TheGRUNEN SYSTEMS GRUNEN SYSTEMS€¦ · 1 Scott Place, 2 Hardman Street e-mail:...
Transcript of TheGRUNEN SYSTEMS GRUNEN SYSTEMS€¦ · 1 Scott Place, 2 Hardman Street e-mail:...
Grunen Systems Limited Phone: +44 7900 895 8071 Scott Place, 2 Hardman Street e-mail: [email protected] M3 3AA www: grunen-systems.comEngland
GRUNEN SYSTEMS
Reference Projects
The GRUNENSYSTEMS
Reference Sheet
Client: AIC, Hanoi, Vietnam
Funder: Government of Vietnam
Application / Capacity: MSW, 650.000 t/a
Solution: Michaelis moved bed systemHeat recovery: Steam boiler, steam turbine (15 MWel)
Pollution control: Dry sorption system acc. to EC/76/2000
Fuel: Mixed MSW, biomass, industrial wastes, used oils
Ash quality: TOC < 3%
Special features: Waste preparation, 6 lines, modular, wet waste up to 60% water
Year of construction: 2015
Availability: > 7800 h/a
- Modular 2,000 t/d design
- Mixed wastes
- Government funding
Modular design, 2 from total 6 lines
Reference Sheet
Reference Sheet
Modular incinerator
Client: ATCO, Kandahar, Afghanistan
Funder: NAMSA (NATO)
Application / Capacity: Municipal and hazardous waste, up to 50,000t/a
Solution: Modular thermal destructionHeat recovery: Hot water
Pollution control: Dry sorption system acc. to EC/76/2000
Fuel: Mixed camp waste, biomass, kitchen waste, industrial wastes
Ash quality: TOC < 3%, according to German standards
Special features: 4 lines, modular system
Year of construction: 2011
Availability: > 8000 h/a
- Up to 50,000 t/a
- Modular 4 lines design
- Rigid and easy to operate
Lay Out: 4 lines, modular design, mobile units (container ised)
Reference Sheet
Total view, 4 lines, easy to operate andmaintain
Low infrastructure costs
Reference Sheet
Flue gas cleaning system according to IED standards
Reference Sheet
Client: Landkreis Günzburg, Burgau, Germany
Funder: German Government
Application / Capacity: Municipal and industrial wastes, 35,000 t/a
Solution: Pyrolysis system, steam boiler, steam turbine (2,2 MW)
Heat recovery: Steam boiler
Pollution control: Dry sorption system acc. to EC/76/2000
Fuel: Mixed camp waste, biomass, kitchen waste , industrial wastes
Ash quality: Pyrolysis coke
Special features: Pyrolysis coke, electrical power production
Year of construction: 1984
Availability: > 7500 h/a
- Gasification / Pyrolysis Plant
- Municipal waste
- Electrical power production
Reference Sheet
Steam boiler
Reference Sheet
Client: Community sewage treatment plantBayrischer Untermain, Obernburg
Funder: German Government
Application / Capacity: up to 25,000 t/a
Solution: Michaelis moved bed system
Heat recovery: Thermal oil boiler
Pollution control: Dry / wet sorption system, SCR DENOX acc. to EC/76/2000
Fuel: Industrial and municipal sewage sludges
Ash quality: TOC < 3%, according toGerman regulations
Special features: Zn recycling, integrated drying fuction of gasifier
Year of construction: 2015
Availability: > 8000 h/a
- Modular 25,000 t/a design
- Sludge waste
- High environmental performance
Michaelis moved bed gasifier for wet sludges
Reference Sheet
Reference Sheet
Client: Ministry of Environment and Energy, Maldives
Funder: World Bank
Application / Capacity: MSW, 2.000 kg/h, 15,000 t/a
Solution: Michaelis moved bed system
Heat recovery: Hot water boiler
Pollution control: Dry sorption system acc. to EC/76/2000
Fuel: Mixed MSW and RDF, biomass, industrial wastes, used oils
Ash quality: TOC < 3%, according to World Bankregulations
Special features: Island solution
Year of construction: 2015
Availability: > 8000 h/a
- Modular 15,000 t/a design
- Mixed wastes
- World Bank funding
Modular and mobile design
Reference Sheet
Difficult
logistics to a small Indian Ocean atoll
Clean enviroment
Reference Sheet
Sea water desalination quality
Reference Sheet
Michaelis moved bed system with flue gas cleaning according to EC regulations
Reference Sheet
Multiple fuel
Cont. moved bed incinerator, autom. feeding anddeashingSteam boiler
Multi-fuel RDF
Client: Bamberger Kaliko
D-Bamberg, Germany
Funder: Bamberger Kaliko / German Government Application /
Capacity: Industrial solid wastes / sewage sludge, 5,000 t/a
Solution:Heat recovery:
Pollution control: Dry sorption system acc. to EC/76/2000
Ash quality: TOC < 3%, according to German standards
Special features: Mixture of solid wastes and sludge, shredder
Year of construction: 2011
Availability: > 8000 h/a
- Multi fuel
- Low maintenance cost
- Continuous emission monitoring
Michaelis multifuel moved bed gasifier / incinerator with steamboiler
Cont. moved bed thermal destruction, autom. feeding and deashing10 barg Steam boiler
Reference Sheet
Dry flue gas cleaning system according to EC IED regulations
Fuel preparation system with shredder plant
Reference Sheet
Complete single thermal line view
Multi-Fuel - Refuse Derived Fuel
Reference Sheet
continuous feed, shredder
Client: Stericycle S.A.
RO-Bucuresti, Romania
Funder: Iridex S.A.
Application / Capacity: Hospital and hazardous wastes, 5,000 t/a
Solution: Cont. moved bed thermal destruction, autom. feeding and deashing
Heat recovery: Hot water boiler
Pollution control: Dry / wet sorption system acc. to EC/76/2000
Fuel: Hospital and hazardous wastes, solid and liquid
Ash quality: TOC < 3%
Special features:
Year of construction: 2011
Availability: > 7800 h/a
- Hazardous wastes
- Toxic wastes
- Good ash quality
Hazardous waste thermal destruction plant in Romania
Reference Sheet
Michaelis moved bed system
Multiple stage flue gas cleaning system
Reference Sheet
High ash quality, low carbon value
Reference Sheet
Tail end gas incineration, 20 t/h high pressuresteam
3 stage incineration system
Foul gas from process oxidiser, 20 t/h high pressure steam
Client: Cyplus, Mexico
Funder: Evonik AG, Germany Application /
Capacity:
Solution: 3 stage oxidisation and destruction system
Heat recovery: Steam boiler
Pollution control: Acc. to EC/76/2000
Special features: 3 stage thermal oxidiser
Year of construction: 2015
Availability: > 8000 h/a
- High Tech thermal system
- Big project size
- Exacting customer specification
Oxidiser and superheated steam production
Reference Sheet
Thermal oxidiser
Reference Sheet
Client: Siemens AG
Funder: Siemens AG
Application / Capacity: Pressurised air heating system, gas turbine test plant
Solution: 3 stage thermal system
Heat recovery: Heat exchanger for pressurised air, 60 bar, 600 °C
Pollution control: Acc. to EC/76/2000
Special features: Adjustable capacity 0,5-30 MW
Year of construction: 2015
Availability: > 8000 h/a
- High Tech thermal system
- Big project size
- Exacating customer specification
Reference Sheet
Dimensions: Diameter 4,5 m, height 35 m
- Exacting customer specification
Reference Sheet
Siemens AG
Reference Sheet
Off- gas thermal destruction plant
Client: BCI, chemical industry Swityerland
Bonfol, Switzerland
Fuel: Waste gas from hazardous waste disposal, LPG
Pollutants: VOC, smell
Solution: Filter, RTO, activated carbon adsorber, scrubber
Special features: Low emission values
Year of construction: 2010
- Hazardous waste site remediation
- High availability
- High environmental standards
Reference Sheet
Multistage flue gas cleaning system
Reference Sheet
“Technological developments are such that waste need no longer be thought as only imposingsocial and economic costs. With the application and implementation of GRUNENSystems/Michaelis waste-to-energy (WTE) systems, waste processing can become a majorrevenue generator that impacts positively on the bottom line with any environmental disbenefitsbeing minimized through highly efficient capture of pollutants. The company’s direction andvision embrace fully the modern perspective that sustainable energy policies can be bothprofitable and socially beneficial.”
John Bishop – GRUNEN Systems Director
GRUNEN SYSTEMS LTDCompany No. 10562606
Registered Office:
1 Scott Place, Hardman Street
MANCHESTER
M3 3AA
UNITED KINGDOM
CONTACT:
JOHN BISHOPDirector
Tel: +44 7900 895 807
E-mail: [email protected]
www: grunen-systems.com