The Top-level Research Initiative -Presentation at TFI’s annual Conference 2010 PK4 Integration of Large-scale Wind Power

Transcript of The Top-level Research Initiative -Presentation at TFI’s annual Conference 2010 PK4 Integration of...

Page 1: The Top-level Research Initiative -Presentation at TFI’s annual Conference 2010 PK4 Integration of Large-scale Wind Power.

The Top-level Research Initiative

-Presentation at TFI’s annual Conference 2010 PK4 Integration of Large-scale Wind Power

Page 2: The Top-level Research Initiative -Presentation at TFI’s annual Conference 2010 PK4 Integration of Large-scale Wind Power.

Facts about the call

• Goal: • To promote the development of new, innovative and sustainable forms of wind energy and improve the integration of wind power. • To enhance the development of Nordic R&D institutions and business within the wind energy field• Contribute to promoting the Nordic countries in a global context.

• Research topics: grid aspects, power and energy aspects, energy market aspects, operation and maintenance and cold climate and offshore wind power.

• Instrument: user driven research projects

Page 3: The Top-level Research Initiative -Presentation at TFI’s annual Conference 2010 PK4 Integration of Large-scale Wind Power.

Application process

• First application phase: Call launched 15. October 2009 Deadline: 15. December 2009

• Number of applications: 14• Quality: Good quality, variation of thematic focus, balance of geography.

• Second application phase: Evaluation meeting February 3. 2010 6 projects invited to phase 2 Deadline: 15. mars 2010 Expert evaluation meeting 15. April PC decision meeting 27. April

• Number of applicants: 5• Quality: Very good quality, and good balance of partners

Page 4: The Top-level Research Initiative -Presentation at TFI’s annual Conference 2010 PK4 Integration of Large-scale Wind Power.

Decission

• Final Projects:

• Improved forecast of wind, waves and icing (ICEWIND)Project leader: Risø DTU, Denmark. Partner countries: Finland, Iceland, Norway and Sweden. Founded by MNOK : 12,34

• DC grids for integration of large scale wind power (OffshoreDC)Project leader: Risø DTU – Technical University of Denmark, Denmark. Partner countries: Finland, Norway and Sweden. Founded by MNOK : 11,05

• Optimal spinning reserve of power systems considering forecasting error of load and wind power generation under market environment (OSRNordic)Project leader: Aalborg University, Denmark. Partner countries: Iceland og Sweden. Founded by MNOK : 3,75

Total foundation MNOK: NOK 27The total budget of the projects: NOK 45 million

Page 5: The Top-level Research Initiative -Presentation at TFI’s annual Conference 2010 PK4 Integration of Large-scale Wind Power.

Future Process

• Contract phase- Ongoing

• Kick-off meeting-In relation to the TFI conference 15.-16. September 2010- Kick-off for each project autumn 2010

• New call possible, remaining budget: 2,86 MNOK

Page 6: The Top-level Research Initiative -Presentation at TFI’s annual Conference 2010 PK4 Integration of Large-scale Wind Power.

EU & Industry

• Industry participation in the projects was encouraged, and 40 % external contribution requested

• Nordic Power Research Network participated in the first part of the call

• Representatives from the industry will be invited to yearly conferences to spread the results from the projects

Page 7: The Top-level Research Initiative -Presentation at TFI’s annual Conference 2010 PK4 Integration of Large-scale Wind Power.

Projects: Icewind Project title: Improved forecast of wind, waves and icing• Project duration: 2010 – 2014• Participating institutions: Risø DTU National Laboratory for

Sustainable Energy (DK), Vestas Wind Systems (DK), Icelandic Meteorological Office (IS), University of Iceland (IS), Landsvirkjun (IS), Landsvirkjun Power (IS), Kjeller Vindteknikk (NO), Norwegian Meteorological Institute (NO), Statoil (NO), AGR Field Operations (NO), Gotland University (SE), Technical Research Centre of Finland (VTT) (FI), Offshore Windservice ApS (NO).

• Project leader: Niels-Erik Clausen, Risø DTU (DK).

Page 8: The Top-level Research Initiative -Presentation at TFI’s annual Conference 2010 PK4 Integration of Large-scale Wind Power.

Project: OffshoreDCProject title: DC grids for integration of large-scale wind power

• Project duration: 2010 – 2015• Participating institutions: Technical University of Denmark

(Risø DTU and DTU Elektro) (DK), Vestas A/S (DK), Chalmers University of Technology (SE), ABB (SE), SINTEF Energy Research (NO), STATNETT (NO), Technical Research Centre of Finland (VTT) (FI), DONG Energy (DK), Energinet.dk (DK), Aalborg University (DK).

• Project leader: Poul Sørensen, Risø DTU National Laboratory for Sustainable Energy (DK

Page 9: The Top-level Research Initiative -Presentation at TFI’s annual Conference 2010 PK4 Integration of Large-scale Wind Power.

Projects: OSRNordic• Project title: Optimal Spinning Reserve of Power Systems

Considering Forecasting Error of Load and Wind Power Generation under Market Environment

• Project duration: 2010 – 2013• Participating institutions: Aalborg University (DK),

Technical University of Denmark (DK), Lund University (SE), Chalmers University of Technology (SE), University of Iceland (IS), ENFOR A/S (DK), Energinet.dk (DK), DONG Energy (DK).

• Project leader: Birgitte Bak-Jensen, Aalborg University (DK).