The TIGGE experience Richard Swinbank and Masayuki Kyouda with thanks to members of GIFS-TIGGE WG &...

22
The TIGGE experience Richard Swinbank and Masayuki Kyouda with thanks to members of GIFS-TIGGE WG & THORPEX IPO S2S project planning group meeting, Exeter, February 2013

Transcript of The TIGGE experience Richard Swinbank and Masayuki Kyouda with thanks to members of GIFS-TIGGE WG &...

Page 1: The TIGGE experience Richard Swinbank and Masayuki Kyouda with thanks to members of GIFS-TIGGE WG & THORPEX IPO S2S project planning group meeting, Exeter,

The TIGGE experience

Richard Swinbank and Masayuki Kyouda

with thanks to members of GIFS-TIGGE WG & THORPEX IPO

S2S project planning group meeting, Exeter, February 2013

Page 2: The TIGGE experience Richard Swinbank and Masayuki Kyouda with thanks to members of GIFS-TIGGE WG & THORPEX IPO S2S project planning group meeting, Exeter,

The TIGGE experience

Aims Database content Technical – how we run TIGGE TIGGE-based products Looking ahead, post THORPEX

Page 3: The TIGGE experience Richard Swinbank and Masayuki Kyouda with thanks to members of GIFS-TIGGE WG & THORPEX IPO S2S project planning group meeting, Exeter,

TIGGE THORPEX Interactive Grand Global Ensemble

A major component of THORPEX: a WMO World Weather Research Programme to accelerate the improvements in the accuracy of 1-day to 2-week high-impact weather forecasts

GEO task WE-01-C1 – “Global Multi-Model Prediction System for High-Impact Weather”

Objectives: Enhance collaboration on ensemble prediction, both internationally

and between operational centres & universities. Facilitate research on ensemble prediction methods, especially

methods to combine ensembles and to correct systematic errors Enable evolution towards a prototype operational system, the “Global

Interactive Forecast System”

Page 4: The TIGGE experience Richard Swinbank and Masayuki Kyouda with thanks to members of GIFS-TIGGE WG & THORPEX IPO S2S project planning group meeting, Exeter,

TIGGE data Ten of the leading global forecast centres are providing

regular ensemble predictions to support research on predictability, dynamical processes and the development of probabilistic forecasting methods.

TIGGE data is made available for research after a 48-hour delay.

The TIGGE dataset has proved invaluable as a resource for a wide range of research projects. Over 70 articles related to TIGGE have been published in the scientific literature

Page 5: The TIGGE experience Richard Swinbank and Masayuki Kyouda with thanks to members of GIFS-TIGGE WG & THORPEX IPO S2S project planning group meeting, Exeter,

Summary of TIGGE database

CentreEnsemblemembers

Output dataresolution

Forecastlength

Forecasts per day

Fields (out of 73)

Start date

BoM* 33 1.50º x 1.50º 10 day 2 55 3 Sep 07

CMA 15 0.56º x 0.56º 10 day 2 60 15 May 07

MSC 21 0.9º x 0.9º 16 day 2 56 3 Oct 07

CPTEC 15 0.94º x 0.94º 15 day 2 55 1 Feb 08

ECMWF 51N200 (Reduced

Gaussian)N128 after day 10

15 day 2 70 1 Oct 06

JMA 51 1.25º x 1.25º 9 day 1 61 1 Oct 06

KMA 24 0.56º x 0.38º 10 day 2 46 28 Dec 07

Météo-France 35 1.50º x 1.50º 4.5 day 2 62 25 Oct 07

NCEP 21 1.00º x 1.00º 16 day 4 69 5 Mar 07

UKMO 24 0.83º x 0.55º 15 day 2 72 1 Oct 06

* Delivery of BoM data currently suspended

Page 6: The TIGGE experience Richard Swinbank and Masayuki Kyouda with thanks to members of GIFS-TIGGE WG & THORPEX IPO S2S project planning group meeting, Exeter,

TIGGE data flows The ensemble prediction data is transferred from the data

providers to one of the data centres (using LDM, FTP or HTTP). After checking, the data is then sent on to the other data centres. The data is archived and made available to users 48 hours after

initial forecast time.

Page 7: The TIGGE experience Richard Swinbank and Masayuki Kyouda with thanks to members of GIFS-TIGGE WG & THORPEX IPO S2S project planning group meeting, Exeter,

TIGGE features All data are archived at

native resolution (on native grid when possible)

Data may be interpolated on any limited-area lat-lon grid defined by the user just before download

Field names, definitions, units, accumulation times, (etc.) are fully standardized

Data gaps are continuously monitored and every effort is made to repair them quickly

All data provided in GRIB2 (WMO standard data format)

Slide 7AMS - IIPS - 2012

NCAR

EPS 1 EPS 2 EPS n

academic NHMSotherusers

Predictability science

Applications

ECMWF CMA

Page 8: The TIGGE experience Richard Swinbank and Masayuki Kyouda with thanks to members of GIFS-TIGGE WG & THORPEX IPO S2S project planning group meeting, Exeter,

TIGGE Archive The TIGGE database now contains over five years of global

forecast data. Data volume now exceeds 520 terabytes (2.6 billion fields). Around 100 users access TIGGE data every month.

2011/2012 TIGGE Archive Usage (All Portals)

1

10

100

1000

10000

100000

Jan-11 Feb-11 Mar-11

Apr-11 May-11

Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12

Month

Volu

me

(GB)

0

30

60

90

120

150

Num

ber o

f Use

rs (C

ount

)

Vol Accessed (GB)

Vol Delivered (GB)

# Active Users

Page 9: The TIGGE experience Richard Swinbank and Masayuki Kyouda with thanks to members of GIFS-TIGGE WG & THORPEX IPO S2S project planning group meeting, Exeter,

TIGGE – Research focus

The TIGGE project (& GIFS-TIGGE working group) was originally focused on the technical work enabling the establishment of the TIGGE archive dataset. The main scientific aspects of THORPEX were covered by Predictability & Dynamical Processes WG, and also Data Assimilation & Observing Systems WG(s).Following the successful establishment of the TIGGE dataset, the focus of the GIFS-TIGGE working group has shifted towards research on ensemble forecasting. Particular topics of interest include:

a posteriori calibration of ensemble forecasts; combination of ensembles produced by multiple models; research on and development of probabilistic forecast products.

More recently, we have broadened our range of interest to cover improvement of EPSs, including:

representing uncertainties in initial conditions stochastic physics & other techniques to account for model error

Page 10: The TIGGE experience Richard Swinbank and Masayuki Kyouda with thanks to members of GIFS-TIGGE WG & THORPEX IPO S2S project planning group meeting, Exeter,

TIGGE development

Calibration, combination, products

EPS improvement

Time

Evolution of TIGGE & GIFS

The GIFS-TIGGE should also be a forum to focus on R&D directed at improving our EPS systems, to help us develop a “virtuous circle”.

In addition to post-processing and applications of EPS and EPS developments, we will also maintain an interest in ensemble verification and links with convective-scale EPS and the new sub-seasonal to seasonal group.

… to be considered further in post-THORPEX plans.

Page 11: The TIGGE experience Richard Swinbank and Masayuki Kyouda with thanks to members of GIFS-TIGGE WG & THORPEX IPO S2S project planning group meeting, Exeter,

Towards the Global Interactive Forecast System (GIFS)

The THORPEX implementation plan had a grand vision for the development of a Global Interactive Forecast System. Although our plans are now more modest, one key element of GIFS that we are developing is the use of probabilistic forecast products.

Many weather forecast situations are low probability but high risk – unlikely but potentially catastrophic. Probabilistic forecasting is a powerful tool to improve early warning of high-impact events.

Using the TIGGE dataset, we are developing and evaluating probabilistic products to deliver improved forecasts of high-impact weather.

The products are focused on Tropical cyclones Heavy precipitation Strong winds

Page 12: The TIGGE experience Richard Swinbank and Masayuki Kyouda with thanks to members of GIFS-TIGGE WG & THORPEX IPO S2S project planning group meeting, Exeter,

Links with Severe Weather FDP

EPS1 EPS2 EPS3

Generate Products

Regional Centre

users

National Centre

National Centre

National Centre

users usersusers

In-SituObservations

AirborneObservations

Satellite Observations

We are collaborating with WMO Severe Weather Forecast Demonstration Project (SWFDP) and other projects to ensure that products address

needs of operational forecasters and end users;

to provide an environment for the evaluation of prototype products.

GIFS will use global-regional-national cascade pioneered by the SWFDP.

Web-enabled technology will be used for generation and distribution of products.

Page 13: The TIGGE experience Richard Swinbank and Masayuki Kyouda with thanks to members of GIFS-TIGGE WG & THORPEX IPO S2S project planning group meeting, Exeter,

Tropical cyclones

The GIFS-TIGGE working group first set up a pilot project for the exchange of real-time tropical cyclone track predictions using “Cyclone XML” format, initially to support the THORPEX Pacific-Asia Regional Campaign (T-PARC)

Several types of products to support TC forecasting have been developed using those data.

Example of combined TC track forecasts (Met Office + ECMWF)

Page 14: The TIGGE experience Richard Swinbank and Masayuki Kyouda with thanks to members of GIFS-TIGGE WG & THORPEX IPO S2S project planning group meeting, Exeter,

Warnings of other severe weather events

More recently, prototype products have been developed based on gridded forecast data, such as this product which highlights the risk of heavy rainfall.

Prototype product courtesy Mio Matsueda

Similar products also available for

• hot & cold temperatures,

• strong winds

Page 15: The TIGGE experience Richard Swinbank and Masayuki Kyouda with thanks to members of GIFS-TIGGE WG & THORPEX IPO S2S project planning group meeting, Exeter,

Steps to progress use of GIFS products in SWFDP

Progress so far TC products based on CXML data; prototype products based on

gridded TIGGE forecast data Provided documentation of prototype products GIFS-TIGGE WG co-chair attended recent SWFDP SG meeting Seek feedback from RSMCs coordinating SWFDP regional

subprojects

Current Develop real-time products for SWFDP based on preferred

prototypes, e.g., Multi-model versions of TC products; near real-time versions of highest priority rainfall products.

Supply products to SWFDP regional websites

Future Provide training on GIFS products via SWFDP

Page 16: The TIGGE experience Richard Swinbank and Masayuki Kyouda with thanks to members of GIFS-TIGGE WG & THORPEX IPO S2S project planning group meeting, Exeter,

TIGGE-LAM: TIGGE for limited-area models

To complement the global TIGGE project, a TIGGE-LAM panel was set up to coordinate the development of Limited Area Model Ensemble Prediction Systems.

The panel facilitates the interoperability of the different regional ensemble systems and coordinates the archiving of limited-area ensemble forecasts.

The TIGGE-LAM panel is chaired by Tiziana Paccagnella and works closely with the GIFS-TIGGE working group.

The three TIGGE archive centres have agreed to host a sub-set of high priority data, and archiving of LAM EPS data has now started.

With the increasing emphasis on convective-scale ensembles, TIGGE-LAM works closely with the WWRP Mesoscale Weather Forecasting Research group, as well as GIFS-TIGGE.

The TIGGE LAM Panel now structured in regional sub-groups to facilitate the focus on regional activities, with links to THORPEX regional committees.

More information is available from the TIGGE-LAM website http://www.smr.arpa.emr.it/tiggelam/.

Page 17: The TIGGE experience Richard Swinbank and Masayuki Kyouda with thanks to members of GIFS-TIGGE WG & THORPEX IPO S2S project planning group meeting, Exeter,

GIFS-TIGGE 31 August - 2 September 2011

GEOWOW (GEOSS interoperability for Weather, Ocean and Water) is a 3-year EU-funded FP7 project started September 2011.

The Weather component (WP4) includes TIGGE archive enhancements: TIGGE-LAM archive Time-series data – for specified set of locations Provision of data in netcdf format as alternative to GRIB2

Page 18: The TIGGE experience Richard Swinbank and Masayuki Kyouda with thanks to members of GIFS-TIGGE WG & THORPEX IPO S2S project planning group meeting, Exeter,

Other developments

Clear need for coordination with S2S archive, as well as TIGGE-LAM – a trio of complementary datasets

Supplementary data Observations – NCAR model validation portal

Possible future enhancements (to be discussed) Additional fields (e.g. ice-related parameters for polar project) Reforecast data

Resolution Currently TIGGE archives data at native model resolution, but

need to consider standard or maximum resolution in future.

Page 19: The TIGGE experience Richard Swinbank and Masayuki Kyouda with thanks to members of GIFS-TIGGE WG & THORPEX IPO S2S project planning group meeting, Exeter,

Post-THORPEX landscape

Still fluid, but a plausible scenario is: WWRP “Predictability and Ensemble Forecasting”

working group, focusing on science of dynamics & predictability and ensemble forecasting.

Small technical “liaison group” to manage TIGGE database (could include S2S & TIGGE-LAM too?)

New “high-impact weather” project to continue some of THORPEX R&D, with more of a focus on short-range convective-scale resolution. To be discussed at Karlsruhe workshop in March.

Page 20: The TIGGE experience Richard Swinbank and Masayuki Kyouda with thanks to members of GIFS-TIGGE WG & THORPEX IPO S2S project planning group meeting, Exeter,

WWRP-THORPEX

TIGGE dataset

UsersPredictability, dynamics, probabilistic forecasting

PDP working group

GIFS-TIGGE working group

TIGGE-LAM panel

TIGGE-LAMdataset

Page 21: The TIGGE experience Richard Swinbank and Masayuki Kyouda with thanks to members of GIFS-TIGGE WG & THORPEX IPO S2S project planning group meeting, Exeter,

WWRP

TIGGE dataset

UsersSub-seasonal to seasonal and polar predictability,

high-impact weather, probabilistic forecasting, RDPs, FDPs

P&EF expert team

Datasetliaison group

TIGGE-LAMdataset

HIW project team

S2S projectteam

S2S dataset

WCRP

Page 22: The TIGGE experience Richard Swinbank and Masayuki Kyouda with thanks to members of GIFS-TIGGE WG & THORPEX IPO S2S project planning group meeting, Exeter,