Problem SolvingProblem SolvingwithwithIssue Based Information System [IBIS]Issue Based Information System [IBIS]and ‘Wicked Problems’ techniquesand ‘Wicked Problems’ techniques
June 2008
2
The Wicked Problem in Information SystemsThe Wicked Problem in Information Systems
The nature of ‘wicked problems’
.
.
.
.
Characteristic What it means to the problem solvers
Not ‘tamed’ by the requirements waterfall
The problem is not easily solved with the traditional ‘waterfall’ process of gathering facts, evaluating alternatives, and making a decision based on an objective decision criteria
Problem depends on the solution
The problem is an evolving set of interlocking issues and constraints. Indeed, there is no definitive statement of the problem.
You don't really understand the problem until you have developed a solution
Constraints on the solution change
The constraints on the solution, such as limited resources and political ramifications, change over time, and change as the problem becomes understood through the development of the solution.
Many stakeholders involved, and all have an opinion
There are many stakeholders involved; each cares about, or has something at stake in, how the problem is resolved.
The many stakeholders makes the problem solving process fundamentally social and political as different from objective.
Getting a workable answer includes achieving consensus with stakeholders
No definitive end
Since there is no definitive problem, there is no definitive solution.
The problem-solving process ends when a stakeholder consensus forms around ‘a solution’, or time, money, energy, or some other resource runs out, but not when some perfect solution emerges
3
Mitigations to the wicked information systems problemMitigations to the wicked information systems problem
Mitigation What it means to the problem solvers
Iteration and experimentation is encouraged
The problem evolves from the solution, a reversal of the normal order. Iteration and experimentation is encouraged in order to shape the ‘possible’ or the functionally and technically feasible, and affordability.
Team members may work on different elements at the same time
Progress is measured more by the quality of the emerging solution than by the check-off of the waterfall milestones. Quality means: fit to function, environment, technical feasibility, and fit to stakeholder acceptance
Communications increase by nearly N2
The community of stakeholders opens N*(N-1) communication paths, potentially a cacophony of messages and opinions facilitated by both virtual and real connectivity
Diversity is honored
The diversity of stakeholders adds to the richness of the solution.
Put a stake in the ground
At the point of diminishing improvement, in spite continuing debate and experimentation, a solution emerges when the stake is put in the ground
4
Thinking through wicked problemsThinking through wicked problems
What happens What it means to the problem solvers
Ideas are cataloged
The full range of thinking and creativity that occurs in wicked-problem solving requires keeping any idea that comes up out of sequence
Sudden changes in topic or focus
There will be sudden changes of topic or focus and new insights,
Topic changes may not appear to pertain to the problem or the solution, but they deserve a hearing
There will be emergence of new pieces of the problem
Stake in the ground
You may have to stop at some point, and declare that "this is the problem we've addressed, and this is our solution."
Managing to a waterfall timeline is difficult
The gap between the linear and orderly progress the project is supposed to be making, and the more iterative and experimental IBIS method closed by declaring the solution if convergence and decision-making does not emerge.
Linear gets mixed with IBIS
Linear solutions, e.g. "That's a good idea; hold on to that point until later."is a mitigation while divergence and convergence processes are executed
5
IBIS FundamentalsIBIS Fundamentals
• IBIS is an issue-based methodology for dialogue and conversation. – Issues are framed in a three-part matrix structure
• Question -- states a question, but does not include in the question Ideas or Arguments
• Ideas – link to the Question and propose possible resolutions for the Question; aka: solutions
• Arguments – link to the Ideas, and state opinions, facts, or judgments that either support or object to one or more Ideas; aka justifications
– Structuring the Question-Idea-Argument [QIA] provides:• Exposure of points-of-view early in the process to enable
stakeholder dialogue and project possibilities or opportunities• Loose coupling of question, justifications, and solutions to
enable iteration • Rich landscape of ‘links’ or relationships among the matrix
values
6
IBIS FundamentalsIBIS Fundamentals
• IBIS improves ‘answer reflex’ dialogues
– ‘Answer-reflex’ is the normal meeting dialogue employing “question answered reflexively with ‘solution-justification’”
• Advantages: – Decisive, directional, knowledgeable, expertise on display
– Fits the waterfall model and linear project model
– Progress is easily represented on a dashboard or scorecard
• Disadvantages: – Reflexive dialogue attempts to limit conversation to a perceived
problem statement
– Early closure of ideas and arguments is not ‘agile’, meaning little support for iteration and experimentation
– Limited dialogue scope may foreclose participation by some valued stakeholders
– Makes it hard to break the tight coupling on question-idea-argument
7
IBIS Process stepsIBIS Process steps
1. Diverge– All stakeholders participate– Develop the QIA map with dialogue and communications– Keep going until there are diminishing value-adds to the map
2. Converge– Develop deeper understanding of the various QIA’s– Categorize and weigh for consensus [preponderance of acceptance]– Endorsement
• Approval of an Idea by stakeholders• Can be made by workflow approval or other communication
– Retirement• Ideas are taken off the table by consensus of stakeholders• Can be implemented by workflow
3. Decide– Finalize consensus on an Idea set, or– Stake-in-the-ground by a ‘decider’ if no consensus emerges and
time/resources runs out
8
IBIS getting started with QIAIBIS getting started with QIA
• Root Question begins the conversations
– This will generally be something like "What should be our strategic plan for the next 5 years?" or "How can we increase customer 'delight' in our products and services?".
• Ideas respond to a Question
– Brief, neutral proposal for resolution of the Question
– Linked to their Questions with "responds to" links.
– Does not contain a justification, or opinion re applicability, feasibility, affordability, desirability [benefits] etc
• Arguments are statements of fact, judgments, or opinions which either support or object to one or more Ideas
– Arguments are linked to their Ideas with links called "supports" (for pros) and "objects to" (for cons).
9
Expanding QIAExpanding QIA
• Challenges. A challenges link is used when a Question challenges some part of the content of another IBIS node (a Question, Idea, or Argument).
– It could be an explicit claim in an Argument that someone wishes to dispute.
– Example: an Argument objecting to a certain Idea, saying "The cost of this item will be more than budgeted,"
• And a Challenge to that Argument could be the linked question "Will it cost too much?", and
• An Idea saying "No", and
• An Argument supporting "No" by claiming "For the next 30 days there is a special discount that will put this item's cost within budget."
10
Expanding QIAExpanding QIA
• Expands-on. This link is used when a Question further develops an Idea in another Question or an Idea or Argument.
– The second Question "expands on" the idea by exploring it in more detail.
– For example, if one Idea on a particular Question offered the "Hire more people," then a Question "How many people should we hire?." expands that Idea
11
QIA FormatQIA Format
• List format of QIA [hierarchical]:– 1. Question: "What system should we buy?"
1.1 Idea: "X" 1.1.1 Argument Con (Objects to): Doesn't fit w/ existing tools 1.2 Idea: "Y" 1.2.1 Argument Pro (Supports): State-of-the-art Technology
• Table format of QIA [relational]
12
Other Nodes that connectOther Nodes that connect
• Notes
– It can say anything, be placed anywhere, and be linked to anything.
– For example, a Note node called "Introduction," provides context setting and background information
• References
– Documents, emails, SIRs, ASRs, that bear on the issue
• Decisions
– Resolves a Question into a Decision.
– Restate the Question into a Decision format• Question, solution, rationale, context or applicability
13
Mistakes to avoidMistakes to avoid
• Do not put more than one question in a Question– Example of poor practice: “How should complaints be handled, and
who should handle them?“• Avoid putting a point into the wrong kind of node.
– Example, putting a Question in an Idea, or using a Question node for a general announcement
• Question should not contain possible answers. – It should avoid the words "and", "or", or "not“
• Avoid "Yes/No" Questions, and Questions that follow the pattern "Should we do X or Y?". – Leave questions ‘open’ for Ideas
• Avoid ‘Should we do…’ Questions– Replace with ‘What [how] should we do..’?
• Replace “Is there a need..’ with ‘How can…’