The World Works Here…. · The World Works Here…. Jeff Bishop Executive Director Port of Moses...

7
The World Works Here…. Jeff Bishop Executive Director Port of Moses Lake

Transcript of The World Works Here…. · The World Works Here…. Jeff Bishop Executive Director Port of Moses...

Page 1: The World Works Here…. · The World Works Here…. Jeff Bishop Executive Director Port of Moses Lake . Composites, Chemicals, Aerospace and High Tech Manufacturing. Line-of-Sight

The World Works Here….

Jeff Bishop

Executive Director Port of Moses Lake

Page 2: The World Works Here…. · The World Works Here…. Jeff Bishop Executive Director Port of Moses Lake . Composites, Chemicals, Aerospace and High Tech Manufacturing. Line-of-Sight

Composites, Chemicals, Aerospace and High Tech Manufacturing

Page 3: The World Works Here…. · The World Works Here…. Jeff Bishop Executive Director Port of Moses Lake . Composites, Chemicals, Aerospace and High Tech Manufacturing. Line-of-Sight

Line-of-Sight (LOS) Rehabilitation

• Runway 14L/32R• Remove Hump

from Runway • AIP/FAA Grant

Funded• Project Area 1,000 ft

x 4,500 ft• Replacement of

Lighting Full length • Set to Begin Fall

2019 and Conclude 2020

Page 4: The World Works Here…. · The World Works Here…. Jeff Bishop Executive Director Port of Moses Lake . Composites, Chemicals, Aerospace and High Tech Manufacturing. Line-of-Sight

• Addition of Sec 19 (640 Acres)• Fresh Water Expansion

• Master Development Plan• New Rate Model 2019• JMUSA

• BOD Treatment• Pretreatment Program • LOS Spoils to Create

Additional Storage Capacity

Industrial Wastewater

Page 5: The World Works Here…. · The World Works Here…. Jeff Bishop Executive Director Port of Moses Lake . Composites, Chemicals, Aerospace and High Tech Manufacturing. Line-of-Sight

Planning for the Future

Road G Project (Westside Employment Center)

• 2,100 Acres of Undeveloped Land• 1,388 Acres Public (66%)

• 1,257 Acres Port Owned (60%)• 698 Acres Private (34%)

• Formation of an LID to Facilitate Infrastructure Development• 53% of Private Ownership Approve• Formation of LID Approved by Port

Commission March 11th 2019

• Project Includes • Entrance to Highway 17• 3 ½ Miles of Road Bed• Water, Sewer and IWW• Resolve Power Needs

Page 6: The World Works Here…. · The World Works Here…. Jeff Bishop Executive Director Port of Moses Lake . Composites, Chemicals, Aerospace and High Tech Manufacturing. Line-of-Sight

Northern Columbia Basin Rail (NCBR) Project

• Construction of 8 Miles New Track

• Rehabilitation of 3 Miles Existing Track

• 20 mil in State Funding

• 10 mil in Federal Funding• Federal

Obligation Fall 2019

• Construction to Begin Spring 2021 and Conclude In 2022

Page 7: The World Works Here…. · The World Works Here…. Jeff Bishop Executive Director Port of Moses Lake . Composites, Chemicals, Aerospace and High Tech Manufacturing. Line-of-Sight

Thank You For Your Attention.