The Renewables Case Gerhard Christiner, · NTC-5000-4000-3000-2000-1000 0 1000 2000 3000 4000 5000...

9
The Renewables Case Gerhard Christiner, Chief Technical Officer at APG

Transcript of The Renewables Case Gerhard Christiner, · NTC-5000-4000-3000-2000-1000 0 1000 2000 3000 4000 5000...

Page 1: The Renewables Case Gerhard Christiner, · NTC-5000-4000-3000-2000-1000 0 1000 2000 3000 4000 5000 CZ-5000-4000-3000-2000-1000 0 1000 2000 3000 4000 5000 HU-5000-4000-3000-2000-1000

The Renewables Case Gerhard Christiner,Chief Technical Officer at APG

Page 2: The Renewables Case Gerhard Christiner, · NTC-5000-4000-3000-2000-1000 0 1000 2000 3000 4000 5000 CZ-5000-4000-3000-2000-1000 0 1000 2000 3000 4000 5000 HU-5000-4000-3000-2000-1000

AUSTRIAN POWER GRID AG

RegionalSecurityCoordination:TheRenewablesCase

1

DI Mag.(FH) Gerhard ChristinerChief Technical Officer, Austrian Power Grid AG (APG)Chairman, TSC Shareholders‘ Meeting & TSC Cooperation Board

ElSeC 2017 – Conference on Electricity Security Coordination, 17th Oktober 2017

Page 3: The Renewables Case Gerhard Christiner, · NTC-5000-4000-3000-2000-1000 0 1000 2000 3000 4000 5000 CZ-5000-4000-3000-2000-1000 0 1000 2000 3000 4000 5000 HU-5000-4000-3000-2000-1000

AUSTRIAN POWER GRID AG

Thechallenge…and where the renewables come-in!

2

DE

AT

IT

>41GW

~50GW

~2,8GW

~20GW

~10GW

Turbine:~8,3GWPump:~4,1GW

~1,1GW

• RapidlygrowingRESinAustriaandaroundinCentralEurope(2017)

• Austriabyend2020~2GWsolar,~4GWwind

• RESinAustriatodayalready~ 70%

Page 4: The Renewables Case Gerhard Christiner, · NTC-5000-4000-3000-2000-1000 0 1000 2000 3000 4000 5000 CZ-5000-4000-3000-2000-1000 0 1000 2000 3000 4000 5000 HU-5000-4000-3000-2000-1000

AUSTRIAN POWER GRID AG 319.10.17

Evena„pump-storage-rich“TSOcannot managethis alone!

3

APGconsumption

Windgeneration (normalized)

Solargeneration normalized

Unit[MW]

Unit[GW]

Unit[GW]

Page 5: The Renewables Case Gerhard Christiner, · NTC-5000-4000-3000-2000-1000 0 1000 2000 3000 4000 5000 CZ-5000-4000-3000-2000-1000 0 1000 2000 3000 4000 5000 HU-5000-4000-3000-2000-1000

AUSTRIAN POWER GRID AG

P[MW]

t

MakeuseoftheEuropeantransmissiongridasanadditionalflexibilityoption

P[MW]

t

P[MW]

t

P[MW]

t

~

Individu

alGridMod

els

„Synapse“Software

Amprion50HzT

Swissgrid

APG

CommonGridModel

Loadflowcalculation (n-1)Calculation

TSC

GenerationforecastDemandforecast

Gridtopology(planned)

TSC…TransmissionSystemOperatorSecurityCooperation

„Amica“Tool

Page 6: The Renewables Case Gerhard Christiner, · NTC-5000-4000-3000-2000-1000 0 1000 2000 3000 4000 5000 CZ-5000-4000-3000-2000-1000 0 1000 2000 3000 4000 5000 HU-5000-4000-3000-2000-1000

AUSTRIAN POWER GRID AG

TSCas afacilitator to solve grid congestionsAreal-life example from operationalpractice (03.Oct.2017)

5

16:30be

fore

coordinatedsecurityanalysis(„witho

utTSC“)

21:00–ne

cessarycoun

term

easuresagreed

inTSC

Load-flows:no more overload

Severity:no (n-1)violationsSeverity:red =(n-1)violations

Load-flows:red=overload

Page 7: The Renewables Case Gerhard Christiner, · NTC-5000-4000-3000-2000-1000 0 1000 2000 3000 4000 5000 CZ-5000-4000-3000-2000-1000 0 1000 2000 3000 4000 5000 HU-5000-4000-3000-2000-1000

AUSTRIAN POWER GRID AG

Energieaustausch mit Regelzonen - Fahrpläne und NTCvon 01.01.2017 00:15 So

bis 01.09.2017 00:00 Fr

Einheit: MW

+...Import, -...Export

Fahrpläne (ohne Istwertaufschaltungen)NTC

-5000

-4000

-3000

-2000

-1000

0

1000

2000

3000

4000

5000

CZ

-5000

-4000

-3000

-2000

-1000

0

1000

2000

3000

4000

5000 HU

-5000

-4000

-3000

-2000

-1000

0

1000

2000

3000

4000

5000 SL

-5000

-4000

-3000

-2000

-1000

0

1000

2000

3000

4000

5000 IT

-5000

-4000

-3000

-2000

-1000

0

1000

2000

3000

4000

5000 CH

-10000

-9000

-8000

-7000

-6000

-5000

-4000

-3000

-2000

-1000

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

DE

-10000

-9000

-8000

-7000

-6000

-5000

-4000

-3000

-2000

-1000

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

REGLER

-938 GWh

-2.797 GWh

-3.668 GWh-1.338 GWh

-3.691 GWh

real. Fahrpläne(ohne Istwertaufschaltungen)

AustriaasanEuropeanelectricityhubSchedulesandNTC(afterRedispatch)

18.985 GWh100%

-6.553 GWh~ 35% à Austria

-12.432 GWh~ 65% à South-

East-EuropeTransit from Germany to neighbouring countries

Page 8: The Renewables Case Gerhard Christiner, · NTC-5000-4000-3000-2000-1000 0 1000 2000 3000 4000 5000 CZ-5000-4000-3000-2000-1000 0 1000 2000 3000 4000 5000 HU-5000-4000-3000-2000-1000

AUSTRIAN POWER GRID AG

Thefuture:key principles &mission• Cooperation of RSCs

• Decision support for TSOs

• Evolutionof services,fitfor purpose,meeting the needs

• Build uponlessons learned from the past to prevent future troubles

• Facilitating mutualassistance and common understanding of TSOs

• Regionalcoordination with RSCsto bridge the gap betweendecentralization and criticality of secure electricity suppply

• Maintain flexibility,responsiveness to future challenges

• RSCsand the future of the Europeanway• Thinkglobally (continent-wide)act locally (regionally-aligned)

• Europeanframework with unbundling,renewables and legislation

• Europeanmarket integration,synchronous frequency decentralized security

7

Page 9: The Renewables Case Gerhard Christiner, · NTC-5000-4000-3000-2000-1000 0 1000 2000 3000 4000 5000 CZ-5000-4000-3000-2000-1000 0 1000 2000 3000 4000 5000 HU-5000-4000-3000-2000-1000

AUSTRIAN POWER GRID AGThank you for your attention!

8