The YMI Group - Brochure

12
MECHANICAL, Inc. Quality Without Compromise

Transcript of The YMI Group - Brochure

Page 1: The YMI Group - Brochure

MECHANICAL,�Inc.

YMI Mechanical, Inc. 350 Crossen Avenue • Elk Grove Village, IL 60007

Ph: (847) 258-4650 Fax: (866) 519-6172

www.ymimechanicalinc.com

Quality Without Compromise

Piping | Sheetmetal | Plumbing | Electrical | Refrigeration | Building Automation | Service & Maintenance

MECHANICAL,�Inc.

Page 2: The YMI Group - Brochure

YMI Mechanical, Inc was incorporated in 2009, with Safety, Quality and Service being our main objectives. Everyone at YMI Mechanical is dedicated to ensure we achieve these requirements every day, without exception.

YMI Mechanical provides sound, professional and cost effective service distinguishing and separating ourselves from the rest. Built on a strong foundation of professional and diverse workforce comprising over 30 years in the construction industry. Performing services in the plan & spec. as well as services in Design Build, Design Assist in the Healthcare, Commercial, Educational, Data Corporate Centers, Hospitality and High Rise Residential market places in the private and public sectors.

Mercy Hospital and Medical Center Central Plant Chilled Water Expansion Project

AreAs of expertise• Hospitals–Operating Rooms,

Patient Areas, Central Plant

• Medical Office Buildings

• MRI

• Professional Office Buildings

• Laboratories/Clean Rooms

• Food Processing Facilities

• Plastics Manufacturing

• High Tech Industry

• Data Centers

• Educational Facilities

• Tenant Improvement Build-outs

• Renovations & Additions

• Design/Build

• Special Projects (Unique)

• Technologies Used: BIM (Building Information Modeling), Trimble

service And MAintenAnceYMI Mechanical, Inc. has a state-of-the-art computer dispatching system to ensure serving you efficiently, accurately and on a timely basis. Our Technicians are qualified to service and maintain the following equipment:

• Chillers – Centrifugal and Air-Cooled

• Cooling Towers

• Hot Water & Steam Boilers – Power Burners and Atmospherics

• Pumping

• CRAC Units

• Make-Up Air

• Exhaust

• Humidification

• Dehumidification

• Packaged Heat/Cool

• Commercial Refrigeration

• Ice Machines

• Walk-In Coolers and Freezers

• Reach-In Coolers and Freezers

• Energy Management and Building Control

Page 3: The YMI Group - Brochure

Mercy Hospital and Medical Center

BOILER PLANT PROJECT

Mercy Hospital and Medical Center, a 150-year old city facility

nestled in the heart of Chicago, faced an aging boiler system

that was not able to supply the necessary heat output needed on

a daily basis to run the hospital efficiently. YMI Mechanical, Inc.

was awarded a contract to completely overhaul the mechanical

boiler room located in the sub-basement of the patient tower

and replace the original 1960 era boilers with four new state-of-

the-art, 750 HP, high-pressure steam boilers.

So how do you overhaul the boiler room of a bustling Chicago hospital and medical center that operates 24 hours a day, 7 days a week and 365 days a year? To ensure minimal interruption to the hospital and its patients, YMI Mechanical used a phased approach to install the new system. Due to the high demand on the hospital and the needs of the patients, two boilers had to be running at all times.

Working closely with the Owner, Owners Representative, and the General Contractor, YMI implemented a coordinated team approach allowing for an intricately designed shut down. YMI connected all the steam tie-ins to the existing system, installed blast gates in a new location for the flues and upgraded the existing incoming gas supply from People’s Gas. YMI was able to replace the outdated 1960’s era boilers with four new high-efficiency boilers equipped with Lo-NOx burners that have a 12:1 turn down ratio, all with no noticeable interruption to patient care.

Through innovative design and implementation, Mercy’s Central Boiler Plant improvements made by YMI Mechanical qualified and received a substantial rebate to the hospital from the gas utility company.

YMI MechanicalsERvICE dIvIsION

HVAC SERVICE With our highly trained technicians, YMI is able to service any commercial, hi-rise, or industrial HVAC application. Our mechanical services include equipment repair, equipment replacement, 24/7/365 emergency service response, and building automation. We seek business owners, property managers, and facility engineers who are serious about receiving a reliable, cost-effective, maintenance and service program for their heating, ventilation, air conditioning and refrigerant equipment.

SERVICE AGREEMENT PLANSYMI offers FIVE TIERS of service agreement offerings that can be customized to your specifications and budget. From our basic HVAC maintenance plan to full maintenance and repair coverage, our offerings provide a proactive approach to comfort improvement and the lowering of your HVAC operating expenses. Included in each service agreement offering is environmental data logging. When requested, we will place performance monitoring devices in areas of temperature and/or humidity concern for a one-to-two week period. We will return to pick up the devices and print out a report of our findings for our customer to review. A plan for remedy can then be put together to alleviate the concern.

Tier Five is an “Energy Savings” agreement which, in addition to HVAC maintenance and service, offers an energy audit and performance testing of your building systems. The data collected during this assessment is converted into usable information for benchmarking performance, identification of savings opportunities, calculating returns on investments, maximization of utility company rebates and incentives, and enhancement of building system performance.

BUILDING AUTOMATIONYMI provides time and performance proven modern temperature control solutions that offer rapid ROI. We provide engineering and programming personnel to deliver a turnkey Tridium solution featuring the NiagaraAX web-based platform. This allows us to integrate multiple protocols and 3rd party equipment into a non-proprietary front end. In simple terms, we ease the burden on customers who feel tied down to their control system because their vendor is the “only game in town.” Wireless solutions, lighting controls, door access, video surveillance systems, and control system maintenance programs are other BAS products we furnish.

“Problems solved.”

Page 4: The YMI Group - Brochure

st. Mary’s Medical Center

CENTRAL ExPANsION PROJECT

Having opened in 1973, St. Mary’s Medical Center, located in

Hobart, IN, has been meeting the daily needs of its patients for over

40 years. To meet the needs of a growing suburban population,

the hospital, in 2013, approved building a new 4-story patient

tower to provide additional capacity for patient expansion. YMI

Mechanical was hired in the lead role as General Contractor to

provide a turnkey and seamless construction process.

The project had an accelerated build schedule with specific milestone dates. The client issued a “Notice to Proceed” on December 23, 2013. Faced with an extremely tight time frame to carry out the updates, YMI Mechanical laid out the project into the three phases to be completed over a three month period as follows: 1. Phase one required YMI Mechanical to ensure all major piping revisions and structural steel were

in place. Completed and running by March 1, 2014, this deadline was achieved with seven days to spare.

2. Phase two involved installation of a new 1,000-Ton centrifugal chiller, along with all associated electrical switchgear upgrades, electrical infrastructure and BAS controls. Start-up and testing met the milestone completion date of April 15, 2014.

3. Phase three involved installation of a 350 horsepower boiler and associated piping modifications, electrical infrastructure upgrades, and a new BAS integration. Start-up and testing met the milestone completion date.

The addition of the chiller and boiler to the hospital’s central plant allows St. Mary’s the ability to provide additional capacity in efficiently heating and cooling their 4-story patient tower expansion.

Fermi Lab

CRYO MOduLE TEsT FACILITY (CMTF) BuILdINg TITLE II dEsIgN – HvAC sYsTEM Commissioned by the U.S. Atomic, Energy Commission in 1967,

Fermilab (Fermi National Accelerator Laboratory) has been

home to the Tevatron, the world’s most powerful atomic particle

accelerator, for more than 20 years. Fermilab is the premiere

national laboratory for physics in America and is dedicated to

working with global partners on pioneering research to transform technologies for

science and industry.

Whether it is hiring the top scientists in the world, creating new technologies for research or building new facilities, Fermilab is committed to providing the best facilities in the world to explore particle physics research. YMI Mechanical was contracted to install the HVAC system for two new buildings at the lab, the Cryo Module Test Facility (CMTF) building and Compressor building. Upon completion, the new buildings conformed to the U.S. Department of Energy’s Guiding Principles for High Performance and Sustainable Buildings.

• Provide HVAC and process cooling to new CMTF building, new piping sheet metal and extensive temperature control infrastructure improvement and upgrade.

• Provide HVAC and process cooling to the Cryo Module Testing Facility, HDPE underground piping to the AC chiller as well as comfort cooling to lab personnel.

AcerlorMittelEast Chicago, Indiana

Welding on high pressure

hydraulic piping lines.

Page 5: The YMI Group - Brochure

EDUCATIONAL FACILITIESWheaton Community Unit School District 200Wheaton North High School and John-son Elementary- Installation of (77) vertical classroom units, VAV’s instal-lation and control retro t, (2) 16,000 CFM air handling units, (2) new chilled water pumps and (2) new condensing boilers.

ATWOOD SCHOOL DISTRICTReplacement roof top units on 3 schools, Geothermal piping, aquatherm piping, new chilled water piping and pumps, vertical classroom units, new VRF system.

PALATINE HIGH SCHOOL (KITCHEN PROJECT)Make-Up Air Unit Lift2 large make-up air units and ex-haust fans for new kitchen cafeteria. Black iron ductwork for kitchen hood, new ductwork throughout cafeteria, gas piping for new kitchen equip-ment.

WESTMOOR SCHOOL NORTHBROOKRemodel and ExpansionDismantle and re-install all rooftop equipment, ductwork, piping for re-roof plus addition of (4) new rooftop units and (2) dehumidi cation units. New unit ventilators, unit heater, and n tube radiation. Ductwork and piping for 2 phases of new school addition.

UNIVERSITY OF CHICAGO

COMMUNITY FOUNDATION NORTHWEST INDIANA

BILLINGS BUILDOUT(2) new roof top units, piping

and ductwork installation for VAV system and n tube radiation.

ERMAN BUILDINGProvided General Contractor services for the project to connect campus chilled water system to the building. This included (3) chilled water pumps, plate and frame heat exchanger, and complete piping throughout the building.

COMMUNITY HOSPITAL, MUNSTER, INCommunity Hospital Vertical Expansion- Installation of entire medical gas system for 5 story vertical expansion. Project included installation of:• Medical air compressor with 5 oil-less scroll air compressors, a 240 gallon air

receiver and 2 desiccant dryers• Medical vacuum pump - oil-less claw type vacuum pump with 4 separate

vacuum pumps• Complete new medical gas piping and installation of over 1300 medical gas

outlets, headwall units, ceiling booms, slides and zone valve boxes• Installation and wiring of new master and area alarm system for new and

existing hospital• Neonatal Intensive Care Unit, medgas piping in wall rough, C-Section Room

ST. CATHERINE’S, EAST CHICAGO, INChiller piping ow controls. Install valve kits in chiller piping and balance ow.

Page 6: The YMI Group - Brochure

WOUND CARE - BUILDOUT Provided mechanical systems to the four hyperbaric chambers including medical gas, hydronic piping, ductwork, VAV’s and radiant ceiling panels, temperature control system and plumbing services.

LAGRANGE

Page 7: The YMI Group - Brochure

WOUND CARE - BUILDOUT Provided mechanical systems to the four hyperbaric chambers including medical gas, hydronic piping, ductwork, VAV’s and radiant ceiling panels, temperature control system and plumbing services.

LAGRANGE

Page 8: The YMI Group - Brochure

EDUCATIONAL FACILITIESWheaton Community Unit School District 200Wheaton North High School and John-son Elementary- Installation of (77) vertical classroom units, VAV’s instal-lation and control retro t, (2) 16,000 CFM air handling units, (2) new chilled water pumps and (2) new condensing boilers.

ATWOOD SCHOOL DISTRICTReplacement roof top units on 3 schools, Geothermal piping, aquatherm piping, new chilled water piping and pumps, vertical classroom units, new VRF system.

PALATINE HIGH SCHOOL (KITCHEN PROJECT)Make-Up Air Unit Lift2 large make-up air units and ex-haust fans for new kitchen cafeteria. Black iron ductwork for kitchen hood, new ductwork throughout cafeteria, gas piping for new kitchen equip-ment.

WESTMOOR SCHOOL NORTHBROOKRemodel and ExpansionDismantle and re-install all rooftop equipment, ductwork, piping for re-roof plus addition of (4) new rooftop units and (2) dehumidi cation units. New unit ventilators, unit heater, and n tube radiation. Ductwork and piping for 2 phases of new school addition.

UNIVERSITY OF CHICAGO

COMMUNITY FOUNDATION NORTHWEST INDIANA

BILLINGS BUILDOUT(2) new roof top units, piping

and ductwork installation for VAV system and n tube radiation.

ERMAN BUILDINGProvided General Contractor services for the project to connect campus chilled water system to the building. This included (3) chilled water pumps, plate and frame heat exchanger, and complete piping throughout the building.

COMMUNITY HOSPITAL, MUNSTER, INCommunity Hospital Vertical Expansion- Installation of entire medical gas system for 5 story vertical expansion. Project included installation of:• Medical air compressor with 5 oil-less scroll air compressors, a 240 gallon air

receiver and 2 desiccant dryers• Medical vacuum pump - oil-less claw type vacuum pump with 4 separate

vacuum pumps• Complete new medical gas piping and installation of over 1300 medical gas

outlets, headwall units, ceiling booms, slides and zone valve boxes• Installation and wiring of new master and area alarm system for new and

existing hospital• Neonatal Intensive Care Unit, medgas piping in wall rough, C-Section Room

ST. CATHERINE’S, EAST CHICAGO, INChiller piping ow controls. Install valve kits in chiller piping and balance ow.

Page 9: The YMI Group - Brochure

st. Mary’s Medical Center

CENTRAL ExPANsION PROJECT

Having opened in 1973, St. Mary’s Medical Center, located in

Hobart, IN, has been meeting the daily needs of its patients for over

40 years. To meet the needs of a growing suburban population,

the hospital, in 2013, approved building a new 4-story patient

tower to provide additional capacity for patient expansion. YMI

Mechanical was hired in the lead role as General Contractor to

provide a turnkey and seamless construction process.

The project had an accelerated build schedule with specific milestone dates. The client issued a “Notice to Proceed” on December 23, 2013. Faced with an extremely tight time frame to carry out the updates, YMI Mechanical laid out the project into the three phases to be completed over a three month period as follows: 1. Phase one required YMI Mechanical to ensure all major piping revisions and structural steel were

in place. Completed and running by March 1, 2014, this deadline was achieved with seven days to spare.

2. Phase two involved installation of a new 1,000-Ton centrifugal chiller, along with all associated electrical switchgear upgrades, electrical infrastructure and BAS controls. Start-up and testing met the milestone completion date of April 15, 2014.

3. Phase three involved installation of a 350 horsepower boiler and associated piping modifications, electrical infrastructure upgrades, and a new BAS integration. Start-up and testing met the milestone completion date.

The addition of the chiller and boiler to the hospital’s central plant allows St. Mary’s the ability to provide additional capacity in efficiently heating and cooling their 4-story patient tower expansion.

Fermi Lab

CRYO MOduLE TEsT FACILITY (CMTF) BuILdINg TITLE II dEsIgN – HvAC sYsTEM Commissioned by the U.S. Atomic, Energy Commission in 1967,

Fermilab (Fermi National Accelerator Laboratory) has been

home to the Tevatron, the world’s most powerful atomic particle

accelerator, for more than 20 years. Fermilab is the premiere

national laboratory for physics in America and is dedicated to

working with global partners on pioneering research to transform technologies for

science and industry.

Whether it is hiring the top scientists in the world, creating new technologies for research or building new facilities, Fermilab is committed to providing the best facilities in the world to explore particle physics research. YMI Mechanical was contracted to install the HVAC system for two new buildings at the lab, the Cryo Module Test Facility (CMTF) building and Compressor building. Upon completion, the new buildings conformed to the U.S. Department of Energy’s Guiding Principles for High Performance and Sustainable Buildings.

• Provide HVAC and process cooling to new CMTF building, new piping sheet metal and extensive temperature control infrastructure improvement and upgrade.

• Provide HVAC and process cooling to the Cryo Module Testing Facility, HDPE underground piping to the AC chiller as well as comfort cooling to lab personnel.

AcerlorMittelEast Chicago, Indiana

Welding on high pressure

hydraulic piping lines.

Page 10: The YMI Group - Brochure

Mercy Hospital and Medical Center

BOILER PLANT PROJECT

Mercy Hospital and Medical Center, a 150-year old city facility

nestled in the heart of Chicago, faced an aging boiler system

that was not able to supply the necessary heat output needed on

a daily basis to run the hospital efficiently. YMI Mechanical, Inc.

was awarded a contract to completely overhaul the mechanical

boiler room located in the sub-basement of the patient tower

and replace the original 1960 era boilers with four new state-of-

the-art, 750 HP, high-pressure steam boilers.

So how do you overhaul the boiler room of a bustling Chicago hospital and medical center that operates 24 hours a day, 7 days a week and 365 days a year? To ensure minimal interruption to the hospital and its patients, YMI Mechanical used a phased approach to install the new system. Due to the high demand on the hospital and the needs of the patients, two boilers had to be running at all times.

Working closely with the Owner, Owners Representative, and the General Contractor, YMI implemented a coordinated team approach allowing for an intricately designed shut down. YMI connected all the steam tie-ins to the existing system, installed blast gates in a new location for the flues and upgraded the existing incoming gas supply from People’s Gas. YMI was able to replace the outdated 1960’s era boilers with four new high-efficiency boilers equipped with Lo-NOx burners that have a 12:1 turn down ratio, all with no noticeable interruption to patient care.

Through innovative design and implementation, Mercy’s Central Boiler Plant improvements made by YMI Mechanical qualified and received a substantial rebate to the hospital from the gas utility company.

YMI MechanicalsERvICE dIvIsION

HVAC SERVICE With our highly trained technicians, YMI is able to service any commercial, hi-rise, or industrial HVAC application. Our mechanical services include equipment repair, equipment replacement, 24/7/365 emergency service response, and building automation. We seek business owners, property managers, and facility engineers who are serious about receiving a reliable, cost-effective, maintenance and service program for their heating, ventilation, air conditioning and refrigerant equipment.

SERVICE AGREEMENT PLANSYMI offers FIVE TIERS of service agreement offerings that can be customized to your specifications and budget. From our basic HVAC maintenance plan to full maintenance and repair coverage, our offerings provide a proactive approach to comfort improvement and the lowering of your HVAC operating expenses. Included in each service agreement offering is environmental data logging. When requested, we will place performance monitoring devices in areas of temperature and/or humidity concern for a one-to-two week period. We will return to pick up the devices and print out a report of our findings for our customer to review. A plan for remedy can then be put together to alleviate the concern.

Tier Five is an “Energy Savings” agreement which, in addition to HVAC maintenance and service, offers an energy audit and performance testing of your building systems. The data collected during this assessment is converted into usable information for benchmarking performance, identification of savings opportunities, calculating returns on investments, maximization of utility company rebates and incentives, and enhancement of building system performance.

BUILDING AUTOMATIONYMI provides time and performance proven modern temperature control solutions that offer rapid ROI. We provide engineering and programming personnel to deliver a turnkey Tridium solution featuring the NiagaraAX web-based platform. This allows us to integrate multiple protocols and 3rd party equipment into a non-proprietary front end. In simple terms, we ease the burden on customers who feel tied down to their control system because their vendor is the “only game in town.” Wireless solutions, lighting controls, door access, video surveillance systems, and control system maintenance programs are other BAS products we furnish.

“Problems solved.”

Page 11: The YMI Group - Brochure

YMI Mechanical, Inc was incorporated in 2009, with Safety, Quality and Service being our main objectives. Everyone at YMI Mechanical is dedicated to ensure we achieve these requirements every day, without exception.

YMI Mechanical provides sound, professional and cost effective service distinguishing and separating ourselves from the rest. Built on a strong foundation of professional and diverse workforce comprising over 30 years in the construction industry. Performing services in the plan & spec. as well as services in Design Build, Design Assist in the Healthcare, Commercial, Educational, Data Corporate Centers, Hospitality and High Rise Residential market places in the private and public sectors.

Mercy Hospital and Medical Center Central Plant Chilled Water Expansion Project

AreAs of expertise• Hospitals–Operating Rooms,

Patient Areas, Central Plant

• Medical Office Buildings

• MRI

• Professional Office Buildings

• Laboratories/Clean Rooms

• Food Processing Facilities

• Plastics Manufacturing

• High Tech Industry

• Data Centers

• Educational Facilities

• Tenant Improvement Build-outs

• Renovations & Additions

• Design/Build

• Special Projects (Unique)

• Technologies Used: BIM (Building Information Modeling), Trimble

service And MAintenAnceYMI Mechanical, Inc. has a state-of-the-art computer dispatching system to ensure serving you efficiently, accurately and on a timely basis. Our Technicians are qualified to service and maintain the following equipment:

• Chillers – Centrifugal and Air-Cooled

• Cooling Towers

• Hot Water & Steam Boilers – Power Burners and Atmospherics

• Pumping

• CRAC Units

• Make-Up Air

• Exhaust

• Humidification

• Dehumidification

• Packaged Heat/Cool

• Commercial Refrigeration

• Ice Machines

• Walk-In Coolers and Freezers

• Reach-In Coolers and Freezers

• Energy Management and Building Control

Page 12: The YMI Group - Brochure

MECHANICAL,�Inc.

YMI Mechanical, Inc. 350 Crossen Avenue • Elk Grove Village, IL 60007

Ph: (847) 258-4650 Fax: (866) 519-6172

www.ymimechanicalinc.com

Quality Without Compromise

Piping | Sheetmetal | Plumbing | Electrical | Refrigeration | Building Automation | Service & Maintenance

MECHANICAL,�Inc.