THEGANGAWAITTHE GANGA: WAITTINGFORGODOTTING FOR...
Transcript of THEGANGAWAITTHE GANGA: WAITTINGFORGODOTTING FOR...
THE GANGA WAITTHE GANGA: WAITPresentation by: Banjot Kaur, C
TING FOR GODOTTING FOR GODOTCorrespondent, Down To Earth
Holy River, UH y R , UGanga Action Plan I IN 1986Ganga Action Plan I IN 1986
Ganga Action Plan II IN 1993
Closure of GAP I in 2000 (10 years delayClosure of GAP I in 2000 (10 years delay
Yamuna Action Plan I in 2003
Yamuna Action Plan II in 2004Y A P II
NGBRA in 2004
Finance min announces Namami Gange in budget in g g
Cabinet approval in May 2015, Rs 22000cr sanctio
NMCG, formed in 2011, became authority via gazeO bOctober 2016
May 2018: Gadkari declared the Ganga would be c80% by March 2019y
Unholy attemptsU y p
July 2014y
oned, decline 2019
etted notification in
cleaned by 2020, 70-
CPCB
PROJECTS STATUS
Till August 31, 2018)
236 sanctioned, 63 completed
R d RRs 22323.37 sanctioned, Rs 5291.78 spent
114 sewage projects sanctioned, 27 completedcompleted
River front/ghats : 70 sanctioned, 27 completed
Institutional devpt: Rs 1069.92cr sanctioned, Rs 37.06cr completed
ff dAfforestation: Rs 236.56cr sanctioned, Rs 114 cr completed
Source: NMCGSource: NMCG
)
UTTAR PUTTAR P
33 Sanctioned/
Sewer line: 110
Ghats/crematol t dcompleted
RADESHRADESH
/8 completed
08 km laid/1643km
oria: 81 sanctioned/7
Output of Kanpur tanneries
BIHBIH
Sewage: 21 san
S lSewer line: 172sanctioned/38/3
Ghats/crematoG /sanctioned/0 c
HARHAR
lnctioned/0 completed
k22.36km 1.63km completed3 p
oria/riverfront: 5 / 5ompleted
WEST BWEST B
16 sewage proje16 sewage projecompleted
Sewer line: 627i dsanctioned
Gh t tGhats.crematorsanctioned
BENGALBENGAL
ects sanctioned/2ects sanctioned/2
7km laid/1001.68km
i 24 l t d/31ria: 24 completed/31
JHARKJHARK
Sewage: 2 sanc
S lSewer line: 38.7sanctioned
Ghats/crematoG /completed/4 sa
KHANDKHAND
lctioned/0 completed
k l d k78km laid/89km
oria/riverfront: 0 /anctioned
UTTARAUTTARA
32 sewage projel dcompleted
AKHANDAKHAND
ects sanctioned, 15
LACK OFAPPROAPPRO
IITIIT report prepbasin approachpp
There are aboustem on the riveradar none incluradar, none incluthe basin
F BASIN OACHOACH
d i R 6 fpared in Rs 16 crore for lies dumpedp
ut 90 cities all of main r which are on govt’s uded outside stem lying inuded outside stem lying in
E-FLE FL
Challenge is not to cle
59% baseflow amount rIIT Kharagpur’s AbhijIIT Kharagpur’s Abhij
14 ongoing and 14 prog g pBhagrirathi and Alakn
G D A lG D Agarwal’s strugg
Govt’s E flow notificaGovt s E-flow notifica
LOWLOW
an the river but save the river
reduced from 1970s to 2016: ijeet Mukherjeeijeet Mukherjee
oposed projects on p p jnanda basins: WWI report
lgle
ation: A bluffation: A bluff
Twin pit toilets
No though give
a fad, but no solution
en to sludge management
GOVERGLITCGLITC
GAP vs Namami Gange: Co-K ’ Vi d T bKanpur’s Vinod Tare says bo
No monitoring of MoUs with g
PM-led National Ganga Cou
Water Resources minister led 2017, supposed to meet once
NMCG director post: musica
N b tt hNo bottom-up approach
NANCE CHESCHES
-ordination of departments, IIT-th d thoth are one and the same
10 ministries
uncil has never met
task force met only thrice since every three months
al chairs: 7 people in six months
FINANCCLEACLEA
More than Rs 986IIII
IIT: 1 paise per litrIIT p s p
Cost overruns multdeadlines
Pl f fPlanning of financeSewer line cost in Gthan Rs 5k crore
CES OF AN UPAN-UP
6 crores spent in GAP I and
re
tiple times: Extended p
UP SAAPes: UP SAAP, 2016—Ganga basin towns is more
WILL GANGCLECLE
It will take 200 yearconsidering your linconsidering your lin2014
Not a drop has bee
It is an ever going pTareT
OR WILL IT KEGODOT?
A BE EVER EAN?EAN?
rs to clean the Ganga ne of action: SC to govt inne of action: SC to govt in
en cleaned: NGT in 2017
process: IIT-Kanpur’s Vinod
EEP WAITING FOR