THESE DRAWINGS ARE NOT TO BE SCALED: ACCESS ROAD …
Transcript of THESE DRAWINGS ARE NOT TO BE SCALED: ACCESS ROAD …
1.30m LANDSCAPED WALKWAY
2.00
m LA
NDSC
APED
WAL
KWAY
1.50 3.65 2.70
5.707.00
2.00
SALES OFFICE
270.2 SQ.M
DUNDAS STREET WIDENING
POST
RO
AD
ACCESS ROAD
DUNDAS STREET
25
18.29
15.856.00
3.45
33
42
60
43
1
5.705.70
7.00
2.00m LANDSCAPED WALKWAY
WHEELCHAIR RAMPW/C 1 W/C 2
2.00
1.30
XXXX
XXXX
XXXX
2.5mHOARDING
BLOCK 417
171.49
172.
1717
1.00
171.
06EX
.EX
.HP
172.07
172.
30
172.85
171.64171.80
172.09
171.77
172.35
172.50
FFE = 173.05
171.50
172.65
172.51
EX.
(171.61)
(171.71)
172.
15
172.42
172.21
172.32
172.36
172.43
1R
1R
172.24 171.
60
172.21
HP
172.
46
172.
37
EX.
171.
21
172.
20
172.
11
172.
11
(171.65)(171.48)
EX.
EX.
EX.
EX.
EX.
EX.
EX.
2.00
5.02
1.503.65
2.70
5.707.00
5.70
(171.20)
172.
33
171.
24
FLUSH FLUSH FLUSH
9.29
EX.
EX.
EX.
EX.
EX.
EX.
1920
26
34
51
52
ASPHALT PARKING LOT
LANDSCAPING
LAND
SCAP
ING
LANDSCAPING
(171.74)
5.707.00
1.77
0.5%
171.
98
172.41
(171
.54)
73.35
60.91
73.43
60.96
6.505.50
2.00
172.56
0.8%
172.16
172.
08 3.7%
172.23
0.5%
0.5%
172.25
172.
04
0.5%
4.59
15.17
0.5%
0.5%
6.57
0.5%
HOLDINGTANKS
51.04
31.29
25.81
0.5%
0.5%
PRIVATE WASTE
MANAGEMENT
PICK UP LOCATION
172.20
3:1
TEMPORARY 7m WIDE
X 20m LONG MUDMAT
(TO BE REMOVED
UPON STABILIZATION
OF THE SITE)
EMERGENCY SPILLWAY
(300mm DEPTH OF
150mm RIP RAP STONE
PLACED ON TERRAFIX
360R FILTER CLOTH OR
APPROVED EQUIVALENT)
TEMP. EMERGENCY
CONVEYANCE SWALE TO
BE REMOVED UPON
URBANIZATION OF
DUNDAS STREET
1.0m DEPTH RETENTION BASIN
(TO BE TOPSOILED AND SEEDED)
RETENTION CAPACITY = 230m³
MATCH EX.
GROUND
F
U
T
U
R
E
E
M
E
R
G
E
N
C
Y
F
L
O
W
C
O
N
V
E
Y
A
N
C
E
S
W
A
L
E
(T
O
B
E
G
R
A
D
E
D
U
P
O
N
U
R
B
A
N
I
Z
A
T
I
O
N
O
F
D
U
N
D
A
S
S
T
R
E
E
T
)
3:1
3:1
3:1
3
:1
FUTURE CURB (B.O.)
FUTURE CURB (B.O.)
FUT. 375mm STM (B.O.)
FUT. 450mm STM (B.O.)
F
U
T
. 5
2
5
m
m
S
T
M
FUT. DICB (B.O.)
FUT. DCBMH (B.O.)
FUT. CBMH (B.O.)
FUT. CBMH (B.O.)
2
:1
2
:1
2:1
2:1
172.50
F
U
T
U
R
E
D
IC
B
T
O
B
E
C
O
N
S
T
R
U
C
T
E
D
B
Y
H
A
L
T
O
N
R
E
G
IO
N
A
S
P
A
R
T
O
F
T
H
E
D
U
N
D
A
S
S
T
R
E
E
T
U
R
B
A
N
IZ
A
T
IO
N
. T
O
P
O
F
D
IC
B
T
O
B
E
A
D
JU
S
T
E
D
A
S
R
E
Q
U
IR
E
D
T
O
M
A
T
C
H
F
U
T
U
R
E
S
W
A
L
E
IN
V
E
R
T
.
3:1
(171.91)
MATCH EX.
GROUND
172.51
SILT FENCING
(SEDIMENT
CONTROL FENCE)
172.56
172.49
(172.15)
(172.18)
172.30
172.43
172.08
172.08
172.51
172.56
172.49
172.27
172.43172.34
172.30
172.30
172.48
(171.58)
172.43
172.47
1.8%172.32
172.39172.45
1.3%5:1 (FUT.)
172.
39
0.5%
0.5%
171.
25
172.28
172.13
172.33
172.38
(171.32)
(171.64)
(171.55)
(171.76)
(171.76)
(171.80)172.02EX.
0.5%
0.5%
0.5%
0.5%
171.
04
CONSTRUCTION
FENCING
171.
02
171.
03
172.
11EX. 172.16
172.25
(171.64)
(171.49)(171.46)
(171.58)
(171.43)
(171.53)
(171.38)
(171.52)
(171.37)
171.11EX.
(170
.93)
172.
16
171.
26
172.
21
171.
27
171.28
171.71
172.
31
173.05
171.
82
171.
87
171.87 171.
97EX
.
0.6%
0.7%
0.5%
EX.
EX.
4.8%
5.0%
171.
21
171.
11
0.5%
0.5%
2.0%
172.63HP 0.7%
0.5%1.
0%
2.0%
0.5%0.5%
2.0%
2.1% 2.
1%(171.68)
3.1%
(172
.16)
173.01
172.37 2.0%
3
:1
2.0%
171.00EX.
171.18EX.
170.79EX.EX. DITCH
EX. DITCH
3
:1
M
A
X
3
:1
M
A
X
3
:1
3
:1
(171.39)
3
:1
172.62
172.
2017
2.27
172.152.0%
3
:1
171.
96
3:1
4.8%
2.0%
4.70
2.0%
2.0%
2.00
2.0%
(171.67)
(171.52)
MAX 1:12 SLOPE
SIGNAGE LOCATION
AC
1 ISSUE FOR REVIEW 23-NOV-17 ESG SH
DRAWING
PROJECT/LOCATION
CLIENT
DRAWING NUMBERPROJECT NUMBER
DRAWN BY CHECKED BY
ISSUED OR REVISION COMMENTSNO. DESCRIPTION DATE CHKDWN
8395 JANE STREET, SUITE 203
VAUGHAN, ONTARIO. L4K 5Y2
T:905-738-3177 | F: 905-738-5449
RN DESIGN LTD.
DATE SCALE
THESE DRAWINGS ARE NOT TO BE SCALED:ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR PRIOR TO
COMMENCEMENT OF ANY WORK. ANY DISCREPANCIES MUST BEREPORTED DIRECTLY TO SRN ARCHITECTS INC.
PROJECT CONSULTANTS:
17016
PRIMONT HOMES
NORTH OAKVILLE
LEGEND
USFRUSFTBS
TFWFFE
USFG
FINISHED FLOOR ELEVATIONTOP OF FOUNDATION WALLTOP OF BASEMENT SLAB
UNDER SIDE FOOTINGUNDER SIDE FOOTING @ REAR
UNDER SIDE FOOTING @ GARAGE
SL
H* ENGINEERED FILLHYDRO CONNECTIONFIRE HYDRANTSTREET LIGHT
FSE FINISHED SECOND FLOOR ELEVATION
WOD
REVWOB
R
LOB
STD
NUMBER OF RISERS TO GRADEWALKOUT DECKLOOKOUT BASEMENT
WALK OUT BASEMENTREVERSE PLAN
STANDARD PLANDOORWINDOWBELL PEDESTALCABLE PEDESTALCATCH BASINDBL. CATCH BASIN
MAIL BOXTRANSFORMER
SEWER CONNECTIONS (2 LOTS)
SEWER CONNECTIONS (1 LOT)
AC AIR CONDITIONINGDOWN SPOUT TO SPLASH PAD
SWALE DIRECTION
SP SUMP PUMP
WATER VALVECHAMBER
WATER CONNECTION
HYDRANT ANDVALVEHYDRO METERGAS METER
H
FOOTING TO BE EXTENDEDTO 1.22 (MIN) BELOW GRADE
CHAINLINK FENCE
SOUND BARRIERPRIVACY FENCE
XXXXXX
FIRE FIGHTER TRAVEL PATHFR FR FR
DOWN LIGHT
14' POLE LIGTHING
12' POLE LIGTHING
BOLLARD LIGHTING
SIGN POST
## MUNICIPAL ADDRESS
x
PROPOSED GRADE ELEVATIONx
RETAINING WALLTW -TOP OF WALLBW -BOTTOM OF WALL
SNOW STORAGE AREAS
EXISTING TREE (TO BE REMOVED)
EXISTING TREE (TO BE RETAINED)
EXISTING GRADE ELEVATION
MANHOLE - STORM
MANHOLE - SANITARYSIAMESE CONNECTION
DOWN SPOUT CONNECTED TO STM
SALES OFFICE SITE PLAN
MAR. 21/18 1:250
ESG SH
SALES OFFICE
CONSULTADDRESS, SUITECITY, PROVINCE, POSTAL CODET: 111-111-1111 F: 111-111-1111
2 REVISED PER SURVEY REPORT / GRADED 06-DEC-17 ESG SH
3 RELOCATED ACCESS ROAD 07-DEC-17 ESG SH
4 REVISE ACCESS ROAD AS PER CLIENT 21-DEC-17 MA SH
5 REVISE ACCESS ROAD AS PER CLIENT COMMENT07-FEB-18 ESG SH
6 REVISED AS PER TOWN COMMENTS 21-MAR-18 BWS SH
7 REVISE ACCESS ROAD AS PER CLIENT COMMENT23-APR-18 BWS SH
8 REVISE AS PER NEW ENG. 29-MAY-18 BWS SH
x
FUTURE GRADE ELEVATION
9 RE-ISSUED FOR SPA 16-AUG-18 BWS SH