PETE 405Well Dri l l ing
Lesson 3
Th e Rig - Dr i ll ing Equ ipm en t
-
8/12/2019 the Rig - Drilling Equipment
2/39
2
Contents
Rig PumpsSolids Control Equipment
Air DrillingThe Rotary SystemThe Swivel
The Well Control SystemThe Well Monitoring SystemOffshore Drilling
-
8/12/2019 the Rig - Drilling Equipment
3/39
3
A s s ign men t s :
READ: A DE Ch. 1, to p .30
HW #1: A DE 1.1, 1.2, 1.3
NOTE: A ns w ers in bo ok are no talway s c o rrec t ...
-
8/12/2019 the Rig - Drilling Equipment
4/39
4
Schematicof Rig
CirculatingSystem for
liquid
drillingfluid
-
8/12/2019 the Rig - Drilling Equipment
5/39
5
-
8/12/2019 the Rig - Drilling Equipment
6/39
6
Exam p le 1.3
Compute the pump factor in units ofbarrels per stroke for a double-actingduplex pump having:
6.5-inch liners (d L) 2.5 inch rods (d r ) 18-inch strokes (LS ) and a volumetric efficiency of 90%. (E V)
-
8/12/2019 the Rig - Drilling Equipment
7/39
7
Solu t ion :
The pump factor for a duplex pump canbe determined using Equation 1.10
stroke
d d E L F r LV S p
/in991,1
5.25.629.0182
22
3
22
22
-
8/12/2019 the Rig - Drilling Equipment
8/39
8
Recall :
There are 231 in. 3 in a U. S. gallon and42 U.S. gallons in a U.S. barrel. Thusconverting to the desired field unitsyields:
1,991 in. 3/stroke * gal/231 in. 3 * bbl/42 gal.= 0.2052 bbl/stroke.
Thus: Pump Factor = 0.2052 bbl/stroke
-
8/12/2019 the Rig - Drilling Equipment
9/39
9
Pump Factor = 3 * /4 d L2 LS E V / (231 * 42)
-
8/12/2019 the Rig - Drilling Equipment
10/39
10
Example :
Pump Factor for Triplex Pump
3
3
2
VS
2
L
inbbl
422311
strokein0.90126
43
ELd4
3
bbl/stroke0.09442Factor Pump
-
8/12/2019 the Rig - Drilling Equipment
11/39
11
Example : Pump Rate
= Pump Factor * Strokes/min
= 0.09442
= 7.554 bbl/min
= 317.3 gal/min
min
stks
80stk
bbl
Pump Rate = 317 gal/min
-
8/12/2019 the Rig - Drilling Equipment
12/39
12
Pumps of the future
Source: drilling contractor, sept/oct 2002
-
8/12/2019 the Rig - Drilling Equipment
13/39
13
Pumps of the future
BENTECs SOFT PUMP SYSTEM (SPS)
-
8/12/2019 the Rig - Drilling Equipment
14/39
14
Hydrocyclone
desander desilter
* No moving parts* Low cost* Pressure drop* Diameter
-
8/12/2019 the Rig - Drilling Equipment
15/39
15Decanting Centrifuge Use?
-
8/12/2019 the Rig - Drilling Equipment
16/39
16
l
l
Use?
-
8/12/2019 the Rig - Drilling Equipment
17/39
17
Fig. 1.33 Schematic
of RotarySystem
-
8/12/2019 the Rig - Drilling Equipment
18/39
18
Fig. 1.34 Cutaway
View ofSwivel
ROTATING * Seals* Bearings
-
8/12/2019 the Rig - Drilling Equipment
19/39
19
Fig. 1.38
Cutaway View andDimensions forExample Tool Joint
PINBOX
TJShoulder
-
8/12/2019 the Rig - Drilling Equipment
20/39
20
Fig. 1.39 Stabilizer
* Keeps pipe in center of hole
* Aids in drilling straight hole
* Prolongs bit life
-
8/12/2019 the Rig - Drilling Equipment
21/39
21
Fig. 1.41 Kick Detection During
Drilling Operations
1
2
3
KICK
GAIN IN PIT VOLUME EQUALTO KICK VOLUME
-
8/12/2019 the Rig - Drilling Equipment
22/39
22
Fig. 1.46 RemoteControl
Panel for
operatingBlowout
PreventersCHOKE
What to do if KICK occurs?
-
8/12/2019 the Rig - Drilling Equipment
23/39
23Fig. 1.44 Annular Blowout Preventer
DPTJDCOH
Press
-
8/12/2019 the Rig - Drilling Equipment
24/39
24
Ram Blowout Preventer
-
8/12/2019 the Rig - Drilling Equipment
25/39
25Ram Blowout Preventer -contd
SHEAR / BLIND
RAM ASSEMBLY
-
8/12/2019 the Rig - Drilling Equipment
26/39
26Fig. 1.48 Rotating Blowout Preventer
-
8/12/2019 the Rig - Drilling Equipment
27/39
27
Fig. 1.51 High-
PressureCirculating
System forWell
Control
Operations
Keep BHP const.
Kick
-
8/12/2019 the Rig - Drilling Equipment
28/39
28
Fig. 1.56 Subsurface
Well
MonitoringSystem
MWD
-
8/12/2019 the Rig - Drilling Equipment
29/39
29Fig. 1.57 Spread Mooring Systems
OFFSHORE DRILLING
-
8/12/2019 the Rig - Drilling Equipment
30/39
30
Fig. 1.58
Schematic ofEquipmentfor Marine
Drilling
-
8/12/2019 the Rig - Drilling Equipment
31/39
31
Fig. 1.59 Operation of aHeave Compensator
-
8/12/2019 the Rig - Drilling Equipment
32/39
32
Fig. 1.60 Subsea
BOPStack
-
8/12/2019 the Rig - Drilling Equipment
33/39
33
Fig. 1.63 Subsea Equipment
Installation Procedure
-
8/12/2019 the Rig - Drilling Equipment
34/39
34
Ty pic al Casin g Str ing s
Water Level
Depth Seafloor Below ML
Conductor pile 36 30 200
Conductor Casing 26 20 1000
Surface Casing 17 1/2 13 3/8 4000
Hole Csg. Depth
-
8/12/2019 the Rig - Drilling Equipment
35/39
35
Som e Typ ical Cas ing Str ing s
Depth Below ML
Conductor pile 36 30 200
Conductor Casing 26 20 1000
Surface Casing 17 1/2 13 3/8 4000
Hole Csg. Depth
-
8/12/2019 the Rig - Drilling Equipment
36/39
36
Example Hole and String Sizes (in)
Structural casing
Conductor string
Surface pipe
Intermediate String
Production Liner
Hole Size30 20
13 3/8
9 5/8
7
Pipe Size 36 26
17 1/2
12 1/4
8 3/4
-
8/12/2019 the Rig - Drilling Equipment
37/39
37Capacity = Area * Length
-
8/12/2019 the Rig - Drilling Equipment
38/39
38
What is the capacity of 10,000 ft of 5OD, 19.50 lb/ft drillpipe?
Capacity = Area * Length
Area = /4 d 2 = /4 * 4.276 2 = 14.36 in 2
Length = 10,000 ft = 120,000 in
Capacity = 14.36 *120,000 in 3 /(231*42 in 3 /bbl)
Capacity = 177.6 bbls
-
8/12/2019 the Rig - Drilling Equipment
39/39
What is the displacement of 10,000 ftof 5 OD, 19.50 lb/ft drillpipe?
Capacity = Area * Length
Area = /4 (od 2 - id 2 ) = /4 * (5 2 - 4.276 2)
= 5.275 in 2
Length = 10,000 ft = 120,000 in
Displ. = 5.276 * 120,000 in3
/(231 * 42 in3
/bbl)
Displacement = ? bbls