TheGRUNEN SYSTEMS GRUNEN SYSTEMS€¦ · 1 Scott Place, 2 Hardman Street e-mail:...

28
Grunen Systems Limited Phone: +44 7900 895 807 1 Scott Place, 2 Hardman Street e-mail: [email protected] Manchester M3 3AA www: grunen-systems.com England GRUNEN SYSTEMS Reference Projects TheGRUNEN SYSTEMS

Transcript of TheGRUNEN SYSTEMS GRUNEN SYSTEMS€¦ · 1 Scott Place, 2 Hardman Street e-mail:...

Page 1: TheGRUNEN SYSTEMS GRUNEN SYSTEMS€¦ · 1 Scott Place, 2 Hardman Street e-mail: john@grunen-systems.com Manchester M3 3AA www: grunen-systems.com England GRUNEN SYSTEMS Reference

Grunen Systems Limited Phone: +44 7900 895 8071 Scott Place, 2 Hardman Street e-mail: [email protected] M3 3AA www: grunen-systems.comEngland

GRUNEN SYSTEMS

Reference Projects

The GRUNENSYSTEMS

Page 2: TheGRUNEN SYSTEMS GRUNEN SYSTEMS€¦ · 1 Scott Place, 2 Hardman Street e-mail: john@grunen-systems.com Manchester M3 3AA www: grunen-systems.com England GRUNEN SYSTEMS Reference

Reference Sheet

Client: AIC, Hanoi, Vietnam

Funder: Government of Vietnam

Application / Capacity: MSW, 650.000 t/a

Solution: Michaelis moved bed systemHeat recovery: Steam boiler, steam turbine (15 MWel)

Pollution control: Dry sorption system acc. to EC/76/2000

Fuel: Mixed MSW, biomass, industrial wastes, used oils

Ash quality: TOC < 3%

Special features: Waste preparation, 6 lines, modular, wet waste up to 60% water

Year of construction: 2015

Availability: > 7800 h/a

- Modular 2,000 t/d design

- Mixed wastes

- Government funding

Modular design, 2 from total 6 lines

Page 3: TheGRUNEN SYSTEMS GRUNEN SYSTEMS€¦ · 1 Scott Place, 2 Hardman Street e-mail: john@grunen-systems.com Manchester M3 3AA www: grunen-systems.com England GRUNEN SYSTEMS Reference

Reference Sheet

Page 4: TheGRUNEN SYSTEMS GRUNEN SYSTEMS€¦ · 1 Scott Place, 2 Hardman Street e-mail: john@grunen-systems.com Manchester M3 3AA www: grunen-systems.com England GRUNEN SYSTEMS Reference

Reference Sheet

Modular incinerator

Client: ATCO, Kandahar, Afghanistan

Funder: NAMSA (NATO)

Application / Capacity: Municipal and hazardous waste, up to 50,000t/a

Solution: Modular thermal destructionHeat recovery: Hot water

Pollution control: Dry sorption system acc. to EC/76/2000

Fuel: Mixed camp waste, biomass, kitchen waste, industrial wastes

Ash quality: TOC < 3%, according to German standards

Special features: 4 lines, modular system

Year of construction: 2011

Availability: > 8000 h/a

- Up to 50,000 t/a

- Modular 4 lines design

- Rigid and easy to operate

Lay Out: 4 lines, modular design, mobile units (container ised)

Page 5: TheGRUNEN SYSTEMS GRUNEN SYSTEMS€¦ · 1 Scott Place, 2 Hardman Street e-mail: john@grunen-systems.com Manchester M3 3AA www: grunen-systems.com England GRUNEN SYSTEMS Reference

Reference Sheet

Total view, 4 lines, easy to operate andmaintain

Low infrastructure costs

Page 6: TheGRUNEN SYSTEMS GRUNEN SYSTEMS€¦ · 1 Scott Place, 2 Hardman Street e-mail: john@grunen-systems.com Manchester M3 3AA www: grunen-systems.com England GRUNEN SYSTEMS Reference

Reference Sheet

Flue gas cleaning system according to IED standards

Page 7: TheGRUNEN SYSTEMS GRUNEN SYSTEMS€¦ · 1 Scott Place, 2 Hardman Street e-mail: john@grunen-systems.com Manchester M3 3AA www: grunen-systems.com England GRUNEN SYSTEMS Reference

Reference Sheet

Client: Landkreis Günzburg, Burgau, Germany

Funder: German Government

Application / Capacity: Municipal and industrial wastes, 35,000 t/a

Solution: Pyrolysis system, steam boiler, steam turbine (2,2 MW)

Heat recovery: Steam boiler

Pollution control: Dry sorption system acc. to EC/76/2000

Fuel: Mixed camp waste, biomass, kitchen waste , industrial wastes

Ash quality: Pyrolysis coke

Special features: Pyrolysis coke, electrical power production

Year of construction: 1984

Availability: > 7500 h/a

- Gasification / Pyrolysis Plant

- Municipal waste

- Electrical power production

Page 8: TheGRUNEN SYSTEMS GRUNEN SYSTEMS€¦ · 1 Scott Place, 2 Hardman Street e-mail: john@grunen-systems.com Manchester M3 3AA www: grunen-systems.com England GRUNEN SYSTEMS Reference

Reference Sheet

Steam boiler

Page 9: TheGRUNEN SYSTEMS GRUNEN SYSTEMS€¦ · 1 Scott Place, 2 Hardman Street e-mail: john@grunen-systems.com Manchester M3 3AA www: grunen-systems.com England GRUNEN SYSTEMS Reference

Reference Sheet

Client: Community sewage treatment plantBayrischer Untermain, Obernburg

Funder: German Government

Application / Capacity: up to 25,000 t/a

Solution: Michaelis moved bed system

Heat recovery: Thermal oil boiler

Pollution control: Dry / wet sorption system, SCR DENOX acc. to EC/76/2000

Fuel: Industrial and municipal sewage sludges

Ash quality: TOC < 3%, according toGerman regulations

Special features: Zn recycling, integrated drying fuction of gasifier

Year of construction: 2015

Availability: > 8000 h/a

- Modular 25,000 t/a design

- Sludge waste

- High environmental performance

Michaelis moved bed gasifier for wet sludges

Page 10: TheGRUNEN SYSTEMS GRUNEN SYSTEMS€¦ · 1 Scott Place, 2 Hardman Street e-mail: john@grunen-systems.com Manchester M3 3AA www: grunen-systems.com England GRUNEN SYSTEMS Reference

Reference Sheet

Page 11: TheGRUNEN SYSTEMS GRUNEN SYSTEMS€¦ · 1 Scott Place, 2 Hardman Street e-mail: john@grunen-systems.com Manchester M3 3AA www: grunen-systems.com England GRUNEN SYSTEMS Reference

Reference Sheet

Client: Ministry of Environment and Energy, Maldives

Funder: World Bank

Application / Capacity: MSW, 2.000 kg/h, 15,000 t/a

Solution: Michaelis moved bed system

Heat recovery: Hot water boiler

Pollution control: Dry sorption system acc. to EC/76/2000

Fuel: Mixed MSW and RDF, biomass, industrial wastes, used oils

Ash quality: TOC < 3%, according to World Bankregulations

Special features: Island solution

Year of construction: 2015

Availability: > 8000 h/a

- Modular 15,000 t/a design

- Mixed wastes

- World Bank funding

Modular and mobile design

Page 12: TheGRUNEN SYSTEMS GRUNEN SYSTEMS€¦ · 1 Scott Place, 2 Hardman Street e-mail: john@grunen-systems.com Manchester M3 3AA www: grunen-systems.com England GRUNEN SYSTEMS Reference

Reference Sheet

Difficult

logistics to a small Indian Ocean atoll

Clean enviroment

Page 13: TheGRUNEN SYSTEMS GRUNEN SYSTEMS€¦ · 1 Scott Place, 2 Hardman Street e-mail: john@grunen-systems.com Manchester M3 3AA www: grunen-systems.com England GRUNEN SYSTEMS Reference

Reference Sheet

Sea water desalination quality

Page 14: TheGRUNEN SYSTEMS GRUNEN SYSTEMS€¦ · 1 Scott Place, 2 Hardman Street e-mail: john@grunen-systems.com Manchester M3 3AA www: grunen-systems.com England GRUNEN SYSTEMS Reference

Reference Sheet

Michaelis moved bed system with flue gas cleaning according to EC regulations

Page 15: TheGRUNEN SYSTEMS GRUNEN SYSTEMS€¦ · 1 Scott Place, 2 Hardman Street e-mail: john@grunen-systems.com Manchester M3 3AA www: grunen-systems.com England GRUNEN SYSTEMS Reference

Reference Sheet

Multiple fuel

Cont. moved bed incinerator, autom. feeding anddeashingSteam boiler

Multi-fuel RDF

Client: Bamberger Kaliko

D-Bamberg, Germany

Funder: Bamberger Kaliko / German Government Application /

Capacity: Industrial solid wastes / sewage sludge, 5,000 t/a

Solution:Heat recovery:

Pollution control: Dry sorption system acc. to EC/76/2000

Ash quality: TOC < 3%, according to German standards

Special features: Mixture of solid wastes and sludge, shredder

Year of construction: 2011

Availability: > 8000 h/a

- Multi fuel

- Low maintenance cost

- Continuous emission monitoring

Michaelis multifuel moved bed gasifier / incinerator with steamboiler

Cont. moved bed thermal destruction, autom. feeding and deashing10 barg Steam boiler

Page 16: TheGRUNEN SYSTEMS GRUNEN SYSTEMS€¦ · 1 Scott Place, 2 Hardman Street e-mail: john@grunen-systems.com Manchester M3 3AA www: grunen-systems.com England GRUNEN SYSTEMS Reference

Reference Sheet

Dry flue gas cleaning system according to EC IED regulations

Fuel preparation system with shredder plant

Page 17: TheGRUNEN SYSTEMS GRUNEN SYSTEMS€¦ · 1 Scott Place, 2 Hardman Street e-mail: john@grunen-systems.com Manchester M3 3AA www: grunen-systems.com England GRUNEN SYSTEMS Reference

Reference Sheet

Complete single thermal line view

Multi-Fuel - Refuse Derived Fuel

Page 18: TheGRUNEN SYSTEMS GRUNEN SYSTEMS€¦ · 1 Scott Place, 2 Hardman Street e-mail: john@grunen-systems.com Manchester M3 3AA www: grunen-systems.com England GRUNEN SYSTEMS Reference

Reference Sheet

continuous feed, shredder

Client: Stericycle S.A.

RO-Bucuresti, Romania

Funder: Iridex S.A.

Application / Capacity: Hospital and hazardous wastes, 5,000 t/a

Solution: Cont. moved bed thermal destruction, autom. feeding and deashing

Heat recovery: Hot water boiler

Pollution control: Dry / wet sorption system acc. to EC/76/2000

Fuel: Hospital and hazardous wastes, solid and liquid

Ash quality: TOC < 3%

Special features:

Year of construction: 2011

Availability: > 7800 h/a

- Hazardous wastes

- Toxic wastes

- Good ash quality

Hazardous waste thermal destruction plant in Romania

Page 19: TheGRUNEN SYSTEMS GRUNEN SYSTEMS€¦ · 1 Scott Place, 2 Hardman Street e-mail: john@grunen-systems.com Manchester M3 3AA www: grunen-systems.com England GRUNEN SYSTEMS Reference

Reference Sheet

Michaelis moved bed system

Multiple stage flue gas cleaning system

Page 20: TheGRUNEN SYSTEMS GRUNEN SYSTEMS€¦ · 1 Scott Place, 2 Hardman Street e-mail: john@grunen-systems.com Manchester M3 3AA www: grunen-systems.com England GRUNEN SYSTEMS Reference

Reference Sheet

High ash quality, low carbon value

Page 21: TheGRUNEN SYSTEMS GRUNEN SYSTEMS€¦ · 1 Scott Place, 2 Hardman Street e-mail: john@grunen-systems.com Manchester M3 3AA www: grunen-systems.com England GRUNEN SYSTEMS Reference

Reference Sheet

Tail end gas incineration, 20 t/h high pressuresteam

3 stage incineration system

Foul gas from process oxidiser, 20 t/h high pressure steam

Client: Cyplus, Mexico

Funder: Evonik AG, Germany Application /

Capacity:

Solution: 3 stage oxidisation and destruction system

Heat recovery: Steam boiler

Pollution control: Acc. to EC/76/2000

Special features: 3 stage thermal oxidiser

Year of construction: 2015

Availability: > 8000 h/a

- High Tech thermal system

- Big project size

- Exacting customer specification

Oxidiser and superheated steam production

Page 22: TheGRUNEN SYSTEMS GRUNEN SYSTEMS€¦ · 1 Scott Place, 2 Hardman Street e-mail: john@grunen-systems.com Manchester M3 3AA www: grunen-systems.com England GRUNEN SYSTEMS Reference

Reference Sheet

Thermal oxidiser

Page 23: TheGRUNEN SYSTEMS GRUNEN SYSTEMS€¦ · 1 Scott Place, 2 Hardman Street e-mail: john@grunen-systems.com Manchester M3 3AA www: grunen-systems.com England GRUNEN SYSTEMS Reference

Reference Sheet

Client: Siemens AG

Funder: Siemens AG

Application / Capacity: Pressurised air heating system, gas turbine test plant

Solution: 3 stage thermal system

Heat recovery: Heat exchanger for pressurised air, 60 bar, 600 °C

Pollution control: Acc. to EC/76/2000

Special features: Adjustable capacity 0,5-30 MW

Year of construction: 2015

Availability: > 8000 h/a

- High Tech thermal system

- Big project size

- Exacating customer specification

Page 24: TheGRUNEN SYSTEMS GRUNEN SYSTEMS€¦ · 1 Scott Place, 2 Hardman Street e-mail: john@grunen-systems.com Manchester M3 3AA www: grunen-systems.com England GRUNEN SYSTEMS Reference

Reference Sheet

Dimensions: Diameter 4,5 m, height 35 m

- Exacting customer specification

Page 25: TheGRUNEN SYSTEMS GRUNEN SYSTEMS€¦ · 1 Scott Place, 2 Hardman Street e-mail: john@grunen-systems.com Manchester M3 3AA www: grunen-systems.com England GRUNEN SYSTEMS Reference

Reference Sheet

Siemens AG

Page 26: TheGRUNEN SYSTEMS GRUNEN SYSTEMS€¦ · 1 Scott Place, 2 Hardman Street e-mail: john@grunen-systems.com Manchester M3 3AA www: grunen-systems.com England GRUNEN SYSTEMS Reference

Reference Sheet

Off- gas thermal destruction plant

Client: BCI, chemical industry Swityerland

Bonfol, Switzerland

Fuel: Waste gas from hazardous waste disposal, LPG

Pollutants: VOC, smell

Solution: Filter, RTO, activated carbon adsorber, scrubber

Special features: Low emission values

Year of construction: 2010

- Hazardous waste site remediation

- High availability

- High environmental standards

Page 27: TheGRUNEN SYSTEMS GRUNEN SYSTEMS€¦ · 1 Scott Place, 2 Hardman Street e-mail: john@grunen-systems.com Manchester M3 3AA www: grunen-systems.com England GRUNEN SYSTEMS Reference

Reference Sheet

Multistage flue gas cleaning system

Page 28: TheGRUNEN SYSTEMS GRUNEN SYSTEMS€¦ · 1 Scott Place, 2 Hardman Street e-mail: john@grunen-systems.com Manchester M3 3AA www: grunen-systems.com England GRUNEN SYSTEMS Reference

Reference Sheet

“Technological developments are such that waste need no longer be thought as only imposingsocial and economic costs. With the application and implementation of GRUNENSystems/Michaelis waste-to-energy (WTE) systems, waste processing can become a majorrevenue generator that impacts positively on the bottom line with any environmental disbenefitsbeing minimized through highly efficient capture of pollutants. The company’s direction andvision embrace fully the modern perspective that sustainable energy policies can be bothprofitable and socially beneficial.”

John Bishop – GRUNEN Systems Director

GRUNEN SYSTEMS LTDCompany No. 10562606

Registered Office:

1 Scott Place, Hardman Street

MANCHESTER

M3 3AA

UNITED KINGDOM

CONTACT:

JOHN BISHOPDirector

Tel: +44 7900 895 807

E-mail: [email protected]

www: grunen-systems.com