  • The Ramco Cements Limited RR Nagar

    P.M.RAMASUBRAMANIAN GM Process & QCV.SURESH Sr. Manager - ProcessS.V.Veeraraghavan Asst.Manager-Electrical

  • The Ramco Cements Limited, RR Nagar

    Salient Futures of Ramasamy Raja Nagar Unit

    In 1976, we were the first to introduce 1200TPD Dry process kiln in South India.

    Manufacturing 100% Portland Pozzolana Cement

    A flagship company of RAMCO Group, having five Cementmanufacturing and 4 Grinding units with a capacity of 16.5MTPA

    We are the leaders in First to introduce latest technologieslike Surface Miner, Vertical roller mill, SF cross bar cooler,Limestone Beneficiation Plant, Optical sorter, Cross BeltAnalyser, X-Ray analyser, ESPs, Cambidan Mill etc.,

  • The Ramco Cements Limited, RR Nagar

    Integrated Management System Certification

    3

    IS/ISO 9001: 2008

    IS/ISO 14001: 2004

    IS 18001: 2007

    IS/ISO 50001: 2011

    5S

    Quality Management System

    Environment Management System

    Occupational Health & Safety Management System

    Energy Management System

    (Implemented awaiting for Certification)

    Workplace Management System

  • The Ramco Cements Limited, RR Nagar

    ENCON PROJECTS WITH ZERO INVESTMENT

    No. of Projects : 31

    Savings on Electrical Energy : 38.34 Lakh Kwh

    Savings on Thermal Energy : 1595 MT of Coal

    Total Cost savings : Rs.239.7 Lakhs

  • The Ramco Cements Limited, RR Nagar

    Sl.NoENCON Projects Implemented for the year

    2014-15

    Savings (Rs. in Lakhs)

    1 Modification of Y piece in kiln -1 secondary firing circuit 53.04

    2 Reduction of excess air in TPP Boiler from 16 % to 12 % 13.43

    3 Interlinking of stacker and reclaimer compressor line 7.18

    4Optimization of set point and arresting air leaks in Kiln-2 CF Silocompressor

    2.77

    5 Removal of damper in Cement mill vent bag filter fan 1.63

    6 Modification of raw meal silo extraction screw 1.63

    7Optimization of set point and arresting air leaks in Cement millroller press compressor

    0.88

    ENCON Projects with Zero Investment

  • The Ramco Cements Limited, RR Nagar

    Sl.NoENCON Projects Implemented for the year

    2014-15

    Savings (Rs. in Lakhs)

    8Optimization of set point and arresting air leaks in Packing plant compressor

    0.85

    9 Reduction of blower run hours in Blending & storage silo 0.65

    10Optimization of set point and arresting air leaks in Cement silo compressor

    0.42

    11 Installation of GRR in Raw mill VRMP Main motor 0.41

    12Reduction of Raw mill VRMP Circulating air fan speed by process optimization

    0.16

    13 Interlinking of compressors in raw grinding circuit 0.16

    14Optimization by stopping the aeration blower in Cement intermediate feed bin

    0.15

    15 Optimization by stopping the aeration blower in Fly ash feed bin 0.15

    ENCON Projects with Zero Investment

  • The Ramco Cements Limited, RR Nagar

    Sl.No

    ENCON Projects Implemented for the year 2015-16

    Savings (Rs. in Lakhs)

    1 Installation of VFD in Kiln-1 primary firing blower 39.7

    2 Productivity optimization in Raw mill 34.0

    3 Productivity optimization in kiln 20.9

    4 Reduction of idle run hours in fly ash unloading 11.9

    5 Removal of Damper in Cement mill Bag house fan 3.7

    6 Replacement of reciprocating compressors in Packing Plant 2.9

    7 Compressor air usage optimization 2.8

    8 Removal of Damper in Raw mill-1 Separator fan 2.1

    9 Removal of Damper in Raw mill-1 Hot gas fan 1.0

    ENCON Projects with Zero Investment

  • The Ramco Cements Limited, RR Nagar

    Sl.NoENCON Projects Implemented for the year

    2016-17Savings

    (Rs. in Lakhs)

    1Reduction of False air and Elimination of Top Cyclone Water spray in Kiln-1 Preheater fan

    14.1

    2Improvement of excavator productivity and reduction of fuel consumption by reducing the marching time

    9.9

    3 Reduction of False air in Kiln-2 Preheater from 11 % to 8.5 % 5.6

    4 Removal of Damper in Roller press bag house fan 4.2

    5 Replacement of de-dusting ducts in Kiln Tunnel venting bag filter 1.4

    6Elimination of DG operation in SVP-North mines and switch over to electrical supply by upgrading the existing transformer

    1.3

    7Elimination of unnecessary pipeline in the pump delivery to reduce the line losses

    0.7

    ENCON Projects with Zero Investment

  • The Ramco Cements Limited, RR Nagar

    ENCON PROJECTS WITH INVESTMENT

    No. of Projects : 19

    Total Cost Investment : 256 Lakhs

    Savings on Electrical Energy : 25.1 Lakh Kwh

    Savings on Thermal Energy : 938 MT of Coal

    Total Cost savings : Rs.130.5 Lakhs

  • The Ramco Cements Limited, RR Nagar

    ENCON Projects with Investment

    S.No

    ENCON Project Implemented for the year 2014-15Savings (Rs. in Lakhs)

    Investment made

    (Rs. in Lakhs)

    1 Installation of GRR in Raw mill ball mill Separator fan 29.4 9.0

    2 Installation of Pillard Burner in Kiln-1 26.5 43.0

    3Optimization by modifying the Kiln -2 raw meal feeding circuit

    11.1 0.5

    4 Installation of VFD in Raw mill ball mill hot gas fan 4.9 7.0

    5 Installation of VFD in Cement mill vent bag filter fan 4.9 3.5

    6 Optimization of ejector input in Thermal power plant 3.5 2.0

    7 Reduction of pulley size in kiln feed extraction blower 1.6 0.1

  • The Ramco Cements Limited, RR Nagar

    ENCON Projects with Investment

    S.No

    ENCON project implemented for the year 2015-16Savings (Rs. in Lakhs)

    Investment made

    (Rs. in Lakhs)

    8 Installation of VFD in Kiln-1 bag house fan 5.6 3.5

    9 Installation of VFD in Kiln-2 ESP fan 5.6 13.0

    10Elimination of Elevator in raw mill limestone feeding circuit

    5.3 104.0

    11 Installation of new dilution damper in Kiln-1 bag house 1.4 1.0

    12LED lights replaced in place of Sodium vapour & fluorescent lamps

    0.3 1.6

  • The Ramco Cements Limited, RR Nagar

    ENCON Projects with Investment

    S.No

    ENCON Project Implemented for the year 2016-17Savings (Rs. in Lakhs)

    Investment made

    (Rs. in Lakhs)

    13 Installation of gas analyser in Kiln-2 inlet 17.9 10.0

    14 Compressor stopped in Kiln bag filter by inter linking 7.0 0.5

    15 Installation of VFD in Raw mill-1 Vent fan 5.6 25.0

    16Installation of VFD in Primary Air fan of Thermal Power Plant

    4.2 15.0

    17 Installation of VFD in Kiln-2 Primary air fan 2.8 9.0

    18 Transmission Loss reduced in Mines power line 2.5 7.0

    19 A/C unit system Replaced with Split A/C 1.9 1.6

  • The Ramco Cements Limited, RR Nagar

    Specific Thermal Energy Consumption

    690

    700

    710

    720

    730

    740

    2014-152015-16

    2016-17

    735

    721

    705Kca

    l/K

    g C

    linke

    r

  • The Ramco Cements Limited, RR Nagar

    Specific Electrical Energy Consumption

    68

    70

    72

    74

    76

    78

    80

    82

    2013-142014-15

    2015-162016-17

    81.23

    76.60

    73.78

    72.20

    Kw

    h /

    MT

    Ce

    me

    nt

  • The Ramco Cements Limited, RR Nagar

    BEE PAT Scheme

    700

    720

    740

    760

    780

    800

    820

    840

    2013-142014-15

    2015-162016-17

    PATTarget

    902

    828820

    806

    761

    Kca

    l/K

    g C

    em

    en

    tGate to Gate Energy Consumption

  • The Ramco Cements Limited, RR Nagar

    Sl.No

    ENCON Projects Planned for the year 2017-18

    Expected Electrical

    Saving (Kwh/Year)

    Expected ThermalSaving

    (MT/Year)

    1 Installation of Pillard burner for Kiln-2 35,160 430

    2Reduction of DP in Kiln -1 Bag house by modifyingpurging pipes

    1,20,600

    3 Installation of occupancy sensor in kiln substation 7,008

    4 Installation of VFD in Kiln-2 primary firing blower 36,000 160

    5 Installation of VFD in Coal mill 1 Hot gas fan 40,200

    6 Installation of VFD in Coal mill 2 Bag filter fan 80,400

    7 Installation of VFD in Coal mill 2 Hot gas fan 40,200

    8 Installation of VFD in Coal mill 2 Bag filter fan 80,400

    ENCON Projects Proposed

  • The Ramco Cements Limited, RR Nagar

    Sl.No

    ENCON Projects Planned for the year 2017-18

    Expected Electrical

    Saving (Kwh/Year)

    Expected ThermalSaving

    (MT/Year)

    9 Installation of VFD in VRM Venting bag filter fan 1,20,600

    10 Installation of VFD for feed water pump 7,23,600

    11Compressor optimization in Kiln-1 & 2 by inter linking

    1,60,800

    12LED light replacement in place of Conventional lights

    20,100

    13Replacement of reciprocating by Screw compressor in Coal mill 2 bag filter

    24,120

    14Installation of Energy efficient motor for primary crusher

    80,400

    15To install capacitor at the pump switch board to boost voltage for the dewatering operation

    40,200

    ENCON Projects Proposed

  • The Ramco Cements Limited, RR Nagar

    Road Map To Reduce Carbon Foot Print Activities

    YearScope 1

    EmissionsCO2e (MT)

    Scope 2 EmissionsCO2e (MT)

    Scope 3EmissionsCO2e (MT)

    kg CO2e/MTof cement

    Baseline 9,55,158 1,21,410 35,738 8932014-15 9,67,956 3,78,350 44,246 891

    2015-16 11,47,927 2,24,008 50,252 834

    2016-17 10,98,303 1,42,932 55,121 752

    We have reduced 17.0 % CarbonEmissions compared with baselineyear. Further to reduce carbonemissions we have planned thefollowing:

    1. Installation of high efficiency Pillard Burner for Kiln-2

    2. Installation of stacker & Reclaimer for Limestone and Fuel

    650

    700

    750

    800

    850

    900

    Bas

    elin

    e

    20

    14

    -15

    20

    15

    -16

    20

    16

    -17

  • The Ramco Cements Limited, RR Nagar

    Renewable Energy

    Replacement of Electrical Energy with Renewable

    Energy

    2014-15 2015-16 2016-17

    Annual Energy

    Generated (Lakhs kWh)

    % Share

    Annual Energy

    Generated (Lakhs kWh)

    % Share

    Annual Energy

    Generated (Lakhs kWh)

    % Share

    Wind 2312.4 - 1807.0 - 3013.4 -

    Replacement of Thermal Energy with Renewable

    Energy

    2014-15 2015-16 2016-17

    Equivalent Fuel Saving(Lakhs Kcal)

    % Share

    Equivalent Fuel Saving(Lakhs Kcal)

    % Share

    Equivalent Fuel Saving(Lakhs Kcal)

    % Share

    Biogas - - - - 95.8 12.9

    During the year 1996, wind mill installed capacity is 33.235 MW, which was the Single Largest Wind Farm in the South East Asia. Present Capacity is 160 MW

  • The Ramco Cements Limited, RR Nagar

    Utilization of Waste as Fuel

    Name of the Fuel

    2014-15 2015-16 2016-17

    Quantity (MT)

    Waste fuel as % of

    Energy used

    Quantity (MT)

    Waste fuel as % of

    Energy used

    Quantity (MT)

    Waste fuel as % of

    Energy used

    TPP Coal Ash 485 0.45 2192 1.77 9133 4.97

    Saw Dust 28 0.02 - - - -

    Wood Chips - - - - 308 0.17

  • The Ramco Cements Limited, RR Nagar

    Innovative Project - 1 : Optical sorter

  • The Ramco Cements Limited, RR Nagar

    Constraints in present operation

    Presently we are mining crystalline limestone from our fourcaptive mines. The limestone contains average of 18% of blackstone.

    We are adding Imported limestone and High grade limestone assweetener to meet the Quality Requirement.

    There are three magnetic separators in our mines after thecrusher, which is used in removal of a part of black stones fromlimestone which are magnetic in nature.

    As a result, of the total 18% black stones, out of which 16% ofblack stones are non magnetic will remain in the product evenafter separation.

    Hence the quality of limestone will be inferior by a greaterextent.

  • The Ramco Cements Limited, RR Nagar

    Optical sorter - Overview

    Introduced State of the Art Technology Optical Sorter which

    separates the Blackstone from Limestone on the basis of colour

    of the material.

    There are three sorters classified based on their handling sizes,

    namely

    Primary sorter : 75 mm to 250 mm

    Secondary sorter : 30 mm to 75 mm

    Tertiary sorter : 10 mm to 30 mm

  • The Ramco Cements Limited, RR Nagar

    Performance Improvement & Benefits achieved

    The black stone content in the limestone has been reduced to less

    than 2% thereby usage of Imported / High Grade limestone is

    totally avoided.

    We have consumed 36,746 MT of low grade Limestone which

    enhanced the limestone recovery from 78 to 86% resulted

    increase in Mines life

    The savings in limestone cost by avoiding Imported limestone is

    60/- Per MT. The overall savings is 9 Crores per annum and the

    payback is less than 2 years.

  • The Ramco Cements Limited, RR Nagar

    In our packing plant, we have motorised belt diverter for divertingbags in to the loading point

    Based on truck availability & loading machine availability thediverter is changed for the loading point.

    One discharge point is having two loading machines. In ouroperation, it needs to divert the bags several times.

    The belt diverter is stopped frequently, bags gets jam in diverterand thus affected the packer performance due to the followingreasons

    Drive bearing failure

    Idler damage

    Geared motor pinion damage and

    Diverter belt problem

    Innovative Project - 2 : Drum Diverter in place of Motorized Diverters

  • The Ramco Cements Limited, RR Nagar

    In-house Powerless Drum

    An innovative drum diverter locally designed, fabricated and

    installed in place of motorised diverter

    Power Saving : 16,630 units/ annum

    Maintenance Cost Saving : Rs. 0.42 Lakhs/annum

  • The Ramco Cements Limited, RR Nagar

    The crushing plant is located 23 Kms from the factory at our PandalgudiMines.

    The average power requirement for operation of this plant is 1.5 MVA. This power requirement was fulfilled with TNEB power & Diesel

    Generators. We had frequent power failures, power fluctuations, high power cost

    resulting in lower productivity and higher limestone cost. To over come these issues, we have decided to provide power from our

    25 MW power plant available at factory. 11 KV overhead line was laid and power transmitted across 23 Kms

    with 470 poles. Benefits :

    Run hours of crushing plant improved from 14 hours per day to 18hours per day.

    Productivity improved from 242 TPH to 273 TPHCost savings : Rs.24.87 Lakhs/annum

    Innovative Project - 3 : Overhead Transmission Line to Mines Crushing plant

  • The Ramco Cements Limited, RR Nagar

    Team Work Project 1 : Kiln-1 feed extraction screw modification

    There are 2 nos. of 47 meters length screw conveyor in our kiln feed

    extraction

    We have faced the following problems in the screws

    Screw cut off, Connecting shaft damage and Hanger bearing failure

    One of the Mechanical Engineer suggested to reduce the screw length from

    47 to 18 meters and provide the air connection from existing blowers

    Due to reduction in screw length the power consumption is reduced

    Power Saving: 32160 Units/annum

    Cost Saving : Rs. 11.25 Lakhs/annum

  • The Ramco Cements Limited, RR Nagar

    Team Work Project - 2 : Prevention of Coal mill inlet jam

    In Kiln 1 Coal mill, we frequently noticed coal accumulation in the inlet

    chute.

    Due to this accumulation the productivity of the mill was poor and there

    was occasional firing of the accumulated coal.

    Engineer suggested the idea to modify the inlet feed chute by providing

    a guide plate to uniformly feed coal to the mill without accumulation.

    Implementation of that idea resulted in the reduction of coal mill run

    hours from 15:30 Hours to 15:00 hours a day.

    Power Saving : 89700 Units/annum

    Cost Saving : Rs. 2.71 Lakhs/annum

  • The Ramco Cements Limited, RR Nagar

    Team Work Project - 3: Cement Bag Weight optimization

    We are operating two 12-spout packer supplied by M/s. FLSmidth with

    Ventomatic electronics.

    Due to frequent additional dosing the productivity of the packer was low.

    Instrumentation & Mechanical workmen together gave an idea to provide

    an additional dosing valve so that the slide gate cylinder opening is

    controlled during fine feed.

    Implementation of that idea resulted in increased productivity by 5%.

    Power Saving : 1.2 Lakh units/annum

    Cost Saving : Rs. 3.72 Lakhs/annum

  • The Ramco Cements Limited, RR Nagar

    Team Work Project - 4: Coal Ash feeding system for Raw meal

    In Raw mill, our TPP Coal ash was fed for silica correction by mixing the same

    in limestone yard and feeding to the hopper.

    Our Engineer suggested the idea to provide a dedicated Loss-in-weight

    system for feeding TPP Coal ash to Rawmill.

    Implementation of that idea resulted in uniform feeding of coal ash for silica

    correction which improved the quality of Clinker.

    Improvement in Clinker quality resulted increase in fly ash addition by 0.5%

    in Cement

    Power Saving : 0.28 units/ Ton of Cement

    Net Cost Saving : Rs. 51.0 Lakhs/annum

  • The Ramco Cements Limited, RR Nagar

    Environmental Projects

    Sl.No

    List of the Major Environmental ProjectsInvestment(Rs. Lakhs)

    1 12 Nos. of unit bag filters installed in Mines crusher area 638.0

    2Surveillance camera is located at all the hopper discharge and transfer points to monitor and avoid any spillage

    300.0

    3External Clinker Unloading hopper and Packer-2 de-dusting bag filter capacity increased from 25000 to 55000 m3/hr

    250.0

    4Dramix fibre Concrete road at lorry yard of 10,000 sq.m, to reduce the fugitive dust generation.

    170.0

    5Concrete road development for 3000 sq.m. to reduce the fugitive dust generation

    30.0

    6Additionally 5 Nos. of de-dusting bag filters are installed in Raw mill & Coal mill area

    25.0

    7 High efficiency bag filter installed in Coal mill-2 18.0

  • The Ramco Cements Limited, RR Nagar

    Sl.No

    List of the Major Environmental ProjectsInvestment(Rs. Lakhs)

    8New de-dusting bag filter for Kiln-2 coal firing to avoid fugitive dust emission

    8.0

    9Gas analyzer is installed at the kiln inlet, to monitor the kiln condition and thereby improve the combustion, and to predict the quality of clinker

    6.0

    10Re routing of de-dusting ducts in Roller press to avoid the fugitive dust generation

    3.0

    1116 Nos. of Solar lights in place of 16 Nos. of Sodium vapour lights in Colony

    4.0

    1260 Nos. of LED lights in place of tube lights, Sodium vapour lights and BC Bulbs in Colony and Guest house

    2.92

    13 Dust suppression system for coal storage yard to avoid dust emission 0.75

    14CO reduction in Kiln preheater by reducing secondary firing coal pipe bends

    0.5

    Environmental Projects

  • The Ramco Cements Limited, RR Nagar

    Future Environmental Projects

    Sl.No List of the Future Environmental ProjectsInvestment(Rs. Lakhs)

    15 Nos. of additional Dust Collectors for transfer points at plant

    220.0

    22 Nos. of Dust Collectors for transfer points at mines crushing plant

    90.0

    3 Stacker & Reclaimer with closed shed for Coal 48.0

    4 Stacker & Reclaimer with closed shed for Limestone 35.0

    5 15 Nos. LED lights in place of Conventional lights 0.67

  • The Ramco Cements Limited, RR Nagar

    Green Belt development

    Sl.No

    Location

    2016-17 Up to 2017

    Area in Acres

    No. of Trees

    Area in Acres

    No. of Trees

    1 Mines 20 12,200 253 2,53,700

    2 Factory 15 9000 38.7 14,750

    3 Colony 2 2000 11.1 5,060

    4 School 7 3000 23 7,500

    5 Nearby Villages 11 7500 54.8 25,760

    Grand total 55 33,700 380 3,06,770