the Re p THE GOVERNMENT OF THE PHILIPPINES pp ines - JICA · 2004. 5. 11. · EM 1110-2-1901...

10
THE GOVERNMENT OF THE PHILIPPINES THE DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS The Study on Sabo and Flood Control for Western River Basins of Mount Pinatubo in the Republic of the Philippines JAPAN INTERNATIONAL COOPERATION AGENCY Figure 1.7.8 Presumed Riverbed Change with Two-Dimensional Mudflow Analysis in the Sto. Tomas River VI-F23

Transcript of the Re p THE GOVERNMENT OF THE PHILIPPINES pp ines - JICA · 2004. 5. 11. · EM 1110-2-1901...

Page 1: the Re p THE GOVERNMENT OF THE PHILIPPINES pp ines - JICA · 2004. 5. 11. · EM 1110-2-1901 Seepage Analysis and Control for Dam, U.S. Army Corps of Engineers (September 1986) THE

THE G

OV

ERN

MEN

T OF TH

E PHILIPPIN

ES TH

E DEPA

RTM

ENT O

F PUB

LIC W

OR

KS A

ND

HIG

HW

AY

S

The Study on Sabo and Flood C

ontrol for W

estern River B

asins of Mount Pinatubo in

the Republic of the Philippines

JAPAN IN

TERNATIO

NAL C

OO

PERATION

AGEN

CY

Figure 1.7.8 Presum

ed Riverbed C

hange w

ith Tw

o-Dim

ensional Mudflow

Analysis

in the Sto. Tom

as River

VI-F23

Page 2: the Re p THE GOVERNMENT OF THE PHILIPPINES pp ines - JICA · 2004. 5. 11. · EM 1110-2-1901 Seepage Analysis and Control for Dam, U.S. Army Corps of Engineers (September 1986) THE

THE G

OV

ERN

MEN

T OF TH

E PHILIPPIN

ES TH

E DEPA

RTM

ENT O

F PUB

LIC W

OR

KS A

ND

HIG

HW

AY

S

The Study on Sabo and Flood C

ontrol for W

estern River B

asins of Mount Pinatubo in

the Re public of the Philippines

JAPAN INTERN

ATIONAL C

OO

PERATION AG

ENC

Y

Figure 1.7.9 Presum

ed Riverbed C

hange after 20 Years

with O

ne-Dim

ensional Sediment T

ransport A

nalysis in the Sto. Tom

as River

VI-F24

Page 3: the Re p THE GOVERNMENT OF THE PHILIPPINES pp ines - JICA · 2004. 5. 11. · EM 1110-2-1901 Seepage Analysis and Control for Dam, U.S. Army Corps of Engineers (September 1986) THE

THE G

OV

ERN

MEN

T OF TH

E PHILIPPIN

ES TH

E DEPA

RTM

ENT O

F PUB

LIC W

OR

KS A

ND

HIG

HW

AY

S

The Study on Sabo and Flood C

ontrol for W

estern River B

asins of Mount Pinatubo in the

Re public of the Philippines

JAPAN INTERN

ATIONAL C

OO

PERATION AG

ENC

Y

Figure 1.8.1 Im

aged Perspective Draw

ing of Proposed D

ike Heightening in the B

ucao River

Future AgriculturalDevelopment Plan

Botolan Side

Baquilan River

National Road No.7

Cabangan Side

Existing Swamp

Bucao River

VI-F25

Page 4: the Re p THE GOVERNMENT OF THE PHILIPPINES pp ines - JICA · 2004. 5. 11. · EM 1110-2-1901 Seepage Analysis and Control for Dam, U.S. Army Corps of Engineers (September 1986) THE

THE G

OV

ERN

MEN

T OF TH

E PHILIPPIN

ES TH

E DEPA

RTM

ENT O

F PUB

LIC W

OR

KS A

ND

HIG

HW

AY

S

The Study on Sabo and Flood C

ontrol for W

estern River B

asins of Mount Pinatubo in the

Re public of the Philippines

JAPAN INTERN

ATIONAL C

OO

PERATION AG

ENC

Y

Figure 1.8.2 Im

aged Perspective Draw

ing of Proposed D

ike Strengthening in the Middle reaches of

the Sto. Tom

as River

Future AgriculturalDevelopment Plan

Vega Hill

Santa Fe Side

To South China See

Sto. Tomas River

San Rafael Side VI-F26

Page 5: the Re p THE GOVERNMENT OF THE PHILIPPINES pp ines - JICA · 2004. 5. 11. · EM 1110-2-1901 Seepage Analysis and Control for Dam, U.S. Army Corps of Engineers (September 1986) THE

THE G

OV

ERN

MEN

T OF TH

E PHILIPPIN

ES TH

E DEPA

RTM

ENT O

F PUB

LIC W

OR

KS A

ND

HIG

HW

AY

S

The Study on Sabo and Flood C

ontrol for W

estern River B

asins of Mount Pinatubo in

the Re public of the Philippines

JAPAN IN

TERNATIO

NAL C

OO

PERATION

AGEN

CY

Figure 2.2.1 G

eneral Plan of Proposed River Im

provement

in the Bucao R

iver

VI-F27

Page 6: the Re p THE GOVERNMENT OF THE PHILIPPINES pp ines - JICA · 2004. 5. 11. · EM 1110-2-1901 Seepage Analysis and Control for Dam, U.S. Army Corps of Engineers (September 1986) THE

THE G

OV

ERN

MEN

T OF TH

E PHILIPPIN

ES TH

E DEPA

RTM

ENT O

F PUB

LIC W

OR

KS A

ND

HIG

HW

AY

S

The Study on Sabo and Flood C

ontrol for W

estern River B

asins of Mount Pinatubo in

the Re public of the Philippines

JAPAN INTERN

ATIONAL C

OO

PERATION AG

ENC

Y

Figure 2.2.2 Presum

ptive Riverbed C

hange after 20 years in the B

ucao River

VI-F28

Page 7: the Re p THE GOVERNMENT OF THE PHILIPPINES pp ines - JICA · 2004. 5. 11. · EM 1110-2-1901 Seepage Analysis and Control for Dam, U.S. Army Corps of Engineers (September 1986) THE

THE G

OV

ERN

MEN

T OF TH

E PHILIPPIN

ES TH

E DEPA

RTM

ENT O

F PUB

LIC W

OR

KS A

ND

HIG

HW

AY

S

The Study on Sabo and Flood C

ontrol for W

estern River B

asins of Mount Pinatubo in

the Re public of the Philippines

JAPAN INTERN

ATIONAL C

OO

PERATION AG

ENC

Y

Figure 2.2.3 L

ongitudinal Profile of Proposed River

Improvem

ent in the Bucao R

iver

VI-F29

Page 8: the Re p THE GOVERNMENT OF THE PHILIPPINES pp ines - JICA · 2004. 5. 11. · EM 1110-2-1901 Seepage Analysis and Control for Dam, U.S. Army Corps of Engineers (September 1986) THE

DifferentWater Depth (d)

(Landside)Design Water Level

Estimated Seepage Line

Existing Ground Level

Lahar Embankment (Dike Heightening & Strengthening)

Discharge Point

Soil Block (1)

Soil Block (2)

0.70

0.80

0.90

1.00

1.10

1.20

1.30

1.40

1.50

1.60

1.70

1.80

1.90

2.0 4.0 6.0 8.0 10.0 12.0 14.0

Different Water Depth (m)

Com

pute

d Sa

fety

Fac

tor

1: 2.0

1: 3.0

1: 4.0

1: 4.5

1: 5.0

1: 6.0

Relation Between Different Water Depth and Computed Landside Slope Failure

Estimated Soil Properties

Soil Block AverageN-Value

Unit WetWeight

Unit SaturatedWeight

UnitSubmergible

Weight

ResistantAngle Cohesion

Unit N γt (kN/m3) γsat (kN/m3) γ' (kN/m3) φ C (kN/m2)(1) 15 17.0 19.0 7.0 30.0 0.0(2) 9 16.0 18.0 6.0 27.0 0.0

THE GOVERNMENT OF THE PHILIPPINES THE DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

The Study on Sabo and Flood Control for Western River Basins of Mount Pinatubo in

the Republic of the PhilippinesJAPAN INTERNATIONAL COOPERATION AGENCY

Figure 2.3.1 Results of Computed Landside Slope Failure

Landside Slope Gradient

VI-F30

Page 9: the Re p THE GOVERNMENT OF THE PHILIPPINES pp ines - JICA · 2004. 5. 11. · EM 1110-2-1901 Seepage Analysis and Control for Dam, U.S. Army Corps of Engineers (September 1986) THE

Line-BC: Line of Seepage BoundaryLine-CD: Seepage Exit Face BoundaryPoint-C: Seepage Discharge Point

Schematic Diagram of Phreatic Surface in Dike Body

a : Length of Seepage Exit Faceq: quantity of Seepage per unit Length of Embankment

Source:EM 1110-2-1901 Seepage Analysis and Control for Dam, U.S. Army Corps of Engineers (September 1986)

THE GOVERNMENT OF THE PHILIPPINES THE DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

The Study on Sabo and Flood Control for Western River Basins of Mount Pinatubo in

the Republic of the PhilippinesJAPAN INTERNATIONAL COOPERATION AGENCY

Figure 2.3.2 The Manner of Estimated Phreatic Surface in Dike Body

VI-F31

Page 10: the Re p THE GOVERNMENT OF THE PHILIPPINES pp ines - JICA · 2004. 5. 11. · EM 1110-2-1901 Seepage Analysis and Control for Dam, U.S. Army Corps of Engineers (September 1986) THE

THE G

OV

ERN

MEN

T OF TH

E PHILIPPIN

ES TH

E DEPA

RTM

ENT O

F PUB

LIC W

OR

KS A

ND

HIG

HW

AY

S

The Study on Sabo and Flood C

ontrol for W

estern River B

asins of Mount Pinatubo in the

Re public of the Philippines

JAPAN INTERN

ATIONAL C

OO

PERATION AG

ENC

Y

Figure 2.3.3 T

ypical Cross Section of Proposed N

ew D

ike in the B

ucao River

VI-F32