The Risks of Participating in the AMPGS Coal Plant:

February 14, 2008

David Schlissel

Page 2: The Risks of Participating in the AMPGS Coal Plant: February 14, 2008 David Schlissel.

2 www.synapse-energy.com | ©2006 Synapse Energy Economics Inc. All rights reserved.

Most Significant Uncertainties and Risks

• Potential for federal restrictions/regulations of greenhouse gas emissions.

• State actions that can affect need for and economics of proposed coal-fired plants.

• Further increases in the Project’s capital cost.

Page 3: The Risks of Participating in the AMPGS Coal Plant: February 14, 2008 David Schlissel.

3 www.synapse-energy.com | ©2006 Synapse Energy Economics Inc. All rights reserved.

Federal Regulation of Carbon Dioxide Emissions is a Matter of When, Not If

Page 4: The Risks of Participating in the AMPGS Coal Plant: February 14, 2008 David Schlissel.

4 www.synapse-energy.com | ©2006 Synapse Energy Economics Inc. All rights reserved.

Synapse and R.W. Beck CO2 Price Forecasts

0

10

20

30

40

50

60

2010 2015 2020 2025 2030

CO2

Pric

es U

S200

5$/s

hort

ton

Synapse High

Synapse Mid

Synapse Low

R.W. Beck Feb.2007 Power SupplyPlans

Page 5: The Risks of Participating in the AMPGS Coal Plant: February 14, 2008 David Schlissel.

5 www.synapse-energy.com | ©2006 Synapse Energy Economics Inc. All rights reserved.

Synapse and R.W. Beck CO2 Price Forecasts Compared to Other Recent Forecasts

Levelized CO2 Costs (2010-2030)

0

10

20

30

40

50

60

R.W. BeckPowerSupplyPlans

Synapse2006

MIT April2007

2007 XcelMN

ResourcePlan

EIA 2007Analysis of

S. 280

EPA 2007Analysis of

S. 280

EIA 2008Analysis of

S. 1766

New MexicoCommission

2007

MinnesotaPUC 2007

2007$/t

on

Page 6: The Risks of Participating in the AMPGS Coal Plant: February 14, 2008 David Schlissel.

6 www.synapse-energy.com | ©2006 Synapse Energy Economics Inc. All rights reserved.

Annual Cost of Power from AMPGS Project under Synapse and R.W. Beck CO2 Price Forecasts ($/MWh)

$0

$20

$40

$60

$80

$100

$120

$140

$160

$180

$200

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

2031

2032

($/M

Wh)

Synapse Low CO2 Prices Synapse Mid CO2 Prices Synapse High CO2 Prices R.W. Beck CO2 Prices

Page 7: The Risks of Participating in the AMPGS Coal Plant: February 14, 2008 David Schlissel.

7 www.synapse-energy.com | ©2006 Synapse Energy Economics Inc. All rights reserved.

Annual Cost of Power from AMPGS Project under Synapse and R.W. Beck CO2 Price Forecasts

(Millions of Dollars)

$0

$20

$40

$60

$80

$100

$120

2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

Mill

ion

s o

f N

om

ina

l D

oll

ars

R.W. Beck CO2 Price Forecast Synapse Low CO2 Price Forecast

Synapse Mid CO2 Price Forecast Synapse High CO2 Price Forecast

Page 8: The Risks of Participating in the AMPGS Coal Plant: February 14, 2008 David Schlissel.

8 www.synapse-energy.com | ©2006 Synapse Energy Economics Inc. All rights reserved.

Costs of New Power Plants Have Skyrocketed

• It is generally accepted that power plant capital costs have increased dramatically in the past 2-3 years.

• For example, Duke Energy originally estimated that its two unit Cliffside coal project would cost $2 billion. Now Duke estimates that the cost of a single unit will be $2 billion.

• Westar Energy announced in Dec. 2006 that it was deferring site selection for new 600 MW coal plant due to significant increases in estimated costs of 20 to 40 percent in just 18 months. Westar CEO said:

“When equipment and construction cost estimates grow by $200 million to $400 million in 18, it’s necessary to proceed with caution.”

• Cost of now cancelled Taylor Energy Center in Florida increased by 25 percent, $400 million, in just 17 months between Nov. 2005 and March 2007.

Page 9: The Risks of Participating in the AMPGS Coal Plant: February 14, 2008 David Schlissel.

9 www.synapse-energy.com | ©2006 Synapse Energy Economics Inc. All rights reserved.

The Estimated Cost of Building the AMPGS Project Has Increased Dramatically Since 2005

$0.0

$0.5

$1.0

$1.5

$2.0

$2.5

$3.0

$3.5

$4.0

October 05 May 06 June 07 January 08 Future

Bil

lio

ns o

f D

oll

ars

Page 10: The Risks of Participating in the AMPGS Coal Plant: February 14, 2008 David Schlissel.

10 www.synapse-energy.com | ©2006 Synapse Energy Economics Inc. All rights reserved.

Factors Which Have Led to Rising Power Plant Construction Costs

• Cost increases are due, in large part, to significant increase in worldwide demand for power plants. Demand for plants is straining the supply.

• Demand from China and India.• Despite recent cancellations there is a strong U.S.

demand for new power plants and pollution control projects for older plants.

• Limited capacity of EPC (Engineering, Procurement and Construction) firms and manufacturers.

• Fewer bidders for work, higher prices, earlier payment schedules and longer delivery times.

Page 11: The Risks of Participating in the AMPGS Coal Plant: February 14, 2008 David Schlissel.

11 www.synapse-energy.com | ©2006 Synapse Energy Economics Inc. All rights reserved.

Rising Power Plant Cost Escalation

• Significant cost increases for critical power plant commodities, e.g., steel, copper, cement, fabricated alloy piping.

Page 12: The Risks of Participating in the AMPGS Coal Plant: February 14, 2008 David Schlissel.

12 www.synapse-energy.com | ©2006 Synapse Energy Economics Inc. All rights reserved.

Alternatives to AMPGS Project

Combined Heat and Power.

• Energy Efficiency.

• Renewable Resources

• Short-term or Long-Term Capacity and Energy Purchases from Existing Gas-Fired Power Plants