in Bangladesh Fast Track Procurement 2001 Study concluded](https://reader031.fdocuments.in/reader031/viewer/2022041921/5e6c1ad5ba6b6e454f7cda0e/html5/thumbnails/6.jpg)
Main Bridge Layout - Pier
![Page 7: Third Karnaphuli Bridge - CBDG · Third Karnaphuli Bridge th fi t j bl t d b id i B l d hthe first major cable supported bridge in Bangladesh Fast Track Procurement 2001 Study concluded](https://reader031.fdocuments.in/reader031/viewer/2022041921/5e6c1ad5ba6b6e454f7cda0e/html5/thumbnails/7.jpg)
Main Bridge Layout - Midspan
![Page 8: Third Karnaphuli Bridge - CBDG · Third Karnaphuli Bridge th fi t j bl t d b id i B l d hthe first major cable supported bridge in Bangladesh Fast Track Procurement 2001 Study concluded](https://reader031.fdocuments.in/reader031/viewer/2022041921/5e6c1ad5ba6b6e454f7cda0e/html5/thumbnails/8.jpg)
Extradosed Bridge - Definition
• Extradosed: Tower height = 1/15 to 1/10 of span• Cable-stayed: Tower height = 1/5 to 1/4 of span
K h li T h i ht 1/8 f• Karnaphuli: Tower height = 1/8 of span
• Extradosed: <30% total vertical load carried by stays• Cable stayed: >40% total vertical load carried by stays• Cable-stayed: >40% total vertical load carried by stays• Karnaphuli: 45% total (dead+live) carried by stays
![Page 9: Third Karnaphuli Bridge - CBDG · Third Karnaphuli Bridge th fi t j bl t d b id i B l d hthe first major cable supported bridge in Bangladesh Fast Track Procurement 2001 Study concluded](https://reader031.fdocuments.in/reader031/viewer/2022041921/5e6c1ad5ba6b6e454f7cda0e/html5/thumbnails/9.jpg)
Main Bridge Articulation
(1) Construction (temporary erection loads); (2) Normal (traction,wind); (3) Seismic
![Page 10: Third Karnaphuli Bridge - CBDG · Third Karnaphuli Bridge th fi t j bl t d b id i B l d hthe first major cable supported bridge in Bangladesh Fast Track Procurement 2001 Study concluded](https://reader031.fdocuments.in/reader031/viewer/2022041921/5e6c1ad5ba6b6e454f7cda0e/html5/thumbnails/10.jpg)
Main Bridge Piers
Tabletop
2.25m diameter Columns
Pile Cap
3m diameter piles
![Page 11: Third Karnaphuli Bridge - CBDG · Third Karnaphuli Bridge th fi t j bl t d b id i B l d hthe first major cable supported bridge in Bangladesh Fast Track Procurement 2001 Study concluded](https://reader031.fdocuments.in/reader031/viewer/2022041921/5e6c1ad5ba6b6e454f7cda0e/html5/thumbnails/11.jpg)
Shock Transmission Units
• Velocity Sensitive
• Allows “Slow” movements (e.g creep, shrinkage, temperature)
• Locks under impulse loading (e.g. seismic and ship impact)
![Page 12: Third Karnaphuli Bridge - CBDG · Third Karnaphuli Bridge th fi t j bl t d b id i B l d hthe first major cable supported bridge in Bangladesh Fast Track Procurement 2001 Study concluded](https://reader031.fdocuments.in/reader031/viewer/2022041921/5e6c1ad5ba6b6e454f7cda0e/html5/thumbnails/12.jpg)
RM2000 Model (Detail)
Permanent loadStresses (No Tension)
![Page 13: Third Karnaphuli Bridge - CBDG · Third Karnaphuli Bridge th fi t j bl t d b id i B l d hthe first major cable supported bridge in Bangladesh Fast Track Procurement 2001 Study concluded](https://reader031.fdocuments.in/reader031/viewer/2022041921/5e6c1ad5ba6b6e454f7cda0e/html5/thumbnails/13.jpg)
Deck Fibre Stresses(P t l d l t d f t ti )(Permanent loads only at end of construction)
45MPa (cylinder) Concrete (cf 50MPa Specified)
LIMIT 1 (Construction 35MPa)21 MPa Comp2.97 MPa Tens
LIMIT 2 (Final 45 MPa)19 8 MP C19.8 MPa Comp1.67 MPa Tens
Includes reductionf l dfor slenderness
![Page 14: Third Karnaphuli Bridge - CBDG · Third Karnaphuli Bridge th fi t j bl t d b id i B l d hthe first major cable supported bridge in Bangladesh Fast Track Procurement 2001 Study concluded](https://reader031.fdocuments.in/reader031/viewer/2022041921/5e6c1ad5ba6b6e454f7cda0e/html5/thumbnails/14.jpg)
Deck Fibre Stresses(Li l d l l )(Live load only envelopes)
ONLY 2-3Mpa!
![Page 15: Third Karnaphuli Bridge - CBDG · Third Karnaphuli Bridge th fi t j bl t d b id i B l d hthe first major cable supported bridge in Bangladesh Fast Track Procurement 2001 Study concluded](https://reader031.fdocuments.in/reader031/viewer/2022041921/5e6c1ad5ba6b6e454f7cda0e/html5/thumbnails/15.jpg)
Tower Top Displacement due to Creep (10 000 d )(10,000 days)
110mm transversely110mm transverselydue to deck curvature!
![Page 16: Third Karnaphuli Bridge - CBDG · Third Karnaphuli Bridge th fi t j bl t d b id i B l d hthe first major cable supported bridge in Bangladesh Fast Track Procurement 2001 Study concluded](https://reader031.fdocuments.in/reader031/viewer/2022041921/5e6c1ad5ba6b6e454f7cda0e/html5/thumbnails/16.jpg)
Deck Transverse DesignFeatures:
– Single cell RCCentral longitudinal beam with struts @– Central longitudinal beam with struts @ 8m c/c
– Top slab transversely prestressed over “stayed” lengthSt f b l d b t t t– Stay forces balanced by strut prestress
– 3D LUSAS analysis XYZ
![Page 17: Third Karnaphuli Bridge - CBDG · Third Karnaphuli Bridge th fi t j bl t d b id i B l d hthe first major cable supported bridge in Bangladesh Fast Track Procurement 2001 Study concluded](https://reader031.fdocuments.in/reader031/viewer/2022041921/5e6c1ad5ba6b6e454f7cda0e/html5/thumbnails/17.jpg)
Substructure Design PIERS 8,9 AND 10
– Compliant structure for seismic– 3D Framework modelled in RM2000– Section design using SAM software– 3.0m diameter piles
PIER 7 PIER 7– Insufficient height to fit “legs”– “Stiffer” so attracts more seismic
load particularly when unscoured– 3.0m diameter piles
PIER 6– Transition between main bridge andTransition between main bridge and
approach viaduct– Expansion joint– 1.5m diameter piles
SOUTH ABUTMENT– Expansion joint
Transverse No Scour Longitudinal No Scour
![Page 18: Third Karnaphuli Bridge - CBDG · Third Karnaphuli Bridge th fi t j bl t d b id i B l d hthe first major cable supported bridge in Bangladesh Fast Track Procurement 2001 Study concluded](https://reader031.fdocuments.in/reader031/viewer/2022041921/5e6c1ad5ba6b6e454f7cda0e/html5/thumbnails/18.jpg)
Pile DesignTHEORETICAL PILE CAPACITY
– 1.5m or 3.0m diameter bored concrete piles
– AASHTO LRFD Method with “Service” (unfactored), “Strength” (factored), and “Extreme” (seismic) capacities.
– Scoured and unscoured ground profiles
Capacities calculated using Nq and δ– Capacities calculated using Nq and δ(using lower bound friction angle) NOT LRFD empirical method (based on uncorrected N)
– Pile toe founded in very dense sand (N160>50) but Service loads mainly carried in friction
![Page 19: Third Karnaphuli Bridge - CBDG · Third Karnaphuli Bridge th fi t j bl t d b id i B l d hthe first major cable supported bridge in Bangladesh Fast Track Procurement 2001 Study concluded](https://reader031.fdocuments.in/reader031/viewer/2022041921/5e6c1ad5ba6b6e454f7cda0e/html5/thumbnails/19.jpg)
Pile Testing
![Page 20: Third Karnaphuli Bridge - CBDG · Third Karnaphuli Bridge th fi t j bl t d b id i B l d hthe first major cable supported bridge in Bangladesh Fast Track Procurement 2001 Study concluded](https://reader031.fdocuments.in/reader031/viewer/2022041921/5e6c1ad5ba6b6e454f7cda0e/html5/thumbnails/20.jpg)
Pile Load Test Method
– “O-Cell” test on 1.5m diameter piles
– Cell is located 1m above toe to measure end bearing resistance and friction above toe
LIMIT STATE
DESIGN LOAD
PILE SETTLEMENT CRITERIA
– Shaft stresses measured with strain gauges to show distribution of friction (no need for two-level “O-Cell”)
SERVICE 4.2MN 10mm differential settlement = 20mm total say
– Plot graphs:Frictional resistance against Displacement
STRENGTH 5.6MN 5% diameter=75mm total
End bearing resistance against Displacement
– Calculate Total resistance against
EXTREME 6.1MN 5%-10% diameter=150mm (Damage Criteria)
gDisplacement and check (See Table opposite for Pier 3)
– Results from Pier 3 confirm thatResults from Pier 3 confirm that Service Loads carried by shaft friction alone with 3mm settlement!
![Page 21: Third Karnaphuli Bridge - CBDG · Third Karnaphuli Bridge th fi t j bl t d b id i B l d hthe first major cable supported bridge in Bangladesh Fast Track Procurement 2001 Study concluded](https://reader031.fdocuments.in/reader031/viewer/2022041921/5e6c1ad5ba6b6e454f7cda0e/html5/thumbnails/21.jpg)
Stay Cable Design
SUMMARYSUMMARY
– 91No 15mm strand system individual encapsulated– Continuous across tower saddle anchored in deck
St li it d t 45% t 50% UTS ( ti t it– Stress limited to 45% to 50% UTS (conservative to permit replacement)
– Single stage stressing (but can be re-stressed) at deck level
![Page 22: Third Karnaphuli Bridge - CBDG · Third Karnaphuli Bridge th fi t j bl t d b id i B l d hthe first major cable supported bridge in Bangladesh Fast Track Procurement 2001 Study concluded](https://reader031.fdocuments.in/reader031/viewer/2022041921/5e6c1ad5ba6b6e454f7cda0e/html5/thumbnails/22.jpg)
Stay Cable System
![Page 23: Third Karnaphuli Bridge - CBDG · Third Karnaphuli Bridge th fi t j bl t d b id i B l d hthe first major cable supported bridge in Bangladesh Fast Track Procurement 2001 Study concluded](https://reader031.fdocuments.in/reader031/viewer/2022041921/5e6c1ad5ba6b6e454f7cda0e/html5/thumbnails/23.jpg)
Multi-Pipe Saddle
![Page 24: Third Karnaphuli Bridge - CBDG · Third Karnaphuli Bridge th fi t j bl t d b id i B l d hthe first major cable supported bridge in Bangladesh Fast Track Procurement 2001 Study concluded](https://reader031.fdocuments.in/reader031/viewer/2022041921/5e6c1ad5ba6b6e454f7cda0e/html5/thumbnails/24.jpg)
Tower Top Under Construction
![Page 25: Third Karnaphuli Bridge - CBDG · Third Karnaphuli Bridge th fi t j bl t d b id i B l d hthe first major cable supported bridge in Bangladesh Fast Track Procurement 2001 Study concluded](https://reader031.fdocuments.in/reader031/viewer/2022041921/5e6c1ad5ba6b6e454f7cda0e/html5/thumbnails/25.jpg)
Stay Cable Installation
![Page 26: Third Karnaphuli Bridge - CBDG · Third Karnaphuli Bridge th fi t j bl t d b id i B l d hthe first major cable supported bridge in Bangladesh Fast Track Procurement 2001 Study concluded](https://reader031.fdocuments.in/reader031/viewer/2022041921/5e6c1ad5ba6b6e454f7cda0e/html5/thumbnails/26.jpg)
Stay Cable Stressing
![Page 27: Third Karnaphuli Bridge - CBDG · Third Karnaphuli Bridge th fi t j bl t d b id i B l d hthe first major cable supported bridge in Bangladesh Fast Track Procurement 2001 Study concluded](https://reader031.fdocuments.in/reader031/viewer/2022041921/5e6c1ad5ba6b6e454f7cda0e/html5/thumbnails/27.jpg)
Concrete Supply
Deck 50MPa Cylinder
CEM I 42.5 OPC with superplasticiserp p
Local aggregates:
‘Sylhet’ sand‘Pakur’ stone
Two batch plants:50-80 cu m/hr from each river bank
Access via temporary trestle bridge to piers 7,8 and 9
![Page 28: Third Karnaphuli Bridge - CBDG · Third Karnaphuli Bridge th fi t j bl t d b id i B l d hthe first major cable supported bridge in Bangladesh Fast Track Procurement 2001 Study concluded](https://reader031.fdocuments.in/reader031/viewer/2022041921/5e6c1ad5ba6b6e454f7cda0e/html5/thumbnails/28.jpg)
Deck Cantilever Construction
![Page 29: Third Karnaphuli Bridge - CBDG · Third Karnaphuli Bridge th fi t j bl t d b id i B l d hthe first major cable supported bridge in Bangladesh Fast Track Procurement 2001 Study concluded](https://reader031.fdocuments.in/reader031/viewer/2022041921/5e6c1ad5ba6b6e454f7cda0e/html5/thumbnails/29.jpg)
Deck Cantilever Construction
![Page 30: Third Karnaphuli Bridge - CBDG · Third Karnaphuli Bridge th fi t j bl t d b id i B l d hthe first major cable supported bridge in Bangladesh Fast Track Procurement 2001 Study concluded](https://reader031.fdocuments.in/reader031/viewer/2022041921/5e6c1ad5ba6b6e454f7cda0e/html5/thumbnails/30.jpg)
ICE PAPER
Design and Construction of Third Karnaphuli Bridge, Bangladesh.
Astin, Xie and Gillarduzzi
Proc ICEBridge Engineering 163December 2010 Issue BE4P 161 171Pages 161-171
![Page 31: Third Karnaphuli Bridge - CBDG · Third Karnaphuli Bridge th fi t j bl t d b id i B l d hthe first major cable supported bridge in Bangladesh Fast Track Procurement 2001 Study concluded](https://reader031.fdocuments.in/reader031/viewer/2022041921/5e6c1ad5ba6b6e454f7cda0e/html5/thumbnails/31.jpg)
Third Karnaphuli Bridgeth fi t j bl t d b id i B l d hthe first major cable supported bridge in Bangladesh
FACTS & FIGURES
BRIDGE SPAN: 830m (950m with viaduct)
BRIDGE WIDTH: 24 4mBRIDGE WIDTH: 24.4m
EACH MAIN-SPAN OF MAIN BRIDGE: 200m
EACH SIDE-SPAN OF MAIN BRIDGE: 115m
CARRIAGEWAY: 2 x 7.30mCARRIAGEWAY: 2 x 7.30m
SLOW MOVING VEHICLE LANE: 2 x 1.65m
FOOTPATH: 2 x 1.5m
PILING: 40 x 1.5m dia. and 16 x 3.0m dia.
![Page 32: Third Karnaphuli Bridge - CBDG · Third Karnaphuli Bridge th fi t j bl t d b id i B l d hthe first major cable supported bridge in Bangladesh Fast Track Procurement 2001 Study concluded](https://reader031.fdocuments.in/reader031/viewer/2022041921/5e6c1ad5ba6b6e454f7cda0e/html5/thumbnails/32.jpg)
High-Point Rendel61 Southwark Street
London SE1 1SAUnited Kingdom
David AstinBSc (Eng) ACGI CEng MICE
United Kingdom
T: +44 20 7654 0400F: +44 20 7654 0401
D: +44 20 7654 0556
© 2011 High-Point Rendel Limited