The SWING Project: status and closure of the project Bruno Zolesi. [email protected]...

19
The SWING Project: status and closure of the project Bruno Zolesi. bruno.zolesi@ingv .it Istituto Nazionale di Geofisica e Vulcanologia

Transcript of The SWING Project: status and closure of the project Bruno Zolesi. [email protected]...

Page 1: The SWING Project: status and closure of the project Bruno Zolesi. bruno.zolesi@ingv.it bruno.zolesi@ingv.it Istituto Nazionale di Geofisica e Vulcanologia.

The SWING Project: status and closure of the project

Bruno [email protected]

Istituto Nazionale di Geofisica e Vulcanologia

Page 2: The SWING Project: status and closure of the project Bruno Zolesi. bruno.zolesi@ingv.it bruno.zolesi@ingv.it Istituto Nazionale di Geofisica e Vulcanologia.

The Project

2SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

• Starting date: January 1st , 2012 • End date: December 31st , 2013• Duration: 24 Months

Partnership:

• Consiglio Nazionale universitario per le Telecomunicazioni

• Istituto Nazionale di Geofisica e Vulcanologia

• Observatori de l’Ebre

• National Observatory of Athens

Page 3: The SWING Project: status and closure of the project Bruno Zolesi. bruno.zolesi@ingv.it bruno.zolesi@ingv.it Istituto Nazionale di Geofisica e Vulcanologia.

The Aim of the Project

3SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

In case of wide scale terroristic or attacks able to render useless Internet links the aim of the Project named SWING was:

1. to establish the basis for a South European robust radio network, based on SW architecture;

2. to utilize innovative ionospheric sounding techniques and real time signal processing and forecasting, to support Critical Infrastructure communications, both short and long range.

Page 4: The SWING Project: status and closure of the project Bruno Zolesi. bruno.zolesi@ingv.it bruno.zolesi@ingv.it Istituto Nazionale di Geofisica e Vulcanologia.

The Aim of the Project

4SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

In fact the potential risk of wide scale terrorist attacks able to put out of order, for a long period, the internet connections capabilities exposes the some European Critical Infrastructures (ECIs), like electric power distribution and production infrastructure, CPAs, safety and defense organization, water distribution agency, airports, etc. in a stage of vulnerability because of some essential information are transferred by means of internet both for management and control.

Page 5: The SWING Project: status and closure of the project Bruno Zolesi. bruno.zolesi@ingv.it bruno.zolesi@ingv.it Istituto Nazionale di Geofisica e Vulcanologia.

The Aim of the Project

5SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

The aim of SWING was to study a high survival HF radio network (data/voice) to real time support of ECIs communications, maintaining the minimum flux of essential information for the management and control in case of wide scale terrorist attacks able to render internet links useless over the Mediterranean region.

This will increase the awareness of ECIs operator in the extreme case of the complete broadband failure of the communication.

Page 6: The SWING Project: status and closure of the project Bruno Zolesi. bruno.zolesi@ingv.it bruno.zolesi@ingv.it Istituto Nazionale di Geofisica e Vulcanologia.

Objectives

6SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

1. To study internet communications criticality.

2. To analyze the requirements necessary to ECIs and CGAs management and control.

3. To develop a communication protocols in order to define standard software and hardware tools supporting reliable and interoperable Short Wave radio communication techniques for ECIs and CGAs protection.

4. To study the frequency management system taking into account the special characteristics of the ionospheric channel.

5. To design a radio-communication architecture for a distributed South European short wave radio network.

Page 7: The SWING Project: status and closure of the project Bruno Zolesi. bruno.zolesi@ingv.it bruno.zolesi@ingv.it Istituto Nazionale di Geofisica e Vulcanologia.

The Aim of the Project

7SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

Target groupsAgencies and institution devoted to management of Critical Infrastructures that are linked by internet network. Expected resultsThe project is finalized to demonstrate the feasibility of a network high survival HF communication as buck-up and independent system to ensure minimum management and communication requirements, in the case of internet failure due to a terrorist attack.

Page 8: The SWING Project: status and closure of the project Bruno Zolesi. bruno.zolesi@ingv.it bruno.zolesi@ingv.it Istituto Nazionale di Geofisica e Vulcanologia.

Activities and Deliverables

8SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

1. Interface with EU authorities and coordination.2. Technical analysis of the communication problems related to the identification and designation of CIs in the

interested area. 3. Determination of the topology of high survival radio communication network.4. Characterization of the minimal amount of information necessary for the survival of the CIs communication.5. Operative supervision of the network architecture. 6. 6-Analysis of the existing architecture of HF communication based on internet protocol access with reference

to the above considered infrastructures.7. Analysis of existing HF connection system in terms of software and hardware for internet connection.8. Definition of the High survival HF radio network technical requirements.9. Radio network system design.10. Criteria of early warning alert and procedures to activate the back up network. 11. Monthly prediction of the hourly HF set of frequencies over the n radio links given by the network, based on

the available ionospheric model and methods.12. Daily forecasting of the hourly HF set of frequencies based on the Mediterranean ionospheric measurements.13. Ground wave propagation analysis when required.14. Frequency management system for HF communication link optimization. 15. Identification of the professional profile able to maintain and operate network.16. Dissemination of deliverables within communities informing about initiatives organised in the context of the

project.17. Professional training activities trough courses, workshops and conferences.18. Assessment of the potential impact and feasibility of the project for ECIs and CGAs and final

recommendations for the EC. 19. Realization of a demonstrator constituted by 4- terminals HF network.

Page 9: The SWING Project: status and closure of the project Bruno Zolesi. bruno.zolesi@ingv.it bruno.zolesi@ingv.it Istituto Nazionale di Geofisica e Vulcanologia.

SWING System’s generalities and structure of the final report: Cesidio Bianchi.

9SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

Page 10: The SWING Project: status and closure of the project Bruno Zolesi. bruno.zolesi@ingv.it bruno.zolesi@ingv.it Istituto Nazionale di Geofisica e Vulcanologia.

Design and realization of HF station prototype: James Baskaradas and Anna Lisa Saverino.

10SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

Page 11: The SWING Project: status and closure of the project Bruno Zolesi. bruno.zolesi@ingv.it bruno.zolesi@ingv.it Istituto Nazionale di Geofisica e Vulcanologia.

HF management communication system and link optimization: Bruno Zolesi

11SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

Page 12: The SWING Project: status and closure of the project Bruno Zolesi. bruno.zolesi@ingv.it bruno.zolesi@ingv.it Istituto Nazionale di Geofisica e Vulcanologia.

High Survival HF radio Network: Michele Morelli.

12SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

Page 13: The SWING Project: status and closure of the project Bruno Zolesi. bruno.zolesi@ingv.it bruno.zolesi@ingv.it Istituto Nazionale di Geofisica e Vulcanologia.

13SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

• Internet Criticalities: Fabrizio Cuccoli.

• Determination of the topology of high survival HF radio communication network:Andrea Abrardo.

• Identification of Critical Infrastructures in the Mediterranean Sea context and communications’ criticalities: Irene Fiorucci.

Page 14: The SWING Project: status and closure of the project Bruno Zolesi. bruno.zolesi@ingv.it bruno.zolesi@ingv.it Istituto Nazionale di Geofisica e Vulcanologia.

Final recommendations and closure of the financial budget: Antonio Meloni

14SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

Applicant organisation 1. Partner 2. Partner 3. Partner 4. Partner 5. Partner 6. Partner 7. Partner 8. Partner 9. Partner 10. Partner 11. Partner 12.Partner 13. Partner 14. Partner

REF Headings IN EURO

Verification of division of

costs between partners-

beneficiary

INGV CNIT NOA EBRE

Fill in the name of the Partner in

worksheet K Partn in cell A

12

Fill in the name of the Partner in

worksheet K Partn in cell A

13

Fill in the name of the Partner in

worksheet K Partn in cell A

14

Fill in the name of the Partner in

worksheet K Partn in cell A

15

Fill in the name of the Partner in

worksheet K Partn in cell A

16

Fill in the name of the Partner in

worksheet K Partn in cell A

17

Fill in the name of the Partner in

worksheet K Partn in cell A

18

Fill in the name of the Partner in

worksheet K Partn in cell

A 19

Fill in the name of the Partner in

worksheet K Partn in cell A

20

Fill in the name of the Partner in

worksheet K Partn in cell A

21

Fill in the name of the Partner in

worksheet K Partn in cell

A 22

1. Eligible direct costs

A Staff Costs496.730,82

Division among partners OK 237.421,72 227.309,10 16.000,00 16.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

BTravel and subsistence allowances for project staff

19.250,67Division among partners OK 9.192,82 1.457,85 4.300,00 4.300,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

C Equipment and Consumables97.811,50

Division among partners OK 55.039,46 42.772,04 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

D Conferences and seminars10.000,00

Division among partners OK 10.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

EPublications and dissemination 20.000,00

Division among partners OK 20.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

FOther possible direct costs (subcontracting up to max 30% of I - Total eligible costs) 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

GTotal eligible direct costs (A+B+C+D+E+F) 643.792,99 331.654,00 271.538,99 20.300,00 20.300,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

2. Eligible indirect costs

HOverheads (max 7% of G - Total eligible direct costs and max 50.000 €) 27.352,83

Division among partners OK 10.000,00 10.000,00 3.678,02 3.674,81 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

ITotal eligible costs for the action (G+H) 671.145,82 341.654,00 281.538,99 23.978,02 23.974,81 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

REF Headings IN EURO

J Project-related income 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

K

Financial contribution from Applicant organisation /coordinator and project partners 202.839,38

Division among partners OK 106.339,38 96.500,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

LFinancial contribution from other organisations 0,00 0,00 0 0 0 0 0 0 0 0 0 0 0 0 0 0

M Grant requested from the EU €468.306,44

Division among partners OK 238.387,04 196.457,91 16.731,86 16.729,62 0,0000 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

NTotal expected income (J+K+L+M) 671.145,82 344.726,42 292.957,91 16.731,86 16.729,62 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

% Share of grant →

50,90% 41,95% 3,57% 3,57% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00%

671.145,82

Name of Authorised signatory:

468.306,44 Position:

69,78%

OK: overheads below 50.000€

EXPENDITURE (€)

INGV

SWING

4,2487%

PART B - PROJECT BUDGET ESTIMATE FORM - CIPS 2010 Action Grants

NOTE: Before the award decision, the Commission reserves the right to reduce and/or remove any costs if deemed unreasonable, unjustified and contrary to sound financial management

OK: the % of the requested amount of grant is within the eligible limit

Signature:

The information in this Budget Estimate Form and in the Timetable is complete, true and verifiable.

REVENUE (€)

OK: the Budget is in balance

Date :

Prof domenico Giardini

President

Total budget estimate (eligible costs) €

SUMMARY OF THE BUDGET

Grant requested from the EU €

Grant requested from the EU / Total eligible costs %

Page 15: The SWING Project: status and closure of the project Bruno Zolesi. bruno.zolesi@ingv.it bruno.zolesi@ingv.it Istituto Nazionale di Geofisica e Vulcanologia.

Partner members

15SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

Enzo Dalle Mese Fabrizio Berizzi Alessandro Andreadis Andrea AbrardoAnnalisa Saverino Davide Adami Fabrizio CuccoliFrancesco Sermi Giovanni Dore Luca Sanguinetti Marco MorettiMichele MorelliAmerigo CapriaMarco Martorella Giovanna ZanelloSimeon Kamdem Kuiteing

Consiglio Nazionale universitario per le Telecomunicazioni

Page 16: The SWING Project: status and closure of the project Bruno Zolesi. bruno.zolesi@ingv.it bruno.zolesi@ingv.it Istituto Nazionale di Geofisica e Vulcanologia.

Partner members

16SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

Anna BelehakiIoanna Tsagouri

David AltadillEstefania Blanch

Observatori de l’Ebre

National Observatory of Athens

Page 17: The SWING Project: status and closure of the project Bruno Zolesi. bruno.zolesi@ingv.it bruno.zolesi@ingv.it Istituto Nazionale di Geofisica e Vulcanologia.

Partner members

17SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

Cesidio Bianchi James Arokiasamy BaskaradasAntonio MeloniIrene FiorucciValentina Orlandi Alessandro SettimiAdriano AzzaroneBruno Zolesi

Istituto Nazionale di Geofisica e Vulcanologia

Page 18: The SWING Project: status and closure of the project Bruno Zolesi. bruno.zolesi@ingv.it bruno.zolesi@ingv.it Istituto Nazionale di Geofisica e Vulcanologia.

Website

18SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

Home page screenshot of the SWING website at http://swing.rm.ingv.it

Page 19: The SWING Project: status and closure of the project Bruno Zolesi. bruno.zolesi@ingv.it bruno.zolesi@ingv.it Istituto Nazionale di Geofisica e Vulcanologia.

Conclusion

19SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

Thanks for your attention!