The RES Integration Study –Methodology, Overall Results and Recommendations

Financial Advisory Strategy Consulting Market IntelligencePolicy Consulting

RecommendationsBrussels, 7 December 2011

Jan-Benjamin Spitzley, Edoardo Binda Zane, Robert Brückmann

Page 2: The RES Integration Study – Methodology, Overall Results ...

Agenda

• Purpose of the contract & tasks

• Methodology

• Main findings

Structure of presentation

RES-Integration

2

• Main findings

• Barriers & solutions

• NREAP assessment

Page 3: The RES Integration Study – Methodology, Overall Results ...

Task of Study

• “Assessment of current legal, technical and operational framework of grid and electricity

market related issues in each of the EU-27 Member States.“

• “Establishment of a comparative study of the present situation and the future plans,

description of the regulatory framework and identification of best practices and

recommendations regarding grid and market integration of electricity from renewable

sources.“

Purpose of contract & tasks:

RES-Integration

3

sources.“

• “Assessment of Compliance with the requirements of Article 16 of Directive 2009/28/EC on

the promotion of the use of energy from renewable sources.”

• “Evaluation of the consistency, viability and credibility of the foreseen measures related to

the sectoral electricity targets reported under each NREAP.“

• “Formulation of recommendation for each Member State and the EU as a whole.”

Page 4: The RES Integration Study – Methodology, Overall Results ...

Methodology RES-Integration

Methodology steps I

Research

First consultation round

4

Compilation of national reports

Second consultation round

Page 5: The RES Integration Study – Methodology, Overall Results ...

Methodology RES-Integration

Methodology steps II

Harmonisation of barriers

Open final consultations

5

NREAP evaluation

National & European recommendations

Page 6: The RES Integration Study – Methodology, Overall Results ...

Main Findings

Grid connection as very critical

phase for integration

RES-Integration

6

phase for integration

Page 7: The RES Integration Study – Methodology, Overall Results ...

Main Findings

Grid connection as very critical phase for integrat ion

RES-Integration

40 barriers detected

(Operation: 7; Development:16)

Most information available

7

No opposition to current focus of

debate on development

Page 8: The RES Integration Study – Methodology, Overall Results ...

Main Findings

Very strong link between

connection and development

RES-Integration

8

connection and development

phase

Page 9: The RES Integration Study – Methodology, Overall Results ...

Main Findings

Very strong link between connection and development phase

RES-Integration

Two sides of same medal

Reciprocity of barriers

9

Especially relevant for

costs as well as for waiting time

Page 10: The RES Integration Study – Methodology, Overall Results ...

Main Findings

Grid operation presently no

serious issue

RES-Integration

10

serious issue

Page 11: The RES Integration Study – Methodology, Overall Results ...

Main Findings

Grid operation presently no serious issue

RES-Integration

Low share of volatile RES-E in

many MS

Situation may change

dramatically in the future

11

Early steps required to

minimise future impact

Page 12: The RES Integration Study – Methodology, Overall Results ...

Main Findings

Grid development suffers quite

strong lack of regulatory

RES-Integration

12

strong lack of regulatory

instruments

Page 13: The RES Integration Study – Methodology, Overall Results ...

Main Findings

Grid development suffers quite strong lack of regul atory instruments

RES-Integration

High costs for grid operators for RES

integration

Current regulatory instruments only

partially cover costs

13

Problem especially at DSO level in regions with low

population and high RES-E potential

Unbundling has impaired financial situation of some

grid operators

Page 14: The RES Integration Study – Methodology, Overall Results ...

Main Findings

NREAPs mainly do not

address the barriers identified

RES-Integration

14

address the barriers identified

in this study

Page 15: The RES Integration Study – Methodology, Overall Results ...

Main Findings

NREAPs mainly do not address the barriers identifie d in this study

RES-Integration

MS were not aware of issues

MS had no interest in sharing information with

Commission

15

Issue did not fit in categories of

NREAP template

Page 16: The RES Integration Study – Methodology, Overall Results ...

Grid Connection – Barrier Analysis

• Impossibility of

connection due to

insufficient

infrastructure

• Higher growth rate of

RES-E than

Lack of grid capacity / different pace of grid and RES-E development

RES-Integration

16

RES-E than

development rate of

infrastructure

• Consequence:

deployment and RES-

E integration slowed

down

Page 17: The RES Integration Study – Methodology, Overall Results ...

Steps at European level – General guidelines

Different pace of grid & RES-E development leading to lack of grid capacity

RES-Integration

Enhance coordination between RES-E & grid infrastructure development

17

Page 18: The RES Integration Study – Methodology, Overall Results ...

Steps at European level – Enhance Coordination RES-Integration

Data

• Clear data basis of existing and planned RES-E

Planning

• Master plans including overall electricity

Cooperation

• Dedicated regional platforms (All Island project –

Concrete Steps:

18

planned RES-E plants

• Ambitious long term targets (2020-2050)

electricity sector (Planning process in Estonia, TYNDP)

Island project –Ireland)

• Development in neighbouring countries process (Austria)

Page 19: The RES Integration Study – Methodology, Overall Results ...

Steps at European level – Enhance Coordination

Action at European level:

RES-Integration

Data

• Clear data basis of existing and planned RES-E plants

Planning

• Master plans including overall electricity sector

Cooperation

• Dedicated regional platforms (All Island project –Ireland)

Methodology

19

plants• Ambitious long

term targets (2020-2050)

sector (Planning process in Estonia, TYNDP)

Ireland)• Development

in neighbouring countries process (Austria)

Page 20: The RES Integration Study – Methodology, Overall Results ...

Steps at European level – Enhance Coordination

Action at European level:

RES-Integration

Data

• Clear data basis of existing and planned RES-E plants

Planning

• Master plans including overall electricity sector

Cooperation

• Dedicated regional platforms (All Island project –Ireland)

TYNDP

20

plants• Ambitious long

term targets (2020-2050)

sector (Planning process in Estonia, TYNDP)

Ireland)• Development

in neighbouring countries process (Austria)

Page 21: The RES Integration Study – Methodology, Overall Results ...

Steps at European level – Enhance Coordination

Action at European level:

RES-Integration

Data

• Clear data basis of existing and planned RES-E plants

Planning

• Master plans including overall electricity sector

Cooperation

• Dedicated regional platforms (All Island project –Ireland)

EU Projects

21

plants• Ambitious long

term targets (2020-2050)

sector (Planning process in Estonia, TYNDP)

Ireland)• Development

in neighbouring countries process (Austria)

Page 22: The RES Integration Study – Methodology, Overall Results ...

Grid Connection – Barrier Analysis

• Connection not

possible, because

whole capacity is

reserved by plants

that are not yet

connected

Virtual saturation and speculation

RES-Integration

22

connected

• Speculation main

reason

Page 23: The RES Integration Study – Methodology, Overall Results ...

Steps at European level – General guidelines

Speculative behaviour and virtual saturation

RES-Integration

Adopt national legal framework to more and differen t stakeholders

23

Page 24: The RES Integration Study – Methodology, Overall Results ...

Steps at European level – Adopt national laws

Concrete Steps:

RES-Integration

Milestones

• Intermediate steps and milestones

• Achievement of

Reservation fee

• Fee for project developers upon reserving capacity

Open issue

• What solution for countries where virtual saturation is

24

• Achievement of milestones conditional for grid reservation (France, Estonia, Germany...)

capacity (Bulgaria and Poland)

saturation is already existing?

Page 25: The RES Integration Study – Methodology, Overall Results ...

Steps at European level – Adopt national laws

Action at European level:

RES-Integration

Milestones

• Intermediate steps and milestones

• Achievement of

Reservation fee

• Fee for project developers upon reserving capacity (Bulgaria and

Open issue

• What solution for countries where virtual saturation is already

Attention to existence of barrier

25

• Achievement of milestones conditional for grid reservation (France, Estonia, Germany...)

capacity (Bulgaria and Poland)

saturation is already existing?

Page 26: The RES Integration Study – Methodology, Overall Results ...

Steps at European level – Adopt national laws

Action at European level:

RES-Integration

Milestones

• Intermediate steps and milestones

• Achievement of

Reservation fee

• Fee for project developers upon reserving capacity (Bulgaria and

Open issue

• What solution for countries where virtual saturation is already

Final choice not necessary

26

• Achievement of milestones conditional for grid reservation (France, Estonia, Germany...)

capacity (Bulgaria and Poland)

saturation is already existing?

Page 27: The RES Integration Study – Methodology, Overall Results ...

Steps at European level – Adopt national laws

Action at European level:

RES-Integration

Milestones

• Intermediate steps and milestones

• Achievement of

Reservation fee

• Fee for project developers upon reserving capacity (Bulgaria and

Open issue

• What solution for countries where virtual saturation is already

Initialise discussion process

27

• Achievement of milestones conditional for grid reservation (France, Estonia, Germany...)

capacity (Bulgaria and Poland)

saturation is already existing?

Page 28: The RES Integration Study – Methodology, Overall Results ...

Grid Connection – Barrier Analysis

• Communication

problems and other

general conflicts

between grid

operators and plant

operators

Lack of communication & conflicts & weak position of plant operators

RES-Integration

28

operators

• Weak position of plant

operators

• Lack of trust in

judicial procedures

Page 29: The RES Integration Study – Methodology, Overall Results ...

Steps at European level – General guidelines

Lack of communication, conflicts and weak position of plant operators

RES-Integration

Improve communication between stakeholders

29

Page 30: The RES Integration Study – Methodology, Overall Results ...

Steps at European level – Improve Communication

Concrete Steps:

RES-Integration

Process

• Opportunities for communication at early stage of process

Platform

• Communication platforms (Electricity Networks Strategy

Direct link

• Permanent representation of stakeholder groups for continuous

30

process• Central bodies

providing out-of-court decisions (EEG Clearingstelle –Germany)

Strategy Groups – Great Britain, Plan N –Germany)

continuous contact

Page 31: The RES Integration Study – Methodology, Overall Results ...

Steps at European level – Improve Communication

Action at European level:

RES-Integration

Process

• Opportunities for communication at early stage of process

Platform

• Communication platforms (Electricity Networks Strategy

Direct link

• Permanent representation of stakeholder groups for continuous

Legal definitions

31

process• Central bodies

providing out-of-court decisions (EEG Clearingstelle –Germany)

Strategy Groups – Great Britain, Plan N –Germany)

continuous contact

Page 32: The RES Integration Study – Methodology, Overall Results ...

Steps at European level – Improve Communication

Action at European level:

RES-Integration

Process

• Opportunities for communication at early stage of process

Platform

• Communication platforms (Electricity Networks Strategy

Direct link

• Permanent representation of stakeholder groups for continuous

Support initiatives

32

process• Central bodies

providing out-of-court decisions (EEG Clearingstelle –Germany)

Strategy Groups – Great Britain, Plan N –Germany)

continuous contact

Page 33: The RES Integration Study – Methodology, Overall Results ...

Steps at European level – Improve Communication

Action at European level:

RES-Integration

Process

• Opportunities for communication at early stage of process

Platform

• Communication platforms (Electricity Networks Strategy

Direct link

• Permanent representation of stakeholder groups for continuous

Encourage actions

33

process• Central bodies

providing out-of-court decisions (EEG Clearingstelle –Germany)

Strategy Groups – Great Britain, Plan N –Germany)

continuous contact

Page 34: The RES Integration Study – Methodology, Overall Results ...

Grid development – Barrier Analysis

• Mismatch between

incentive regulation

that aims at cost

reduction and network

extension needed for

RES-E development

Lack of incentives & regulatory instruments for the grid operator to integrate RES-E

RES-Integration

34

RES-E development

that leads to higher

costs

• Particular problem at

DSO level in case of

DSOs in large and

uninhabitated areas

Page 35: The RES Integration Study – Methodology, Overall Results ...

Steps at European level – General guidelines

Lack of incentives or regulatory instruments for gr id development

RES-Integration

Increase investment security for grid development

35

Page 36: The RES Integration Study – Methodology, Overall Results ...

Steps at European level – Increase investment securi ty

Concrete Steps:

RES-Integration

RES-E integration considered by

regulation

• Provide priority premiums for projects supporting

Financing

• Financial assistance for investments in large projects of

Modalities

• Decrease minimum limits of eligible costs for

36

supporting integration of RES-E

• Improve deadlines through carrot-for-less-and-stick-for-more-solution

large projects of grid operators, where required

for reimbursement

• Allow for reimbursement of staff costs and IT investments

Page 37: The RES Integration Study – Methodology, Overall Results ...

Steps at European level – Increase investment securi ty

Actions at European level:

RES-Integration

RES-E integration considered by

regulation

• Provide priority premiums for projects supporting

Financing

• Financial assistance for investments in large projects of

Modalities

• Decrease minimum limits of eligible costs for

European projects

37

supporting integration of RES-E

• Improve deadlines through carrot-for-less-and-stick-for-more-solution

large projects of grid operators, where required

for reimbursement

• Allow for reimbursement of staff costs and IT investments

Page 38: The RES Integration Study – Methodology, Overall Results ...

Steps at European level – Increase investment securi ty

Actions at European level:

RES-Integration

RES-E integration considered by

regulation

• Provide priority premiums for projects supporting

Financing

• Financial assistance for investments in large projects of

Modalities

• Decrease minimum limits of eligible costs for

Encourage or harmonise

38

supporting integration of RES-E

• Improve deadlines through carrot-for-less-and-stick-for-more-solution

large projects of grid operators, where required

for reimbursement

• Allow for reimbursement of staff costs and IT investments

Page 39: The RES Integration Study – Methodology, Overall Results ...

Steps at European level – Increase investment securi ty

Actions at European level:

RES-Integration

RES-E integration considered by

regulation

• Provide priority premiums for projects supporting

Financing

• Financial assistance for investments in large projects of

Modalities

• Decrease minimum limits of eligible costs for

Encourage or harmonise

39

supporting integration of RES-E

• Improve deadlines through carrot-for-less-and-stick-for-more-solution

large projects of grid operators, where required

for reimbursement

• Allow for reimbursement of staff costs and IT investments

Page 40: The RES Integration Study – Methodology, Overall Results ...

Grid Connection – Barrier Analysis

• Time the plant

operator needs to wait

before connection to

the grid and feeding of

electricity in the grid

• Strongest category

Long lead times / inefficient procedures – development phase

RES-Integration

40

• Strongest category

assessed throughout

the EU 27 Member

States

Page 41: The RES Integration Study – Methodology, Overall Results ...

Steps at European level – General guidelines

Long lead times and complex procedures

RES-Integration

Increase efficiency of grid development process

41

Page 42: The RES Integration Study – Methodology, Overall Results ...

Steps at European level – Increase efficiency

Concrete Steps:

RES-Integration

Analysis

• Identification of existing inefficiencies

Organisation

• Shift of workload to private actors

Processes

• Fast-track procedure for specific

42

inefficiencies private actors• Harmonisation

and simplification of requirements

specific projects

• One-stop-shop procedure

Page 43: The RES Integration Study – Methodology, Overall Results ...

Steps at European level – Increase efficiency RES-Integration

Analysis

• Identification of existing inefficiencies

Organisation

• Shift of workload to private actors

Processes

• Fast-trackprocedure for specific

European projects

Action at European level:

43

inefficiencies private actors• Harmonisation

and simplification of requirements

specific projects

• One-stop-shop procedure

Page 44: The RES Integration Study – Methodology, Overall Results ...

Steps at European level – Increase efficiency RES-Integration

Analysis

• Identification of existing inefficiencies

Organisation

• Shift of workload to private actors

Processes

• Fast-trackprocedure for specific

Encourage or harmonise

Action at European level:

44

inefficiencies private actors• Harmonisation

and simplification of requirements

specific projects

• One-stop-shop procedure

Page 45: The RES Integration Study – Methodology, Overall Results ...

Steps at European level – Increase efficiency RES-Integration

Analysis

• Identification of existing inefficiencies

Organisation

• Shift of workload to private actors

Processes

• Fast-trackprocedure for specific

Action at European level:

Encourage or harmonise

45

inefficiencies private actors• Harmonisation

and simplification of requirements

specific projects

• One-stop-shop procedure

Page 46: The RES Integration Study – Methodology, Overall Results ...

NREAP assessment

Considerations on NREAP assessment

RES-Integration

MS were not aware of barriers

• Enhance information flow in MS• monitoring

MS had no interest in sharing

barrier

• Convince MS that it is them who mainly benefit from the

Categories of NREAP template

not suitable

• Widen the scope of the NREAP template and supplement it by

46

• monitoring mechanism

• collection of interviews

• „suggestion box“

benefit from the NREAP process

• Provide the Commission with sufficient information to base its findings on own sources

supplement it by open questions

Page 47: The RES Integration Study – Methodology, Overall Results ...

Conclusion

• Grid connection as very critical phase for integrat ion

• Very strong link between connection and development phase

Summary of main findings

RES-Integration

47

• Grid operation presently no serious issue, but pote ntially in the future

• Grid development suffers quite strong lack of regul atory instruments

• NREAPs mainly do not address the barriers identifie d in this study