Thematic Working Group - MSP Thematic Working Group - MSP Klaipeda, November 22th Andreas Möser,...

21
© 50Hertz Thematic Working Group - MSP Klaipeda, November 22th Andreas Möser, Lund University ©EnBW

Transcript of Thematic Working Group - MSP Thematic Working Group - MSP Klaipeda, November 22th Andreas Möser,...

Page 1: Thematic Working Group - MSP Thematic Working Group - MSP Klaipeda, November 22th Andreas Möser, Lund University ©EnBW. 2 Outline • High & Low OWP development • Maritime Spatial

© 50Hertz

Thematic Working Group - MSPKlaipeda, November 22th

Andreas Möser, Lund University

©EnBW

Page 2: Thematic Working Group - MSP Thematic Working Group - MSP Klaipeda, November 22th Andreas Möser, Lund University ©EnBW. 2 Outline • High & Low OWP development • Maritime Spatial

2

Outline

• High & Low OWP development

• Maritime Spatial Planning (MSP) • Sweden• Poland• Lithuania

• Scenario 1a and 3a• Draft layouts• GIS layouts

• Comparison 1a & 3a

• Scenario 2a• Draft layouts• GIS layout

Outline

CS1

Page 3: Thematic Working Group - MSP Thematic Working Group - MSP Klaipeda, November 22th Andreas Möser, Lund University ©EnBW. 2 Outline • High & Low OWP development • Maritime Spatial

3High/Low OWP visions

High OWP – Vision 2045

Swe

Lit

2035

Pol

Commissioning year

20402045

2030

2025

OWP capacity: 11.5 GW

1.5 GW

3.2 GW

5.1 GW

1.7 GW

• Project size/clustering pot.• Interconnection path• Presented OWF plans• Feasible future OWF

• Valid permits• Past/expired permits• 500m inward buffer (turbines)• 2km Natura2000 buffer

• Project size/clustering pot.• Interconnection path • Contact with Nerijus

Page 4: Thematic Working Group - MSP Thematic Working Group - MSP Klaipeda, November 22th Andreas Möser, Lund University ©EnBW. 2 Outline • High & Low OWP development • Maritime Spatial

4High/Low OWP visions

Low OWP – Vision 2045

Swe

Lit

Pol

2035

Commissioning year

20402045

2030

2025

OWP capacity: 6.7 GW

1.0 GW

2.3 GW

2.4 GW

0.9 GW

• Project size/clustering pot.• Interconnection path• Presented OWF plans (fewer)• Feasible future OWF

• Valid permits• Past/expired permits• 500m inward buffer (turbines)• 2km Natura2000 buffer

• Project size/clustering pot.• Interconnection path • Contact with Nerijus

Page 5: Thematic Working Group - MSP Thematic Working Group - MSP Klaipeda, November 22th Andreas Möser, Lund University ©EnBW. 2 Outline • High & Low OWP development • Maritime Spatial

5MSP – Overview

Swe

Pol

Lit

Page 6: Thematic Working Group - MSP Thematic Working Group - MSP Klaipeda, November 22th Andreas Möser, Lund University ©EnBW. 2 Outline • High & Low OWP development • Maritime Spatial

6MSP – Sweden

Page 7: Thematic Working Group - MSP Thematic Working Group - MSP Klaipeda, November 22th Andreas Möser, Lund University ©EnBW. 2 Outline • High & Low OWP development • Maritime Spatial

7MSP – Poland

Page 8: Thematic Working Group - MSP Thematic Working Group - MSP Klaipeda, November 22th Andreas Möser, Lund University ©EnBW. 2 Outline • High & Low OWP development • Maritime Spatial

8MSP – Lithuania

Page 9: Thematic Working Group - MSP Thematic Working Group - MSP Klaipeda, November 22th Andreas Möser, Lund University ©EnBW. 2 Outline • High & Low OWP development • Maritime Spatial

9

Scenarios

Scenario suggestion

Zero Integration

Partial Integration

Max. Integration

High OWP

Low OWP

High OWP

Low OWP

High OWP

Low OWP

Scenario 1a

Scenario 1b

Scenario 2a

Scenario 2b

Scenario 3a

Scenario 3b

Integration level

OWP level Scenario

Vision + Roadmap

Vision + Roadmap

Vision + Roadmap

Vision + Roadmap

Vision + Roadmap

Vision + Roadmap

Page 10: Thematic Working Group - MSP Thematic Working Group - MSP Klaipeda, November 22th Andreas Möser, Lund University ©EnBW. 2 Outline • High & Low OWP development • Maritime Spatial

10Scenario suggestion

(1a) Zero integration – High OWP – Vision 2045

Swe

2035

Pol

Commissioning year

20402045

2030

2025

OWP capacity: 11.5 GW

Page 11: Thematic Working Group - MSP Thematic Working Group - MSP Klaipeda, November 22th Andreas Möser, Lund University ©EnBW. 2 Outline • High & Low OWP development • Maritime Spatial

111a. High OWP, Zero integration – DC Overview

Page 12: Thematic Working Group - MSP Thematic Working Group - MSP Klaipeda, November 22th Andreas Möser, Lund University ©EnBW. 2 Outline • High & Low OWP development • Maritime Spatial

12

Scenarios

Scenario suggestion

Zero Integration

Partial Integration

Max. Integration

High OWP

Low OWP

High OWP

Low OWP

High OWP

Low OWP

Scenario 1a

Scenario 1b

Scenario 2a

Scenario 2b

Scenario 3a

Scenario 3b

Integration level

OWP level Scenario

Vision + Roadmap

Vision + Roadmap

Vision + Roadmap

Vision + Roadmap

Vision + Roadmap

Vision + Roadmap

Page 13: Thematic Working Group - MSP Thematic Working Group - MSP Klaipeda, November 22th Andreas Möser, Lund University ©EnBW. 2 Outline • High & Low OWP development • Maritime Spatial

13

(3a) Max integration – High OWP – Vision 2045

Scenario suggestion

Swe OWP capacity: 11.5 GW

2035

Commissioning year

20402045

2030

2025

Page 14: Thematic Working Group - MSP Thematic Working Group - MSP Klaipeda, November 22th Andreas Möser, Lund University ©EnBW. 2 Outline • High & Low OWP development • Maritime Spatial

143a. High OWP, Max integration – Overview DC system

Page 15: Thematic Working Group - MSP Thematic Working Group - MSP Klaipeda, November 22th Andreas Möser, Lund University ©EnBW. 2 Outline • High & Low OWP development • Maritime Spatial

15CS1: Sweden – Poland - Lithuania

Component comparison 1a and 3a

1a (Zero) 3a (Max) Difference

Converter substations 14 17 +21 %

DC cable length (km) 3 730 2 434 -35 %

DC conductor volume (km*mm2) 4.48*106 6.53*106 +46 %

OWP on DC system (GW) 5.1 11.5 +56 %

Onshore AC transformers 15 0 -100 %

AC export cable length (km) 1 093 374 -66 %

ScenarioFeature

Further analysis:

• Market flow in combination with wind patterns

• DC cable utilization factor

• Power flow control strategies

• DC protection zones

Page 16: Thematic Working Group - MSP Thematic Working Group - MSP Klaipeda, November 22th Andreas Möser, Lund University ©EnBW. 2 Outline • High & Low OWP development • Maritime Spatial

16Scenario suggestion

(2a) Partial integration – High OWP – Vision 2045

Swe

2035

Pol

Commissioning year

20402045

2030

2025

OWP capacity: 11.5 GW

Page 17: Thematic Working Group - MSP Thematic Working Group - MSP Klaipeda, November 22th Andreas Möser, Lund University ©EnBW. 2 Outline • High & Low OWP development • Maritime Spatial

172a. High OWP – Part integration – Zoom overview

Page 18: Thematic Working Group - MSP Thematic Working Group - MSP Klaipeda, November 22th Andreas Möser, Lund University ©EnBW. 2 Outline • High & Low OWP development • Maritime Spatial

18

For further information:

Mail: [email protected]

Web: www.baltic-integrid.eu

Baltic InteGrid represented by

the Lead Partner:

Institute for Climate Protection,

Energy and Mobility (IKEM)

Magazinstraße 15-16,

10179 Berlin, Germany

Phone: +49 (0) 30 408187015

Mail: [email protected]

Web: www.ikem-online.de

The content of the presentation reflects the author’s/partner’s views and the EU Commission and the

MA/JS are not liable for any use that may be made of the information contained therein. All images are

copyrighted and property of their respective owners.

Contact & Disclaimer

May 16 2017Riga

Andreas MöserResearch Engineer

Box 118, SE-22100 Lund, SwedenPhone: +46 (0)46 222 97 31Mail: [email protected]: www.iea.lth.se

Page 19: Thematic Working Group - MSP Thematic Working Group - MSP Klaipeda, November 22th Andreas Möser, Lund University ©EnBW. 2 Outline • High & Low OWP development • Maritime Spatial

19

Extras

July 4 2017Berlin

Page 20: Thematic Working Group - MSP Thematic Working Group - MSP Klaipeda, November 22th Andreas Möser, Lund University ©EnBW. 2 Outline • High & Low OWP development • Maritime Spatial

20High/Low OWP visions

High OWP – 2045

Swe

Lit

2035

Pol

Commissioning year

20402045

2030

2025

4.2 MW /km2

4.8 MW/km2

5.2 MW /km2

3.8 MW /km2

OWP capacity: 11.5 GW

1.5 GW

3.2 GW

5.1 GW

1.7 GW

Page 21: Thematic Working Group - MSP Thematic Working Group - MSP Klaipeda, November 22th Andreas Möser, Lund University ©EnBW. 2 Outline • High & Low OWP development • Maritime Spatial

21High/Low OWP visions

Low OWP – 2045

Swe

Lit

Pol

2035

Commissioning year

20402045

2030

2025

4.8 MW /km2

5 MW/km2

5.4 MW /km2

4.0 MW /km2

OWP capacity: 6.7 GW

1.0 GW

2.3 GW

2.4 GW

0.9 GW