Use of system engineering in large scale transportation technology integration project
Brad Ring
1
Article extract:
Keywords: blade servers, A/C data center solution, ITS, back office, best practices, program management, strategic planning, IT infrastructure and fiber optic conduit integrity Technology leadership, System engineering, Transportation, tolling, ITS, intelligent transportation system, fiber optic cable, system integration, design review, requirements review, cap ex, op ex, testing, review, schedule, scalability, maintainability.
Implement “V” model of System Engineering for Intelligent Transportation Systems (ITS) endorsed by the U.S. DOT Federal Highway Administration Industry best practice for implementing ITS Systems and when integrating multiple disparate systems such as tolling, fiber optics, back office, transportation, ITS, etc. .
![Page 2: The system engineering process used in Tolling greenfield project](https://reader036.fdocuments.in/reader036/viewer/2022082811/55893578d8b42a39398b468a/html5/thumbnails/2.jpg)
Methodology
2
Train necessary staff at beginning of project to implement the system engineering process from day 1.
![Page 3: The system engineering process used in Tolling greenfield project](https://reader036.fdocuments.in/reader036/viewer/2022082811/55893578d8b42a39398b468a/html5/thumbnails/3.jpg)
Recommended process
3
U.S. DOT Federal Highway Administration Industry best practice for implementing ITS Systems
![Page 4: The system engineering process used in Tolling greenfield project](https://reader036.fdocuments.in/reader036/viewer/2022082811/55893578d8b42a39398b468a/html5/thumbnails/4.jpg)
Benefits of independent technical reviewer
4
1. Integrated Master Schedule integrates 4 different schedules
2. tracks critical path to ensure we meet planned service commencement date.
3. Implemented Mandrel Test to improve fiber installation.
4. Reviews and approves all system engineering deliverables.
![Page 5: The system engineering process used in Tolling greenfield project](https://reader036.fdocuments.in/reader036/viewer/2022082811/55893578d8b42a39398b468a/html5/thumbnails/5.jpg)
Participating stakeholders
5
Brad Ring
Multiple system integrators