The SPEAR3 Upgrade Project at SLAC

26
The SPEAR3 Upgrade Project at SLAC Catherine Le Cocq, Brian Fuss, Michael Gaydosh Alignment Engineering Group SLAC

description

The SPEAR3 Upgrade Project at SLAC. Catherine Le Cocq, Brian Fuss, Michael Gaydosh Alignment Engineering Group SLAC. SPEAR History. 1972: Commissioning as a 2.4 GeV colliding beam facility. 1974: Upgrade to 4 GeV. - PowerPoint PPT Presentation

Transcript of The SPEAR3 Upgrade Project at SLAC

Page 1: The SPEAR3 Upgrade Project at SLAC

The SPEAR3 Upgrade Project at SLAC

Catherine Le Cocq, Brian Fuss, Michael GaydoshAlignment Engineering Group

SLAC

Page 2: The SPEAR3 Upgrade Project at SLAC

10/03/2004 IWAA2004 2

SPEAR History

• 1972: Commissioning as a 2.4 GeV colliding beam facility.• 1974: Upgrade to 4 GeV.• 1991: Completion of a dedicated electron injector.SPEAR2

operates routinely at 2.3 GeV as a synchrotron radiation source. • IWAA97: “Re-Visiting SPEAR After 25 Years” poster by M.

Pietryka and all.• 1997: Initial upgrade proposal.• 1999: Start of SPEAR3 upgrade project.• 2004: 3 GeV 100 mA operations.

SLAC-SSRL-SPEAR 3 dedication event of January 29, 2004:“The project was completed three months ahead of schedule, and within its $58M budget.”

Page 3: The SPEAR3 Upgrade Project at SLAC

10/03/2004 IWAA2004 3

Page 4: The SPEAR3 Upgrade Project at SLAC

10/03/2004 IWAA2004 4

SPEAR3 Goals

• 3 GeV injection energy (increase from current 2.3 GeV).

• 18 nm-radian beam emittance (reduction from 160 nm-radian).

• 100 mA stored beam initially (same as SPEAR 2) with future increases towards 500 mA.

Page 5: The SPEAR3 Upgrade Project at SLAC

10/03/2004 IWAA2004 5

SPEAR3 Lattice

• 18 magnet girders:– 14 standard cells– 4 matching cells

• 18 straight sections:– 12 are 3.1 m– 4 are 4.7 m– 2 are 7.6 m

• 234.126 m storage-ring circumference

Page 6: The SPEAR3 Upgrade Project at SLAC

10/03/2004 IWAA2004 6

Standard Cell Part 1

Page 7: The SPEAR3 Upgrade Project at SLAC

10/03/2004 IWAA2004 7

Standard Cell Part 2

Page 8: The SPEAR3 Upgrade Project at SLAC

10/03/2004 IWAA2004 8

Standard Cell Part 3

Page 9: The SPEAR3 Upgrade Project at SLAC

10/03/2004 IWAA2004 9

SPEAR3 Magnets Summary

• 36 gradient dipoles:– 28 full-length and 8 3/4 lenghth

• 94 quadrupoles:– 4 different lengths: 0.60, 0.50, 0.35 and 0.2 m

• 72 sextupoles– 2 different lengths: 0.25 and 0.21 m

• 72 dipole correctors• 2 injection dipoles• 2 injection quadrupoles• 1 septum magnet

Page 10: The SPEAR3 Upgrade Project at SLAC

10/03/2004 IWAA2004 10

SPEAR3 Beamlines

α in radian x in mm z in mm

BL 1 -0.160000 -105.686 3951.16

BL 2 -0.162375 -108.738 3969.94

BL 3 -0.162375 -108.738 3969.94

BL 8 -0.158910 -104.298 3942.52

The 7 Insertion Devices beamlines stayed in the same position. The 4 bend magnets beamlines had to be moved. Here are their SPEAR3 characteristics with respect to the center of the upstream straight.

Page 11: The SPEAR3 Upgrade Project at SLAC

10/03/2004 IWAA2004 11

SPEAR3 Timeline

» Network 0

• April SPEAR2 removal• May to mid June Floor construction• June 13 to 19 New monuments

» Network 1

• June 26 – July 3 Mark templates» Network 2

• July 18 – August 1 Support plates• August to November Installation

» Network 3

• November 17 to 23 Final alignment• December Commissioning

» 2004 Network

Page 12: The SPEAR3 Upgrade Project at SLAC

10/03/2004 IWAA2004 12

Network 0 Description

Number of Points 330

Number of Stations 173

Number of Triplets 1356

Number of Height Differences

400

Page 13: The SPEAR3 Upgrade Project at SLAC

10/03/2004 IWAA2004 13

Network 0 Composition

• Booster TC2002 Survey: 9/2001

• BTS TC2002 Survey: 3/2002

• Building 130 Tracker Survey: 7/2002

• SSRL Tracker Survey: 9/2002

• SPEAR Ring Tracker Survey: 11/2002

• SSRL BL0 TC2002 Survey : 2/2003

Page 14: The SPEAR3 Upgrade Project at SLAC

10/03/2004 IWAA2004 14

From SPEAR2 To SPEAR3

Z

X

Z

X

SPEAR3

Z offset = 6000 m X offset = 3000 m Y offset = 500 m H O = 75.791 m

38 floor SMxxFx

SPEAR2

Z offset = 90000 m X offset = 70000 m Y offset = 2000 m H O = 0.0 m

22 floor SPxxx3D

Page 15: The SPEAR3 Upgrade Project at SLAC

10/03/2004 IWAA2004 15

Network 1

• Purpose: Give values to the new SPEAR3 monuments.• Description:

– 166 points: • 121 ring monuments including 34 new floor and 4 old floor• 45 SSRL and BTS monuments

– 46 laser tracker stations– 611 triplet observations:

• Distances: 30 µm• Horizontal angles: 50 µm / D• Vertical angles: 50 µm / D

– 144 height differences: 50 µm

• Comment:– sigma a posteriori: 0.628621 (distance: 0.859524, horizontal angle:

0.450801, vertical angle: 0.563869, height difference: 0.782653)– Weighted datum

Page 16: The SPEAR3 Upgrade Project at SLAC

10/03/2004 IWAA2004 16

Network 2

• Purpose: Check the new floor stability before the alignment of the support plates.

• Description: – 152 points:

• 121 ring monuments• 31 SSRL and BTS monuments

– 47 laser tracker stations– 676 triplet observations:

• Distances: 30 µm• Horizontal angles: 40 µm / D• Vertical angles: 50 µm / D

– 123 height differences: 50 µm

• Comment:– sigma a posteriori: 0.825995 (distance: 0.832926, horizontal angle:

0.900147, vertical angle: 0.671085, height difference: 0.967139)– Free datum

Page 17: The SPEAR3 Upgrade Project at SLAC

10/03/2004 IWAA2004 17

Network 3

• Purpose: Assign new values to the SPEAR3 monuments before fine tuning all necessary magnets and vacuum chambers.

• Description:– 368 points:

• 122 ring monuments: 38 floor, 33 aisle, 50 wall and 1 ceiling• 45 SSRL monuments• 201 magnet TB

– 40 laser tracker stations– 636 triplet observations:

• Distances: 40 µm• Horizontal angles: 40 µm / D• Vertical angles: 50 µm / D

– 303 height differences: 60 µm

• Comment:– sigma a posteriori: 1.046304 (distance: 0.891794, horizontal angle:

0.802313, vertical angle: 1.206194, height difference: 1.245124)– Mixed datum with further 3-parameter transformation

Page 18: The SPEAR3 Upgrade Project at SLAC

10/03/2004 IWAA2004 18

Datum Controlling Points

HRLN025

HRLS010

HRLS090

HRLS100 HRLS105

HBL8N10

SM14F5 SM05F5

Page 19: The SPEAR3 Upgrade Project at SLAC

10/03/2004 IWAA2004 19

First Conclusion

• December 11, 2003: first complete turn of an injected electron bunch around the ring.

• By December 15, 2003: the RF system was operational and SPEAR 3 started accumulating beam up to 2 mA.

• January 22, 2004: the stored current reached 100 mA (maximum current allowed for operation this year).

• March 8, 2004: BL 9 was opened with first users March 15. • By end of March 2004: BL 10, BL 11, BL 6 and BL 5 were

opened and ready for users.

Extract from the SPEAR 3 Upgrade Project Close-out Report from April 2004:“Measurements of beam line parameters indicated that the SPEAR 3 optical performance goals were achieved.”

Page 20: The SPEAR3 Upgrade Project at SLAC

10/03/2004 IWAA2004 20

2004 Network

• Purpose: Map the whole ring as part as the 2004 Summer/Fall downtime.

• Description: – 950 points:

• 143 monuments: 37 floor, 32 aisle, 45 wall, 1 ceiling, 11 others and 17 SSRL points used for height only.

• 807 magnet TBs– 44 laser tracker stations– 1809 triplet observations:

• Distances: 40 µm• Horizontal angles: 50 µm / D• Vertical angles: 50 µm / D

– 270 height differences: 50 µm

• Comment:– sigma a posteriori: 0.938286 (distance: 1.287779, horizontal angle:

0.825724, vertical angle: 0.589023, height difference: 0.996919)– Mixed datum, offset between the 2 trackers

Page 21: The SPEAR3 Upgrade Project at SLAC

10/03/2004 IWAA2004 21

Floor Monuments ChangesNovember 2003 – October 2004

Page 22: The SPEAR3 Upgrade Project at SLAC

10/03/2004 IWAA2004 22

Floor Monuments ChangesJuly 2003- November 2003

Page 23: The SPEAR3 Upgrade Project at SLAC

10/03/2004 IWAA2004 23

Network Weak Spot

BL11ID

Page 24: The SPEAR3 Upgrade Project at SLAC

10/03/2004 IWAA2004 24

Magnet X as-built

-0.030

-0.020

-0.010

0.000

0.010

0.020

0.030

0.0 50.0 100.0 150.0 200.0 250.0

Z Distance (meters)

X P

osi

tio

n (

inc

he

s)

Quads Bends Other Re Map

Page 25: The SPEAR3 Upgrade Project at SLAC

10/03/2004 IWAA2004 25

Magnet Y as-built

-0.030

-0.020

-0.010

0.000

0.010

0.020

0.030

0.0 50.0 100.0 150.0 200.0 250.0

Z distance (meters)

Y P

osi

tio

n (

inc

he

s)

Quads Bends Other Re Map

Page 26: The SPEAR3 Upgrade Project at SLAC

10/03/2004 IWAA2004 26

Final Conclusion

Map Z inch X inch Y inch

mean 0.001 -0.004 0.001

std 0.013 0.011 0.005

Re-Map Z inch X inch Y inch

mean 0.001 0.001 0.001

std 0.012 0.007 0.005

Quad & Bend Z inch X inch Y inch

mean 0.000 0.000 0.000

std 0.013 0.006 0.005

Next beam to beamlines will be Monday, October 18, at 6:00AM