The role of the West African Power Pool in driving grid ......The role of the West African Power...
Transcript of The role of the West African Power Pool in driving grid ......The role of the West African Power...
The role of the West African
Power Pool in driving grid
development
AMOUSSOUGA ERIC
CEO Francophone Africa, GENERAL ELECTRIC,
Côte d’Ivoire
© 2019, General Electric Company.
GE Proprietary Information - The information contained in this document is General Electric Company (GE) proprietary information. It is
the property of GE and shall not be used, disclosed to others or reproduced without the express written consent of GE, including, but
without limitation, in the creation, manufacture, development, or derivation of any repairs, modifications, spare parts, or configuration
changes or to obtain government or regulatory approval to do so, if consent is given for reproduction in whole or in part, this notice
and the notice set forth on each page of this document shall appear in any such reproduction in whole or in part. The information
contained in this document may also be controlled by the US export control laws. Unauthorized export or re-export is prohibited. This
presentation and the information herein are provided for information purposes only and are subject to change without notice. NO
REPRESENTATION OR WARRANTY IS MADE OR IMPLIED AS TO ITS COMPLETENESS, ACCURACY, OR FITNESS FOR ANY PARTICULAR
PURPOSE.
23 May 2019
All relative statements are with respect to GE technology unless otherwise noted. © 2018 General Electric Company. Confidential information. All rights reserved.
23 May 2019
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 23/05/2019 – P 3
WEST AFRICA
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 23/05/2019 – P 4
ENERGY FIGURES IN WEST AFRICA
>10GW
30%(Electrification)
Prix moyens
/KWh
30%
>65%
>350M
GDP 2,5% 2,6%/year
0,14$
/Kwh(average)
(2017)
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 23/05/2019 – P 5
AVAILABLE GENERATION
VS INSTALLED (2017)
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 23/05/2019 – P 6
AVAILABLE GENERATION
VS MAX LOAD (2017)
LOAD
MW
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 23/05/2019 – P 7
ENERGY IMPORT / EXPORT
ECOWAS (2017)
Nigeria
Export
Import
GhanaCote
d’ivoireBenin
Togo
COUNTRY APPROACH WEAKNESS
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 23/05/2019 – P 10
Regional electricity
market
development
(optimization of the
resources)
Energy
infrastructure
development (Hydro/
Thermal/Renewable/int
erconnections)
WAPP
Abundance of
Energetic Resources
Insufficient generation
capacities at countries
level
Unequal geographical
distribution of
resources
REGIONAL APPROACH ADVANTAGES
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 23/05/2019 – P 11
REGIONAL APPROACH ADVANTAGES
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 23/05/2019 – P 12
INTRODUCTION OF WAPP
1
2
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 23/05/2019 – P 13
INTRODUCTION OF WAPPWAPP was created to coordinate West African multi-national power system operations into a unified regional electricity market.
Requirements:
Cross-border
intercos
Gen & Trans facilities 28 Transmission line
projects
47 generation projects
Synchronized
Systems
Energy
flows
14
CountriesCross-border Collaboration
ICC: Information & Coordination Centre
Calavi, Benin – 30 Meuros EU donation
Within the next 2 years, CLSG line
& the OMVG loop will lead to the full
interconnection of the 14 countries
CLSG
OMVG
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 23/05/2019 – P 14
INTRODUCTION OF WAPP
>
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 23/05/2019 – P 15
WAPP INTERCOS 2007-2017
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 23/05/2019 – P 16
WAPP INTERCOS 2018-2020
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 23/05/2019 – P 17
WAPP INTERCOS BEYOND 2020
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 23/05/2019 – P 18
WAPP INTERCOS VISION
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 23/05/2019 – P 19
WAPP ENERGY TRADE 2016
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 23/05/2019 – P 20
WAPP FUTURE ENERGY TRADE
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 23/05/2019 – P 21
INTRODUCTION OF WAPP MARKET
The WAPP market – 3 stages
3 stages to allow the countries adapt to the new environment
BILATERAL MARKET Short, medium- or long-term agreementsBetween TSOsTransmission price agreed for old contracts & regulated for new
PHASE 1
DAY-AHEAD MARKET for short-term exchangeBetween individual agentsTransmission pricing regulated by ERERA
PHASE 2
FULL COMPETITIVE MARKET & sub-marketsPHASE 3
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 23/05/2019 – P 22
HOURLYBLOCKS
Technical Standard
REGIONAL SYSTEM & MARKET OPERATION
RegisterParticipants
RegisterContracts
Metering& Settlement
SystemCoordination and advisory role
EmergencyProcedures
SystemReserve
Monitoring
CBI Scheduling & Dispatching
WAPP ICCDatacenter
Billing & Financial Systems
c
Market Reports
SYSTEM OPERATION
Declare TTC’sCalculate cross-border TTC’s (various
criteria)
Security assessment N-1, Volt & Freq control, …
Invoicing
Organize Markets (contracts & S/P bids)
ValidateSchedules
SystemReports
Forecast & L/T planning
MARKET OPERATION
POWERFLOWS
ENSURE SYSTEM SAFETY & RELIABILITYCOMMERCIAL
TRANSACTIONS
System & Market Operator
No control on TSO networks, only a coordination and advisory role.
MO: Day-to-day management of the markets:
Bilateral & Day-ahead markets
Schedules validation
Settlement of the market fees (incl. services, transmission payments, etc.)
SO: Coordination of the operation with 5 control areas (ultimately more than 10 TSO’s)
THE ICC ROLE AND
RESPONSIBILITIES
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 23/05/2019 – P 23
THE ICC PROJECT – CONTENTS
Construction of the ICC building
ICC Equipment with SCADA/EMS/MMS/WAMS/AMR.
Regional telecom links (satellite & FO) in all countriesInstallation of TCM equipment
ICCP for real-time operational data exchange between the ICC and the NCCs of the TSO’s
AMR (Automatic reading) of energy meters Installation of meters for all cross border lines
WAMS with phase monitoring units (PMUs)
ICC
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 23/05/2019 – P 24
THE ICC BUILDING
LAGOS
Cotonou
Site
Location
@ PLAN LIBRE Architectes
Location : Calavi, in Cotonou- Benin
One-floor 5000m2 building,
Plot 37500 m2 plot approximately.o WAPP General Secretariat & departments (Projects, Admin & Fin.)
o Regional System Operation (Control Room and dependencies)
o Regional Market Operation (Market Room)
o Various areas & dependencies: technical, service & security.
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 23/05/2019 – P 25
@ PLAN LIBRE Architectes
LAGOS
Cotonou
Site
Location
THE ICC BUILDINGLocation : Calavi, in Cotonou- Benin
One-floor 5000m2 building,
Plot 37500 m2 plot approximately.o WAPP General Secretariat & departments (Projects, Admin & Fin.)
o Regional System Operation (Control Room and dependencies)
o Regional Market Operation (Market Room)
o Various areas & dependencies: technical, service & security.
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 23/05/2019 – P 26
The ICC Tier III building:
Control room with 7 operators
4 data server rooms
- 2 redundant for SCADA /EMS
- 2 redundant for Market (MMS)
Optimized Electrical and
Mechanical Infrastructure
network
THE ICC CONTROL ROOM
@ PLAN LIBRE Architectes
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 23/05/2019 – P 27
ICC SYSTEM MODELLING
The whole West African transmission and generation system shall be
modelled and daily maintained in the ICC system, for all subsystems.
Essential for both market operation (calculation of the cross-border
transfer capacities for the market)
and system
operation
(coordination
between TSO’s, for
the load forecast &
risk assessment for
the regional
system – N-1 rule,
load transfer,
reserve monitoring,
...)
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 23/05/2019 – P 28
WAPP – OVERVIEW OF THE
REGIONAL POWER SYSTEM
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 23/05/2019 – P 29
REGIONAL APPROACH LEVERAGES
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 23/05/2019 – P 30
THANK YOU