Page 1: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

THE RICHARD G. FALLON THEATRE RENOVATION By: The Florida State University Renovation Team

Page 2: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

AGENDA

• Introduction To The Richard G. Fallon Theatre

• Pre-Project Planning

• Enhancements Chosen To Tackle and Explanation Of Existing Conditions

• The Lobby

• The House Seating Configuration

• The Loading Dock/ Wagon House

• The Electrics Line Sets

• The Back Hallway/Costume Area

• How Each Issue Was Resolved and The Enhancements That Were Implemented

Page 3: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

FALLON THEATRE HISTORY

• Location: On The North Side OF Florida State University Campus (Tallahassee, FL)

• Year Constructed: 1970

• Project Size: 16,000 sqft.

• Current Use: Traditional Proscenium Theatre (Mainly Musicals)

Page 4: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

VICINITY MAP

Page 5: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

AERIAL VIEWS

Google Earth

Page 6: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

EXTERIOR PHOTOS

Southside Of The Building (2)

Westside Of The Building

Page 7: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

EXTERIOR PHOTOS

Northside Of The Building

Eastside Of The Building

Page 8: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

WELCOME TO THE FALLON!( A BRIEF WALKTHROUGH)

Page 9: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

FALLON STAGE GROUND PLAN & SECTION

Fallon Ground Plan Fallon Section

Page 10: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

PRE-PROJECT PLANNING

• Brainstorming Of Ideas Within The Team

• Survey Sent To:

• Patrons

• Students

• Faculty & Staff

• Collected Data From The Above Recipients Of The Survey and Narrowed Down The Desired Changes To The Space.

• Sample Size:

• 8 Patrons

• 4 Graduate Students

• 8 Undergraduate Students

Page 11: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

PRE-PROJECT PLANNING(CONTINUED)

• Survey Questions:

• What Would You Change About The Lobby/Restroom Areas Of The Fallon and Why?

• What Would You Want To Change About The Seating And Patron Experience Of The Fallon and Why?

• What Would You Want To Change About The Stage and Backstage Areas Of The Fallon and Why?

• What Would You Want To Change About The Overall Experience Of The Fallon and Why?

• What Other Changes Would You Like To See Made To The Fallon and Why?

• Any Other Comments?

Page 12: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

ENHANCEMENTS CHOSEN

• The Lobby

• The House

• The Loading Dock/ Wagon House

• The Electrics Line Sets

• The Back Hallway/Costume Area

Page 13: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

THE LOBBY (EXISTING CONDITIONS)

East View Of The Lobby

• Not Much Seating (Only 11 Solid Stone Benches)

• Benches Are Lower Than

Average Seating Height Of 18”-

20”

• Dark and Not Very Welcoming

• Small Ticket Booth (2 Windows)

• No Permanent Location For Concessions/Receptions Drinks and Food

Page 14: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

THE LOBBY (EXISTING CONDITIONS) CONTINUED

Southeast View Of The Benches

North View Of The Ticket Office

Page 15: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

THE HOUSE (EXISTING CONDITIONS)

South View Of The House

• Long Rows (Up To 32 Seats In a Single Row)

• Difficulty For Individual To Get In and Out Of Rows Before, During, and After a Show

• Seats Need To Be Reupholstered Or Replaced

• Additional Accessible Seating Is Needed Throughout The Space To Meet or Exceed ADA Compliance

Page 16: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

THE HOUSE (EXISTING CONDITIONS) CONTINUED

Existing House Seating Ground Plan Of Existing House Seating

Page 17: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

THE HOUSE (EXISTING CONDITIONS) CONTINUED

View Of Torn Seating North View Looking To The Stage

Page 18: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

THE LOADING DOCK/WAGON HOUSE (EXISTING CONDITIONS)

East View Looking Off The Loading Dock

• Very Small

• Steep Grade Leading From Road To Dock

• No Uniform Incline Running Perpendicular To Entry Path

• Limited Length Of Scenery Due To Poor Building Setup

• Limited Storage In Wagon House Due To Multiple Other Users

Page 19: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

THE LOADING DOCK/ WAGON HOUSE (EXISTING CONDITIONS) CONTINUED

West View Looking Into The Theatre

East View Looking At The Wagon House

From The Stage

Page 20: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

THE LOADING DOCK/ WAGON HOUSE (EXISTING CONDITIONS)

CONTINUED

North View Looking Towards Tennessee

Street

South View Looking Away From Tennessee

Street

Page 21: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

THE ELECTRICS LINE SETS (EXISTING CONDITIONS)

View Of Grid From The Stage Floor

• Weight Loading Issues With Unexperienced Students

• Load Weight Limit Of 1075 lbs. Per Batten

• Difficulty With Friction In The Single Purchase System As Weight is Increased

Page 22: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

THE ELECTRICS LINE SETS(EXISTING CONDITIONS)

CONTINUED

Southwest View Of Grid From Grid

West View Of Fly Rail

Page 23: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

THE BACK HALLWAY/COSTUME AREA (EXISTING CONDITIONS)

Northeast View Of The Costume Shop

• Little To No Natural Light (Only 1 Window)

• Narrow Clearance Prevents New and Some Existing Equipment To Be Unable To Move Into The Costume Studio Smallest Doorway Clearance 3’-4”

• Tight Space Within Shop Due To Numerous Tables, Desk, and Shelves To Accommodate Storage Needs

Page 24: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

THE BACK HALLWAY/COSTUME AREA (EXISTING CONDITIONS)

CONTINUED

West View Of Back Hallway

Doors/Walkways With Size Issues (3)

Page 25: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

THE LOBBY (RENOVATIONS)

Ground Plan For The Proposed Lobby

• Color Changes To Make The Lobby More Welcoming and Warm

• Increase From Two Ticket Windows To Three

• From Twenty-Two Uncomfortable Seats To Thirty-Seven Seats In The Lobby

• Added a Bar/Concession Area On The East Wall

• Curved LED Panels Along North Wall To The Right Of The Ticket Booth

Page 26: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

THE LOBBY (RENOVATIONS) CONTINUED

Elevation Renderings East Wall

Page 27: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

THE LOBBY (RENOVATIONS) CONTINUED

Elevation Renderings North Wall

Page 28: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

THE LOBBY (RENOVATIONS) CONTINUED

East View Of The Lobby

Southeast View Of The Benches

Page 29: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

THE LOBBY (RENOVATIONS) CONTINUED

Northwest View Of The Entrances To The House

Northeast View Of The LED Screens

Page 30: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

THE LOBBY (RENOVATIONS) CONTINUED

Northwest View Of The Entrance To The House (With Poster)

Page 31: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

THE HOUSE (RENOVATIONS)

Ground Plan Of The Proposed House Layout

• Division Of The House Into: Left, Center, and Right

• Reduction Of Seats From 487 To 380 + 9 Accessible Seats (Increase of 6 Accessible Seats)

• 33% Increase Of Walkable Space In Conjunction with a maximum 13 Seats Per Row (Down From 32) Giving a Better Flow and Exodus Post Shows and During Emergency Situations

• Extreme Sight Lines Remain The Same Due To No Outer Seat Perimeter Changes

• All Aisles Are 48”

Page 32: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

THE HOUSE (RENOVATIONS) CONTINUED

Proposed House Seating

Enlarged Ground Plan Of Proposed House Seating

Page 33: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

THE LOADING DOCK/WAGON HOUSE (RENOVATIONS)

Isometric View Of The Proposed Dock Area

• Regraded The Paved Road Leading From The Street To The Loading Dock

• Added A Loading Rollup Door Twice The Size Of The Original To Allow Larger Pieces Of Scenery To Be Made and Transported

• Acquired Land On The North Side Of The Building To Allow Semi-trucks To Park and Unload More Directly Into The Theatre and Wagon House

Page 34: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

THE LOADING DOCK/ WAGON HOUSE (RENOVATIONS) CONTINUED

Ground Plan Of Proposed Loading Dock

Page 35: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

THE ELECTRICS LINE SETS (RENOVATIONS)

Ground Plan Of Proposed Line Sets

• Installation Of 4 JR Clancy Power Assists On Line Sets 3, 11, 18, & 22

• 3 & 11 Are Dedicated Electric Line Sets

• 18 & 22 Are Commonly Used As 3rd

and 4th Electric Line Sets

• 2,000 lbs. Capacity (An Increase Of 950 lbs.)

Page 36: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

THE ELECTRICS LINE SETS(RENOVATIONS) CONTINUED

Enlarged Image Of JR Clancy Power Assist Housed Within Existing Line Sets

Page 37: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

THE BACK HALLWAY/COSTUME AREA (RENOVATIONS)

Overall Proposed Ground Plan Of Back Hallway/ Costume Area

• Increase Of Windows For Natural Light From 1 Window To 10 Windows

• Double Doors added To The East Leading To The Dye Room

• Increase of Door Minimum Width From 3’- 4” To 4’- 2” Internal Travel

• Increase of Door Minimum Width To The Outside World From 3’- 4” To 3’-8”

Page 38: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

THE BACK HALLWAY/COSTUME AREA (RENOVATIONS) CONTINUED

Enlarged View Of The Proposed Costume Shop

Page 39: THE RICHARD G. FALLON THEATRE RENOVATION...2019/02/15  · PRE-PROJECT PLANNING •Brainstorming Of Ideas Within The Team •Survey Sent To: •Patrons •Students •Faculty & Staff

QUESTIONS?