The Project On Improvement of Chennai Port Operation Final...

122
Republic of India Chennai Port Trust The Project On Improvement of Chennai Port Operation Final Report September, 2016 Japan International Cooperation Agency The Overseas Coastal Area Development Institute of Japan Mitsui Engineering & Shipbuilding Co., Ltd. Hakata Port Terminal Co., Ltd. 4R JR 16-035

Transcript of The Project On Improvement of Chennai Port Operation Final...

Page 1: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Republic of India

Chennai Port Trust

The Project

On

Improvement of Chennai Port Operation

Final Report

September, 2016

Japan International Cooperation Agency

The Overseas Coastal Area Development Institute of Japan

Mitsui Engineering & Shipbuilding Co., Ltd.

Hakata Port Terminal Co., Ltd.

4R

JR

16-035

Page 2: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description
Page 3: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Chennai p

port and its hhinterland

:Container

:Flow line

Port of CheCCTL:DPW TeCITPL:PSA Te

TVT-Par

Port Gate No.

r Freight Station

towards the Term

About 5km

ennai erminal erminal

rking

.1

n

minal

m

Page 4: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Lay

out

of C

hen

nai

Por

t

Page 5: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

List of Abbreviation and Terminology

Abbreviation Description

B/L Bill of Lading

CBIC Chennai-Bangalore Industrial Corridor

CCTL Chennai Container Terminal

CFS Container Freight Station

CHA Customs House Agent

ChPT Chennai Port Trust

CISF Central Industrial Security Force

CITPL Chennai International Terminals Pvt. Ltd.

CONCOR Container Corporation of India Ltd.

CWC Container Warehousing Corporation

DO Delivery Order

DPW Dubai Port World

DRF Delivery Request Form

EIR Equipment Interchange Receipt

FORM 13 FORM 13 ①Export FORM13 ②Import FORM13

HEP Harbour Entry Permit

HiTS Hakata Port Logistics IT System

ICD Inland Container Depot

IIT Indian Institute of Technology (Madras)

JNPT Jawaharlal Nehru Port Trust

MOS Ministry of Shipping

NACCS Nippon Automated Cargo and Port Consolidated System

NACFS National Association of Container Freight Station

NHAI National Highway Authority of India

NHTA Nagoya Harbor Transport Association

NUTS Nagoya United Terminal System

OOG Out Of Gauge (Cargo)

PDCA Plan-Do-Check-Action

PNR Public Notification of Regarding

PPP Public Private Partnership

PSA Port of Singapore Authority International

RFID Radio Frequency Identification

Page 6: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

RO/RO Roll On/Roll Off

S/C Steering Committee

TEU Twenty Feet Container Equivalent Unit

TOS Terminal Operating System

Page 7: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Conten

Bac1

1.1

Tea2

Sur3

3.1

3.2

3.3

3.4

3.5

3.6

3.7

3.8

3.9

3.10

3.11

3.12

3.13

Out4

4.1

4.2

4.3

Fut5

5.1

5.2

5.3

nts

ckground an

Background

am Members

rvey and Stud

Outline of P

Status of Po

Status of Co

Implementa

Effects of M

Implementa

Examinatio

Study on th

Improveme

Related Info

Additional T

Arrangemen

Presentation

tcome and E

Systematic

Evaluation

Objective E

ture Issues ...

Follow-up f

Modernizat

Modernizat

d Purpose of

d of the Proje

s and Dispatc

dy Activities

Project Activi

ort Activities .

ongestion ......

ation of Demo

Measures by S

ation of IT Re

n of Efficient

he Direction o

nt of Synergy

ormation .......

Technical As

nt of Study T

n Materials o

Evaluation of

Implementat

of Technical

Evaluation for

.....................

for improvem

tion of Chenn

tion of Chenn

f the Project

ect .................

ch Schedule .

s of the Proje

ities ..............

.....................

.....................

onstration Tri

Simulation M

elated Measur

t Process of T

of the Master

y on the Oper

.....................

sistance Issue

Tour in Japan .

n Activities a

f the Project

ion of Measu

Assistance ...

r the Project .

.....................

ment of Chenn

nai Port I .......

nai PortⅡ .....

t ....................

....................

.....................

ect ................

....................

....................

....................

ials and Follo

Model ............

res ...............

Trailer Flow I

Plan ............

ration of Reg

....................

es .................

....................

and Outcome

....................

ures for Techn

....................

....................

.....................

nai Port opera

....................

....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

ow-up Activit

.....................

.....................

Inside the Por

.....................

ulatory Autho

.....................

.....................

.....................

s of the Proje

.....................

nical Assistan

.....................

.....................

.....................

ation .............

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

ties ...............

.....................

.....................

rt ..................

.....................

orities Conce

.....................

.....................

.....................

ect .................

.....................

nce. ...............

.....................

.....................

.....................

.....................

.....................

.....................

.....................

....................

.....................

.....................

....................

....................

....................

....................

....................

....................

....................

....................

erned ............

....................

....................

....................

....................

.....................

....................

....................

....................

.....................

....................

....................

....................

.. 1

............. 1

.. 3

.. 4

............. 4

............. 6

........... 11

........... 32

........... 38

........... 42

........... 44

........... 50

........... 53

........... 54

........... 59

........... 59

........... 60

61

........... 61

........... 66

........... 71

74

........... 74

........... 74

........... 75

Page 8: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description
Page 9: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Table 3-1 Schedule of S/C and W/G ............................................................................................................ 5

Table 3-2 Major Cargoes Handled at Chennai Port ...................................................................................... 6

Table 3-3 Container Handling Volume at Chennai Port ............................................................................... 7

Table 3-4 Container Handling Volume by Terminal ..................................................................................... 8

Table 3-5 Table 3-6 Services of Container Vessels at Chennai Port ........................................................... 10

Table 3-6 Number of Queuing Trailers Outside the Port............................................................................ 11

Table 3-7 Comparison of Transportation Time from Departure to Port Gate No.1 .................................... 29

Table 3-8 List of surveys on Traffic Congestion Status (1) ........................................................................ 30

Table 3-9 List of surveys on Traffic Congestion Status (2) ........................................................................ 31

Table 3-10 Processing Time At Port Gate NO.1 ......................................................................................... 33

Table 3-11 Number of Parked Trailers along the Roads inside Port .......................................................... 35

Table 3-12 Number of Waiting Trailers ...................................................................................................... 35

Table 3-13 Input Condition of Simulation Model ...................................................................................... 39

Table 3-14 Average Processing Time for Outgoing Trailers at Port Gate No.1 ......................................... 44

Table 3-15 Tendency of Processing Time for Outgoing Trailers at Port Gate No.1 ................................... 45

Table 3-16 Number of Trailers Passing Through Terminal Gates (Actual Survey) ................................... 45

Table 3-17 Number of Trailers Passing Through Terminal Gates (DPW Statistics) .................................. 46

Table 4-1 Measures conducted outside the port for the last two years ....................................................... 65

Table 4-2 Measures conducted inside the port for the last two years ......................................................... 65

Table 4-3 Measures conducted at Terminal and Overall Agendas for the last two years ........................... 65

Table 4-4 Number of queuing trailer outside the port ................................................................................ 72

Table 4-5 Processing time at Port Gate No.1 ............................................................................................. 72

Table 4-6 Transit time required from CFSs to Port gate No.1 .................................................................... 73

Figure 1-1 Overview of Chennai port .......................................................................................................... 1

Figure 1-2 Location of Chennai in India ...................................................................................................... 2

Figure 3-1 Number of vessels whose loading container can be received in container yard (from 27

January to 16 February 2016) .................................................................................................... 9

Figure 3-2 Number of the permitted vessels to receive export containers (from 30 September to 23

October 2014) ............................................................................................................................ 9

Figure 3-3 Congestion Status inside/outside the Port ( 3rd Dispatch) ....................................................... 12

Figure 3-4 Congestion Status inside/outside the Port ( 4th Dispatch) ....................................................... 13

Figure 3-5 Congestion Status inside/outside the Port ( 5th Dispatch) ....................................................... 14

Figure 3-6 Congestion Status inside/outside the Port ( 6th Dispatch) ....................................................... 15

Figure 3-7 Congestion Status inside/outside the Port ( 7th Dispatch) ....................................................... 16

Figure 3-8 Congestion Status inside outside the Port ( 8th Dispatch) ....................................................... 17

Figure 3-9 HEP Possession ratio (Export) .................................................................................................. 18

Figure 3-10 HEP Possession ratio (Import) ................................................................................................ 18

Page 10: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Figure 3-11 Sticker Possession Ratio ......................................................................................................... 18

Figure 3-12 Staying Time inside the Port ................................................................................................... 19

Figure 3-13 Proportion of Double Transaction and Work Patterns ............................................................ 19

Figure 3-14 Parking Place .......................................................................................................................... 20

Figure 3-15 Reason for Waiting ................................................................................................................. 20

Figure 3-16 Trailers in Queue inside the Port Inward (27/Oct/2014 – 3/Nov/2014) .................................. 21

Figure 3-17 Trailers in Queue inside the Port Outward (27/Oct/2014 – 3/Nov/2014) ............................... 22

Figure 3-18 Idling Time (6th Dispatch ....................................................................................................... 23

Figure 3-19 Idling Time (7th Dispatch) ..................................................................................................... 23

Figure 3-20 Number of Departing Trailers per Hour : CWC(Madhavaram) .............................................. 24

Figure 3-21 Number of Departing Trailers per Hour : Continental Warehousing (Red Hill) ..................... 24

Figure 3-22 Staying Time ........................................................................................................................... 25

Figure 3-23 Stuffing Place ......................................................................................................................... 25

Figure 3-24 Expiry Date of Form13 ........................................................................................................... 26

Figure 3-25 Transportation Time from Departure to Port Gate No.1 (4/Oct/2014) ................................... 27

Figure 3-26 Transportation Time from Departure to Port Gate No.1 (18/19/Oct/2014) ............................ 27

Figure 3-27 Transportation Time from Departure to Port Gate No.1 (13/Feb/2016) ................................. 28

Figure 3-28 Transportation Time from Departure to Port Gate No.1 (2/Jun/2016).................................... 28

Figure 3-29 Utilization of TVT-Parking ..................................................................................................... 33

Figure 3-30 Designated No Parking Roads ................................................................................................ 35

Figure 3-31 Traffic Flow Regulation at X-Ray Intersection ...................................................................... 37

Figure 3-32 Traffic Flow Regulation at DPW Intersection ........................................................................ 37

Figure 3-33 Traffic Flow Regulation at X-Ray Intersection ......................................................................... 38

Figure 3-34 Simulation Model for the 3rd Dispatch .................................................................................. 39

Figure 3-35 Results of Simulation (Current Situation) .............................................................................. 40

Figure 3-36 Results of Simulation (Demo1) .............................................................................................. 40

Figure 3-37 Results of Simulation (Demo3, 4) .......................................................................................... 41

Figure 3-38 Results of Simulation (Demo1, 3, 4) ...................................................................................... 41

Figure 3-39 Image of Web Portal System .................................................................................................. 42

Figure 3-40 Modification to the ChPT Homepage ..................................................................................... 43

Figure 3-41 Suspensions at DPW IN Gate (6th dispatch) .......................................................................... 47

Figure 3-42 Suspensions at DPW IN Gate (7th dispatch) .......................................................................... 47

Figure 3-43 Suspensions at PSA IN Gate (6th dispatch) ............................................................................ 48

Figure 3-44 Layouts of Gate Facilities at DPW IN Gate ........................................................................... 48

Figure 3-45 Layouts of Gate Facilities at PSA IN Gate ............................................................................. 49

Figure 3-46 Idling Time (6th dispatch) ...................................................................................................... 49

Figure 3-47 Idling Time (7th dispatch) ...................................................................................................... 49

Figure 3-48 Proposed project image .......................................................................................................... 52

Page 11: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Figure 3-49 Stakeholders of Congestion Issue ........................................................................................... 53

Figure 3-50 Arrangement of Equipment around CFS Entrance and Exit ................................................... 56

Figure 3-51 Container Terminals in Jawaharlal Nehru Port ....................................................................... 58

Figure 4-1 Activities Undertaken under Technical Assistance ................................................................... 61

Figure 4-2 The Comparison of Processing Capacity among major Points in the Trailer Flow .................. 68

Figure 4-3 Trend of number of queuing trailers outside the port ............................................................... 72

Picture 1-1 A line of container trailers waiting for passing through the port gate No1 to

enter the port ........................................................................................................ 2

Picture 1-2 Traffic congestion in front of the terminal gate ................................................... 2

Picture 3-1 Aerial Photo of TVT-Parking ............................................................................... 33

Picture 3-2 TVT-Parking / Closed Gate and HEP issuance place at 8th dispatch ............... 34

Picture 3-3 Incoming Trailers around DPW IN Gate (6th dispatch) .................................... 46

Picture 3-4 Parked Trailers around DPW IN Gate (7th dispatch) ....................................... 47

Picture 3-5 Sticker for CWC ................................................................................................... 54

Picture 3-6 Sticker for CFS .................................................................................................... 54

Picture 3-7 RFID Reader around CFS ................................................................................... 56

Picture 3-8 RFID Reader around Entrance of Port Gate No.1 ............................................. 56

Picture 3-9 RFID Reader around Exit of Port Gate No.1 ..................................................... 56

Picture 3-10 RFID Reader around DPW IN Gate ................................................................... 56

Picture 3-11 RFID Reader around PSA IN Gate ..................................................................... 56

Picture 3-12 RFID tag on Front Glass of a Trailer ................................................................. 57

Page 12: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description
Page 13: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

1

1.1

Chenn

South Ea

cities in T

There

governm

as a gatew

Chenn

2014 to

Jawaharl

case of in

Chennai

On the

and outsi

as the po

a proper

terminal

Based

of Japan

Diploma

surround

POR

Backgro

Backgroun

nai port, locat

ast Asia. Jap

Tamil Nadu,

are thirteen

ment. Chennai

way of physi

nai port is no

March 2015

lal Nehru Por

ncluding priv

port drops to

e other hand,

ide the port a

oor condition

r set of docu

and that gate

on these circ

n-India Strat

atic Relations

ding facilities

RT GATE No1(

ound and

nd of the Proj

ted in Tamil N

anese firms i

contributing

major ports

port, a major

cal distributio

ow being con

5, making it

rt (Mumbai, M

vate ports, Mu

o 3rd place).

F

Chennai por

as shown in th

of the road n

uments, the f

e transactions

cumstances, J

tegic and Gl

s,” aiming t

in Ennore, C

DPW term

(only the gate

Purpose

ject

Nadu State, p

including aut

to the state’s

in India ma

r port located

on in Eastern

nverted to a c

the second l

Maharashtra),

undra port oc

Figure 1-1 O

rt is suffering

he pictures be

network, the te

fact that trail

are conducte

Japan and Ind

lobal Partner

to improve

Chennai and th

PSA te

inal

e to enter and

The Pro

1

of the Pro

plays a strate

tomobile ma

steady econo

anaged by th

d on the weste

n India.

container por

largest conta

, which hand

cupies 2nd pl

Overview of

g from seriou

elow. The hea

endency of tr

lers have to

ed manually a

dia signed a J

rship on the

infrastructur

he adjoining

erminal

d exit port)

oject of Impro

oject

egic role in m

nufacturers a

omic growth.

he Ministry o

ern side of Ch

rt. It handled

iner handling

dled 4,467 tho

lace handling

f Chennai po

us congestion

avy congestio

railer drivers

go through t

and are gener

Joint Stateme

e 60th Anni

re such as

areas.

ovement of Ch

marine transpo

are investing

of Shipping

hennai city, p

1,552 thous

g port among

ousand TEUs

g 2,720 thousa

rt

caused by co

on is a result o

to enter the q

three gates t

rally inefficien

ent on “Vision

iversary of

ports, indust

View o

hennai Port OFina

ort to the Far

in Chennai

(MOS) of th

plays an impo

sand TEUs fr

g major port

in the same p

and TEUs in

ontainer trail

of various fac

queue withou

to reach the

ent, etc.

n for the Enh

the Establish

trial parks

of Chennai por

Operation al Report

r East and

and other

he central

ortant role

rom April

ts next to

period (in

2014 and

lers inside

ctors such

ut carrying

container

hancement

hment of

and their

t

Page 14: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

P

e

Conse

operation

collection

basic infr

and Indu

governm

Finally

easing th

1.2

Object

1) To

2) To

intr

Target

Picture 1-1 A lin

enter port gate N

quently, JICA

ns” (hereinaf

n survey rev

frastructure in

ustry in India

ment of India a

y, JICA decid

he congestion

Purpose

tive of this pr

enhance the

enhance the

roducing an e

t area of this p

ne of container

No1

A conducted

fter referred

ealed the nee

ncluding port

a, which con

and the State

ded to dispat

n in collaborat

of the Proje

roject is to ma

efficiency of

capacity of c

effective port

project is Che

Fi

trailers waiting

d a study ent

to as “Data

ed to improv

facilities, po

nsists of over

of Tamil Nad

tch experts to

tion with Che

ct

ake Chennai

f Chennai por

ontainer oper

t operation an

ennai port and

igure 1-2 L

The Projec

2

g to P

te

titled “Data c

collection su

ve port operat

ort road and a

r 400 Japane

du to take me

o assist in im

ennai Port Tru

port user-frie

rt by reducing

ration in Che

nd traffic cont

d its surround

Location of C

ct of Improvem

Picture 1-2 Traff

erminal gate

collection su

urvey”) in O

tion and port

a parking lot.

ese companie

easures to imp

mproving port

ust.

endly through

g container m

nnai port thro

trol system

ding area.

Chennai in I

ment of Chenn

ffic congestion i

urvey on the

October and D

t traffic contr

The Japan C

es located in

prove operatio

t operation in

h the followin

movement lead

ough technica

India

nai Port OpeFinal R

in front of the

improvemen

December 20

rol as well a

Chamber of C

India, also

ons at Chenn

n Chennai po

ng tasks.

d times etc.

al assistance f

eration Report

nt of port

013. Data

s develop

Commerce

urged the

nai port.

ort and in

for

Page 15: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

2

The JI

the first d

(1)

Team

Mana

CFS

Port I

Port I

Gate

Traff

Cont

(1)

Gate

Traff

Cont

(2) /

Note: Th

(2)

Disp

S

F

S

E

Note: Di

Team M

ICA Study Te

dispatch to th

Compositio

Assigned

m Leader / Po

agement and

IT System De

IT System De

Manageme

fic Manageme

tainer Traffic

Manageme

fic Manageme

tainer Traffic

Coordinator

here are a few

Dispatch S

patch No.

First

Second

Third

Fourth

Fifth

Sixth

Seventh

Eighth

spatch schedu

Members a

eam (hereina

he eight dispa

on of the Tea

Area

rt Planning

Operation of

esign (1)

esign (2)

nt and Port

ent (1)

c Simulation

nt and Port

ent (2)

c Simulation

w names in a n

chedule of T

16th

29th Sep

18th Ja

12

6th

29th Se

26th Ja

23

ule includes t

and Dispa

after referred

atch are shown

am

N

Akira KO

f Takeshi S

Makoto M

Ryuichi K

Norihiro F

Hiroshi K

t Daitoku F

n Makoto M

Osamu KU

t Osamu IG

n Ken SAIT

name’s colum

The Team for

Dispatchh July 2014 –

ptember 2014

anuary 2015 –

2th April 2015h July 2015 –

ptember 2015

anuary 2016 –

3rd May 2016

travel days to

Pro

3

atch Sched

to as “The T

n below.

Name

OYAMA

SUZUKI

MIUTANI

KUWAJIMA

FUKAZAWA

KIMOTO

FUJINO

MIZUTANI

UNITA

GUCHI

TO

mn. The lower

r the first yea

h Schedule

– 14th August

4 – 7th Novem

– 28th Februa

5 – 1st May 2

– 4th August 2

5 – 28th Octo

– 24th Februa

– 10th June 2

o/from Japan.

oject of Impro

dule

Team”) memb

The Ove

Institute

OCDI

A Mitsui E

Shipbuil

Hakata P

Hakata P

OCDI

OCDI

OCDI

r name is a su

ar

2014

mber 2014

ary 2015

015

2015

ber 2015

ary 2016

2016

ovement of Ch

bers and disp

Organiz

erseas Coasta

of Japan (OC

Engineering &

lding Co., Ltd

Port Terminal

Port Terminal

uccessor of th

Numbe

hennai Port OFina

patched sched

zation

al Area evelop

CDI)

&

d.

l Co., Ltd.

l Co., Ltd.

he upper nam

er of Experts

6

8

8

6

6

8

7

5

Operation al Report

dule from

pment

e.

s

Page 16: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

3

Major

3.1

Activi

The Ste

terminal

order for

(W/G) m

prior to t

No.

Conge

Demons

I T R

M

Othe(Simul

Surv

Survey a

Activities un

Outline of P

ties conducte

eering Comm

operators an

r all stakehol

meetings were

the S/C. Date

of Dispatch

estion Survey

stration Tria

Related Measures

asterplan

r Activitiesation,Hearinvey of otherports)

S/C

W/G

and Study

ndertaken dur

Project Activ

ed as part of t

mittees (S/C)

d the concern

lders to parti

e also held to

and agendas

07-09

y

al

sng,

2

1 st

y Activitie

ring the two-y

vities

the Project are

consisting o

ned port logi

cipate in the

exchange vie

of the said S

10-12

2014

2 nd

Preparatio

Pro

Propasal o

Pro

4

es of the P

year period o

e outlined in

of the govern

stic members

e Project und

ews on all asp

S/C and W/G

01-03 04

◎◎◎

3 rd 4 t

on Impleme

opoasal

of Infrastructure Im

oject of Impro

Project

f the project a

the table belo

nment of Ind

s as well as C

er a spirit of

pects of impr

are shown be

4-06 07-09

2015

th 5 th

nration

mprovement

Trial

ovement of Ch

are as follows

ow.

dia, the State

ChPT were he

f cooperation

rovement of C

elow.

9 10-12

6 th

Evaluation,

Study

E

hennai Port OFina

s.

e of Tamil N

eld as shown

n. The Workin

Chennai port

01-03

2016

◎◎

7 th

Follow-up

y of Direction

Evaluation

Operation al Report

Nadu, the

n above in

ng Group

operation

04-06

6

8 th

Page 17: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Project of Improvement of Chennai Port Operation Final Report

5

Table 3-1 Schedule of S/C and W/G

Many stakeholders participated in Steering Committee Meetings and lively discussions were held on the

status of congestion and demonstration trials etc. The majority of the proposals made by the Study Team

were accepted. ChPT officially requested the Tamil Nadu Government to participate in the S/C based on the

advice of the Team and as result officials from the Police and Road department joined the S/C.

Stage Meeting Date Chairman The main agenda

S/C 17Jul.2014 Traffic Manager ・Eplanation of the Inception report

・Eplanation of the Inception report

・Major Activities in the 1st Dispatch

・Progress of the Study

・Scope of Demonstration Trials

・I T Based Measures

・Scope of Demonstration Trials

・I T Based Measures

・Results and Findings of Demonstration Trials

・I T Based Measures

・Futher Studies

・Simulation Model

・Status of Congestion

・Evaluation of Demonstration Trials

・1st Year Results

・2nd Year Assistance

・1st Year Results

・2nd Year Assistance

・Follow-up of Demonstration Trial

・Examination of Efficient Process of Trailer Flow

・Follow-up of Demonstration Trial

・Examination of Efficient Process of Trailer Flow

・Follow-up of Demonstration Trial

・Study on the Direction of the Masterplan

・Major Activities in the 2nd Year

・Examination of Efficient Process of Trailer Flow

・Outline of the 2nd Year Assistance

・Examination of Efficient Process of Trailer Flow

・Study on the Direction of the Masterplan

・Demonstration Trial of Web Portal System

・Follow-up of Demonstration Trial

・Sustainable Activities by Taskforce Team

・Follow-up of Demonstration Trial

・Outline and Evaluation of the 2 year Assistance

・Visualized Presentation for the Project

・Invioation Program to Japan

3rd Dispatch

Chairman23Apr.2015S/C4th Dispatch

Deputy Chairman23Feb.2015S/C

W/G 12Jan.2015 Traffic Manager

S/C 23Jan.2015 Sr. Deputy Traffic Manager

・Congestion Alleviation Measures at Chennai Port (Demonstration Trial,I T Based Measures, Other Measures)

Deputy Chairman17Oct.2014S/C

2nd Dispatch

1st DispatchW/G 17Jul.2014 Sr. Deputy Traffic Manager

・Congestion Alleviation Measures at Chennai Port (Demonstration Trial,I T Based Measures, Other Measures)

Traffic Manager08Oct.2014W/G

Traffic Manager27Jul.2015S/C5th Dispatch

Traffic Manager9Oct.2015W/G

Deputy Chairman15Oct.2015S/C

6th Dispatch

Chairman i/c7th Dispatch

Chairman i/c7Jun.2016S/C8th Dispatch

W/C 2Feb.2016 Traffic Manager

Chairman i/c

4Feb.2016

18Feb.2016

S/C(1)

S/C(2)

Page 18: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

3.2

(1)

Major

The to

since the

is located

the total

and 60%

(2)

The co

decreased

handling

steady at

that of 2

January t

The co

P.O.LIRON ORFertilizerCoalContainerOthersTotal (ToContainer(TEUs)

 Cargo

Status of P

Cargo Han

cargo handle

otal handling

e handling of

d close to the

handling volu

% in 2015.

Container H

ontainer han

d to 1,546 th

g volume incr

t 1,529 thous

2014, while

to May 2016

ontainer hand

12,794

RE 10,815

882

3,990

18,049

10,624

ns) 57,154

1,020

2007

ort Activitie

ndling Trend

ed at Chennai

volume incre

iron ore and

e port. Howev

ume has also

Table 3-

Handling Tr

ndling volume

housand TEU

reased to 1,52

sand TEUs in

laden export

is 638 thousa

dling volume

4 13,112

5 8,247

2 761

0 4,684

9 20,581

4 10,1064 57,491

0 1,143

S

2008

s

i Port is show

eased from 20

coal has bee

ver, among m

been increas

-2 Major C

rend

e in 2011 w

Us in 2012 a

27 thousand

n 2015. Laden

t containers

and TEUs wh

at Chennai p

13,425 13,

7,882 2,

591

3,362 2,

23,476 29,

12,321 12,61,057 61,

1,225 1,

Source: 2007-20

2009 201

Pro

6

wn in the table

007 to 2010 b

en suspended

major cargoes

sing; containe

Cargoes Hand

was 1,579 tho

and 1,482 tho

TEUs in 201

n import con

decreased by

hich is virtual

ort is shown

882 13,295

176 97

776 633

503 961

421 30,075

702 10,646460 55,707

523 1,558

014; Indian PorSu

0 2011

oject of Impro

e below.

but has shown

due to envir

s, container c

ers accounted

dled at Chen

ousand TEUs

ousand TEUs

14 compared

tainers in 20

y 9.8%. The

lly unchanged

in the table b

13,425

52

421

-

29,708

9,79853,404

1,539

rts Association, Aupplement: 200

2012 2

ovement of Ch

n a tendency

onmental con

cargo is stable

d for 57% of t

nnai Port

s, the highes

s in 2013. H

to the previo

15 increased

e container h

d from the sam

below.

12,784 12,7

- 1

415 5

- -

28,330 29,9

9,576 9,151,105 52,5

1,468 1,5

April 2015 -Jun07 (April 2007 to

2013 2014

hennai Port OFina

to decline si

ncerns as Che

e and its prop

the total carg

st on record,

However, the

ous year and

by 2.9% com

handling volu

me period las

736 11,890

146 -

541 260

-

945 30,210

173 7,700

541 50,060

552 1,565

ne 2016; ChPTo March 2008)

(In ‘000 Tons,

20154

Operation al Report

nce 2011,

ennai city

portion to

go in 2014

but then

container

remained

mpared to

ume from

st year.

2016Apr-Jun

3,121

-

58

-7,293

2,673

13,145

-

‘000 TEUs)

Page 19: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Project of Improvement of Chennai Port Operation Final Report

7

Table 3-3 Container Handling Volume at Chennai Port

The container handling volume at DPW (CCT) has been increasing recently, reaching 861 thousand

TEUs in 2015, an increase of 7.2% compared to the previous year. However, the container handling volume

fell sharply by 23% in April and 27% in May compared to the same months of the previous year.

The container handling volume at PSA fell to 667 thousand TEUs in 2015 compared to 724 thousand

TEUs in 2014, a decrease of 7.7%. However, it significantly increased during the period from February to

May 2015 compared to the same period last year. It was 69 thousand TEUs in April this year compared to

66 thousand TEUs in April last year, an increase of 5% and was 64 thousand TEUs in May this year

compared to 54 thousand in May last year, an increase of 19%.

These fluctuations in the container handling volume of each terminal seem to be a result of the

competition between the two terminals or re-arrangement of vessel services as the total handling volumes

have not changed much during these periods.

laden container empty container laden container empty container

714,802 27,290 481,408 208,646 10,332 1,442,478791,200 20,535 674,407 87,013 6,680 1,579,835758,460 22,132 554,680 210,472 802 1,546,546

January 65,616 1,953 45,627 16,543 50 129,789February 55,897 2,214 47,038 12,352 116 117,617March 57,840 2,500 55,689 9,661 32 125,722April 61,964 2,376 46,460 8,902 2 119,704May 62,212 1,623 46,070 13,543 1 123,449June 64,274 1,754 47,958 12,674 2 126,662July 63,645 2,452 50,547 14,539 20 131,203August 62,278 2,924 49,984 13,260 0 128,446September 59,484 3,408 52,994 8,105 9 124,000October 57,226 3,271 51,100 11,304 42 122,943November 53,791 3,445 47,035 7,285 6 111,562December 57,916 3,388 53,181 6,828 2 121,315Total(2013) 722,143 31,308 593,683 134,996 282 1,482,412January 56,688 4,234 47,716 6,942 6 115,586February 47,905 4,346 50,113 6,028 6 108,398March 57,093 6,958 59,890 4,436 4 128,381April 59,196 5,492 49,962 4,046 1 118,697May 65,385 3,504 55,705 6,933 2 131,529June 66,417 4,759 47,376 9,039 4 127,595July 67,652 3,228 54,756 14,069 2 139,707August 65,520 4,445 53,746 10,795 0 134,506September 68,962 4,196 53,241 9,904 3 136,306October 61,104 4,100 51,047 13,029 1 129,281November 59,181 3,704 47,934 12,353 76 123,248December 60,318 5,635 53,775 14,202 506 134,436Total(2014) 735,421 54,601 625,261 111,776 611 1,527,670January 60,108 3,993 48,020 9,550 174 121,845February 53,292 4,294 49,047 6,443 2 113,078March 61,010 6,515 55,021 8,335 212 131,093April 70,746 4,051 51,416 11,088 0 137,301May 65,947 3,896 43,573 15,648 0 129,064June 67,634 3,901 45,115 12,076 0 128,726July 68,875 3,386 50,554 19,272 0 142,087August 60,468 5,147 47,761 14,489 0 127,865September 65,328 6,967 47,938 13,699 572 134,504October 60,668 7,650 45,768 14,988 655 129,729November 60,557 3,853 36,642 10,819 400 112,271December 62,057 2,960 43,151 11,825 2,000 121,993Total(2015) 756,690 56,613 564,006 148,232 4,015 1,529,556January 64,028 4,416 44,950 15,695 2 129,091February 55,803 3,077 46,002 12,777 0 117,659March 73,269 3,818 54,774 15,486 1 147,348April 65,544 4,164 40,729 14,111 40 124,588May 66,602 2,869 33,366 16,301 0 119,138Total(2016) 325,246 18,344 219,821 74,370 43 637,824

Export(TEU)Tranship(TEU) Total(TEU)

Source: 2010 - March 2013; Data Collection Survey 2013 JICA, April 2013 -May 2016; ChPT

2016

201020112012

2013

2014

2015

DPW+PSAImport(TEU)

Page 20: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

As for

DPW han

2015. Ho

handled 4

(3)

The Te

The Te

received

The tr

dispatch

r the share b

ndled 56.3%

owever, durin

48.6%.The

Trends of C

eam studied t

eam compare

in a containe

ransition of t

is shown in t

JaFeMAMJuJuASONDTo

JaFeMAMJuJuASONDTo

JaFeMAMJuJuASONDTo

JaFeMAMTo

2015

2014

2013

201020112012

2016

etween two t

and PSA ha

ng the period

container ha

Table 3-

Calling Vesse

the changes o

ed the number

er yard per ev

the vessel nu

the figure bel

anuaryebruary

Marchpril

Mayuneulyugusteptember

Octoberovemberecemberotal(2013)

anuaryebruary

Marchpril

Mayuneulyugusteptember

Octoberovemberecemberotal(2014)

anuaryebruary

Marchpril

Mayuneulyugusteptember

Octoberovemberecemberotal(2015)

anuaryebruary

Marchpril

Mayotal(2016)

So

012

Numbe

terminals, DP

ndled 43.7%

d from Januar

ndling volum

-4 Containe

els

of calling vess

r of the callin

very half day t

umber per ev

ow

121,845113,078131,093137,301129,064

147,348124,588119,138

129,091

ource: 2010 - March

117,659

127,865134,504129,729112,271121,993

1,529,556

128,726142,087

127,595139,707134,506136,306129,281123,248

122,943111,562121,315

1,482,412

134,4361,527,670

115,586108,398128,381118,697131,529

129,789117,617125,722119,704123,449126,662131,203128,446124,000

1,442,4781,579,8351,546,546

Totaler of container(TE

637,824

Pro

8

PW handled

in 2015. Thu

ry to May 20

me by termina

er Handling

sels at Chenn

ng vessels an

to study the c

ery half day

Number of container(TE

1,137,7261,090,317944,00866,57659,38064,12758,64861,18963,09964,93061,98662,61862,78653,05461,605739,99856,50255,13769,64066,63974,28076,67864,89566,31167,35668,76161,69175,567803,45765,24959,18574,14171,77674,60272,02978,68773,18780,35173,75766,72471,876861,56473,71254,82171,23755,49654,742310,008

h 2013; Data Collect

DPWEU)

oject of Impro

52.6% and P

us, the share

16 PSA’s sha

al is shown be

Volume by T

nai port.

d those vesse

correlation be

at Chennai

EU) share(%)78.9%69.0%61.0%51.3%50.5%51.0%49.0%49.6%49.8%49.5%48.3%50.5%51.1%47.6%50.8%49.9%48.9%50.9%54.2%56.1%56.5%60.1%46.5%49.3%49.4%53.2%50.1%56.2%52.6%53.6%52.3%56.6%52.3%57.8%56.0%55.4%57.2%59.7%56.9%59.4%58.9%56.3%57.1%46.6%48.3%44.5%45.9%48.6%

tion Survey 2013 JI

W(CCT)

ovement of Ch

PSA handled

of DPW is in

are increased

elow.

Terminal

els whose load

etween both.

container ter

Number of container(TEU)

304,752489,518602,53863,21358,23761,59561,05662,26063,56366,27366,46061,38260,15758,50859,710742,41459,08453,26158,74152,05857,24950,91774,81268,19568,95060,52061,55758,869724,21356,59653,89356,95265,52554,46256,69763,40054,67854,15355,97245,54750,117667,99255,37962,83876,11169,09264,396327,816

CA, April 2013 -May

PSA(CITP

hennai Port OFina

47.4% in 20

ncreased from

to 51.4% wh

ading containe

rminals durin

share(%)21.1%31.0%39.0%48.7%49.5%49.0%51.0%50.4%50.2%50.5%51.7%49.5%48.9%52.4%49.2%50.1%51.1%49.1%45.8%43.9%43.5%39.9%53.5%50.7%50.6%46.8%49.9%43.8%47.4%46.4%47.7%43.4%47.7%42.2%44.0%44.6%42.8%40.3%43.1%40.6%41.1%43.7%42.9%53.4%51.7%55.5%54.1%51.4%

y 2016; ChPT

PL)

Operation al Report

014 while

m 2014 to

hile DPW

ers can be

ng the 7th

Page 21: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Project of Improvement of Chennai Port Operation Final Report

9

Figure 3-1 Number of vessels whose loading container can be received in container yard

(from 27 January to 16 February 2016)

Maximum number of vessels whose loading container can be received in container yard was 11 vessels

while the minimum number was 5. Many vessels arrive on Tuesday (10 vessels on average) and fewer

vessels on Thursday (1vessel on average). DPW terminal accepts around 5 vessels from Friday to next

Monday, around 3 vessels on Wednesday and Thursday. On the other hand, PSA terminal accepts around 6

vessels on Tuesday and around 1 vessel on Friday and Sunday. The transition of the vessel number per

every half day during the 2nd dispatch is shown in the Figure below.

Figure 3-2 Number of the permitted vessels to receive export containers

(from 30 September to 23 October 2014)

Many vessels arrive on Wednesday (11 vessels on average) and fewer vessels on Monday (7 vessels on

average). DPW terminal accepts around 6 vessels on Wednesday and around 3 vessels on Monday. On the

other hand PSA terminal accepts around 6 vessels on Saturday and around 4 vessels on Sunday and

Monday. There are some differences in the tendency of the number of vessels between the 2nd dispatch and

7th dispatch.

The Team studied the details of the changes in container vessels calling at two terminals during the 8th

dispatch as below.

0

2

4

6

8

10

12

AM PM AMPM AMPM AMPM AMPM AMPM AMPM AMPM AMPM AMPM AMPM AMPM AMPM AMPM AMPM AMPM AMPM AMPM AMPM AMPM AMPM

WED THU FRI SAT SUN MON TUE WED THU FRI SAT SUN MON TUE WED THU FRI SAT SUN MON TUE

1/27 1/28 1/29 1/30 1/31 2/1 2/2 2/3 2/4 2/5 2/6 2/7 2/8 2/9 2/10 2/11 2/12 2/13 2/14 2/15 2/16

DPW

PSA

Total

Vessel

0

2

4

6

8

10

12

14

AMPM AMPM AMPM AMPM AMPM AMPM AMPM AMPM AMPM AMPM AMPM AMPM AMPM AMPM AMPM AMPM AMPM AMPM AMPM AMPM AMPM AMPM AMPM AMPM

TUE WED THU FRI SAT SUN MON TUE WED THU FRI SAT SUN MON TUE WED THU FRI SAT SUN MON TUE WED THU

9/30 10/1 10/2 10/3 10/4 10/5 10/6 10/7 10/8 10/9 10/10 10/11 10/12 10/13 10/14 10/15 10/16 10/17 10/18 10/19 10/20 10/21 10/22 10/23

DPW

PSA

Total

Vessel

Page 22: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Note: na

Source:

The nu

from 17

two calls

Furthe

dispatch

1) DPW

- MS

Che

- YC

allo

2) PSA

- AC

ship

HY

(Re

Based

DPW te

suspende

thought

Furtherm

not frequ

Tab

ames above are

Prepared by th

umber of ves

to 14 compa

s per day, has

ermore, the T

and 8th dispa

W Terminal

SK FEEDER

ennai port on

CC (Yangon C

ocated. Shipp

A Terminal

CS (Asia Che

pping compan

YUNDAI,

eference: Hom

on the infor

rminal switc

ed its service

that the con

more, this cha

uently occur w

ble 3-5 Tab

e service names

he Team based o

ssel services

ared to the 2n

basically rem

Team found t

atch.

has suspend

ce a week wi

Colombo Serv

ing company

ennai Service

nies (T.S Lin

mepage of HA

rmation from

ched to the

e at the DPW

ntainer handli

ange is thoug

while congest

ble 3-6 Servic

that the shippin

on Homepages

for the 2 con

nd dispatch. H

mained the sa

the following

ded its servic

ith a vessel of

vice) started

y is Continent

e) alliance wa

nes & SIMAT

ANJIN/HYUN

m a shipping l

PSA termin

W terminal. T

ing volume a

ht to be one

tion in front o

Pro

10

ces of Contai

ng company (si

of DPW and PS

ntainer termi

However, the

ame.

g changes in

ce from May

f 2,100 TEUs

its service fr

tal Shipping L

as realigned.

TECH) joined

NDAI/SIMA

line and ChP

nal following

These chang

at DPW was

of the reason

of PSA was o

oject of Impro

iner Vessels

ingle or plural)

SA

inals during t

e average num

the details o

y 2016. MSK

s.

from 11 April

Line.

After suspe

d this service

ATECH/Contin

PT, some call

g the realign

es occurred

s decreased

ns that conge

often observed

ovement of Ch

at Chennai P

provides.

the 7th and 8

mber of vesse

of vessel serv

K FEEDER

l 2016. A ve

nsion of IFX

e which was o

nental Shippi

ling vessels w

nment of AC

in early 201

while that at

stion in front

d.

hennai Port OFina

Port

8th dispatch d

el calls, appro

vices betwee

service had

ssel of 1,500

X server at D

originally pro

ing Lines)

which used t

CS. Moreove

6. Conseque

t PSA was i

t of DPW IN

Operation al Report

decreased

oximately

en the 7th

called at

0 TEUs is

DPW, two

ovided by

to use the

er, feeder

ently, it is

increased.

N Gate did

Page 23: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

3.3

(1)

The T

congestio

trailers o

from the

trailers o

collection

The ch

The nu

dependin

the data

number o

to the de

than 800

Manali J

was dras

activities

analyze t

Handled/M

Maxi

Aver

No. o

Status of C

Regular Ob

Team regular

on at each di

outside the po

flyover whe

outside the Po

n survey (De

haracteristics

umber of qu

ng on the time

collection su

of queuing tr

ecrese in the

0 after the 4th

Junction in th

stically decre

s undertaken

traffic conges

Maximum/day

Average/day

Handled Container

(TEU)/Month

200 

400 

600 

800 

1,000 

1,200 

1,400 

1,600 

Number of Trailers

d ContainerMonth

121(Dece

imum/day

rage/day

2013.12

DaColle

1,0

81

f Trailers

Congestion

bservation o

rly observed

ispatch. As p

ort, observed

re inside the

ort during the

cember 2013

Table 3-6

of the conge

ueuing trailer

e. The maxim

urvey to the

ailers greatly

container han

h dispatch. T

he suburbs, w

eased during

by the tasks

stion and shar

Data CollectionSurvey

1st Dis

1,097  1,0

819  37

121,315  134,

1,097 1,02

819 

3

121,315 

134,

,315mber)

134,506(August)

1,024

373

2014.7.21-8.

1st Dispatc

2.6-12.7

ataection

097

19

f Traffic Con

the traffic c

part of its ob

d the end of

port can be v

period from

).

Number of

stion outside

rs is decreasi

mum number

2nd dispatch

y decresed du

ndling volum

The traffic co

was one of th

the latest 8t

force team.

re informatio

patch2nd 

Dispatch

24  1,478 

73  467 

506  129,281 

24  1,478 

73  467 

506  129,281 

129,281(October)

1,478

467

3

.13 2014.9.30-11.5 2

ch 2nd Dispatch

Pro

11

ngestion

congestion st

bservation wo

the queue, a

viewed, etc. T

the 1st dispat

f Queuing Tr

the port base

ing in genera

of queuing tr

h but no lon

uring the 3rd d

me. The numb

ontrol, which

he reasons for

th dispatch. T

It is also tho

on on the cong

3rd Dispatch

4thDispa

568  709

162  336

113,078  137,3

568 

709

162 33

113,078 

137,3

137(A

113,078(February)

568 7

162 3

3rd Dispatch 4th D

2015.1.19-2.7 2015.4

oject of Impro

tatus and ex

orks, the Team

and confirmed

The figure be

tch to the 8th

railers Outsi

ed on this suv

al though the

railers was m

ng queues ha

dispach. The

ber of queuin

was conduct

r the increase

The Team co

ought to be d

gestion status

h atch

5th Dispatch

9  754 

6  274 

301  142,087 

9  754 

36  274 

301  142,087 

7,301April)

142,087(July)

709 754

336 274

Dispatch 5th Dispat

4.13-4.24 2015.7.7-7

ovement of Ch

xamined the

m counted th

d congestion

elow shows t

h dispatch and

de the Port

vey are descri

ere was an in

more than 1,00

ve been obse

Team consid

ng trailers som

ted at the we

e. The numbe

onsidered tha

due to efforts

s with shareho

6th Dispatch

7thDispat

849  874

441  505

134,526  129,0

849  874 

441  50

134,526 129,0

7

6th Dispatch

2015.9.30-10.20

849

441

134,526(September)

tch

7.28 2

hennai Port OFina

characteristi

he number o

status inside

the number o

d the period o

ibed below.

increase or a

00 during the

erved since t

dered that this

metimes reac

est and north

er of queuein

at this was d

of the Study

olders throug

h tch

8th Dispatch

4  497 

5  253 

091  119,138 

497 

05 253 

091 119,138 

8th D

2016.

11(

7th Dispatch

2016.1.27-2.16

874

505

129,091(January)

Operation al Report

cs of the

f queuing

e the port

f queuing

of the data

a decrease

period of

then. The

s was due

ched more

from the

ng trailers

due to the

y Team to

gh the S/C

20,000 

40,000 

60,000 

80,000 

100,000 

120,000 

140,000 

160,000 

TEU

Dispatch

.5.22-6.10

497

253

19,138May)

Page 24: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Project of Improvement of Chennai Port Operation Final Report

12

and so on. The demonstration trials may have also motivated stakeholders to make efforts to reduce

congestion. For example, ChPT started to implement measures to ease congestion in cooperation with the

private sector while the State of Tamil Nadu improved the access road through road expansion works.

In this way the traffic congestion outside the Port has been largely alleviated. It seems that the measures

conducted by ChPT and the Team are working well and have been well-received by the stakeholders.

In addition, from the 1st to 8th dispatch, there were typically longer queues of trailers at the middle of

the week or on the weekend and smaller queues at the beginning of the week (Monday).

The results of the surveys on the degree of traffic congestion outside Chennai Port are shown from

Figure 3-3 to Figure 3-8 below (red color indicates queues of more than 30 trailers and orange color

indicates queues less than 30 trailers).

The queuing trailers inside the port starts from either DPW IN Gate, PSA IN Gate, or Port Gate No.1

(Exit). The queue starting from DPW IN Gate frequently occured during a period from the 3rd dispatch to

the 7th dispatch, but congestion was significantly reduced during the 8th dispatch.

On the other hand, the queues starting from PSA IN Gate continually occurred during the period from the

3rd dispatch to the 7th dispatch and it occurred even more frequently during the 8th dispatch. This was

considered to be due to the increase of container handling volume at PSA. The Team observed that the

queue, which extended almost to the DPW OUT Gate, obstructed the other traffic flow.

The heavy congestion starting from Port Gate No.1 (Exit) has not occurred since procedures by Customs

and CISF at Port Gate No.1 were simplified during the 5th dispatch. The enhancement of Port Gate No.1

during the 8th dispatch helped alleviate the congestion as well.

Figure 3-3 Congestion Status inside/outside the Port

(3rd dispatch: 9 February to 15 February 2015)

Page 25: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Figure 3

(4

-4 Congest

4th dispatch:

Pro

13

tion Status in

: 13 April to

oject of Impro

nside/outside

24 April 201

ovement of Ch

e the Port

15)

hennai Port OFina

Operation al Report

Page 26: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Figure 3-5 Congest

(5th dispatch

Pro

14

tion Status in

h: 5 July to 2

oject of Impro

nside/outside

28 July 2015

ovement of Ch

e the Port

)

hennai Port OFina

Operation al Report

Page 27: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Project of Improvement of Chennai Port Operation Final Report

15

Figure 3-6 Congestion Status inside/outside the Port

(6th dispatch: 30 September to 20 October 2015)

E E´

beyodBharath

Nagar Point

BharathNagar Point~TVT-Parking

TVT-Parking~Access

RoadEntrance

Access RoadEntrance~Port Gate 1

Port Gate 1~X-RayIntersection

X-RayIntersection~DPWEntrance

DPWEntrance~DPW Exit

DPW Exit~PSAEntrance

PSA Exit~PSAIntersection

PSAIntersection~Fire Station

Fire Station~DPW Exit

DPW Exit~Port Gate 1

ーーーーーーーー

longnilnilnilnilnil

longshort

ーーnilnil

longnilnilnil

longnil

longshort

ーーnilnilーー

longnilnilnil

shortnil

11:30ThuOct 15th

longlong9:45WedOct 14th

WedOct 7th

long long

long

long long

10:30

10:20

10:20

11:00

TueOct 6th

long long long long

nilnilnilnil

longnilnilnilnilnilshort

14:50 nil

nilnil

nilnil

nilnil

nilnil

nilnil

nillong

long11:30

10:30SunOct 4th

nilnilnilnil11:30MonOct 5th

nilnilnilnilnilnillonglong

long long

longlonglong

longlong11:50FriOct 2nd

ーーーーーnillonglonglongnilnil10:30SatOct 3rd

ーーーーーnillong

ーーーーーnillong

ーーーーーnillong

Sep 30th Wed 11:30 long long long long

Oct 1st Thu 10:50 long long long long

nil nil

nil nil nil nil

long long short Short

long long

long long long long

long long

long long long long

nillong

longlonglonglong

nillong nil long nil nil nil

nil

nil

longnil nil short nil nil

long

long long long nil nil nil nil nil long

short

long nil long nil nil nil long

long nil ー ー ー ー

nil nil

short

long nil nil nil nil nil

nil nil

nil nil

nil

nil

long nil

short nilnil nil nil

long nil

nil nil

short

Fri

nil

nil nil

long long

nil nil

nil nil nil

Oct 19th

Oct 20th

10:30

10:10

14:30

9:30

9:30

Mon

Oct 17th

Fri

Sat

Oct 18th Sun

Oct 16th

Truck Queue : nil, short (less than 30), long (30 or more),

Outside Port Inside Port

A B C D F G H I J K

Oct 8th

Oct 9th

longnil nil

Oct 10th

Oct 12th

Sat

Tue

L

Thu 11:00 long long

nil

Oct 13th

nil nil nil nil

long nil nil nil nil

Date

Mon

long long long long nil

Tue

AL K

J

I

HGF

DCB

TVT‐Parking

Port Gate No.1

Inside PortOutside Port

E´E

Page 28: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Project of Improvement of Chennai Port Operation Final Report

16

Figure 3-7 Congestion Status inside/outside the Port

(7th dispatch: 27 January to 16 February 2016)

Page 29: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

(2)

The Te

in 3.3 (1)

alleviatin

1) Surv

The Te

3rd disp

for 400

The de

2) Surv

The T

to grasp

summa

conduc

2 hours

Date

Lo

3rd Jun

Truck Que

1st Jun

2nd Jun

23th May

24th May

25th May

26th May

27th May

28th May

5th Jun

4th Jun

29th May

30th May

31st May

Survey on T

eam conducte

). These surv

ng the conges

vey on Proce

eam conducte

patch. The su

0 trailers were

etails are desc

vey on Traile

Team conduc

p the process

arized daily b

cted the surve

s each in the

Week Time

beyodBharath

Nagar Po

ocation

Fri

long

Wed 17:00

Thu

eue : nil, short (less than

A

Mon 15:15 nil

Tue 15:00 long

15:30Wed

nil16:30Thu

long

long17:00Fri

short15:30Sat

Sun

12:00

Sat 16:15 long

Sun

nil11:00Mon

long

nil

17:00

10:00

nil

Tue 17:00 long

11:30 long

A

Figure 3

(

Traffic Cong

ed a various

veys aimed at

stion. The ove

essing Time at

ed the survey

urvey was con

e collected in

cribed in 3.7

ers Passing th

ted the surve

ing capacity

by CISF, at

eys on the num

e morning an

hoint

BharathNagar Point~TVT-Parking

TVT-PaAcces

Entr

lo

long lo

n

30), long (30 or more),

Outside Port

B C

nil n

ikong lo

long

lolong

lolong

n

lo

lolomg

loshort

long

nil

long

long

nil

lo

lo

long lo

BTVT‐Par

-8 Congest

(8th dispatch

gestion Statu

surveys other

t grasping the

erview and re

t Port Gate N

y on the proce

nducted for 2

total.

(2).

hrough Gates

ey on trailers

at each gate.

the 3rd, 4th

mber of traile

nd afternoon

arking~s Road

rance

Access RoadEntrance~Port Gate 1

Po

In

ong

ong syort

short

nil short

C D

nil nil

ong long

long

ong

ong

nil nil

lomgong

longong

long

longong

ong long

ong

ong long

long

C

rking

Outside Port

Pro

17

tion Status in

h: 23 May to

us

r than the reg

e status of the

esults of the m

No.1

essing time at

2.5 hours con

passing thro

As for Port G

h, 7th, and 8

ers passing th

for 2 days d

E E´

ort Gate 1~X-Ray

ntersection

X-RayIntersection~

DPWEntrance

nilnil

shortnilnilnil

shortnilnilnilnilnilnilnilnilnilnilnil

longnil

longlong

ilnilnilnil

shortnil

nil

long

Truck Queue

F

short

long

nil

short

short

long

short

short

long

short

long

short

D

oject of Impro

nside outside

o 5 June 2016

gular observa

e traffic cong

major surveys

t Port Gate N

ntinuously for

ugh Port Gat

Gate No.1, th

8th dispatch.

hrough the ga

during the 4th

DPWEntrance~DPW Exit

DPW ExPSA

Entranc

nil short

nil

I

G H

nil

short long

nil

long

nil

long

short

nil

nilnil

longnil

longnil

lomgnil

lomglomg

nil

liongnil

short

longnil

L

F

D

Port Gate No.1 E´

E

ovement of Ch

e the Port

6)

tion of traffic

estion and ex

s are describe

No.1 for outgo

r two days an

te No.1 and t

he Team colle

As for term

ates at DPW

h dispatch. F

it~

ce

PSA Exit~PSA

Intersection

PInterseFire

nil

nside Port

I

nil

short

nil

s

short

nil

nil

nil

nil

lolomg

long

long

nil

nil

K

HG

Inside Port

hennai Port OFina

c congestion

xamining mea

ed below.

oing trailers d

nd the process

terminal gate

ected the data

minal gates,

and PSA term

Furthermore,

PSAection~Station

Fire Station~DPW Exit

DP

nil nil

J K

nil nil

nil

hort short

nil nil

nilnil

nilnil

nilnil

nilnil

nilong

nilnil

nil

longnil

nil

nil nil

nil

J

I

Operation al Report

described

asures for

during the

sing times

s in order

a, which is

the Team

minals for

the Team

DPW Exit~Port Gate 1

long

L

nil

nil

nil

nil

long

short

short

short

short

short

nil

long

long

Page 30: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

collecte

The d

3) Surv

a. Ha

The

Gate

the re

Figur

HEP

94.1%

and 2

posse

b. St

From

witho

with

sticke

later.

The st

ed and analyz

details are des

vey on Docum

arbor Entry P

Team conduc

No.1 (IN) to

esults of the s

re 3-9 HEP

P possession r

% at the data

2nd dispatch,

ession ratio ha

ticker

m 15 August

out the approp

stickers with

er possession

1st Dispa

ickers are no

zed statistical

scribes in 3.7

ments carried

Permit

cted interview

o determine i

urveys condu

P Possession

ratio for exp

collection su

and 98.4% a

as been impro

2015, all lad

priate sticker

hout fail afte

n ratio of driv

atch (12/Aug

longer used

Figure 3-

l data obtaine

(3).

d by Trailer D

ws with traile

f they were c

ucted at the d

ratio (Expor

ort container

urvey (Decem

at the 6th dis

oved for both

en container

rs. All the lad

r checking a

vers was 60%

g, 2014)

as trailer driv

11 Sticker

Pro

18

ed from DPW

Drivers

er drivers of b

carrying the

data collection

rt) Figu

rs was 100%

mber 2013). A

spatch, while

h Import and E

trailers form

den container

all relevant d

% (1st dispatc

ver’s docume

r Possession

oject of Impro

W during the 6

both import an

proper docum

n survey and

ure 3-10 HE

at the 1st, 2

As for import

it was 84%

Export.

CFS and CW

r trailers exiti

documents. A

ch), but rose t

2nd Dispa

nt possession

Ratio

ovement of Ch

th dispatch.

nd export con

ments. The fo

at the 1st, 2nd

EP Possessio

2nd, and 6th

t containers, i

at the data c

WC was not p

ing form CFS

According to

to 88% (2nd

tch (18-19/O

n ratio was im

hennai Port OFina

ntainer vehicl

following figu

nd, and 6th dis

on ratio (Imp

dispatch, wh

it was 100%

collection sur

permitted into

S/CWC were

the interview

dispatch) tw

Oct, 2014)

mproved.

Operation al Report

les at Port

ures show

spatch.

port)

hile it was

at the 1st

rvey. HEP

o the Port

provided

w survey,

wo months

Page 31: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

4) Surv

a. Su

The

enteri

interv

durin

i) S

Stay

perce

inside

stayed

ii) D

The

Accor

Amon

1 A trailecontainer

O

vey inside the

urvey on Park

Team conduc

ing time to

viewed trailer

g the 2nd dis

Staying Time

1st

ying time insi

ent of vehicle

e the Port wa

d in the port m

Double Trans

e Team inferr

rding to the

ng them, 144

er sometimesr terminals.

Other6%

(Prop

Figu

e Port

ked Trailers

cted interview

the Port and

r drivers on t

patch.

e

Dispatch (1

ide the Port

s stayed in th

as 13.3 hours

more than 12

saction Ratio

2n

red that many

Team survey

trailers (96%

s carries an im

Expor21

Double Transaction

72%

Double Transacportion of double t

Figur

ure 3-13 Pr

ws with trailer

d calculated

their staying t

8/Oct, 2014)

was 18.2 ho

he port for m

s on average,

2 hours.

nd Dispatch

y drivers stay

y, Double Tra

%) conducted

mport contain

t only1% Import on

1%

ctiontransaction)

re 3-12 Stay

roportion of

Pro

19

r drivers at P

their staying

time inside th

)

ours on avera

more than 12 h

, and 70.0 ho

(4/Nov, 2014

y inside the P

ansaction wa

a Double Tra

ner out just aft

ly

ying Time in

f Double Tra

oject of Impro

ort Gate No.1

g time inside

he Port, doub

2nd Dis

age, and 48.9

hours. During

ours at maxim

4)

Port in order

as conducted

ansaction at th

fter delivering

nside the Po

ansaction an

ovement of Ch

1 (OUT) at th

e the Port. I

ble transactio

patch (4/Nov

9 hours at m

g the second

mum. Fifty-s

to perform a

by 149 out

he same cont

g an export co

ort

nd Work Pat

hennai Port OFina

he 1st dispatc

In addition, t

ons1, and park

v, 2014)

maximum. Si

dispatch, sta

six percent of

a Double Tra

of 207 traile

tainer termina

ontainer from

tterns

Operation al Report

ch on their

the Team

king place

xty-seven

aying time

f vehicles

ansaction.

ers (72%).

al.

m/to

Page 32: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Project of Improvement of Chennai Port Operation Final Report

20

iii) Parking Place and Reason for Waiting

The Team interviewed trailer drivers of waiting container vehicles on 4 October 2014 from 8:00 to

10:00, on 18 October 2014 from 16:00 to 18:00, and on 19 October 2014 from 8:00 to 10:00.

1st (4/Oct, 2014) 2nd (18/Oct, 2014)

Figure 3-14 Parking Place

1st (4/Oct, 2014) 2nd (18/Oct, 2014)

Figure 3-15 Reason for Waiting

Many drivers parked their container vehicles near container terminals and around the Hospital Gate.

Furthermore, it was observed that many trailers were parked along the peripheral road towards Port

Gate No.1 (OUT).

In the 1st dispatch, 45% of surveyed drivers were waiting for instructions from their companies

while that figure rose to 95% in the 2nd dispatch.

In addition, the Team continued to conduct the survey on parked trailers because the demonstration

trial for the restriction of parked trailers was conducted during the 3rd dispatch. The details of the

demonstration trial are described in 3.4 (4).

CCT50%

CITPL0%

Coal Yard9%

Hospital Gate32%

"0"Yard 9%

Parking Place

TotalNumber:22/ Date of survey:04.Oct.2014

CCT22%

CITPL22%

Coal Yard0%

Hospital Gate28%

"0"Yard 28%

Parking Place

TotalNumber:18 / Date of survey:18.Oct.2014

Import form13/DO

/DRF

0%

Instruction form boss

95%

Resting only/Until?

5%

Other0%

Reason for Waiting 

TotalNumber:20 / Date of survey:18.Oct.2014

Import form13/DO

/DRF

45%Instruction form boss

55%

Resting only/Until?

0%

Other0%

Reason for Waiting 

TotalNumber:22/ Date of survey:04.Oct.2014

Page 33: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Project of Improvement of Chennai Port Operation Final Report

21

b. Survey on Traffic Congestion

The Team conducted a survey on the number of queuing trailers inside the Port for 24 hours every two

hours from 27 October to 3 November 2014. The results classified by time and place are as follows:

Figure 3-16 Trailers in Queue inside the Port Inward (27/Oct/2014 – 3/Nov/2014)

The number of incoming queues from Port Gate No.1 (IN) to the DPW terminal was 77 on average

and that from the DPW terminal to PSA was 69 on average. The former (the blue bar in Figure 3-16)

was approximately 50 at all times. On the other hand, the latter (the red bar in Figure 3-16) was

occasionally more than 200 and it fluctuated by day of the week or time zone.

0

50

100

150

200

250

300

8:00 12:00 16:00 20:00 0:00 4:00 8:00 12:00 16:00 20:00 0:00 4:00 8:00 12:00 16:00 20:00 0:00 4:00 8:00 12:00 16:00 20:00

27‐Oct (Mon) 28‐Oct (Tue) 29‐Oct (Wed) 30‐Oct (Thu)

Number of Trailers

Trailers in queue inside the port  Inward 27‐Oct 8:00 to 30‐Oct 22:00

Port Gate No.1‐DPW Terminal Gate in DPW Terminal Gate in‐PSA Terminal Gate in

DPW Terminal Second Gate Port Gate No.10‐PSA Terminal

0

50

100

150

200

250

300

0:00 4:00 8:00 12:00 16:00 20:00 0:00 4:00 8:00 12:00 16:00 20:00 0:00 4:00 8:00 12:00 16:00 20:00 0:00 4:00

31‐Oct (Fri) 1‐Nov (Sat) 2‐Nov (Sun) 3‐Nov (Mon)

Num

ber o

f Trailers

Trailers in queue inside the port  Inward 31‐Oct 0:00 to 3‐Nov 6:00

Port Gate No.1‐DPW Terminal Gate in DPW Terminal Gate in‐PSA Terminal Gate in

DPW Terminal Second Gate Port Gate No.10‐PSA Terminal

Page 34: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Project of Improvement of Chennai Port Operation Final Report

22

Figure 3-17 Trailers in Queue inside the Port Outward (27/Oct/2014 – 3/Nov/2014)

The number of outgoing queues from the PSA terminal to the intersection was 125 on average and that

from the intersection to Port Gate No.1 (OUT) was 143 on average. The number of outgoing queues in

front of the X-Ray Scanning Center was less than 50. The number of outgoing queues from the PSA

terminal to Port Gate No.10 (OUT) was around 100 from midnight to 6 AM.

c. Study on the Flow of Trailers using Monitoring Camera at Terminal IN Gate

The Team monitored incoming trailers to container terminal gates continuously by setting a fixed

point camera around IN Gates of both DPW and PSA terminals during the 6th and 7th dispatch. The

monitoring was conducted in order to grasp the trailer flow and operational status of the terminal gates

on a 24 hour basis. The Team identified factors preventing efficient gate operation such as the

suspension of the gate reception, stoppage of trailer flow by parked trailers, etc. The details are

described in 3.7 (4).

d. Survey on Gate Processing Efficiency

The Team conducted site observation on the operational status of container inspection, document

check procedure, etc. in front of terminal IN Gates in addition to the observation by fixed point camera

during the 6th and 7th dispatch.

0

50

100

150

200

250

300

8:00 12:00 16:00 20:00 0:00 4:00 8:00 12:00 16:00 20:00 0:00 4:00 8:00 12:00 16:00 20:00 0:00 4:00 8:00 12:00 16:00 20:00

27‐Oct (Mon) 28‐Oct (Tue) 29‐Oct (Wed) 30‐Oct (Thu)

Number of Trailers

Trailers in queue inside the port  Outward 27‐Oct 8:00 to 30‐Oct 22:00

PSA Terminal Gate out‐Intersection Intersection‐Port Gate No.1 Container Scanner PSA Terminal‐Port Gate No.10

0

50

100

150

200

250

300

0:00 4:00 8:00 12:00 16:00 20:00 0:00 4:00 8:00 12:00 16:00 20:00 0:00 4:00 8:00 12:00 16:00 20:00 0:00 4:00

31‐Oct (Fri) 1‐Nov (Sat) 2‐Nov (Sun) 3‐Nov (Mon)

Number of Trailers

Trailers in queue inside the port  Outward 31‐Oct 0:00 to 3‐Nov 6:00

PSA Terminal Gate out‐Intersection Intersection‐Port Gate No.1 Container Scanner PSA Terminal‐Port Gate No.10

Page 35: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

As a

of the

waitin

time.

Fig

The

termin

facilit

gate.

in the

As

becau

5) Out

a. CW

The

from

and e

Wareh

a result, the T

e gate lane a

ng behind. Th

gure 3-18 I

e result show

nals. The re

ties around th

It may be als

e yard with ve

for the proce

use no special

tside the Port

WC/CFS Surv

e Team count

17 to 18 Oct

expiry date of

housing (Red

Team found t

and does not

he figures be

Idling Time (

ws that while

duction in th

he gate. The i

so caused by m

essel operatio

ess of trailer

l issue was fo

Survey

vey

ed the numbe

tober 2014. T

f Form 13 at

d Hill) are as

the existence

proceeds to

low show the

(6th Dispatch

Idling Time

he Idling Tim

increase of th

more stops at

on, to avoid to

rs leaving co

ound through

er of departin

The Team als

CWC/CFS.

follows:

Pro

23

of ‘Idling Ti

terminal gat

e ratio of the

h F

has been red

me is indicat

he reception ti

t the gate in o

oo many cont

ontainer termi

the site obse

ng trailers he

so interviewe

The survey r

oject of Impro

ime’, which o

te windows e

idling time a

Figure 3-19

duced, the rec

tive of the s

ime may caus

order to avoid

tainer handlin

inals, the Te

ervations.

aded to Port

ed trailer driv

results at CW

ovement of Ch

occurs when

even if it is e

against the ter

Idling Time

ception time

smoother trai

se more waiti

d the overlap

ngs in the sam

am has not c

Gate No.1 ea

vers on stayin

WC (Madhava

hennai Port OFina

a trailer stop

empty and tr

rminal gate p

e (7th Dispat

has increase

iler flow bet

ing time in fr

of container

me area, etc.

conducted an

ach hour at C

ng time, stuff

aram) and Co

Operation al Report

ps in front

railers are

processing

tch)

ed in both

tween the

ront of the

handlings

ny survey

CWC/CFS

fing place

ontinental

Page 36: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Project of Improvement of Chennai Port Operation Final Report

24

i) Number of Departing Trailers per Hour

Figure 3-20 Number of Departing Trailers per Hour : CWC(Madhavaram)

Figure 3-21 Number of Departing Trailers per Hour : Continental Warehousing (Red Hill)

Number of departing trailers from CWC/CFS was large at specific time zones. There were two peaks

at CWC; 2 hours before and after 11:00 and 3 hours before and after 21:00. Departing trailers from CFS

were concentrated from 15:00 to 21:00. The Team assumed that many trailers were made to wait at

0

5

10

15

20

25

30

35

40

45

50

8:00 ‐9:00

9:00‐10:00

10:00‐11:00

11:00‐12:00

12:00‐13:00

13:00‐14:00

14:00‐15:00

15:00‐16:00

16:00‐17:00

17:00‐18:00

18:00‐19:00

19:00‐20:00

20:00‐21:00

21:00‐22:00

22:00‐23:00

23:00‐0:00

0:00‐1:00

1:00‐2:00

2:00‐3:00

3:00‐4:00

4:00‐5:00

5:00‐6:00

6:00‐7:00

7:00‐8:00

Number of trailers which head to  Port Gate No.1<Depature time>

other vehicles

without container

with container(empty)

with container(laden)

Total Number:191/ Date of survey:17  to 18 Oct.2014

0

5

10

15

8:00 ‐9:00

9:00‐10:00

10:00‐11:00

11:00‐12:00

12:00‐13:00

13:00‐14:00

14:00‐15:00

15:00‐16:00

16:00‐17:00

17:00‐18:00

18:00‐19:00

19:00‐20:00

20:00‐21:00

21:00‐22:00

22:00‐23:00

23:00‐0:00

0:00‐1:00

1:00‐2:00

2:00‐3:00

3:00‐4:00

4:00‐5:00

5:00‐6:00

6:00‐7:00

7:00‐8:00

Number of Trailers which head to  Port Gate No.1<Depature time>

other vehicles

without container

with container(empty)

with container(laden)

Total Number:73/ Date of survey:17  to 18 Oct.2014

Page 37: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Project of Improvement of Chennai Port Operation Final Report

25

CWC/CFS before departure.

ii) Staying Time

CWC (Madhavaram) Continental Warehousing (Red Hill)

Figure 3-22 Staying Time

Many trailers were staying from 6 hours to 12 hours inside CWC (45.6%). By contrast, a lot of trailers

were staying for less than 3 hours inside CFS (41.7%). The average staying time was 8.9 hours for

CWC, and 3.4 hours for CFS.

iii) Stuffing Place

CWC (Madhavaram) Continental Warehousing (Red Hill)

Figure 3-23 Stuffing Place

Container stuffing places were factories (67.3%) and warehouses (21.4%) for containers departing

from CWC. On the other hand, container stuffing places were CFS (11.7%), warehouses (5.8%), and

others (25.2%) for containers departing from CFS.

less than 3hours, 9.7%

3 ‐ 6hours, 18.5%

6 ‐ 12hours, 45.6%

12 ‐ 24hours, 24.1%

more than 24hours, 0.0% N/A, 2.1%

Q1. When did you come here?<Staying time>

Total Number:195/ Date of survey:17 to 18 Oct.2014

less than 3hours, 41.7%

3 ‐ 6hours, 15.5%

6 ‐ 12hours, 11.7%

12 ‐ 24hours, 0.0%

more than 24hours, 0.0%

N/A(Import), 31.1%

Q1. When did you come here?<Staying time>

Total Number:103/ Date of survey:17 to 18 Oct.2014

Factory, 67.3%

Warehouse, 21.4%

CFS, 5.6%

Others, 0.0%N/A, 5.6%

Q2. Stuffing place

Total Number:195/ Date of survey:17 to 18 Oct.2014

Factory, 0.0% Warehouse, 5.8%

CFS, 11.7%

Others, 25.2%N/A(Import), 57.3%

Q2. Stuffing place

Total Number:103/ Date of survey:17 to 18 Oct.2014

Page 38: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Project of Improvement of Chennai Port Operation Final Report

26

iv) Expiry Date of Form13

CWC (Madhavaram) Continental Warehousing (Red Hill)

Figure 3-24 Expiry Date of Form13

Many trailer drivers at CWC carried a Form 13 with an expiry date of more than 3 days (57.4%). By

contrast, many trailer drivers at CFS carried a Form 13 with an expiry date of less than 3 days (52.5%).

The ratio of trailer drivers not carrying Form 13 or an expired Form 13 at CWC was nearly 9%.

b. Transportation Time from CFS to Port Gate No.1

The Team interviewed trailer drivers about transportation time from departure (CWC, CFS, etc.) to

Port Gate No.1 (IN) during the 2nd, 7th, and 8th dispatch.

Average transportation time was 28 hours (1st survey) and 40 hours (2nd survey) during the 2nd

dispatch. There had been no major improvement compared to the transportation time at the data

collection survey (October 2013), which was more than 1 day. The results are shown below.

expired, 3.6%less than 

0.5day, 8.2%

0.5 ‐ 1day, 9.7%

1 ‐ 3days, 15.9%

more than 3days, 57.4%

No Form13, 5.1%

Q3. Expiry date of Form13<Remaining time >

Total Number:195/ Date of survey:17 to 18 Oct.2014

expired, 0.0%

less than 0.5day, 1.0%

0.5 ‐ 1day, 24.3%

1 ‐ 3days, 27.2%more than 

3days, 18.4%

N/A(Import), 29.1%

Q3. Expiry date of Form13<Remaining time>

Total Number:103/ Date of survey:17 to 18 Oct.2014

Page 39: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

F

The

dispat

result

Figure 3-25

Figure 3-26

e survey was

tch. The ave

t on 13 Febru

5 Transpor

Transporta

conducted o

erage transpo

uary 2016 is s

rtation Time

ation Time fr

on 12 Februar

rtation time

hown below.

Pro

27

e from Depar

rom Departu

ary 2016 (1st

was 17.7 ho

oject of Impro

rture to Port

ure to Port G

time) and 13

ours (1st time

ovement of Ch

Gate No.1 (4

Gate No.1 (18

3 February 2

e) and 19.4 h

hennai Port OFina

(4/Oct/2014)

8/19/Oct/2014

2016 (2nd tim

hours (2nd ti

Operation al Report

4)

me) at 7th

ime). The

Page 40: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

The

time

transp

queui

The

at pre

previo

Tran

Figure 3-27

e survey was c

on 2nd of

portation time

ing trailers th

Figure 3-28

e maximum tr

evious dispa

ous dispatche

nsportation ti

7 Transport

conducted on

June was 1

e on 1st of Ju

hat day.

8 Transpor

ransportation

tches. In add

es.

imes obtained

tation Time

n 1st and 2nd

14:54 hours

une, 7.22 hour

rtation Time

n time at the 8

dition, the fl

d from the var

Pro

28

from Depart

of June, 201

(129 trailer

urs on average

from Depar

8th dispatch

fluctuation of

arious surveys

oject of Impro

ture to Port

6 at the 8th d

s are survey

e, was an exc

rture to Port

was about 30

f transportati

s are compare

ovement of Ch

Gate No.1 (1

dispatch. The

yed) . The

eptional case

Gate No.1 (2

0 hour, which

on time was

ed in the follo

hennai Port OFina

13/Feb/2016)

average trans

Team consid

e as there wer

2/Jun/2016)

h was shorter

s smaller tha

owing table.

Operation al Report

)

sportation

dered the

re only 73

r than that

an that at

Page 41: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Project of Improvement of Chennai Port Operation Final Report

29

Table 3-7 Comparison of Transportation Time from Departure to Port Gate No.1

The transportation time from departure (CFS, etc.) to Port Gate No.1 was shortened to 15 hours during

the 8th dispatch, as compared to 18 or 19 hours during the 7th dispatch and 28 hours or 40 hours during

the 2nd dispatch. The alleviation of traffic congestion is steadily in progress in terms of transportation

time.

6) List of Surveys on Traffic Congestion Status

The following list shows all the surveys on traffic congestion status conducted during the technical

assistance period at site.

No. of Trailers surveyed

Note: In the 8th dispatch, the team surveyed on 01 June and obtained the average transit time of 7:22 hrs.(no. of sample is 351.)However, no. of queuing trailers on the day surveyed was very few (only 75 trailers). The team evaluated that day was anexceptional day and the data was used as reference only.

497

129398327200

No. of Queuing Trailerson the Survey days

19:24 hrs 14:54 hrs

595 803/689

7th Dispatch (2016)

12 Feb. 13 Feb.

8th Dispatch (2016)

02 Jun.

2nd Dispatch (2014)

03 Oct. 18/19 Oct.

28:29 hrs 40:25 hrs 155

Transit Time Required fromDepartuer to Port Gate No.1

First Year Second Year

Average Transit Timeduring Surveys

874 689

17:43 hrs

Page 42: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Project of Improvement of Chennai Port Operation Final Report

30

Table 3-8 List of surveys on Traffic Congestion Status (1)

Date

29/07/2014

29/07/2014

08/2014

08/2014

08/2014

08/2014

04/10/2014

04/10/2014

04/10/2014

07-08/10/2014

17-18/10/2014

18-19/10/2014

18-19/10/2014

18-19/10/2014

18-19/10/2014

27/10-03/11/2014

27/10-03/11/2014

04/11/2014

02/2015

18,20,21/04/2015

04/2015

04/2015

07/2015Parked Trailer inside Port Survey on the number of parked trailers inside Port Survey on counting trailers by the Team2015

5th Dispatch

Trailer Flow at Terminal GatesSurvey on the number of trailers passing through terminal gatesfor each hour

Survey on counting trailer by a local company atterminal gates

20154th Dispatch

Trailer Dwell Time at Terminals Survey on stay time of trailers in the terminal Interview by a local company at terminal gates2015

4th Dispatch

Processing Time at Port Gate No.1(OUT)

Survey on processing time for each process at Port Gate No.1 foroutgoing trailers (CISF check, Customs check, CISF log)

Survey on measuring time by a local company atPort Gate No.1200 samples

20153rd Dispatch

Gate Processing Time at TerminalGates

Survey on the number of trailers passing through gates for eachhour

Survey on counting trailers by a local company atterminal gates2 hour/terminal x 2 terminal x 2 times for 2 days

20154th Dispatch

Parked Trailer inside PortSurvey on the number of parked trailers inside Port and thereason why they park

Interview by a local company.171 samples

20142nd Dispatch

Import Container Carrying TrailerDocument Possession

Survey on document possession ratio, HEP validity for outgoingtrailers

Interview by a local company at Port Gate No.1207 samples

20142nd Dispatch

Import Container Carrying TrailerDocument Possession

Survey on document possession ratio, HEP validity for outgoingtrailers

Interview by a local company at Port Gate No.1198 samples

20142nd Dispatch

Traffic Congestion inside Port Survey on the number of queuing trailers inside PortSurvey on counting trailers by a local company.24 hours 7 days

20142nd Dispatch

Import Container Pickup TrailerDocument Possession

Survey on document possession ratio, lead time, TVT-P usage,etc.

Interview by a local company at Port Gate No.1200 samples

20142nd Dispatch

Parked Trailer inside PortSurvey on the number of parked trailers inside Port and thereason why they park

Survey on counting trailers and interview by a localcompany.10/18: 29 samples10/19: 25 samples

20142nd Dispatch

Traffic Flow at CWC/CFS Survey on the number of trailers towards Port Gate No.1

Survey on counting trailers by a local company.a. CWC(Madhavaram):195samplesb. CONCOR:150samplesc. Continental Warehousing:(Red Hill):130samplesd. Sattava:150samples

20142nd Dispatch

Export Container Delivery TrailerDocument Possession

Survey on document possession ratio, sticker, lead time, TVT-Pusage, double transaction, etc.

Interview by a local company at Port Gate No.1200 samples

20142nd Dispatch

Parked Trailer inside PortSurvey on the number of parked trailer inside Port and on thereason why they park

Survey on counting trailers and interview by a localcompany.22 samples

20142nd Dispatch

Traffic Congestion inside Port Survey on the number of queuing trailers inside PortSurvey on counting trailers by a local company.Once by 24 hours

20142nd Dispatch

Export Container Delivery TrailerDocument Possession

Survey on document possession ratio, sticker, lead time, doubletransaction, etc.

Interview by a local company at Port Gate No.1155 samples

20142nd Dispatch

Import Container Pickup TrailerDocument Possession

Survey on document possession ration, lead-time, usage of TVT-P, etc.

Interview by a local company at Port Gate No.1200 samples

20142nd Dispatch

Intersection Status in front of DPWOUT Gate

Survey on operation of DPW OUT Gate where the heavy trafficcongestion was observed

Survey by a local company.2014

1st Dispatch

Gate Processing Time at Port GateNo.1 and Terminal Gates

To detect the unbalance of processing time for each gate in orderto improve the bottle neck for incoming trailers

Survey on measuring time by a local company atPort Gate No.1 and terminal gates

20141st Dispatch

Export Container TrailerSurvey on document possession ratio, departed place, CY cutdate, TVT-P usage, terminal, double transaction, etc.

Survey by a local company at Port Gate No.1200 samples

20141st Dispatch

Import Container TrailerSurvey on document possession ratio, departed place, deliverypermission date, TVT-P usage, terminal, etc.

Interview by a local company at Port Gate No.1200 samples

20141st Dispatch

Export Container TrailerSurvey on document possession ratio, departed place, CY cutdate, TVT-P usage, terminal , double transaction, etc

Survey by a local company at Port Gate No.1200 samples

20141st Dispatch

Import Container TrailerSurvey on document possession ration, departed place, TVT-Pusage, terminals, etc.

Survey by a local company at Port Gate No.1200 samples

20141st Dispatch

Title of Survey Purpose Method Dispatch

Page 43: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

(3)

ChPT

on 18 Jan

1) Tra

Staff m

members

lane, ins

monitorin

2) Adv

ChPT,

check o

of 4 pe

contain

necessa

road.

Howev

from cer

congestio

The ac

the inter

confirme

Container Lead

Title

Terminal Gate R

Trailer Flow in Gate

Trailer Flow in Gate

Container Lead

Terminal Gate R

Container Lead

Document Pos

Activities o

set up the Ta

nuary 2016. A

affic Control

members from

s take turns w

structing trai

ng area on m

vanced Carrie

, Terminal Op

of trailer driv

ersons and t

ner have Form

ary document

ver, trailer dr

rtain drivers).

on inside the

ctivities of tas

rview of pers

ed that the qu

d Time

e of Survey

Reception Time

front of Terminal In

front of Terminal In

d Time

Reception Time

d Time

session

Table 3-9

of the Task F

ask Force Tea

According to

Outside the P

m the Trailer

working a 12

ilers to stop

motorbikes. Th

ed Document

perators and S

vers in advanc

they work in

m 13, Shipp

ts are not allo

rivers withou

. Some drive

port and that

sk force team

sons involve

ueued trailers

Survey on transportat

Survey on 'Idling Timecontainer terminals

Examination on the staweek by observing pic

Examination on the staweek by observing pic

Survey on transportat

Survey on 'Idling Timecontainer terminals

Survey on transportat

Survey on document p/deliver to, etc.

List of sur

Force Team

am which con

interviews w

Port

Owners Asso

- hour shift a

and go, wh

hey control th

t Check

Security Firm

ce around the

n 8 hour shif

ing Bill, Gat

owed to proc

ut containers

r suggested t

t a document

m outside the P

d, this was

s outside the

tion time from CWC, CF

Purpose

e' between processed a

atus in front of terminactures taken by a fixed

atus in front of terminactures taken by a fixed

tion time from CWC, CF

e' between processed a

tion time from CWC, CF

possession ratio, place

Pro

31

rveys on Traf

nsists of Term

with concerned

ociation contr

and do such j

hile commun

he traffic flow

m (which is en

e entrance of t

fts around th

te Pass and

ceed to the Po

were not su

that such insu

check for all

Port were dis

because the

Port were a

FS to Port Gate No.1 I

at IN Gates of St

al gates for 24 hours apoint camera

O

al gates for 24 hours apoint camera

O

FS to Port Gate No.1 I

at IN Gates of St

FS to Port Gate No.1 I

es receive from I2

oject of Impro

ffic Congesti

minal Operato

d persons, its

rol the trailer

jobs as confi

nicating with

w to the Port G

ntrusted by C

the access ro

he clock. Th

their validity

ort Gate and m

ubject to a do

ufficient docu

drivers shou

scontinued du

traffic cong

aligned as nev

Interview by a local co

M

Survey on measuring tterminal gates

Observation of picture

Observation of picture

Interview by a local co

Survey on measuring tterminal gates

Interview by a local co

Interview by a local co200 samples

ovement of Ch

ion Status (2

ors, Trailer Ow

activities are

queue outsid

irming the tra

h colleagues

Gate when co

ChPT) are per

ad to Port Ga

hey confirm

y. Drivers wh

must park alo

ocument che

ument checks

ld be conduct

uring the 8th d

estion was b

ver before an

mpany at Port Gate No

Method

time by a local company

es by the Team

es by the Team

mpany at Port Gate No

time by a local company

mpany at Port Gate No

mpany at Port Gate No

hennai Port OFina

2)

wners Associ

e described b

de the Port. T

ailer queue to

s by cell ph

ongestion occ

rforming the d

ate. One Team

if trailer driv

ho do not po

ong the left s

eck (due to o

ks were contri

ted.

dispatch. Acc

being reduce

nd that the n

o.12016

8th Dispatch

Dispatch

y at 20167th Dispatch

20167th Dispatch

20156th Dispatch

o.12016

7th Dispatch

y at 20156th Dispatch

o.12015

6th Dispatch

o.1. 20156th Dispatch

Operation al Report

iation etc.

elow.

hirty staff

o a single

hones and

curs.

document

m consists

vers with

ossess the

ide of the

opposition

ibuting to

cording to

d. It was

number of

Date

2015/10/7

19,20/10/2015

10/2015

10/2015

02/2016

02/2016

02/2016

02/06/2016h

h

h

h

h

h

h

h

Page 44: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

trailer qu

persons o

aligned w

3.4

As pre

demonstr

of measu

(Monday

succeedin

(1)

1) Outl

The ai

by readin

In pre

specifica

software

ChPT. Th

reading s

The de

system i

demonstr

users and

The sy

hardware

the recom

and the s

for susta

code read

2) Eval

a. The

main

intro

ueue had dec

of the task for

with a lane.

Implement

eviously state

ration trials a

ures for allev

y) to 15 Feb

ng following

Demonstra

ine and follow

im of demons

ng a barcode

eparing for t

ation in orde

. Furthermore

he Team also

system.

emonstration

implementati

ration trial fo

d tried to iden

ystem develo

e failure and

mmendation o

succeeding 6

ainable operat

ding system,

luation

processing t

nly due to the

oduced by the

creased. On t

rce team cont

tation of Dem

ed on the sta

as advanced m

viating the con

bruary 2015

up survey ar

ation Trial 1:

w-up status

stration trial

printed on th

the demonstr

er for ChPT

e, the Team s

held five wo

n trial 1 was c

on support

or about 2 we

ntify and elim

oped for dem

a lack of a su

on Implemen

months of op

tion, setting u

etc.

time at Port

e introduction

e CISF, Custo

the other han

trolled the tra

monstration T

atus quo of tr

measures base

ngestion. The

(Friday). Th

re summarize

Simplificati

1 is to replace

e HEP.

ration trial, t

EDP (Electr

selected and p

orkshops in th

continued aft

in place of

eks after the

minate system

monstration t

ustainable sys

nting Port En

peration. The

up emergency

Gate No.1 h

n of the bar c

oms, etc. have

Pro

32

nd, their activ

affic wheneve

Trials and F

raffic conges

ed on the traf

e trials were

he results an

ed below.

ion of the pr

e the current

the Team de

ronic Data P

procured the

hree days in o

ter the schedu

ChPT EDP

start of the tr

m issues durin

trial 1 was d

stem for cont

ntry/Exit Cont

e recommend

y contact pla

has been larg

code reading

e contributed

oject of Impro

vities inside t

er congestion

Follow-up Ac

tion outside

ffic survey re

conducted fo

nd evaluation

ocedure at P

hand-written

esigned the s

Processing) s

model of the

order to teach

uled period (

section toge

rial. The Team

g this period.

discontinued

tinuous opera

trol System b

dation include

an, system ex

ely reduced

system, thou

as well.

ovement of Ch

the Port cont

n occurred or

tivities

the port, the

esults in order

or one week f

n of the dem

Port Gate No

n log book wi

system and

section to de

e barcode sca

h CISF staff h

(1 week). The

ether with th

m answered v

in August 2

ation. Therefo

based on the

es running ru

xpansion plan

(refer to the

ugh the sever

hennai Port OFina

tinued. Traff

when trailers

Team condu

r to evaluate

from 9 Febru

monstration t

o.1

ith electrical

prepared the

evelop the ap

anner, and len

how to use the

he Team cond

he monitorin

various quest

2015 due to

ore, the Team

experience in

ules for work

n for re-starin

table below

ral procedura

Operation al Report

fic control

s were not

ucted four

the effect

uary 2015

trials and

recording

e detailed

pplication

nt them to

e bar code

ducted the

ng of the

tions from

repeated

m prepared

n the trial

ing group

ng the bar

w). This is

al changes

Page 45: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Proce

Averag

Time (m

b. Alth

recen

readi

syste

(2)

1) Outl

All tra

will guid

The u

impleme

were una

drivers w

The Te

used for

area (1/4

CWC

declared

essing Time a

Gate No.1

ge Processing

min/trailer/lane

ough the bar

ntly introduce

ing system a

em can also b

Demonstra

ine and follow

ailers applying

de trailer drive

utilization o

ntation of de

able to enter

were able to e

eam confirm

export conta

4 ) is to be use

is currently

a Customs b

Table

at Port

e)

IN

OUT

code reading

ed RFID syst

and the recom

be applied to t

ation Trial 2:

w-up status

g for HEP ha

ers back to R

Fi

of TVT-Park

emonstration

the gate and

nter and the i

med that 3/4 o

iner Customs

ed for HEP is

waiting for a

onded area.

3-10 Proce

Prior to th

(June 2

3.5

5.5

g system was

tem. The kno

mmendation p

the new syste

Utilization o

ave to enter T

Route 114.

gure 3-29 U

king was no

trial in Febru

d wait there f

issuance of H

of the TVT-Pa

s clearance by

suance by Ch

approval from

Pro

33

essing Time A

he Project

2014)

5

5

discontinued

owledge obtai

prepared by t

em.

of TVT-Park

TVT-Parking.

Utilization o

ot effective

ruary, 2015 a

for HEP issua

HEP was in op

arking area i

y CWC whil

hPT.

m Customs to

oject of Impro

At Port Gate

Dem

(Februar

2.5

2.0

d, Port Entry/

ined through

the Team on

king

Traffic police

of TVT-Parki

for allevia

and after that

ance or the p

peration.

s planned to

e the remaini

o have the ar

Picture 3

ovement of Ch

e NO.1

o 1

y 2015)

5

0

/Exit Control

the impleme

the establish

e stationed in

ing

ting the co

. The Team c

proper docum

be

ing

rea

H

3-1 Aerial

hennai Port OFina

Follow-up

Demo1(Ap

1.8

2.3

is being con

entation of th

hment of a su

n front of TVT

ongestion du

confirmed th

ments. Howev

CWC

HEP

Photo of TV

Operation al Report

p of

pril 015)

ducted by

e barcode

ustainable

T-Parking

uring the

hat trailers

ver, trailer

C

VT-Parking

Page 46: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

2) Eval

a. Dem

the

that

shar

shor

b. One

driv

imp

c. TVT

cont

offic

d. The

the

(3)

1) Outl

The ai

a. To d

b. To a

park

luation

mo 2 was not

document w

t drivers be n

red among tra

rt to rectify th

e of the outco

vers and conf

portance of co

T-Parking pla

tinue because

ce is open on

e Team expec

traffic conge

Demonstra

ine and follow

im of Demon

designate No P

llocate Road

king trailers w

Picture 3-2

t implemente

as prepared i

notified and a

ailer drivers,

he situation.

omes of the

firming the n

ooperation wi

ays an import

e it is very co

nly during the

cts that the us

stion.

ation Trial 3:

w-up status

stration trial

Parking Road

Managemen

without driver

TVT-Park

d in accordan

in advance in

a notice boar

traffic police

trial was lear

necessity of th

ith external or

tant function

onvenient for

e daytime.

age of TVT-P

Restriction

3 was as follo

d.

t Person in o

s and to repo

king / Closed

Pro

34

nce with Sco

n order to cla

rd be prepare

e and Pass Sec

arning that th

he HEP issua

rganizations.

in issuing HE

users as it is

Parking as ex

of Parking o

ows.

order to order

ort vehicle num

d Gate and H(June, 2016

oject of Impro

pe of Demon

arify the proc

ed etc. Howe

ction persons

e most of th

ance place. It

EP. The issua

open for 24 h

xport CFS by

on Internal R

drivers to m

mbers of park

HEP issuance6)

ovement of Ch

nstration Trial

cedure at TV

ver, the scop

s, and the peri

e HEP applic

t also helped

ance of HEP a

hours while th

CWC will co

Roads

ove their trai

king trailers t

e place at 8th

hennai Port OFina

al of Demo 2,

VT-Parking an

pe of Demo 2

iod of the tria

cants were n

d ChPT recog

at TVT-Parkin

the central pa

ontribute to a

ilers, to put st

to ChPT

h dispatch

Operation al Report

, although

nd request

2 was not

al was too

ot trailers

gnized the

ng should

ass section

alleviating

tickers on

Page 47: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

The Te

number o

The nu

from the

The ex

Along th

intersecti

The nu

The n

Inspectio

No.1 and

was not u

X-Ray InteEntrance

DPW Exit~

Port Gate 1Intersectio

Survey on

Survey

Near the

Near the

Coal wh

PSA Ter

eam has cond

of parked trai

umber of par

DPW OUT t

Tab

xit route had

he entrance

ion at X-Ray

umber of wai

number of w

on Center; the

d 6 near the c

utilized.

rsection~DPW

~Port Gate 1

1~X-Rayon

n Parked Trailers

y on waited Tr

e Port Gate 1

e X-Ray Intersec

harf

rminal south sid

Figu

ducted the fo

ilers along the

rked trailers o

to Port Gate N

ble 3-11 Nu

the largest n

route, the av

Inspection C

iting trailers i

Ta

waiting trailer

e average num

coal terminal.

Maximum

Average

Maximum

Average

Maximum

Average

s inside the Port

M

A

M

A

M

A

M

A

railers at wait

ction

de

ure 3-30 De

llow-up surv

e roads and w

on the roads f

No.1 (an exit

umber of Par

number of pa

verage numb

Center and 15

n the four wa

able 3-12 N

rs was the m

mber of waiti

. On the othe

49

15

59

22

165

89

3rd Dispatch2015.2.9-2.15

Maximum

Average

Maximum

Average

Maximum

Average

Maximum

Average

ting-space

Pro

35

esignated No

veys continua

waiting areas

from Port Ga

route) are sh

rked Trailers

arked trailers;

ber of parked

from Port G

aiting areas is

Number of W

maximum in

ing trailers w

er hand, the w

15

15

87

71

95

90

4th Dispatch2015.4.15&4.20

34

16

81

42

25

11

0

0

5th Dispatch2015.7.9-7.24

oject of Impro

o Parking R

lly after the d

inside the Po

ate No.1 to th

hown in the Ta

s along the R

; the average

d trailers wa

ate No.1 to th

s shown in the

Waiting Traile

the area ne

was 39, while

waiting area n

9

2

44

9

101

57

25th Dispatch2015.7.9-7.25

38

21

91

57

27

18

0

0

h4

6th Dispat2015.10.3-10

ovement of Ch

Roads

demonstration

rt.

he DPW IN (a

able below.

Roads inside P

number of p

as 6 from Po

he DPW IN.

e Table below

ers

ear the inter

it was 2 in th

near the south

10

6

45

41

249

119

720

6th Dispatch2015.10.3-10.13

8

4

53

35

28

12

0

0

7th Disp2015.10.3-

tch0.13

hennai Port OFina

n trial by cou

an entrance r

Port

parked trailer

ort Gate No

w.

rsection at th

he area near

h side of PSA

26

9

52

25

176

102

7th Dispatch016.1.29-2.16

8th2016

5

3

1

patch-10.13

8th Di2015.10

Operation al Report

unting the

route) and

rs was 82.

o.1 to the

he X-Ray

Port Gate

A terminal

17

6

32

15

125

82

h Dispatch6.5.22-6.10

6

2

53

39

14

6

0

0

ispatch0.3-10.13

Page 48: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

2) Eval

a Num

‘No

wer

b The

disp

did

c An

dem

sinc

lane

d The

i) Tr

tea

ii) Pa

tra

re

iii) Pa

iv) Tr

no

v) In

sh

(4)

1) Outl

Demon

X-Ray In

a. Intro

i) No

ii) Ve

b. Allo

luation

mber of parke

o Parking’ rul

re still observ

e number of p

patch. Howev

not seem to s

increase of

monstration tr

ce the 7th dis

e separation b

e following m

raffic control

am should be

arking should

ailer queues

ach the Port G

arking along t

rucks parked

o-reissuing of

nfrastructure d

hall be further

Demonstra

ine and follow

nstration trial

ntersection

oduction of Tr

o Vehicles m

ehicles to/from

ocate 2 Traffic

ed trailers at

e was not fol

ved at the exit

parked trailers

ver, the numb

severely impe

trailers wai

rial, was not o

spatch thanks

by concrete cu

measures shall

activities ins

e continued.

d be strictly p

(i.e., 2 lanes)

Gate No.1

the Periphery

for an exce

f HEP.

development

r promoted.

ation Trials 4

w-up status

l 4 was imple

raffic Flow R

ay stay in the

m X-Ray Scr

c Control Per

the entrance

llowed on the

t route.

s both at the e

er of parked t

ede traffic.

iting in the

observed. Th

s to the road

urb, etc.

l be implemen

side the Port

prohibited fro

) can be main

y Road should

essive period

inside the P

4: Allocation

emented as fo

Regulation.

e Regulated T

reening Cente

rsons

Pro

36

route was de

e No Parking

entrance rout

trailers had d

4 waiting a

his is because

d maintenance

nted in order

and guiding

om the DPW

ntained for D

d be strictly p

of time sho

Port such as r

of Traffic C

ollows.

Traffic Area.

er have priori

oject of Impro

ecreasing afte

Roads. On th

te and the exi

decreased in th

areas, which

number of w

e work inside

to reduce the

of trailers to

Entrance to t

DPW and PS

prohibited to

ould be subje

road widenin

ontrol Perso

ity.

ovement of Ch

er the 5th disp

he other hand

it route increa

he 8th dispatc

were set up

waiting trailer

e the Port, su

e parked traile

o the waiting

he Port Gate

A and that tr

facilitate the

ect to a pena

ng, waiting a

ons in Port A

hennai Port OFina

patch, even th

d, many parke

ased in the 6t

tch. The parke

p by ChPT

rs has been d

uch as road w

ers inside the

area by the t

No.1, so tha

railers queue

exit of trucks

alty, such as

area enhancem

Area

Operation al Report

hough the

ed trailers

th and 7th

ed trailers

after the

decreasing

widening,

e Port.

task force

at separate

s will not

s.

a fine or

ment, etc.

Page 49: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

DPW Int

a. Intro

i)

ii)

b. Allo

The T

impleme

The ex

were occ

not able t

During

and gave

addition,

the regu

progress.

F

tersection

oduce Traffic

No Vehicle

Vehicles fro

ocate 2 Traffic

Team has c

ntation of tra

xistence of p

casionally con

to give suitab

g the 8th disp

e the approp

trailer drive

ulated traffic

.

Figure 3-31

Flow Regula

es may stay in

om DPW and

c Control Per

Figure 3-32

continually c

affic regulatio

parked or stop

nfirmed durin

ble instruction

patch, the Te

priate instruct

ers themselve

area) even

Traffic Flo

ation

n the Regulate

PSA should

rsons.

Traffic Flo

confirmed th

on at the inter

pped trailers

ng the 7 disp

ns or guidanc

am observed

tions or guid

s began to fo

without guid

Pro

37

ow Regulatio

ed Traffic Are

move alterna

ow Regulati

he status on

rsections after

within the i

patch. It was

ce to trailers e

d that traffic c

dance to trai

ollow the Tra

dance from

oject of Impro

on at X-Ray

ea.

ately.

ion at DPW

n allocation

r the demonst

ntersections

also observe

even though t

control person

iler drivers t

affic Flow Re

a traffic con

ovement of Ch

y Intersectio

Intersection

of traffic

tration trial.

and lack of t

ed that traffic

they were allo

ns were alloc

hrough the t

egulations (N

ntrol person.

hennai Port OFina

on

n

control pers

traffic contro

c control pers

ocated.

cated most of

task force ac

No vehicle ma

This repres

Operation al Report

sons and

ol persons

sons were

f the time

ctivity. In

ay stay in

sents true

Page 50: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

2) Eval

X-Ray In

a. Traff

Regu

Scre

b. Traff

park

c. The

i) To m

ii) To a

DPW Int

a. Traff

durin

b. Traff

guid

c. The

i) To a

ii) To c

3.5

The Te

the Steer

luation

ntersection

ffic Flow Reg

ulated Traffic

ening Center

ffic Flow Reg

ked/stopped tr

following me

monitor the X

allocate traffi

tersection

ffic Flow Reg

ng congested

ffic Flow Reg

ded to go out f

following me

allocate traffi

clearly indica

Effects of M

eam used a s

ring Committ

gulations we

c Area were

r.

gulations wer

railers within

easures are re

X-Ray Interse

ic control per

Figure 3-33(Afte

ulations inclu

periods whic

ulation was f

from the DPW

easures shoul

ic control per

ate no parking

Measures by

simulation mo

tee on 23rd Fe

re not follow

observed wh

re followed ev

the intersecti

equired in ord

ection by usin

sons whenev

3 Traffic Floer Implement

uding moving

ch prevented

followed to so

W Exit by a tr

ld continue to

sons whenev

g/stopping rul

Simulation

odel to illustr

ebruary 2015

Pro

38

wed during t

hich sometim

ven when tra

ions were stil

der to keep th

ng outdoor ca

ver the traffic

ow Regulatioting the New

g vehicles fro

trailers from

ome extent af

raffic control

o be impleme

ver the traffic

les by markin

Model

rate the effec

5.

oject of Impro

the demonstr

mes prevented

affic control p

ll observed up

he smooth traf

ameras

congestion o

n at X-Ray Iw Entrance R

om DPW and

DPW from e

fter the demo

l person at con

nted

congestion o

ng white line

ts of Demon

ovement of Ch

ration trial. T

d trailers from

persons were

p to the 7th d

ffic flow at th

ccurs.

Intersection Route)

PSA alternat

exiting.

nstration trial

ngested times

ccurs.

on the road.

stration Trial

hennai Port OFina

Trailers stayi

m entering th

e not present,

dispatch.

he intersection

tely were not

als and trailers

s.

ls (Demo1, 3

Operation al Report

ng in the

he X-Ray

, although

ns.

followed

s were

and 4) at

Page 51: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

(1)

a. Dem

The

dem

b. Dem

The

Roa

c. Dem

The

turn

The sim

Detail

Dem

Dem

Dem

Feedback D

mo1 (Simplifi

e aim of De

monstrated tha

mo3 (Restrict

e aim of Dem

ad. The simul

mo4 (Allocati

e aim of Dem

ns entering th

mulation mod

s of input con

mo1 Proc

Proce

mo3 Nu

mo4

Figure 3

Demonstrati

fication of Ga

emo1 was to

at gate proced

tion of Parkin

mo3 was to e

lation model d

ion of Traffic

mo4 was to ea

e intersection

del was not a

nditions to th

Table 3

cedure time a

edure time at

umber of lane

How to enter

3-34 Simula

on Trials to S

ate Procedures

o reduce gat

dure time was

ng on Internal

ease traffic co

demonstrated

c Control Pers

ase traffic co

n. The simula

able to reflect

e model are a

3-13 Input

at Port Gate N

Port Gate No

s at Periphery

r the intersect

Pro

39

ation Model

Simulation M

s at Port Gate

te procedure

s shortened in

l Roads)

ongestion bou

d the effective

son in Port Ar

ongestion by

ation model re

t the results o

as follows:

Condition o

No.1(IN)

o.1(OUT)

y Road

tion

oject of Impro

for the 3rd D

Model

e No.1)

e time at Po

n Demo1.

und for Port

es of Demo3.

rea)

ensuring that

eflected the re

f Demo2.

of Simulation

With

1.5 min

1.5 min

2 lanes

Limit to max

20 vehicles i

directio

ovement of Ch

Dispatch

ort Gate No.

Gate No.1(O

t vehicles fro

esults of Dem

n Model

n

n

s

ximum

in one

n

hennai Port OFina

.1. Simulatio

OUT) at the

om different l

mo4.

Without

4.5 min

3.5 min

1 lane

At random

Operation al Report

on model

Periphery

lanes take

Page 52: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Project of Improvement of Chennai Port Operation Final Report

40

1) Current Situation

Figure 3-35 Results of Simulation (Current Situation)

Traffic congestion occurred at Port Gate No.1 (IN, OUT) and in front of the PSA terminal entrance. Total

waiting time for traffic congestion and gate procedure time was 4.3 hours on average.

2) Demo1

Figure 3-36 Results of Simulation (Demo1)

Although the traffic queue did not occur at Port Gate No.1 (IN), vehicles remained inside the Port a long

time. Total waiting time was 3.2 hours on average (1.1 hours less than the current situation).

Page 53: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Project of Improvement of Chennai Port Operation Final Report

41

3) Demo3,4

Figure 3-37 Results of Simulation (Demo3, 4)

Although traffic congestion cleared up along the Periphery Road and the intersection, vehicles waited a

long time at Port Gate No.1(IN, OUT). Total waiting time was 3.8 hours on average (0.5 hours less than the

current situation).

4) Demo1, 3, 4

Figure 3-38 Results of Simulation (Demo1, 3, 4)

In the case of conducting Demo1, 3 and 4 at the same time, trailers entered Port Gate No.1 smoothly and

the traffic congestion inside the Port was reduced. However, traffic congestion occurred at the Customs

Gate in front of Port Gate No.1 (OUT). Total waiting time was 3.1 hours on average (1.2 hours less than the

current situation).

Page 54: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

3.6

The Te

congestio

(1)

The sy

congestio

places. A

will be av

The T

systems i

The fo

The T

ChPT du

the exist

MOU wi

additiona

Implement

eam has stud

on.

Web Porta

ystem aims a

on. The infor

A live picture

vailable. Vess

Team has rep

in Japan at W

ollowing figur

Team exchang

uring the 6th

ting ChPT H

ith the coope

al pages.

tation of IT R

ied the imple

l System for

at providing

rmation to be

of the conges

sel schedule i

peatedly expl

W/G and S/C i

re shows the

Fig

ged the MOU

dispatch. Th

omepage. Th

eration of Ch

Related Mea

ementation of

sharing info

more effectiv

e shared amo

sted road, rea

information,

ained the fun

in order to ob

image of the

gure 3-39 I

U on implem

he trial is for

he trial was i

PT and CISF

Pro

42

asures

f IT systems a

ormation rel

ve informatio

ong stakehold

al-time summ

issuing status

unctions of th

btain a consen

Web Portal S

Image of Web

mentation of d

publishing th

implemented

F. The follow

oject of Impro

as one of the

ated to traffi

on for stakeh

ders includes

mary of trailer

s of FORM13

he system an

nsus on imple

System.

b Portal Syst

demonstration

he informatio

d during the 7

wing figure sh

ovement of Ch

measures for

ic congestion

holders in ord

traffic conge

rs passing thro

3, DRF, etc. c

nd introduced

ementing the

tem

n trial of We

on related the

7th and 8th d

hows the ChP

hennai Port OFina

r alleviating t

n

rder to allevia

estion status a

ough several

can also be ac

d examples o

web portal sy

eb Portal Sys

e traffic cong

dispatch base

PT Homepag

Operation al Report

the traffic

ate traffic

at various

gates, etc.

ccessed.

of similar

ystem.

stem with

gestion on

ed on the

ge and the

Page 55: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Figure 33-40 Modifi

Pro

43

fication to the

oject of Impro

e ChPT Hom

ovement of Ch

mepage

hennai Port OFina

Operation al Report

Page 56: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

(2)

The Te

inside th

Entry/Ex

3.7

The T

outside th

(1)

The Te

CFS and

Documen

Gate, and

(2)

a. Inco

The Te

passing t

Calculati

b. Outg

The Te

documen

during th

the surve

Proposal of

eam propose

e Port. Initial

xit Control Sy

Examinatio

Team has con

he Port.

Examinatio

eam conducte

d container te

nt Check Flo

d terminal ga

Survey on P

ming Trailers

eam calculate

through the

ion results are

going Trailers

eam conduct

ntation check

he 3rd dispatc

ey are shown

Table 3-1

Plac

CISF Che

Customs C

CISF/HEP

f Entry/Exit

d a Port Entr

lly, the Team

ystem after le

on of Efficien

nducted the f

on of Operat

ed surveys in

erminals in o

ow, which de

ates.

Processing T

s to the Port

ed the proces

gate as the

e shown in Ta

s from the Po

ted the surve

k is conducted

ch for 2 days

in the follow

14 Average

ce

eck

Check

P Scan

Control Sys

ry/Exit Contr

m proposed th

arning that su

nt Process of

following act

tion Flow

nside and outs

order to gras

escribes the d

Time at Port

ssing time for

documentatio

able 3-14.

rt

ey on the pr

d at multiple

s and the pro

wing table.

e Processing

Other than

Pro

44

stem for the P

rol System at

he barcode rea

uch a system

f Trailer Flow

tivities in or

side the port i

sp the operat

documentatio

Gate No.1

r incoming t

on check is

rocessing tim

e windows by

ocessing time

Time for Ou

Average Pro

Empty Trail

28

55

53

oject of Impro

Port

t Port Gate N

ading system

was planned

w Inside the

rder to enhan

including inte

tion flow. Th

on required a

trailers to the

only conduc

me for outgo

y CISF and C

s for 400 tra

utgoing Trail

ocessing Tim

lers

ovement of Ch

No.1 to enhan

m but later opt

to be implem

Port

nce the flow

erviews with

he results we

and procedure

e Port using t

cted at a sin

oing trailers

Customs. The

ilers were co

lers at Port G

me (Sec)

All Trail

23

39

51

hennai Port OFina

nce the flow o

ted for an RF

mented.

of trailers in

ChPT, CISF,

ere summariz

es between C

the number o

ngle window

from the Po

he survey is c

ollected. The

Gate No.1

lers

Operation al Report

of trailers

FID based

nside and

, Customs,

zed in the

CFS, Port

of trailers

of CISF.

ort as the

conducted

results of

Page 57: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Place

CISF

Custo

CISF

(3)

The Te

for each

The da

reading s

Ave #/lane

Max /lane/

Ave #/ hou

Max /hour

As for

terminal

The Te

during 6t

summari

Table 3-15

e

F Check

oms Check

F / HEP Scan

Survey on N

eam conducte

hour.

ata at Port Ga

system) and th

Table 3-

# of trailers / hour

# of trailer/hour

# of trailers ur (all lanes)

# of trailerr (all lanes)

r terminal ga

gates for thre

Table 3-16

IN

OUT

eam requeste

th dispatch in

zed in the fol

Tendency

0sec< X

80

3

32

Number of T

ed a survey o

ate No.1 is su

he daily summ

-4 Transition

IN

OUT

rs IN

OUT

IN

OUT

rs IN

OUT

ates, the Tea

ee days durin

Number o

Max #

ed both termin

n order to col

llowing table

of Processin

X≦40sec

0%

1%

2%

Trailers Pass

n the number

ummarized fr

mary manual

n of Number

3rd dispa(Feb. 201

24.4

29.6

54

69

-

59.2

-

113

am conducted

g the 4th disp

of Trailers Pa

# of trailers / t

64

65

nals to submi

llect the data

. However, d

Pro

45

ng Time for O

40sec< X≦

16%

44%

54%

sing Through

r of trailers pa

from the data

lly prepared b

r of Trailers P

atch 15)

4th d(Apr

3

2

7

7

d the survey

patch. The fo

assing Throu

terminal / ho

it the statistic

a covering lon

data was not s

oject of Impro

Outgoing Tra

60sec 0s

h Gates

assing throug

collected by

by the CISF.

Passing Thro

dispatch ril 2015)

33.9

26.3

78

48

76.9

72.4

176

111

on actual n

llowing table

ugh Termina

ur Ave. # o

cal data of tra

nger period o

ubmitted by t

ovement of Ch

ailers at Port

sec< X≦60se

96%

75%

86%

gh Port Gate N

the demonst

ough Port G

7th dispatch (Feb. 2016)

34.9

23.4

64

56

69.8

70.2

121

106

number of tra

e shows the re

l Gates (Actu

of trailers / te

34.2

32

ailers entering

f time. The d

the PSA term

hennai Port OFina

rt Gate No.1

ec 60sec

4%

25%

14%

No.1 and term

tration trial 1

Gate No.1

h 8th disp(June 2

28.4

23.1

72

54

56.9

61.6

111

99

ailers passing

esults of the s

ual Survey)

erminal / hour

g/exiting for

data obtained

minal.

Operation al Report

c< X

%

%

%

minal gate

(barcode

patch 016)

4

1

9

6

1

g through

survey.

r

one week

d has been

Page 58: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

(4)

The T

based on

which re

entry pro

a. Stud

A mon

examinin

the Team

night and

during th

taken con

of suspen

operation

As a r

The susp

However

will be i

around D

2 Exceptsurvey pe3 The cachanges

Table 3-17

IN

OUT

Survey aro

Team conduct

n the request f

duce termina

ocess at termi

dy on the Flow

nitoring came

ng the causes

m has monitor

d on holiday

he 6th and 7th

ntinuously in

nsion time, w

n was evaluat

result, the Te

pensions often

r, the cause o

improved if t

DPW IN Gate

tional data (meriod,

amera was insin the situatio

Pi

Number of

Max #

ound Contain

ted the follow

from ChPT. A

al gate efficien

inal IN Gates

w of Trailers u

era is a usef

s and counterm

red incoming

s by setting a

h dispatch3. T

n 30 second in

which is defi

ted by identif

am found tha

n continued fo

of the suspen

the suspensio

e and parked t

more than 90 t

stalled only aton.

cture 3-3 I

f Trailers Pa

# of trailers / t

732

75

ner Terminal

wing survey

As a result, th

ncy. Based on

during the 8t

using Monito

ful tool for g

measures of t

g trailers to co

a fixed point

The Team has

ntervals durin

ined as a stop

fying and mea

at suspension

for more than

nsion has not

ons are elimi

trailers aroun

trailers / hour

t DPW termin

Incoming Tra

Pro

46

assing Throu

terminal / hou

ls

around conta

he Team ident

n these findin

th dispatch.

oring Camera

grasping the o

traffic conge

ontainer term

t camera arou

s analysed th

ng the survey

ppage in trai

asuring the su

ns occurred in

one hour and

been clarifie

inated. The p

nd DPW IN G

r) was exclud

nal in the 7th

ailers around

oject of Impro

ugh Terminal

ur Ave. # o

ainer termina

tified instance

ngs, the Team

a at Terminal

operational s

stion in front

minal gates co

und IN Gates

he flow of tra

y period. The

iler movemen

uspension tim

n average 3 t

d most of the

ed. The opera

photographs

Gate are show

ded as it only

h dispatch to d

d DPW IN G

ovement of Ch

l Gates (DPW

of trailers / te

35.7

25.8

als during the

e of ‘Suspens

m proposed op

IN Gates

status of the

t of terminal

ontinuously fo

s of both DP

ilers using th

Team has co

nt for more t

me during the

to 5 times a

suspensions

ational efficie

which show

n below.

occurs twice

determine if t

Gate (6th disp

hennai Port OFina

W Statistics)

erminal / hour

e 6th and 7th

sion’ and ‘Idl

perational rul

terminal IN

gates. For th

for a week inc

PW and PSA

he pictures wh

onfirmed the

than 20 minu

period.

day at both t

were for a si

ency at term

w the incomin

e during the w

there were an

patch)

Operation al Report

r

h dispatch

ing Time’,

les for the

Gate and

his reason,

cluding at

terminals

hich were

existence

utes. Gate

terminals.

ngle lane.

inal gates

ng trailers

whole

ny

Page 59: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Project of Improvement of Chennai Port Operation Final Report

47

The following tables show the suspensions detected at both terminals.

0:45

0:20

1:20

0:55

0:35

1:40

0:35

0:20

0:340:43

0:36

0:23

0:55

1:37

0:46

0:27 0:28 0:29 0:32 0:33

0:21

1:16

0:20

0:47

0:28

0:39

0:29

10:442:39

0:30

1:43

0:390:44

1:25

0:24

0:40

0:53

1:16

0:00

0:30

1:00

1:30

2:00

13:3

1

14:0

5

16:4

5

18:2

0

21:2

0

1:50

10:1

0

14:1

0

6:34

12:4

9

14:3

6

2:15

4:03

6:35

9:39

8:39

9:33

14:0

7

22:1

3

5:21

6:35

11:3

6

16:0

4

18:5

8

22:3

9

1:03

3:36

8:00

11:0

1

12:3

2

13:5

4

17:3

8

10:3

4

11:5

7

13:4

5

17:1

2

23:2

3

0:04

2:31

6:49

14:4

2

12:4613:4515:2517:2520:450:10 9:3513:506:0012:0614:0020:453:40 5:40 6:50 7:02 8:4713:4021:452:36 6:0611:0415:3118:3721:230:43 2:49 6:0010:3311:5313:256:54 7:5511:2712:0216:3322:3922:392:07 6:0913:49

WED THU FRI SAT SUN MON TUE WED

7-Oct 8-Oct 9-Oct 10-Oct 11-Oct 12-Oct 13-Oct 14-Oct Ave

hr Status of Terminal Gate Suspension and Suspended Time (DPW IN Gate)

No Trailer

AT No.4Lane Only

At no.3LaneOnly

Date of Survey:7th to 14th.Oct.2015 (8days)

5:30 2:49 2:45 2:00 10:442:39

1:56

1:29

0:58

1:14

0:28

1:16

0:380:49

1:35

0:33

1:41 1:37

2:29

0:40

2:37

0:500:42

0:21

0:520:38

0:47

1:20

3:57

1:101:21

0:43

1:02

1:25

0:00

0:30

1:00

1:30

2:00

18:04 17:38 20:41 1:32 7:40 15:47 17:01 18:24 20:57 21:38 23:34 23:35 2:41 2:27 2:49 6:44 22:25 13:52 8:29 16:37 20:35 20:44 22:56 2:23 3:02 3:14 7:23 14:36

16:08 16:09 19:43 0:18 7:12 14:31 16:23 17:35 19:22 21:05 21:53 21:58 0:12 1:47 0:12 5:54 21:43 7:30 8:08 15:45 19:57 19:57 21:36 22:30 1:52 1:53 6:40 13:34

TUE WED THU FRI SAT MON TUE

9-Feb 10-Feb 11-Feb 12-Feb 13-Feb 15-Feb 16-Feb Ave

IdlingTime Status of Terminal Gate Suspension and Suspended Time (DPW IN Gate)

Date of Survey:9thPM to 16thAM.Feb.2016  (7days)

6:22

Break-down Trailer

AT No.3Lane Only

AT No.2Lane Only

AT No.1Lane Only

AT No.1Lane Only

Picture 3-4 Parked Trailers around DPW IN Gate (7th dispatch)

Figure 3-41 Suspensions at DPW IN Gate (6th dispatch)

Figure 3-42 Suspensions at DPW IN Gate (7th dispatch)

Page 60: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

b. Surv

The T

container

and 7th d

The te

both DPW

different

windows

The w

1) Surv

num

docu

of 1

2) Cus

stam

3) Term

info

0

0:00

0:30

1:00

1:30

2:00

15

14

hr

vey on the Ga

Team consider

r terminal ga

dispatch in or

erminal IN G

W and PSA

trailer move

s are located i

works conduct

vey station: S

mber, and con

uments after

6 trailers are

stoms window

mps on the do

minal gate wi

ormation to T

0:24 0:23

1:08 1:12

0:2

5:14 18:42 22:02 22:19 22:

4:50 18:19 20:54 21:07 21:

SAT

17-Oct

Statu

ate Process Pe

red the possi

tes. Therefor

rder to find ou

ate consists o

terminals. Th

ement flow, t

in the same b

ted at each pl

Surveyors ins

ntainer damag

the inspectio

inspected at

ws: Customs o

ocuments, and

indows: Term

OS, and indic

Figure 3-4

29 0:260:20

0:33

1:07

05 23:21 0:59 1:58 6:48

36 22:55 0:39 1:25 5:41

S

18

us of Terminal

N

Figure 3-

erformance

ibility that th

re, the Team c

ut the reasons

of 1) Survey

he layouts of

hough the str

uilding in DP

ace were con

pect an incom

ges (DWP: 4 t

n. They inspe

one time at D

officers confi

d return the d

minal gate cler

cate the locat

44 Layouts

7

0:56

0:20

1:14

8 10:31 17:30 21:26

1 9:35 17:10 20:12

SUN MON

8-Oct 19-Oct

Gate Suspensio

At No.3Lane On

No Trailer

43 Suspens

Pro

48

he bottleneck

conducted a

s for the traff

station, 2) C

f the two term

ructures are

PW).

nfirmed as fol

ming containe

trailer queues

ect 4 trailers f

DPW.

irm the docum

documents.

rks receive th

tion of contain

s of Gate Fac

1:40

0:31 0:30 0:32

5:26 6:37 8:44 14:31 1

3:46 6:06 8:14 13:59 1

N TUE

20-Oct

on and Suspen

A

nly

sions at PSA

oject of Impro

k of the incom

survey aroun

fic congestion

ustoms wind

minals are sl

the same (Cu

llows.

er by checkin

s, PSA: 3 trai

for each queu

ments of trail

he documents

ner to the dri

cilities at DPW

0:45

0:25 0:29

17:32 22:45 21:05 2:54 6

16:47 18:26 20:40 2:25 2

W

21

ded Time (PSA

N

At No.2 Lane Only

4:19

A IN Gate (6t

ovement of Ch

ming trailer

nd the termina

n.

ows, 3) Term

ightly differe

ustoms windo

ng the contain

ler queues) an

ue x 4 lanes; i

er drivers, ke

s from a traile

vers.

W IN Gate

0:290:37 0:37

0:2

6:22 6:57 5:17 14:20 16:

2:56 6:28 4:40 13:43 15:

WED

-Oct

A IN Gate)

No Trailer

Date

3:26

th dispatch)

hennai Port OFina

flow originat

al gates durin

minal gate win

ent, which re

ows and term

ner number, s

and put stamp

in other word

eep a log book

er driver, ente

220:32

0:47

0:340:26

:19 19:23 21:23 21:27 21:2

:57 18:51 20:36 20:53 20:5

THU

22-Oct

e of Survey:17th to 23th

Operation al Report

ted at the

ng the 6th

ndows, in

esults in a

minal gate

eal

ps on the

ds, a total

k, put

er the

6 0:25

0:48

23 22:17

57 21:52

FRI

23-Oct

Ave

h.Oct.2015 (7days)

Page 61: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Note: T

te

ge

(C

he

go

D

During

smoothly

vacant an

as “Idling

Team con

Time’ ac

The fo

by the Te

F

The difference

erminal gate wi

et off trailers tw

Customs windo

eight of trailer c

o forward durin

DPW than at PSA

g the site ob

y. Namely, th

nd many trail

g Time” and

nsiders that s

counted for f

ollowing figur

eam during th

Figure 3-46

Figure 3-4

in layout betw

ndows. The ter

wice at DPW f

ows at PSA are

cabin). It is tim

ng such times.

A as there are 4

bservation, th

here were tim

lers were wai

reported its r

some measur

from 16% to 3

res show the

he 6th and 7th

Idling Time

45 Layouts

ween both term

rminal gate win

for the surveyo

located in a sep

me consuming fo

As for the con

4 trailer lines at

he Team ofte

es when no tr

iting behind.

ratio against t

res for reduci

37% of the to

occurrence ra

h dispatch.

e (6th dispat

Pro

49

s of Gate Fac

minals is just th

ndows and Cust

or station and th

parate house fr

or drivers to get

ntainer inspect

t DPW while on

en observed t

trailer procee

The Team re

the total time

ing the ‘Idlin

otal reception

rate of the Idl

tch) Fi

oject of Impro

cilities at PS

he positional r

toms windows

he Customs wi

om the termina

t off trailers and

tion by surveyo

nly 2 or 3 lines

that the abov

ded to the ter

efers to such

e to pass throu

ng Time’ will

n time.

ing Time acc

gure 3-47 I

ovement of Ch

A IN Gate

elation between

are located side

indow which is

al gate along the

d the following

ors, more conta

at PSA.

ve works had

rminal gate w

times, when

ugh a termina

be required

ording to the

Idling Time (

hennai Port OFina

en Customs wi

e by side and d

s located at gro

he trailer paths a

g trailers someti

ainers can be in

d not been c

windows even

no work is c

al gate at the

as the averag

e site survey c

(7th dispatch

Operation al Report

ndows and

drivers must

ound height

and are at a

mes cannot

nspected at

conducted

n if it was

onducted,

S/C. The

ge ‘Idling

conducted

h)

Page 62: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

c. Stud

The Te

and deliv

were con

a. In

b. Co

c. Si

Among

reports c

3.8

During

Chennai

congestio

conducte

During

1) The

The

west

bridg

2) Mod

Har

lane

3) The

The

4) Srip

The

the

Cus

(thro

In the

gates. On

also prop

visit to Ja

dy on the Trai

eam has cond

very in order

nducted for bo

nterviews on y

ollection of s

ite observatio

g them, interv

ould be colle

Study on th

g the 1st to

Port. Based

on which incl

ed further obs

g the 1st dispa

e highway bri

plan is to co

t. However, s

ge stand on th

dernization p

rbor road netw

es in both dire

e road expans

port authoriti

perambudur d

e ICD known

southwest dir

stoms service

ough the nati

2nd dispatch

ne of the cou

posed that Ch

awaharlal Ne

iler Process In

ducted a surve

r to enhance

oth DPW and

yard operatio

tatistical repo

on

views and si

ected only fro

he Direction

the 5th disp

d on the inf

luded the imp

servation, and

atch, informa

dge project b

onnect Chenn

some were op

he Couum Ri

plan of Chenn

work and railw

ections and th

ion project be

ies and road a

dry port devel

as the Sriper

rection. Curre

s will be avai

ional highway

h, the Team

untermeasure

hPT develop

ehru Port.

nside Termina

ey on the con

the processin

d PSA termina

n

orts from con

te observatio

m DPW.

of the Maste

patch, the stu

formation co

provement of

d exchanged v

tion on the fo

between Chen

nai port to th

pposed to th

ver bed. The

nai Port

way expansio

he railway wi

etween Chen

authorities are

lopment plan

rambudur dry

ently, one of t

ilable there. T

y Route 4) an

visited Jawa

s taken by th

and impleme

Pro

50

als

ntainer handli

ng of trailers

als since the

ntainer termin

on could be c

er Plan

udy team col

ollected, the

f port infrastr

views with C

ollowing proj

nnai Port and

he Maduravoy

he project due

construction

on are being p

ill have more

nnai Port and

re jointly imp

y port has alre

the areas of t

The dry port i

nd will be acc

aharlal Nehru

he port was t

ent a traffic f

oject of Impro

ing status in t

s at container

6th dispatch.

nals

conducted fo

llected inform

team made

ucture. Durin

ChPT on the d

ects was coll

Maduravoya

yal area, 19k

e to the risk

was suspend

planned by C

lines at the i

Ennore Port

lementing thi

eady opened.

the dry port h

is accessible f

cessible throu

u Port and ob

o simplify th

facilitation pl

ovement of Ch

he yard as for

r terminals. T

or both termin

mation relate

proposals to

ng the 6th to 8

irection of th

ected.

al

km away from

of flooding,

ded by the new

ChPT. The har

nlet of the po

is project.

It is located 6

as been awar

from the Che

ugh railway.

bserved sever

he gate-entry

lan based on

hennai Port OFina

or container re

The followin

nals but the

ed to the act

o alleviate th

8th dispatch,

he master plan

m Chennai P

since the pie

w state gover

rbor road will

ort.

60 km from t

rded for conc

ennai port by

re congestion

procedures.

its findings

Operation al Report

eceiving

g surveys

statistical

tivities of

he traffic

the Team

n.

Port to the

ers of the

rnor.

l have 4

he port in

ession.

road

n near the

The team

during its

Page 63: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Project of Improvement of Chennai Port Operation Final Report

51

In the 3rd dispatch, based on the Marine Agenda 2010-2020 prepared by the Shipping Ministry, the Team

examined cargo demand, port capacity, major projects, and accessibility to the hinterland of the Chennai

Port. The team also conducted an analysis on congestion and proposed some solutions.

In the 4th dispatch, the Team examined the Business Plan for Chennai Port Trust which was published in

2008 and has served as the Master Plan of Chennai Port.

However, circumstances surrounding Chennai Port have considerably changed since the above plan was

published. For example competitive container ports (Ennore Port, Kattupalli Port) have emerged and coal

and iron ore are no longer handled at Chennai Port. Accordingly, the Business Plan, including a master plan

for infrastructure development, may need to be updated. The Team proposed that an advisory study be

conducted on basic policy for the master plan of infrastructure development, including improvement of

internal roads (widening, pavement, lane regulation, etc.)

In the 5th dispatch, the progress of the business plan was examined. A PPP scheme for infrastructure

development of the mega terminal could not be successfully introduced. As a result, ChPT is attempting to

construct the breakwater and channel using public funds. The Team also obtained information concerning

the utilization plan of the railway and widening of SH 114.

In the 6th dispatch, the land use inside Chennai port, Ennore port, and Kattuppali Port, as well as the

inland depot of the railway in Tondiapet, 5km away from the port, were examined. The Team also

exchanged the views on the direction of the study of the master plan and confirmed important issues related

to the study.

In the 7th dispatch, the current land use plan inside the port, and the situation of the roads and railways

were confirmed. Workshops were held twice in which important issues related to the master plan study

were discussed and projects that will enhance the efficiency of the port were proposed.

The main points discussed at the workshops were as follows.

1) Meeting the cargo demand and role-sharing among ports

2) Coping with the increasing size of container ships

3) Development of roads and waiting areas for trailers.

4) More utilization of IT, i.e. information service to the drivers via Internet

5) Better Connection to the hinterland of the port

6) Promotion of railway use

7) Review of land use

8) Environmental improvement and sustainable development

Page 64: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Meet

Utiliz

Revie

In the

discussed

Nec

Nec

Sha

Nec

Nec

ting the Carg

zation of rail

ew of land u

8th dispatch

d.

ccessity of de

cessity of upg

aring of cargo

cessity of infr

cessity of dee

go Demand

lways

se/ roads and

F

h, a workshop

epening berth

grading the ac

o among Kattu

rastructure de

pening the Ja

d railway us

Figure 3-48

p on the mas

hs of the DPW

ccess road

upalli, Kamar

evelopment an

awahar Dock

Pro

52

Mee

suffi

Bette

se Envi

Deve

Proposed p

ster plan was

W terminal

rajar, Krishna

nd funding m

and widenin

oject of Impro

ting the c

icient space f

er connectio

ironmental I

elopment

project imag

s also held in

aopatnam, an

methods

g the entranc

ovement of Ch

cargo dema

for the cargo

n to the hint

Improvemen

ge

n which the

d Chennai

e

hennai Port OFina

and/provisio

o handling

terland

nt and Sustai

following iss

Operation al Report

n of

inable

sues were

Page 65: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

In resp

entrance

ChPT

proposed

3.9

Conge

up in the

allows st

Team ha

coordina

road dep

necessary

enlarged

A task

Trailers

Port gate

force ou

activities

ChPT

is to exch

related to

ponse to the

of the Jawah

requested JI

d by the Team

Improveme

estion is a com

e project for th

takeholders t

as strongly r

ation with reg

partment to ta

y for sustaina

S/C has been

k force was

Owners Asso

e No.1 and pr

utside the po

s inside the po

holds a port

hange views

o port activit

strong requ

har Dock.

ICA to contin

m.

ent of Synerg

mplicated issu

he purpose of

to understand

recommended

gulatory autho

ackle congest

able improve

n prepared, w

Figur

formed at th

ociation, Term

romoting traf

ort, while tra

ort.

users meetin

between ChP

ies are invite

est of the pr

nue technical

gy on the Op

ue which invo

f discussing m

d the project

d strengtheni

orities of the

tion issues ef

ement in the

which describe

re 3-49 Sta

he initiative o

minal Operat

ffic discipline

affic control

g each month

PT and port u

ed. As these a

Pro

53

resident of C

al assistance

peration of R

olves many s

matters relate

and share in

ning further

e state govern

ffectively. Th

operations of

es the scope o

akeholders of

of ChPT to

tors and CFS

e among drive

at the inters

h under the in

users about r

activities are

oject of Impro

ChPT, the Tea

and conduct

Regulatory A

takeholders.

ed to traffic co

nformation on

coordination

nment such a

he establishm

f Chennai po

of works and

f Congestion

tackle conge

S association

ers along SH

sections and

nstruction of

elated issues.

meaningful

ovement of Ch

am examined

feasibility st

Authorities C

A steering co

ongestion am

n traffic cong

among stak

as the traffic p

ment of an en

ort, and a draf

members etc

n Issue

estion issues.

n etc. Pre-doc

114 are majo

instructions

MOS. The pu

. Both port u

not only for

hennai Port OFina

d the wideni

tudies on the

Concerned

ommittee (S/C

mong stakehol

gestion. Ther

keholders, sp

police sectio

nlarged S/C i

aft running ru

c.

. It consists

cument check

or activities o

to drivers a

urpose of thi

users and orga

congestion a

Operation al Report

ng of the

e projects

C) was set

lders. S/C

efore, the

pecifically

n and the

s deemed

ule for the

of ChPT,

k prior to

of the task

are major

s meeting

anizations

alleviation

Page 66: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

but also f

Furthe

police an

3.10

(1)

From

Port with

CWC/CF

This m

was start

increase

improved

means th

sticker sy

collected

lately.

(2)

The T

Frequenc

procedur

being im

a. Syste

The rec

for improvem

ermore, the T

nd the road de

Related Inf

Introductio

15 August 2

hout appropri

FSs are provid

Picture 3-

means that a t

ted when the

the number

d from 80%

hat the percen

ystem was no

d and as a resu

Study on In

Team has been

cy Identifier)

res. The RFID

mplemented co

em 1

ception proce

ment of the po

Team would a

epartment, ne

formation

on of a Sticke

015, all laden

iate stickers (

ded with stick

-5 Sticker

trailer which

e screening ce

of trailer dr

to nearly 90

ntage of driv

ot properly ex

ult we were g

ntroduction

n studying th

) system afte

D system con

oncurrently an

edure at a ter

ort operation

again like to e

eeds to becom

er System

n container t

(Refer to the p

kers without

for CWC

has the sticke

entre operatio

rivers carryin

0% according

vers carrying

xplained to d

gradually seei

of RFID Sys

he details of

er confirming

nsists of the

nd System 3

rminal gate is

Pro

54

as a whole, su

emphasize th

me more invol

trailers from

pictures belo

fail after che

er is also carr

on at the TV

ng the prope

g to the surv

the proper d

drivers as man

ing fewer con

stem

the impleme

g that ChPT

following 3

will be imple

s speeded up

oject of Impro

uch activities

hat the state g

lved in issues

CWC & CFS

ow). All the la

cking all rele

Picture 3

rying the prop

VT parking w

er documents

vey conducte

documents ha

ny were unsu

ntainers with

entation plan

had the plan

sub-systems

emented in fe

and the info

ovement of Ch

s need to be c

government, s

s related to co

S have not be

aden containe

evant docume

3-6 Sticker

per documen

as discontinu

. The sticker

ed during the

as increased a

ure where stic

stickers and

and its statu

n to impleme

. System 1 a

ew years later

ormation on C

hennai Port OFina

continued.

specifically, t

ongestion.

een permitted

er trailers exi

ents.

r for CFS

nts. This stick

ued. The purp

r possession

e 2nd dispatc

as well. How

ckers were ch

did not see th

us of the RFI

ent it to expe

and System 2

r.

CFS departur

Operation al Report

the traffic

d into the

iting from

ker system

pose is to

rate was

ch, which

wever, the

hecked or

hem at all

ID (Radio

edite gate

2 are now

re and the

Page 67: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Project of Improvement of Chennai Port Operation Final Report

55

one on terminal arrival are recorded automatically according to the following procedure

i) RFID Tags will be placed on the front doors of all trailers. Trailer information such as trailer ID, its

owner, etc. are contained in the tag. RFID tags are purchased by transportation operators.

ii) In case of export container, when a trailer depart from CFS;

- RFID reader at CFS entrance/exit reads the trailer information from RFID tag and registers them in

CFS server.

- A camera at CFS entrance/exit takes a picture of the truck driver and registers it in CFS server.

- A CFS clerk manually enters the number of container. Then, the container information is linked with

the trailer information in CFS server and the linked information is transferred to terminal server

through NACFS server.

iii) When the trailer arrives at a terminal, RFID reader at a terminal entrance reads the trailer information

and retrieve the container information and the photograph of the truck driver. The information is, then,

shown on a display at terminal gate.

iv) In case of import containers, the procedure is just the other way around.

b. System 2

The reception procedure of a trailer at Port Gate No.1 is speeded up and Port entry/exit information for a

trailer is recorded automatically according to the following procedures. Harbor Entry Permit (HEP) can be

eliminated for trailers.

i) By applying RFID tag used in the system 1, the entrance and exit of a trailer from Port Gate No.1 is

recorded automatically.

ii) On arrival of a trailer at Port Gate No.1 from outside the Port;

- RFID reader at Port Gate No.1 reads the trailer information from RFID tag and register them in ChPT

server.

- A camera at Port Gate No.1 takes a photo of trailer number and shows it together with the trailer

information on a display in a gate booth.

iii) In case of outbound trailers, the procedure is similar to the above.

c. System 3

The reception procedure of a personnel at Port Gate No.1 is speeded up and the Port entry/exit

information for a personnel is recorded automatically according to the following procedures. Harbor Entry

Permit (HEP) will be replaced by RFID card.

i) A trailer driver and his assistants wear the RFID card around the neck. The personnel information

such as driving license number, photo, etc is contained on the RFID card.

ii) On arrival of a trailer at Port Gate No.1 from outside, RFID reader reads the personnel information

from RFID car. The system registers the personnel information in ChPT server and shows them on a

display in a gate booth.

Page 68: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

iii) In c

The sy

was to in

has not y

hardware

Pi

Pictu

PicturGate

case of outbo

ystem verifica

nstall the hard

yet in operati

e has been ins

icture 3-7 R

ure 3-8 RFof P

re 3-10 RF

ound trailers,

ation test for

dware equipm

ion mainly be

stalled at maj

RFID Reade Entranc

FID Reader aPort Gate N

FID Reader

the procedure

both System

ment for each

ecause only 5

or CFSs, Por

er around CFe and Exit

around Entrao.1

around DPW

Pro

56

re is similar to

1 and 2 was

h gate and att

5% of trailer

rt Gate No.1,

FS Fi

ance Pi

W IN Pic

oject of Impro

o the above.

completed at

tach RFID tag

s currently h

and DPW/PS

igure 3-50around C

icture 3-9 RP

cture 3-11 R

ovement of Ch

t the end of 2

gs on trailers

ave RFID tag

SA terminals.

ArrangemenCFS Entranc

RFID ReaderPort Gate No

RFID ReadeGate

hennai Port OFina

2015; all that

. However, th

gs. On the ot

.

nt of Equipmce and Exit

r around Exo.1

er around PS

Operation al Report

remained

he system

ther hand,

ment

xit of

SA IN

Page 69: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

(3)

The Te

(includin

the subje

was to co

Almos

transit tim

described

(4)

The T

(also kno

from Che

i)

ii)

iii)

Jawah

container

Internatio

Seale

Interviews

eam, in coop

ng forwarders

ect of congest

onfirm the res

st all the com

me became 1

d in section 3

Survey at O

Team conduct

own as Nhava

ennai Port Tru

Jawaharlal N

Gateway Te

NYK Line (

harlal Nehru

r terminals: G

onal Containe

ed RFID Tag

with Japane

eration with

s, shipping li

tion and trans

sults of the tw

mpanies have n

16-20 hours f

3.3 (2) 5) b.

Other Major

ted a field su

a Sheva Port)

ust accompan

Nehru Port T

erminal India

(India) Ltd.

Port, located

Gateway Term

er Terminal.

ese Compani

JETRO Chen

nes, etc.) in

sit time (lead

wo-year techn

noticed both

from 3days a

r Ports

urvey and hel

), the largest c

nied the Team

Trust

Pvt. Ltd.

d 70km from

minal India, J

Picture 3-12

Pro

57

ies

nnai, conduct

Chennai and

time) during

nical assistan

an improvem

as before, whi

ld a hearing

container por

m. The Team v

m Mumbai,

Jawaharlal Ne

2 RFID tag

oject of Impro

ted interviews

d Bangaluru w

g the 8th dispa

ce.

ment in the lev

ich is similar

on congestio

rt in India dur

visited the fo

is a dedicate

ehru Port Con

on Front Gl

ovement of Ch

s with severa

which usually

atch. The pur

vel of congest

r to the result

on issues at J

ring the 2nd d

llowing organ

ed container

ntainer Termi

lass of a Trai

hennai Port OFina

al Japanese C

y use Chenna

rpose of the i

tion and a red

t of the Team

Jawaharlal N

dispatch. Two

anizations:

r port consis

inal, and Nha

iler

Operation al Report

Companies

ai port on

nterviews

duction in

m’s survey

Nehru Port

o officials

ting of 3

ava Sheva

Page 70: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Major

i)

ii)

iii)

iv)

v)

vi)

Circum

facilities

Port. Ho

considere

Partic

Termin(FY 201

Quay L

RMQC

RTGs

Reefer

Back u

Rail Sid

Freque

Mode

findings of th

Heavy cong

congestion

roads.

The Port ha

port gate wa

Security ch

For exampl

Measures fo

pre-examin

Customs do

X-Ray scan

Managem

mstances in a

, and land use

owever, the fo

ed at the Port

ulars

nal Throughput13‐ 14  – 4.3 Mn

Length (m)

Cs

r Slots

p Area ( Hectare

dings

ency of Train (Pe

of Transportatio

F

he survey and

gestion was o

might not af

ad three port

as separated f

heck procedur

le, it is not ne

for alleviating

ation space, a

o not carry ou

nning of rand

ment System)

and around th

e around the

following con

t of Chennai:

. TEUs)

es )

r day)

on

igure 3-51

d hearing wer

observed tow

ffect residents

gates, one in

for about 1 km

re is more sim

ecessary to ob

g congestion

and traffic co

ut a physical i

domly select

is conducted

he port, such

port, etc. are

ngestion allev

GTI (APM 

2.06 M(47

71

10 (Twin lif

40 (Tw

84

5

3 (Integ

9

Rail / Road  

Container T

Pro

58

re as follows

ward port gat

s since few r

n each contain

m.

mplified and

btain a HEP (H

such as the c

ontrol by the p

inspection of

ted import co

d before exit

as container

different bet

viation measu

Terminals)

Mn. TEUs7 %)

12

ft 18 wide )

win Lifts)

40

52

grated)

9

: 47 / 53 %

Terminals in

oject of Impro

:

tes just like t

residential bu

ner terminal.

computerize

Harbour Entr

construction o

police have b

f export conta

ontainers as p

ting from eac

r throughput,

tween the Por

ures taken at

JNPT (Govt. of

1.20 Mn. T(28 %)

680

3 (13 Wid6 (18 Wid

18

200

58

4

4

Jawaharlal

ovement of Ch

the Port of C

uildings are o

The lane of

d than that in

ry Permit) bef

of a by-pass r

een taken.

iners at the p

per Customs

ch terminal.

the layout o

rt of Chennai

t Jawaharlal N

f India) N

TEUs

e)e)

Nehru Port

hennai Port OFina

Chennai. How

observed alon

the roads tow

n the Port of

fore entering

road, the allo

port gate (IN)

RMS (Risk

of roads and o

and Jawahar

Nehru Port s

SICT (DP World

1.04 Mn. TEUs(25 %)

600

2 (14Wide)6 (18 Wide)

29

400

26

2

3

Operation al Report

wever, the

ngside the

ward each

f Chennai.

the Port.

ocation of

.

other port

rlal Nehru

should be

d) 

Page 71: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

i)

ii)

iii)

iv)

3.11

Initiall

follows:

T

E

In

In

In

D

E

The fo

E

S

Im

In this

agencies

3.12

The stu

Howev

and Traf

forwarde

The JI

office. T

execute

consultat

Septemb

lane separat

pre-screenin

allocation o

simplificati

Additional

ly, technical

Traffic Norma

Efficient Inspe

ntroduction o

ntroduction o

ntroduction o

Draft Long Te

Establishment

ollowing issue

Efficient Inspe

Study on Basi

mprovement

s way, the Tea

concerned.

Arrangeme

udy tour in Ja

ver, the Mini

ffic Manager

ed this letter w

ICA Delhi off

The Chairman

the study to

tion with the

er.

tion on the ro

ng by Custom

of pre-examin

on of gate pr

Technical A

assistance is

alization with

ection at Port

of Traffic Reg

of Portal Web

of Authenticat

erm Port Faci

t of Cooperat

es were added

ection at Term

ic Direction o

of Synergy o

am has contin

ent of Study

apan to be un

istry of Shipp

were approv

with a cover l

fice discussed

n explained

our in Septem

JICA Delhi

oads toward th

ms

nation space

ocedures

Assistance Iss

sues for the

h CFS Cooper

t Gate No.1

gulation

b System

te Gate Syste

lity Plan

tion Framewo

d in the secon

minal Gate

of Master Plan

of Authority

nuously condu

Tour in Japa

ndertaken in J

ping issued an

ved to partici

letter of ChPT

d this matter

that the app

mber. Accord

office. They

Pro

59

he gates

sues

project on im

ration

em

ork

nd year of tec

n

ucted technic

an

June was post

n approval le

ipate in the t

T to the JICA

with the chai

proval letter w

dingly, JICA

are tentative

oject of Impro

mprovement

chnical assista

cal assistance

tponed due to

etter on 10th

tour only for

A Headquarter

irman i/c of C

was the fina

A will start p

ely scheduled

ovement of Ch

of Chennai p

ance at the re

in cooperatio

o delays on th

May 2016, in

four (4) wor

rs.

ChPT on 7th

al decision an

preparations

d to stay in Ja

hennai Port OFina

port operation

equest of ChP

on with ChPT

he Indian side

n which the C

rking days. T

June at the ch

nd requested

for the stud

Japan from 12

Operation al Report

n were as

PT.

T and

e.

Chairman

The Team

hairman’s

d JICA to

y tour in

2th to 15th

Page 72: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

3.13

Japanes

manufact

measures

assistanc

The Stu

over the

Chennai.

firms the

Presentatio

se companies

turing activit

s taken to i

ce .

udy Team cre

past 2years a

. Furthermore

ere.

on Materials

s including

ties in Tami

improve port

eated present

and provide k

e, the Team a

on Activitie

those in the

il Nadu. It i

t manageme

ation materia

key informatio

also visited B

Pro

60

s and Outco

e automotive

is important

ent & operat

als which exp

on to stakeho

Bengaluru and

oject of Impro

mes of the P

e industry a

to conduct

tion at Chen

plain the acti

olders in Indi

d made a pres

ovement of Ch

roject

are increasin

public relati

nnai Port un

ivities and ou

a as well as J

sentation on t

hennai Port OFina

ng their busi

ions activitie

nder JICA’s

utcomes of th

Japanese com

the project to

Operation al Report

iness and

es on the

technical

he Project

mpanies in

o Japanese

Page 73: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

4

4.1

(1)

The Tea

concerne

assistanc

Major a

items bel

1) Stee

S/C has

Trucker A

tackle tra

2) Wor

W/G m

discuss v

and repre

Outcom

Systematic

Measures i

am implemen

ed authorities

ce are outlined

F

activities and

low.)

ering Commi

s been set up

Associations

affic problem

rking Group

eeting has als

various issues

esentatives of

e and Eva

Implementa

introduced u

nted measure

s. Decongesti

d below.

Figure 4-1

outcomes of

ittee (S/C) on

p to improve

and JICA etc

ms and so on to

p (W/G) on Im

so been held

s on Chennai

f traffic, civil

aluation o

ation of Mea

under Techni

es for the alle

ion measures

Activities U

f the project a

n Improvem

e the operati

c. Concerned

ogether.

mprovement

as preparator

port manage

and mechani

Pro

61

of the Pro

asures for Tec

ical Issues

eviation of tr

s which were

Undertaken u

are listed belo

ment of Chenn

ion of Chenn

d persons can

t of Chennai

ry talks befor

ement & oper

ical, IT, finan

oject of Impro

oject

chnical Assis

raffic congest

e systematica

under Techni

ow. (The num

nai Port Ope

nai Port by C

share related

i Port Opera

e the S/C as w

ration. W/G w

ncial and othe

ovement of Ch

stance.

tion in coope

ally organize

ical Assistanc

bers in the fig

eration

ChPT, Termi

d information

tion

well as to pro

was chaired b

ers offices of

hennai Port OFina

eration with C

ed under the

nce

gure correspo

inal operator

n in the comm

ovide an oppo

by the Traffic

ChPT partici

Operation al Report

ChPT and

technical

ond to the

s, CFSs ,

mittee and

ortunity to

c Manager

ipated.

Page 74: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Project of Improvement of Chennai Port Operation Final Report

62

3) Introduction of a Sticker for a Container Trailer

As trailer drivers who do not carry the proper documents are one of the causes of traffic congestion, a trial

was conducted with the cooperation of the private sector in which stickers were attached to trailers when

drivers possessed the proper documents. This was a good initiative which demonstrated the willingness on

the part of the private sector to cooperate in congestion alleviation measures.However, the sticker system

was soon discontinued due to management problems.

4) Simulation Model Analysis for Traffic Congestion

The Study Team developed a traffic simulation model and showed the qualitative effect of measures for

decongestion in the S/C. It is hoped that ChPT and stakeholders will continue efforts to alleviate the

congestion.

5) Effective Utilization of TVT Parking ( Demonstration Trial )

HEP (Harbor entry permit) was issued to trailer drivers at the TVT Parking located along State Highway

114, about 5km north from Port Gate No.1. Utilizing this parking space, required documents for drivers

were pre-checked as a demonstration trial. The area was also used as a waiting space for trailers to

discourage drivers from parking trailers along the road while waiting to enter the port.

6) No Parking along internal Roads and Establishment of Waiting Area(Demonstration Trial)

Parking along internal roads encumbers trailers as they move. Parking has been banned at some road

sections and a waiting area has been set up for trailers to wait inside Chennai Port.

7) Allocation of Traffic Officers (Demonstration Trial)

Congestion at the intersection in Chennai Port was so serious that traffic control was becoming

increasingly necessary. Therefore, traffic officers were allocated at key intersections to give instructions to

drivers inside the port.

8) Additional Gate for empty container trailers at DPW terminal

An additional terminal gate for empty container trailers was set up at the area of the DPW terminal which

used to be for the handling of iron ore. It has streamlined the traffic flow inside Chennai Port and

contributed to alleviating traffic congestion.

9) Pre-Document Check prior to Port entry (Task Force Activity)

Task Force Team was formed at the initiative of Chennai Port Trust to combat traffic congestion. It

consists of ChPT, Terminal Operators and CFS association etc. Before entry to the port, trailer drivers are

subject to a document check by the Task Force. They are not allowed to enter the port until they show the

proper documents.

Page 75: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Project of Improvement of Chennai Port Operation Final Report

63

10) Promoting Traffic Discipline among Drivers (Task Force Activity)

As one of activities of the Task Force Team, trailer drivers are instructed to keep proper intervals by traffic

officer while forming a line on the road toward Port Gate No.1. The officer patrols the road on a motorbike.

Traffic discipline of drivers is expected to be improved and traffic congestion decreased.

11) Survey of Terminal Gate Operation

With the cooperation of the DPW terminal, the movement of container trailers passing through the

terminal gate was recorded by a camera set up at the entrance in order to grasp the efficiencty of gate

processing. This survey was useful for analyzing the causes of congestion related to the terminal gate and

suggesting measures for alleviation.

12) Incoming Traffic throughput Analysis

The Team analyzed the processing capacity of Port Gate No.1, terminal gates and terminal yards in order

to identify bottlenecks and proposed measures for upgrading the processing capacity to attain the target at

each gate and yard.

13) Continuous Traffic Congestion Survey

The Team conducted a traffic congestion survey outside/inside Chennai Port during every dispatch. The

survey results were utilized to grasp the present situation and examine the outcome of efforts to alleviate

traffic congestion and so on. Findings were fed back to the study activity on improvement of Chennai Port

Operation.

14) Technical Seminar for staff of Chennai Port Trust and CISF

Technical Seminars were held for staff of ChPT and CISF by the Team when the bar-code reading system

was introduced as a demonstration trial. Trainees could learn how to use the bar-code reading system in the

seminar.

15) Introduction of Bar-code Reading System ( Demonstration Trial)

As part of modernization of access control procedures for trailers using IT, the Bar-code reading system

was introduced at the Port Gate No.1.

16) Introduction of Web Portal System ( demonstration Trial)

As one of the demonstration trials to alleviate traffic congestion using IT, Web Portal System has been

established to provide congestion information. Everyone can access the information on the number of

trailers passing through the Port Gate No.1 on an hourly basis using the website of ChPT.

Page 76: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Project of Improvement of Chennai Port Operation Final Report

64

17) Introduction of RFID System

ChPT has a plan to introduce an RFID (Radio Frequency Identification) System to attach IC tags to

trailers with the cooperation of related organizations. The system aim to increase the efficiency of cargo

handling management and gate processing by sharing information among ChPT, CFS and terminal

operators etc.

18) Widening and improvement of roads in Chennai Port

The widening and improvement of internal roads have been carried out inside Chennai Port to alleviate

traffic congestion. In addition, the traffic flow has been clearly separated.

19) Expansion of Port Gate No.1

Port Gate No.1 is the only gate for container trailers to enter and exit Chennai Port, but the lane capacity

was insufficient to cope with the number of waiting trailers. Accordingly, ChPT expanded Port Gate No.1

from 4 to 8 lanes.

20) Widening and Improvement of State Highway 114

State highway 114 is the only road connecting to the Port Gate. Widening and improvement works of

Highway 114 are ongoing in order to provide a dedicated lane for container trailers.

21) Development of Approach Road to Port Gate No.1

Insufficient road infrastructure is also one of the causes of traffic congestion. The approach road to Port

Gate No.1 has been widened and improved to improve the traffic flow of trailers.

22) Study on Direction of the Master Plan

The workshop on the master plan was held in ChPT. The Team discussed the direction of the master plan

and stressed the importance of infrastructure projects as well as the need to further alleviate traffic

congestion.

23) Strengthening of Partnership with Tamil Nadu GovernmentChPT invited officials of the Tami

Nadu Government to attend the S/C. Officers from Traffic Police and Road section of Tamil Nadu joined

the expanded S/C to assist with congestion alleviation efforts.

24) Activity Report of JICA Study

The Team prepared an activity report which details the current state of traffic congestion, analyzes

congestion trends, describes the efforts and outcome of measures to decrease congestion and all other study

activities undertaken at each dispatch. It is submitted to ChPT, JICA etc. ChPT will utilize the results of the

report to take further measures for decongestion.

The following tables show the decongestion measures proposed by the Team suggested which have been

taken inside/outside port and at the terminals. They are also classified by the causes and dispatch times

Page 77: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Project of Improvement of Chennai Port Operation Final Report

65

Table 4-1 Measures conducted outside the port in the last two years

Table 4-2 Measures conducted inside the port in the last two years

Table 4-3 Measures conducted at Terminal and Overall Agendas in the last two years

13-24/4/2015

Site

Improvement of SH114 and Approach Road to Port Gate No.1 by NHAI/Development of Dedicated Lane for Trailers

Introduction of Sticker by CFS

Introduction of Screening Center at TVT-Parking Screening at Entrance of Approach Road

Issuance of HEP at TVT-Parking

Instruction for Export Containers to Terminate at CFS by Customs (no abidance)

Proposal for Leveling of Trailer's Departing Time

Demonstration Trial on Web-Portal System

Traffic Control by Trailer Owners Association

【 Program Matrix of Congestion Issue 】

Data CollectionSurvey

6-7/12/2013

Techinical Assistance : 1st Year of Assistance Tehnical Assistace : 2nd Year of Assistance

1st Dispatch21/7-13/8/2014

2nd Dispatch30/9-5/11/2014

3rd Dispatch19/1-7/2/2015

4th 5th Dispatch7-28/7/2015

6th Dispatch30/9-20/10/2015

7th Dispatch27/1-16/2/2016

8th Disatch22/5-5/6/2016

Lack of Traffic Regulation

Proposal for Introduction ofTraffic Regulation

Lack of Driver's Discipline Bad Driving Manners

Insufficient Capacity ofAccess Road

Low Standard Road

Consentration of Trailers arSpecific Times

Trailer Deaprture at Specific Time

Lack of Information on Congestion Proposal for Provision of Information on Congestion by Utilizing IT

TVT-Parking has not beenutilized afterward

Successive Traffic Flow Control by Traffic Police

Staying Trailers withoutProper Documents

Insufficient Document Check

Cause of Congestion Issue Examined/Proposed and/or Implemented Congestion Alleviation Measures

Outside thePort

Demonstration Trial for Utilization of TVT-Parking

13-24/4/2015

Site

Proposal for Allocation of Traffic Control Person at Intersections Allocation of Traffic Control Person

Proposal for Introduction of No-Parking Regulation on the Roads Introduction of Waiting Areas for Trailers

Proposal for Simplification of Procedure by Utilizing IT

Simplification of Verification/Registation

Demonstration Trail on Bar-Code Reading System Simplification of Recording in Log Book

Study on Introduction of RFID System Introduction of RFID System

Random Verification

Simplification of Regislation

Demonstration Trial

Monitoring

Demonstration Trial Allocation of Traffic Control Person (on occasional basis)Monotoring

【 Program Matrix of Congestion Issue 】

Data CollectionSurvey

6-7/12/2013

Techinical Assistance : 1st Year of Assistance Tehnical Assistace : 2nd Year of Assistance

1st Dispatch21/7-13/8/2014

2nd Dispatch30/9-5/11/2014

3rd Dispatch19/1-7/2/2015

4th 5th Dispatch7-28/7/2015

6th Dispatch30/9-20/10/2015

7th Dispatch27/1-16/2/2016

8th Disatch22/5-5/6/2016

Lack of Driver's Discipline Bad Driving Manners

Simplification of Verification/ Abolishmentof Registration

for Registration(CISF(OUT) Proposal for Simplification of Registation

Lack of Lanes Expansion of Port Gate No.1 from 4 Lanes to 8 Lanes

Insufficient Capacity of InternalRoad

Low Standard RoadProposal for Traffic Planning and Road Improvement Planning

Successive Road Improvement

Parked Trailers block Traffic

Insufficient Capacity of PortGate No.1

Long Processing Time

for Verification/Registration(CISF(IN))

Proposal for Simplification of Verification/Registration

for Verification(Customs(OUT)) Proposal for Abolishment of Verification/Regisration

Proposal for Introduction of No-ParkingRegulation and Waitng Space

Establishment of Three Waiting Areas for Trailers

Confusion at Intersections Lack of Traffic RegulationProposal for Allocation of Traffic ControlPerson

Insidethe Port

Inside thePort

Cause of Congestion Issue Examined/Proposed and/or Implemented Congestion Alleviation Measures

13-24/4/2015

Site

Proposal for Smooth Passing at Gate

Examination of Gate Capacity Compiation of Gate Capacity

Study on Improving Efficiency of Gate Operation

Forming of WG

Task Force for Congestion Free Chennai

【 Program Matrix of Congestion Issue 】

Data CollectionSurvey

6-7/12/2013

Techinical Assistance : 1st Year of Assistance Tehnical Assistace : 2nd Year of Assistance

1st Dispatch21/7-13/8/2014

2nd Dispatch30/9-5/11/2014

3rd Dispatch19/1-7/2/2015

4th 5th Dispatch7-28/7/2015

6th Dispatch30/9-20/10/2015

7th Dispatch27/1-16/2/2016

8th Disatch22/5-5/6/2016

Control at Termnal Gate Inefficient Gate Operation

Long Processing TIme

Insuffucient Processing Capacity

OverallAgenda

Lack of Sustainable System forImprovement on Port Operation Improvement of Synergy among

Authorities Concerned

Proposal for Enlarged Steering Committee (ChPT has startedto call on State Gov. offcials to S/C)

Lack of Master Plan Study on Direction of the Master PlanProposal for Improvement ofInfrastructure inside the Port

Examination of Basic Direction of theMaster Plan

Terminal

Insufficient Capacity ofTerminal Gate

Establishment of Entry/Exit Control Proposal for Establishment of Entry/Exit Control System

Cause of Congestion Issue Examined/Proposed and/or Implemented Congestion Alleviation Measures

Page 78: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

4.2

(1)

The m

1) In

The s

introdu

Howev

disappe

improv

when it

2) Si

The s

(Barcod

officers

visualiz

3) Ef

The u

up the

employ

to the o

a HEP

central

4) No

The

demons

On th

some e

used by

parked

waiting

waiting

Acco

as well

Evaluation

Optimizati

measures impl

ntroduction of

sticker introd

uced to confi

ver, as the per

eared. Accor

ved by 3-4 %

t was first imp

imulation Mo

simulation m

de reading sy

s). The simula

ze the effects

ffective Utiliz

utilization of

HEP. The tri

yees of CHA

optimization o

can be issue

HEP issuanc

o Parking alo

traffic regul

stration trial a

he other hand

extent). After

y some traile

along interna

g for jobs insi

g areas.

rdingly, furth

as complianc

n of Technica

on of Trailer

emented for o

f a Sticker for

duced during

rm whether

rcentage of d

rding to the

at the 6th dis

plemented.

odel Analysis

model analysis

ystem), trial 3

ation contribu

of the trials b

zation of TVT

TVT-Parking

ial, however,

(Customs Ho

of trailer flow

ed at TVT-Pa

e office. In th

ong Internal R

lation to pro

and the parke

, the establish

the trial, fou

ers. However

al roads did n

ide the Port a

her enhancem

ce with the no

al Assistance

r Flow

optimizing tr

r a Container

g the 1st and

a trailer had

drivers carryin

survey cond

spatch, when

for Traffic D

s was conduc

3 (No parkin

uted to the op

before their im

T-Parking (De

g was origina

revealed tha

ouse Agent),

w. However, T

arking 24 hou

his sense, it c

Roads and Set

ohibit parkin

ed cars are sti

hment of the

ur waiting are

r, despite the

not decrease.

as well as the

ment of measu

o parking rul

Pro

66

railers flow ar

Trailer

d 2nd dispat

d cleared the

ng the proper

ducted by th

stickers were

Decongestion

cted in order

ng rule and w

ptimization o

mplementatio

emonstration

ally based on

at most of the

CFS, etc. Th

TVT-Parking

urs a day wh

ontributed to

t-up of Waitin

ng along int

ill one of the

waiting area

eas were new

e establishme

This is cons

e fact that trai

ures to guide

e along the in

oject of Impro

re evaluated a

ch is no lon

documentat

r documents

he Team, the

e no longer u

r to project th

waiting area),

f trailer flow

on.

n Trial 2)

the idea that

e people who

herefore, this

plays an imp

hile it can on

the optimiza

ng Area (Dem

ternal roads

main factors

did contribut

wly establishe

ent of there

idered to be d

iler drivers ha

e parked trail

nternal roads.

ovement of Ch

as follows.

nger being us

ion check as

increased, th

e document

used, compare

he effects of

and trial 4 (

as it allowed

a trailer driv

o came inside

measure did

portant functio

nly be issued

ation of trailer

monstration T

was not im

impeding the

te to optimizi

ed inside the

waiting areas

due to an inc

ave not been

ers to the wa

.

hennai Port OFina

sed. It was

s it entered t

he need for th

possession r

ed to the 2nd

f demonstrati

(arrangement

d the relevant

ver himself w

e were not d

not directly c

on in issuing

during the d

r flow indirec

Trial 3)

mplemented

e trailer flow.

ing the trailer

Port which h

s, the numbe

crease in emp

properly guid

aiting areas is

Operation al Report

originally

the gates.

his system

ratio was

d dispatch,

on trial 1

of traffic

parties to

would pick

rivers but

contribute

the HEP;

day at the

ctly.

after the

rs flow (to

have been

er of cars

ty trailers

ded to the

s required

Page 79: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Project of Improvement of Chennai Port Operation Final Report

67

5) Allocation of Traffic Officers (Demonstration Trial 4)

Traffic officers continued to be allocated after the demonstration trial. Although just a single traffic

officer, security guard or a ChPT officer, was allocated at first, officers from multiple organization as a

task force team are allocated lately. The Team also observed that CISF officers were additionally

allocated during period of heavy congestion. However, traffic officers require training on traffic control

because instructions by traffic officers were sometimes ignored by trailer drivers.

6) Additional Gate for Empty Trailers at DPW Terminal

The implementation of the new DPW gate specialized for empty trailers in April 2015 was one of the

effective measures for the optimization of trailer flow. Separating the flow of empty trailers from that of

export container trailers has been effective because empty trailers often wait for job orders or proper

documents inside the Port.

However, the trailer flow has not been completely separated because empty trailers were still accepted

at the DPW IN Gate which was meant for export container trailers. This occurred because an empty trailer

could not exit from the entrance queue before entering into the DPW terminal once it reached to the DPW

terminal. Furthermore, the empty trailer flow and the export trailers flow sometimes crossed at the

intersection near the X-Ray inspection area after the implementation of the new gate. Further optimization

of the trailers flow can be achieved if these issues are addressed and the empty and export container flows

are completely separated.

7) Pre-Document Check Prior to Port Entry (Task Force Activity 1)

The pre-document check, which was conducted on the access road toward Port Gate No.1 during the 7th

dispatch, was one of the activities undertaken by the Task Force Team (which consists of ChPT, container

terminals, trucking companies, etc).

This document screening activity was similar to the one which used to be conducted at TVT-Parking in

2014. The document screening aims at removing parked trailers which are waiting for the proper

documents on the road. As the number of drivers carrying the proper documents actually increased for

export container, these screening activities have somewhat contributed to optimization of trailers flow

inside and outside the Port.

8) Promoting Traffic Discipline among Drivers (Task Force Activity 2)

The Team observed that traffic officers instructed trailer drivers to drive along a lane, keep proper

intervals, etc. during the 7th dispatch. The traffic officers were dispatched from trucking companies

organized by ChPT. Although, the Team had previously observed similar activities by the trailer union

and CFS association, it was the first attempt for ChPT to organize such a team by themselves. Thanks to

the instructions from officers, situation in which container trailers prevented general vehicles from

proceeding were avoided. Furthermore, together with the restrictions on trailers entering the city area

which have been enforced by the traffic police, the traffic flow along the State Highway 114 has greatly

improved. These activities definitely contribute to optimizing the traffic flow outside the Port.

Page 80: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

However

traffic flo

Port G

is clear

workin

9) S

Based

Team p

during

in front

TOR p

drivers

trailer d

smooth

whole t

10) In

The T

flow an

capacit

shown

Figu

The stud

terminal

r, activities u

ow has remai

Gate No. 1. T

red in the sub

ng on the acce

Survey on Te

d on the find

proposed the

the 8th dispa

t of terminal

proposes the

, the procedu

drivers, etc. I

her, which w

trailer flow to

ncoming Traff

Team studied

nd the traffic

ty, and the tar

in the follow

ure 4-2 The

dy clarified t

yard handlin

ndertaken by

ned in good c

This may be a

burbs. It is cau

ess roads. The

erminal Gate

dings from the

TOR for the

atch. The TOR

gate, relocati

improvemen

ures to be foll

f the TOR is

ill enhance n

owards the Po

fic Throughpu

the relation

c congestion

rget capacity

wing figure.

e Compariso

the target pro

ng. The targe

y the task forc

condition, it w

a result of traf

used by a lack

ese issues nee

Operation

e survey on t

e operational

R is based on

on of survey

nts to faciliti

lowed by surv

fully implem

not only the

ort.

ut Analysis

between the

during the 8t

were calcula

on of Process

ocessing cap

et values and

Pro

68

ce team were

was often obs

ffic police or

k of commun

ed to be addre

terminal gate

l rules on the

n the three ba

point, and fu

ies, operation

veyors or traf

mented, the tra

trailer flow

trailer proces

th dispatch. I

ated, summari

sing Capacity

pacity of trail

the optimiza

oject of Impro

e discontinue

served that on

dering trailer

nication amon

essed.

e operation du

e entry proce

sic concepts,

ull-time alloca

nal rules wh

ffic control p

ailer flow in f

towards term

ssing capacity

In this study,

ized, and com

y among maj

lers both at

ation of traile

ovement of Ch

d at the 8th d

nly a few trail

rs to stop even

ng the various

uring the 6th

ess of trailers

that is, elimi

ation of traffi

ich should b

persons when

front of DPW

minals inside

y among maj

, the required

mpared. The r

jor Points in

the port gate

er flow inside

hennai Port OFina

dispatch. Alth

lers proceede

n when the ro

s traffic polic

h and 7th disp

s at terminal

inating parkin

ic control per

be followed

instructing o

W IN Gate wi

the Port but

jor points in

d capacity, th

results of the

n the Trailer

e, terminal g

e and outside

Operation al Report

hough the

ed to

oad ahead

ce officers

patch, the

IN Gates

ng trailers

rsons. The

by trailer

or guiding

ll become

t also the

the trailer

he current

study are

Flow

gates, and

e the Port

Page 81: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

can be ac

11) Co

The T

and sum

inside a

believe

alleviat

(2)

1) Bar

The B

system

printed

The i

confirm

time w

(Refer t

The T

in the

include

implem

system

2) Web

The T

Howev

the dem

stakeho

the star

The t

ChPT/E

that the

Howe

to reso

receptio

thus re

continu

chieved by bo

ontinuous Tra

Team has con

mmarized the

and outside t

es it is necess

tion measures

Introductio

code Reading

Barcode Read

confirms an

on HEP into

introduction

ming and reco

was reduced d

to Figure 3-1

Team propose

trial and the

es the necessa

mentation of t

which will b

b Portal Syste

Team conduc

ver, they were

monstration t

olders. Althou

rt of the trial a

trial was con

EDP rearrang

ere is no techn

ever, the syst

olve these iss

on of failure r

ecognized th

uously as desc

oth ChPT and

affic Congest

nducted the tra

e results in the

the Port by m

sary to conti

s base on the

on of IT Rela

g System (De

ding System i

nd records th

the system.

of the syste

ording the en

due to the co

for the trans

ed the establi

e succeeding

ary organizati

the Port Entr

be implemente

em

cted the demo

e suspended a

trial was to s

ugh the trial

and thus belie

nducted by u

ged the Home

nical issue in

tem operation

sues despite t

report, arrang

e necessity

cribed above.

d container te

tion Survey

affic congesti

e activity rep

making a vari

nue conducti

findings.

ated Measur

emonstration

introduced in

e entry and

em helped a

ntry and exit

ontinuous im

ition of the p

ishment of a s

6 months of

ion and opera

ry/Exit Contr

ed and operat

onstration tri

after the Team

show the imp

period was s

eves the aim

using the ex

epage and ret

implementin

n was finally

the fact that

gement of the

of establishi

.

Pro

69

erminals if the

ion survey co

ports. Furtherm

ious proposal

ing such traf

res

Trial 1)

n the demons

exit of traile

alleviate the

of trailers at

mprovements

processing tim

sustainable sy

f operation o

ating method

rol System. T

ted by ChPT.

ials on Web P

m returned to

mportance of

short, the Te

was achieved

xisting ChPT

trieved the da

ng the Web Po

suspended a

the Team co

e persons in c

ing a sustain

oject of Impro

e necessary im

ontinuously fr

more, the Tea

ls based on th

ffic congestio

tration trial 1

ers at Port G

traffic conge

Port Gate N

of the proce

me at Port Gat

ystem at Port

of the Barcod

as well as th

This proposa

Portal System

o Japan and h

sharing infor

am thorough

d.

Homepage.

ata entered by

ortal System.

fter several i

overed such m

charge, etc. du

nable system

ovement of Ch

mprovements

rom the 1st d

am tried to op

he results of

on surveys an

1, was continu

ate No.1 by

estion as the

o.1 was shor

dures at Port

te No.1)

t Gate No.1 b

de Reading S

e functions n

l can also be

m during the

have yet to be

rmation on tr

ly explained

CISF entere

y CISF. As a

ssues arose. N

matters as th

uring its stay

m in order to

hennai Port OFina

s are made.

dispatch to 8th

ptimize the tr

the survey. T

nd propose c

ued for 6 mo

scanning the

e processing

rtened. The p

t Gate No.1

base on the e

System. The

necessary for

e applied to

7th and 8th

e restarted. T

raffic conges

its objective

ed the data

result, it was

No actions w

he detection

in Chennai. T

o operate th

Operation al Report

h dispatch

railer flow

The Team

ongestion

onths. The

e barcode

time for

processing

by CISF.

xperience

proposal

the actual

the RFID

dispatch.

he aim of

stion with

es prior to

daily and

s clarified

were taken

of issues,

The Team

he system

Page 82: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

3) RFI

The

CFS/Ch

system

The s

will als

the diss

by RFI

The purp

realize a

(3)

1) Imp

The Tea

traffic co

ChPT) su

expedited

congestio

2) Imp

Widenin

committe

on-going

3) Exa

The Tea

through h

As traff

ChPT joi

infrastruc

4) Exa

The Ch

dock is lo

The purp

(4)

1) Steerin

ID System

RFID syste

hPT/terminal

to control en

system of the

so contribute

semination of

D tags.

pose of 2) is

complete Por

Improveme

provement of

am has surve

ongestion at

uch as extens

d. According

on should be

provement of

ng of State H

ee. Furtherm

g. These proje

amination of t

am examined

holding work

fic congestion

intly conduct

cture projects

amination for

hairman in cha

ocated in the

pose of remod

Developme

ng Committe

em consists

ls by reading

ntry/exit of th

1) is to impr

to improving

f more advan

to further im

rt Entry/Exit

ent of infrast

infrastructure

eyed the statu

every dispat

sion of the ga

gly, ChPT’s e

positively ev

access roads

Highway 114

more, improve

ects have been

the basic dire

d the basic dir

kshops.

n has been re

ted, ChPT req

s for improve

remodeling o

arge requeste

center of the

deling the doc

ent of Social

ee (S/C) on Im

s of 1) th

a RFID tag

he Port by usin

rove the proc

g the efficien

nced informat

mprove the eff

Control Syst

tructure

e inside the p

us of infrastru

tch. Based o

ate, widening

efforts to imp

valuated.

outside the p

4 (SH114) h

ement works

n contributing

ction for a m

rection for fo

educed thank

quested the T

ement of port

of Jawahar do

ed the Team t

e port and han

ck is to increa

Environmen

mprovement o

Pro

70

he system

on a trailer a

ng a RFID ba

cessing effici

ncy of the rec

tion on traffic

ficiency of th

tem with fewe

port

ucture inside

on these prop

g of the roads

prove infrastr

port

has been exp

of the appro

g to reduction

master plan

ormulation of

ks to the con

Team to condu

operation.

ock

to support the

ndles bulk ca

ase cargo han

nt

of Chennai Po

oject of Impro

to utilize

at the CFS, p

ased HEP, wh

ency at termi

ception proce

c congestion

he reception p

er CISF offic

e the port and

posals, variou

, and streaml

ructure inside

edited on th

oach road fr

n of traffic co

f a master pla

gestion allev

uct the maste

e study on the

argoes; howev

ndling efficien

ort Operation

ovement of Ch

the shared

port gate, term

hich will repla

inal gates. Fu

edure at Port

by using the

procedure at P

ers than at pr

d has propose

us projects (

lining of the v

e the port in o

e recommend

om SH114 t

ongestion.

an and propos

iation measu

er planning st

e remodeling

ver, its facilit

ncy.

n

hennai Port OFina

information

minal gate , a

ace the existi

urthermore, th

Gate No.1 an

e information

Port Gate No

resent.

ed measures

(originally pl

vehicle flow

order to redu

dation of the

to Port Gate

sed some pro

ures that the T

tudy which fo

g of Jawahar d

ties are super

Operation al Report

n among

and 2) the

ng HEP.

he system

nd enable

collected

o.1 and to

to reduce

lanned by

are being

uce traffic

e steering

No.1 are

oject ideas

Team and

focuses on

dock. The

rannuated.

Page 83: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

S/C has

share rel

meeting,

on the st

understan

alleviate

2) Establ

The Tea

results of

The TOR

plan for r

Althoug

recognize

own initi

on the W

maintena

was obse

3) Stren

The Tam

congestio

a sugges

expanded

initiative

this way,

4.3

The o

evalua

(1)

The T

of queuin

the numb

container

volume o

s been set up

ated informat

where prelim

tatus of cong

nding of con

congestion h

lishment of a

am prepared

f the demons

R includes ru

re-staring the

gh the TOR h

ed in ChPT a

iative with CI

Web Portal Sy

ance at severa

erved

ngthening the

mil Nadu Gov

on issues. Th

stion by the

d S/C to assi

e to combat tr

, the managem

Objective E

outcomes of t

ated as follow

Outcome o

Team surveye

ng trailers alo

ber of queuin

r handling vo

of 100 thousa

to discuss an

tion in the co

minary discus

gestion and p

ngestion issue

have been suc

sustainable P

the TOR on

stration trial o

unning rules f

e bar code rea

has not been i

and CISF. In

ISF and ChPT

ystem. CISF a

al meetings.

e Partnership

vernment whi

herefore, ChP

Team. Office

ist with cong

raffic congest

ment & opera

Evaluation fo

the efforts ma

ws.

of measures f

ed the conges

ong SH 114 a

ng trailers out

olume; therefo

and containers

nd implement

ommittee and

ssions are hel

presented its

es. After reac

ccessfully imp

Port Entry/Ex

implementing

on the barcod

for sustainabl

ading system,

implemented,

particular, Ch

T EDP sectio

also stressed t

In this way, a

with the Tam

ch develops

T invited offi

ers from the

gestion allevia

tion. It consis

ation of ChPT

or the Projec

ade to decrea

for decreasin

stion status o

and Manali a

side the port

ore, the figur

s per month.

Pro

71

nt measures fo

d tackle traffi

ld prior to th

survey resu

ching a conse

plemented.

xit Control Sy

g a sustainab

de reading sys

le operation,

etc.

, the need to e

hPT traffic de

on in order to

the necessity

a change in t

mil Nadu Gov

and manages

ficials of Tam

Traffic and

ation. ChPT

sts of ChPT.

T has been gre

ct

ase congestion

ng the numbe

outside the po

area was coun

is as follows

re is converte

oject of Impro

or easing con

c problems to

he S/C, has al

ults which en

ensus through

ystem

ble Port Entry

stem and the

an emergenc

establish a su

epartment he

discuss issue

y of establishi

thinking on th

vernment

s the access r

mil Nadu Gov

Road sectio

has also form

Terminal Op

eatly improve

n over the las

er of trailers

ort from the b

nted every da

. The number

d to the numb

ovement of Ch

ngestion. Con

ogether. The

lso been set u

nabled partici

h discussions

y/Exit Contro

succeeding 6

y contact pla

ustainable sys

ld a Working

es related to t

ing a sustaina

he part of Ch

oads to the p

ernment to at

on of Tamil N

med a Task F

erators and C

ed.

t 2 years are

outside the

beginning of t

ay during the

r of queuing t

ber of queuin

hennai Port OFina

ncerned autho

working grou

up. The Team

ipants to dee

s, various me

ol System bas

6 months of o

an, a system e

stem is gradua

g Group meet

the demonstr

able system f

hPT and CIS

port is also in

ttend the S/C

Nadu have j

Force Team a

CFS associati

objectively

port

the study. Th

Team’s stay.

trailers depen

ng trailers per

Operation al Report

orities can

up (W/G)

m reported

epen their

easures to

sed on the

operation.

expansion

ally being

ting on its

ation trial

for system

F officers

nvolved in

C based on

oined the

at its own

ion etc. In

he number

. Trend of

nds on the

r handling

Page 84: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

The

queuin

observ

efforts

the M

will be

(2)

The p

proces

Proces

Aver

Time

ChPT

No. of T

outside 

Maximum

Max No./Da

Average 

Ave No./Da

Figu

maximum nu

ng trailers s

ved at the M

s by the traff

Manali junctio

e required.

Outcome o

processing ef

ss and introdu

ssing Time a

rage Processi

e / Truck / La

T intends to

Trailers

the Port

D

Col

Su

6‐7/1

m No./Day 9

ay on SH114

No./Day 6

ay on SH114

No. o

f Trailers

Table 4-4

ure 4-3 Tre

umber of qu

howed a sli

Manali area b

fic police an

on far from

of measures f

fficiency at P

ucing the bar-

Table

t Port Gate N

ing

ane

IN

OUT

introduce a R

Number of Trai

Data

lection

urvey

12/2013

1st Dispat

21/7‐13/8/2

906 759

- 297

676 278

- 160

0

200

400

600

800

1000

1200

1400

Number o

end of numb

ueuing trailer

ight declinin

ut not on SH

d the task fo

Port Gate N

for improvin

Port Gate No

-code reading

e 4-5 Proce

No.1 Jun

Gate

T Gate

RFID system

ilers by convertin

First Year Techn

tch

2014

2nd Dispatch

30/9‐5/11/2014

1146

346

362

186

Maximum/d

Pro

72

of queuing tr

ber of queui

rs has clearly

ng tendency.

H114. This r

orce in which

No.1 instead

ng the proces

o.1 was drasti

g system (alth

essing time a

n. 2014FeDe

3.5

5.5

m which is no

ng the handled c

nical Assistance

4

3rd Dispatch

19/1‐7/2/2015

4t

13

502

217

143

53

day Averag

oject of Impro

railer outsid

ing trailers o

y been reduc

Recently, h

reason is tho

h trailers hav

of SH114. O

sing time at

ically improv

hough the latt

at Port Gate

eb. 2015(duremonstration

2.5

2.0

ow in the tria

245 19

230 21

containers per m

5thDisp

7‐28/7/

th Dispatch

3‐24/4/2015

517 530

133 11

ge/day

ovement of Ch

de the port

outside the p

ced, while th

heavy conge

ught to be d

ve been force

Overall traff

Port Gate N

ved by simpl

er has been d

e No.1

ring the n Trial)

ApDe

al stage. Afte

3 326

6 332

onth to 100,000

patch

/2015

6th Dispatch

30/9‐20/10/20

Second Year 

0 628

1303

hennai Port OFina

port

he average n

estion has of

due the traffi

ed to make q

fic control o

No.1

lifying the ve

discontinued)

pr. 2015(aftemonstration

1.8

2.3

er full implem

391

147

h

015

7thDispatch

27/1‐16/2/2016

Technical Assistance

678

88

Operation al Report

umber of

ften been

ic control

queues at

operations

erification

.

ter the n Trial)

mentation,

211

248

127

415

8thDispatch

22/5‐

10/6/2016

Page 85: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

it will

at the

(3)

The T

occasi

shorten

measu

Note: Durinthat day wa

During Chennai

Aver

NoNo. o

TransCF

be possible

Gate.

Outcome o

Team also co

ons. Shorteni

ning of the tr

ures. The resu

Ta

ng the 8th dispatcas unusually smal

interviews, port has been

rage Transit TimSurveys

o. of Trailers survof Queuing Traile

Survey days

sit Time RequirFSs to Port Gate

not only to s

of measures f

onducted surv

ing of the tra

ransit time is

ults of the thre

able 4-6 Tr

ch, the average trl (only 75 trailers

Japanese comn shortened.

me during28

veyeders on the

red frome No.1

secure entry/

for reducing

veys on the tr

ansit time resu

s thought to b

ee surveys on

ransit time r

ransit time on Juns). Therefore, the

mpanies in C

04 Oct.

8:29 hrs

155

595

First Ye2nd Dispatch

Pro

73

/exit control,

the transit t

ransit time (le

ults in signif

be an index t

n the transit ti

required fro

ne 1st was 7:22 hteam regarded th

Chennai and

18/19 Oct.

40:25 hrs

200

803/689

ear(2014)

oject of Impro

, but also to e

time from CF

ead time) fro

ficant econom

to grasp the e

ime are shown

m CFSs to P

hrs. (no. of samplhis as an anomaly

Bengaluru c

12 Feb.

17:43 hrs

327

874

7th Disp

ovement of Ch

enhance the

FSs to Port g

m CFSs to P

mic merits for

effect of the

n below.

Port gate No

les: 351.) Howevy and data obtaine

confirmed th

13 Feb.

19:24 hr

398

785

Second Yepatch (2016)

hennai Port OFina

processing e

gate No.1

Port gate No.1

r port users. D

congestion a

o.1

ver, no. of queuined is used for refe

hat the transi

8th Disp02 Ju

rs 14:54

129

497

ear

Operation al Report

efficiency

1 on three

Degree of

alleviation

ng trailers on erence only

it time in

patchun.

hrs

9

7

Page 86: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

5

5.1

In the

allevia

proces

test the

Some

such a

yet po

intend

implem

manag

should

sustain

The t

measu

vital to

focus

reques

infrast

5.2

(1)

The W

represent

inside an

ChPT Ho

there is n

state gov

the stake

and 8th d

which is

real time

In add

the acces

Future I

Follow-up

e project on i

ating congest

ssing situation

e effectivenes

e of the meas

as the web po

ossess the ex

ds to introduce

mentation of

gement and op

d be extended

nably operate

technical assi

ures. Such me

o successfull

on hardware

sted assistan

tructure in ad

Moderniza

Introductio

Web Portal S

ting the degr

nd outside th

omepage, Po

no such a syst

vernment and

eholders from

dispatch. It i

capable of au

e, is now bein

dition, traffic

ss roads outs

Issues

for improvem

mprovement

tion after exa

n at terminal

ss of its propo

sures introdu

ortal system u

xpertise to ef

e a RFID sys

f the RFID a

peration capa

d for an addit

e these system

istance render

easure should

ly compete w

e aspects (inf

nce for impr

ddition to follo

ation of Chen

on of a Web P

System, whic

ree of conges

he Port. Altho

ort Communit

tem which pr

trailer union

m the beginnin

is an opportu

utomatically

ng implemente

control by th

side the Port.

ment of Che

of Chennai P

amining the s

gates. The T

osed measure

ced have alre

using IT requ

ffectively op

tem at all ma

and web port

acity. Accord

tional year in

ms by itself.

red in this pro

d continue to

with newly de

frastructure).

roving the o

owing up on

nnai Port I

Portal Syste

ch publishes

stion, is an i

ough, there a

ty System, H

rovides the PK

ns. The Team

ng the project

une time to in

collecting in

ed.

he Task Force

. Although th

Pro

74

nnai Port op

Port Operatio

status of trail

Team also con

es.

eady produce

uire further te

perate such a

ajor ports incl

tal systems b

dingly, the pro

n order for Ch

oject to date

o be refined. H

eveloped neig

In discussio

operation of

the abovemen

m

information

indispensable

are many acti

Homepages o

KI for traffic

has proposed

t and even im

ntroduce the

formation as

e Team or th

his is effectiv

oject of Impro

peration

on, the Team h

ler movemen

nducted seve

ed the desired

echnical assist

as system. In

luding Chenn

be combined

oject on impr

hPT to gain t

has mainly fo

However, the

ghboring por

ons on the di

f Chennai p

ntioned softw

such as a K

e measure for

ive Web Sys

f DPW/PSA

congestion t

d the necessit

mplemented a

Web Portal

a common in

he traffic poli

ve for allevia

ovement of Ch

has conducted

nts inside /ou

ral trials incl

d results. How

tance from JI

n addition, th

nai Port. It is

in order to

ovement of C

the expertise

ocused on non

e modernizati

rts, and thus

irection of th

port by intro

ware measure

Key Perform

r alleviating

tem around C

terminals an

to all the stak

ty of such We

a demonstrati

System becau

ndicator of th

ce has recent

ating the traff

hennai Port OFina

d various me

utside the por

luding the us

wever, other

ICA as ChPT

he Indian go

recommende

increase Ch

Chennai Port

which will a

on-structural (

ion of Chenn

it is also nec

he Master Pl

oducing the

es.

mance Indica

the traffic c

Chennai Port

nd shipping l

keholders incl

eb Portal Sys

ion trial durin

ause the RFID

he traffic cong

tly been cond

ffic congestio

Operation al Report

asures for

rt and the

e of IT to

measures

T does not

overnment

ed that the

PT’s port

operation

allow it to

(software)

nai port is

cessary to

an, ChPT

required

tor (KPI)

ongestion

t, such as

ines, etc.,

luding the

stem to all

ng the 7th

D system,

gestion in

ducted on

on, it may

Page 87: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

sometime

No.1. Tra

current s

(2)

The de

2nd disp

The Team

experienc

the need

Port.

ChPT

trailers a

Port Ent

impleme

establish

This rem

5.3

The go

Chennai

issues rel

(1)

Conge

access r

port, bu

infrastru

(2)

No par

officers

have be

includin

and pro

es control the

affic congesti

ituation shou

Improveme

emonstration

atch. Since th

m has propo

ce in operatin

to establish a

is currently

at Port Gate N

try/Exit Con

ntation of t

hment of the s

mains a challen

Moderniza

overnment o

Port. The ne

lated to infras

Improveme

estion created

roads to the

ut it is curr

ucture should

Infrastruct

rking along i

s and widenin

een introduc

ng the constr

otecting the en

e trailer flow

ion in the sub

uld be examin

ent of Gate E

n trial on the

hen, the gate

sed the impl

ng the barcod

a sustainable

implementing

No.1 instead

ntrol system

the RFID b

sustainable sy

nging issue.

ation of Chen

f India and C

cessary infra

structure dev

ent of access

d by container

port is an ur

rently not ut

d be examined

ture developm

internal roads

ng and impro

ced as part o

ruction of a n

nvironment a

w too much in

burbs is also e

ned.

Efficiency an

barcode read

e processing e

ementation o

de reading sy

system is gra

g the first ste

of the barcod

using the

ased HEP,

ystem propos

nnai PortⅡ

ChPT should

structures nee

elopment of C

to the hinte

r trailers was

gent issue wh

tilized to a

d to increase

ment to ease

s, the establis

ovement of i

of this proje

new flyover n

re also impor

Pro

75

n the suburbs

exacerbated.

nd Port Entr

ding system w

efficiency ha

of sustainable

ystem. Althou

adually being

ep of the RF

de reading sy

RFID system

in order to

sed by the Te

d request JIC

ed to be deve

Chennai Port

rland

the main rea

hich needs to

great extent

the efficiency

e congestion

shment of a w

internal roads

ect. However

needs to be e

rtant issues w

oject of Impro

so that only

The introduc

ry/Exit Contr

was impleme

s been contin

e Port Entry/

ugh the propo

g recognized

ID system fo

ystem. It is n

m up to th

modernize

am is also re

A assistance

eloped in ord

t are as follow

ason behind th

o be addresse

t. According

y of operation

and enhance

waiting area f

s in Chennai

r, further im

examined. En

which should b

ovement of Ch

few trailers a

tion of an IT

rol System

ented at Port

nuously impr

/Exit Control

osal has not b

among the st

or controlling

ecessary for

he 2nd step,

Chennai Po

quired for op

in formulati

er to modern

ws.

his project. Fu

ed. Railroad

ly, the mode

ns.

e cargo hand

for trailers, tr

port are pos

mprovement o

nhancing carg

be simultaneo

hennai Port OFina

arrive at the

system to im

Gate No.1 d

roved in Chen

l System bas

been impleme

takeholders in

g the entry an

ChPT to com

, which incl

ort. Furtherm

perating there

ing the maste

nize the port.

urther improv

is extended i

ernization of

dling efficien

raffic control

sitive measur

of road infra

go handling o

ously address

Operation al Report

Port Gate

mprove the

during the

nnai Port.

ed on the

ented yet,

n Chennai

nd exit of

mplete the

ludes the

more, the

e systems.

er plan of

The main

vement of

inside the

f railroad

ncy

by traffic

res which

astructure

operations

sed.

Page 88: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

(3)

Chenn

largest

develop

Chenna

ports, it

coopera

(4)

Custo

significa

point ou

Therefo

through

(5)

Proper

governm

scheme

facilitie

(6)

Enviro

the city

port doe

improve

well as

Recently

clean env

Competing

nai port is pla

port in easte

ped which fe

ai port as wel

t will be nece

ative relations

Improveme

oms service

ant impact

uted that th

ore it is imp

h interviews

Timely dev

r procuremen

ment is facin

for the deve

es. The Gover

Implement

onmental burd

y. Iron ore an

es handle gra

ed such as p

ensuring that

y, ChPT launc

vironment sho

g with neighb

aying an imp

ern India. Ho

eature moder

ll as manage

essary to dete

ship with neig

ent of Custom

procedures

on traffic co

heir busines

portant to g

s with stake

velopment of

nt of a budg

ng financial

elopment of

rnment will h

tation of sust

den related to

nd coal are no

avel and fertil

roviding a su

t there is a su

ched a trial o

ould be elabo

boring ports

portant role in

owever, new

rnized port f

ment & oper

ermine which

ghbouring po

ms service

s inside/outs

ongestion. J

ss activities

grasp the s

eholders an

f infrastructu

get is necess

constraints,

port facilitie

have to financ

tainable deve

o port activiti

o longer hand

lizer which m

ufficient num

ufficient water

of the use so

orated in a co

Pro

76

n stimulating

ports such a

facilities. The

ration need t

h types of car

orts should be

side the por

Japanese co

are hampe

situation an

d so on.

ure through

ary to devel

PPP (Public

es. However,

ce the develop

elopment inc

ies should be

dled at Chen

may generate d

mber of toilet

r supply.

lar energy fo

mprehensive

oject of Impro

g economic g

as Kamarajar

erefore, the m

o be examine

rgo Chennai p

e fostered.

rt for expor

ompanies w

red by the i

nd identify

PPP and OD

lop port faci

Private Part

a PPP schem

pment of non

cluding envir

e reduced at C

nai port due

dust. The wo

ts and shaded

or small build

master plan

ovement of Ch

growth around

and Kattupa

modernizatio

ed. To compe

port should t

rt/import co

hich utilize

inefficient c

aspects tha

DA

lities in a ti

tnership) is o

me is only ap

-profitable fa

ronmental pr

Chennai port d

to environme

rking environ

d break areas

dings. Furthe

hennai Port OFina

nd Chennai ar

ali have rece

on of infrastr

ete with neig

target. In this

ontainer als

e Chennai p

customs pro

at can be im

imely manne

one possible

pplicable to

acilities.

rotection me

due to its pro

mental concern

nment also ne

s for trailer d

er efforts to p

Operation al Report

rea as the

ently been

ructure at

ghbouring

regard, a

o have a

port have

ocedures.

mproved

er. As the

effective

profitable

easures

oximity to

ns but the

eeds to be

drivers, as

promote a

Page 89: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Attached Documents

A) Memorandum of Understanding (MOU) on The Implementation of

Demonstration Trial (21 October 2014)

B) Memorandum of Understanding (MOU) on The Implementation of Demonstration Trial of Web Portal System (21 October 2015)

C) Recommendation of Implementation Port Entry/Exit Control System

- New Barcode Reading System and its Sustainable Operation System -

D) Improvement of Synergy on Operation of Regulatory Authorities

Concerned E) TOR on Operation Rule for Trailer Entry Process at Terminal

IN Gates

F) Written Request of Extension of the Project Period for One Year

G) Visualized Presentation Materials (English Version)(June 2016)

Page 90: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description
Page 91: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

A) MeDe

emoranduemonstrat

um of Untion Trial

derstandi

The Proj

A-1

ing (MOU

ject on Impro

U) on The (21

ovement of Ch

e ImplemeOctober 2

hennai Port OFin

entation o2014)

Operation nal Report

of

Page 92: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

The Proj

A-2

ject on Improovement of Chhennai Port OFin

Operation nal Report

Page 93: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

The Proj

A-3

ject on Improovement of Chhennai Port OFin

Operation nal Report

Page 94: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

The Proj

A-4

ject on Improovement of Chhennai Port OFin

Operation nal Report

Page 95: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

B) MeDe

emoranduemonstrat

um of Untion Trial

derstandiof Web P

The Proj

A-5

ing (MOUPortal Sys

ject on Impro

U) on Thestem (21

ovement of Ch

e Impleme1 October

hennai Port OFin

entation or 2015)

Operation nal Report

of

Page 96: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

The Proj

A-6

ject on Improovement of Chhennai Port OFin

Operation nal Report

Page 97: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

The Project on Improvement of Chennai Port Operation Final Report

A-7

C) Recommendation of Implementation Port Entry/Exit Control System -New Barcode Reading System and its Sustainable Operation System -

Recommendation on Implementing Port Entry/Exit Control System - New Barcode Reading System and its Sustainable Operation System –

1. Background

The barcode reading system was implemented in February, 2015 as one of the demonstration trials by the

JICA study team (the Team) and was in operation for about 6 months. The user, CISF, stopped using the

system in September due to several issues including barcode reading error and the tendency for PC/UPS to

stop after a few hours of consecutive operation. Computers and other related hardware will eventually need

repair/maintenance when operated for long periods of time but a department or organization that is

responsible for such support works has not been designated. The barcode reading error, which is probably

caused by a displacement of barcode on HEP, can only be avoided by periodically adjusting the alignment

of barcode printers which are used in ChPT pass section. The Team has observed that the real issue here is

not these failures, but the lack of an operation system to ensure continuous operation of the system by the

party concerned.

Therefore, the team recommended ChPT to set up a Working Group for sustaining the operation of the

Entry / Exit Control system. Running Rules of the Working Group are described below.

Page 98: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

The Project on Improvement of Chennai Port Operation Final Report

A-8

Running Rules for the Working Group for Sustainable Operation System of Entry /

Exit Control for Chennai Port

Article 1 (Purpose)

A Working Group shall be established for the purpose of strengthening the cooperation among parties

concerned for the sustainable operation system of Entry / Exit Control for Chennai Port at Port Gate No.1.

Article 2 (Scope of Works)

The Working Group shall carry out the following.

1) To set up the objectives of the Entry / Exit Control System.

2) To set up rules of an operational procedure for the Entry / Exit Control system. The operational

procedure defines the procedure for each party concerned in time sequence.

3) To establish an Emergency Contact Plan (ECP) among CISF, traffic department, EDP section, and Pass

section in the event of serious trouble. ECP defines the contact point (phone number) for each type of

emergency in a 24 hour/365 day environment.

4) To discuss the improvement of the system when any issues arise.

5) To discuss the enhancement of the system to cope with changes in the surrounding environment.

Definition and details of the works are explained in an attached document.

Article 3 (Composition and Roles)

Members of the Work Group shall be composed of the representatives of the following departments. The

roles of each member are described below.

1) Representative from Chennai Port Trust (ChPT) Traffic Department

To be responsible for overall control of the operation of Entry / Exit Control System including the

effective usage of the information obtained by the system

2) Representative from Gate Team of ChPT Traffic Department

To be responsible for the arrangement of gate lanes, maintenance of the access paths and the gate

building including the power supply, air conditioning, etc.

3) Representative from Pass Section of ChPT Traffic Department

To be responsible for issuing Harbor Entry Permit (HEP) and its authorization.

4) Representative from EDP Section of ChPT Financial Department

To be responsible for development, procurement, installation, and maintenance of the computer hardware,

application software, and necessary network, etc. of the Barcode Reading System

5) Representative from Port Gate No.1 Team of CISF

To be responsible for the security control of personnel and trailers passing through the gate

Article 4 (Leader)

1) The leader of the Working Group shall be the Traffic Manager of ChPT

2) The leader shall be representative of the Working Group

3) The Senior Deputy Traffic Manager of ChPT shall substitute for the leader of the Working Group in

Page 99: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

The Project on Improvement of Chennai Port Operation Final Report

A-9

case that the leader is unable to perform his duties.

Article 5 (Holding of Working Group Meeting)

1) The Working Group meeting shall be held every month as a regular session.

2) The leader of the Working Group shall be able to hold the Working Group meeting if needed.

3) The Working Group meeting shall be called up by the leader of the Working Group.

Article 6 (Secretariat)

1) The ChPT Traffic Department shall serve as the secretariat of the Working Group.

2) The secretariat of the Working Group shall deal with matters of the Working Group by order of the

leader of the Working Group.

Article 7 (Miscellaneous Provision)

Matters necessary for running of the Working Group other than Articles from one to five above shall be

determined by the leader of the Working Group.

Supplementary Provision

These running rules shall enter into force from ******

Page 100: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

The Project on Improvement of Chennai Port Operation Final Report

A-10

Attached Document

Definition and details of the works to be conducted by the Working Group

1. Definition of the System Objectives

The objectives of the system are as follows.

1) Simplification of the document check procedure at Port Gate No.1

The operation to record the log of trailers’ entry and exit is done just by scanning the Harbor Entry

Permit (HEP), which is far simpler than making handwritten entries. Furthermore, gate lanes can be

increased using the minimum number of staffs because a single staff can operate the barcode reader for

multiple lanes.

2) Strict control on the entry and exit of container trailers at Port Gate No.1

The entry and exit of trailers are more strictly controlled and checked using the system. The system can

detect the illegal usage of HEP by drivers and trailers as the entry and exit record can be traced in the

system. The statistical data for the entry/exit of drivers and trailers is accumulated and can be utilized for

improving the Port Operation.

Note: When the RFID tag system is implemented, entry/exit of trailer is recorded automatically by the

system. However, the barcode reading system is still required until the RFID tag base HEP is

implemented.

2. Operation Procedure of the Entry / Exit Control system for Chennai Port

1) Periodical Adjustment of Barcode Printer Alignment

The alignment of barcode printers used in HEP issuance at ChPT pass section shall be adjusted

periodically (e.g. once every three month). Otherwise, many HEPs with misprinted barcode have been

already distributed widely when the misprinting is detected at Port Gate No.1. The adjustment shall be

done by EDP section.

2) Document Check Procedure at Port Gate No.1

HEP of drivers, trailers, and driver’s assistants are scanned at the Port Gate No.1 by CISF staff and their

entry and exit records are logged in the system. The software of the barcode reading system shall be

improved so that the hourly summary of trailers in/out is shown on the data entry screen. Furthermore,

modification function for the registered data shall be provided for a CISF supervisor.

3) Supporting System and Environment

The following supporting system for the operation shall be established.

a. To establish an Emergency Contact Plan among CISF, traffic department, EDP section, and pass

section in the event of serious trouble. CISF mainly uses this plan and calls EDP for system failure

including PC, UPS, power supply, network, and software. It may also be used to call the pass section

for any HEP authorization issues.

b. To setup a regular meeting among traffic department, pass section, EDP, and CISF to discuss

enhancement needs, changes in the environment, system maintenance, etc.

c. To provide the preliminary training course on the use of PC including virus protection, PC

Page 101: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

The Project on Improvement of Chennai Port Operation Final Report

A-11

maintenance, etc. for CISF supervisor.

d. To provide a service so that the hardware / software engineers visit site periodically (e.g. once a

week)

4) Usage of information obtained by the Entry/Exit Control System

The information obtained by the barcode reading system can be used in a variety of ways. Some

examples are listed below.

a. To publish the real time and hourly summary of trailers passing through the Port Gate No.1 on the

ChPT Homepage.

b. To periodically generate the following warning reports

- Trailer and driver retention list

- Trailers with different drivers in entry and exit

- Drivers with different trailers in entry and exit

c. To prepare a statistic report on container trailer movement

3. Emergency Contact Plan

1) CISF at Port Gate No.1:

2) ChPT Traffic Department (Marketing):

3) ChPT Traffic Department Gate Team:

4) ChPT Traffic Department Pass Section:

5) ChPT Financial Department EDP Section:

Hardware:

Software:

4. System Expansion

1) Hardware

a. One set of PC/UPS/barcode reader shall be provided in every lane of Port Gate No.1. In total 9 lanes

will be available for entry/exit from Port Gate No.1

b. The same number of sets of PC/UPS/barcode reader as the above a. shall be provided as spare in

case of hardware failure. One of the spare sets can be used by the CISF supervisor for confirming the

data entry and data correction.

c. At least one set of PC/UPS/barcode reader shall be provided in every pass section office where the

HEP is issued. They are used to confirm the barcode is properly printed on the HEP.

2) Application Software

a. Date entry screen shall be modified according to the Appendix 1. This modification helps CISF staff

to generate the hourly summary of in/our trailers manually.

b. Data correction screen shall be provided in case CISF staff makes data entry error.

c. Daily summary screen which is identical to the existing hand prepared summary sheet shall be

provided.

Page 102: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

The Project on Improvement of Chennai Port Operation Final Report

A-12

5. Others

1) Expansion of gate lanes of Port Gate No.1

2) Implementation of RFID tag at Port Gate No.1

3) Expansion of the barcode reading system to the other gates of the Port

4) Others

Page 103: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

Append

dix 1. The mmodificatio

Additiona

Hourly sum

and it is re

initialized

In case of

after the tr

(The other

on of Harbo

al part of the

mmary is dis

e-calculated /

by the action

OK button, t

ransaction is

r functions ar

The Proj

A-13

or Entry Pe

e screen

splayed when

/ refreshed w

n of OK or C

the summary

registered in

re kept as the

ject on Impro

ermit Inqu

n the window

whenever the

CLEAR butto

y must be re-

n the databas

ey are)

ovement of Ch

iry Screen

w is opened

screen is

on.

calculated

e.

hennai Port OFin

Operation nal Report

Page 104: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

The Project on Improvement of Chennai Port Operation Final Report

A-14

D) Improvement of Synergy on Operation of Regulatory Authorities Concerned

Improvement of Synergy on the Operation of Regulatory Authorities Concerned

Rationale

Chennai Port Trust has been tackling traffic congestion issues for many years. The Team in

collaboration with ChPT has also introduced a variety of measures to alleviate traffic

congestion. Some of the measures have been effective for reducing traffic congestion.

However traffic congestion still exists inside and outside the Port and some measures are not

able to be implemented continuously. A lack of a sustainable system for implementing

measures continuously and a lack of coordination among stakeholders are the reasons for the

above.

Therefore, the establishment of a sustainable system is very important.

The Project on Improvement of Chennai Port Operation has a steering committee for the

purpose of discussing matters related to traffic congestion among stakeholders. The steering

committee plays a vital role for stakeholders to understand the project and share information

on traffic congestion.

After completion of this project, the steering committee might be disbanded.

Instead of the steering committee, a sustainable system that tackles congestion issues with the

collaboration of stakeholders needs to be established.

The Team strongly recommends the establishment of an enlarged steering committee for the

purpose of sustainable improvement on the operation of Chennai port.

State Gov.

Traffic Police

Academic Experts

Ordinary Port Users

Previous S/C

CHA Road Sector

Terminal Operator Trailer OwnersAssociation,etc.

Private

CONCOR

Central Gov.

ChPT Customs

CISF

CWCImprovement Issues on Port Operation

CFS

Bonded TransportsationManagement ofContainers & Trucks

Total Coordinator Container Cargo Check

Security Control

Traffic Control

Container TransportationManagement of Containers

Road Development

Customs House Agent

Page 105: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

The Project on Improvement of Chennai Port Operation Final Report

A-15

By JICA Study Team

(Draft)

Running Rules for the Committee for Improvement of Port Operation and Management

Article 1 (Establishment)

A Committee for Improvement of Port Operation and Management of Chennai port

(hereinafter referred to as the Committee) shall be established for the purpose of sustainable

improvement of port operation and management through exchanging views among the

stakeholders of Chennai port.

Article 2(Scope of Works)

The Committee shall carry out surveys and investigations and exchange views related to the

following items:

i. Items related to traffic congestion alleviation of Chennai port

ii. Items related to improvement of user-friendliness of Chennai port

iii. Items related to improvement of the accessibility of Chennai port

iv. Items related to other issues for improvement of port operation and management and

which are admitted to be required by the chairman of the Committee

Article 3(Composition)

Members of the Committee shall compose the representatives of the following organizations.

Chairman of Chennai Port Trust (ChPT)

Representative from Ministry of Shipping

Representative from Customs Office

Representative from Central Industrial Security Force (CISF)

Representative from Highway & Minor Port Department, Government of Tamil Nadu

Representative from Traffic Police of Chennai

Representative from Shipping Line Agents Association

Representative from Dubai Port World

Representative from PSA International

Representative from Chennai Chapter, National Association of CFS

Representative from CWC

Representative from CONCOR

Representative from Customs House Agent (CHA)

Representative from Trailer Owners Association

Representative from Academic Society

(Representative from Ordinary Port Users)

(Traffic Manager, ChPT)

Page 106: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

The Project on Improvement of Chennai Port Operation Final Report

A-16

(Chief Engineer, ChPT)

(Chief Mechanical Engineer, ChPT)

(Financial Advisor, ChPT)

Article 4(Chairman)

i. The chairman of the Committee shall be the Chairman of Chennai Port Trust.

ii. The chairman shall be representative of the Committee.

iii. The Deputy Chairman of Chennai Port Trust shall substitute the chairman of the

Committee in the case that the chairman is unable to perform his duties of the

Committee.

Article 5(Holding of the Committee)

i. The Committee shall be held every three months as a regular session.

ii. The chairman of the Committee shall be able to hold the Committee if needed.

iii. The Committee shall be called up by the chairman of the Committee.

Article 6(Secretariat)

i. The Traffic Department of Chennai Port Trust shall serve as the secretariat of the

Committee.

ii. The secretariat of the Committee shall deal with matters of the Committee by order

of the chairman of the Committee.

Article 7(Miscellaneous Provision)

Matters necessary for running of the Committee other than Article from one to six shall be

determined by the chairman of the Committee.

Supplementary Provision

These running rules shall enter into force from *****.

Page 107: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

The Project on Improvement of Chennai Port Operation Final Report

A-17

E) TOR on Operation Rule for Trailer Entry Process at Terminal IN Gates

TOR on Operation Rule for Trailer Entry Process at Terminal IN Gates

1. Background The Team has identified instances of ‘Idling Time’ and ‘Suspension’ by observing the pictures taken using

the fixed point static camera and the site observation during the 6th and 7th dispatch. ‘Idling Time’ and

‘Suspension’ significantly reduce terminal gate efficiency. Furthermore, the Team has often observed many

parked trailers such as OOG trailers, empty trailers, etc. in front of the DPW terminal IN gate which also

lowers terminal gate efficiency.

2. Objective

Trailer entry process at the terminal IN gate shall be improved in order to alleviate traffic

congestion starting from that point. The proposed operation rules aim to reduce ‘Idling Time’

and ‘Suspension’ by eliminating parked and stopped cars in front of terminal IN gates and

improving the trailer flow. This TOR describes the operational rules and business flow using

the new operation rules.

3. Required Measures

The following measures shall be taken before starting the operation under the TOR (refer to

figure 1.).

(1) Road Improvements in front of the terminal IN gate

- To allocate space around the Survey Area, Customs Reception Area, and Gate Area by

removing curbs, etc.

- To implement an Exit Lane for trailers around the Survey Area

- To clearly indicate the No Parking Areas through the use of painted signs

- To allocate space in the Survey Area for 4 trailers to line up in 3 rows and mark the stop

lines on a road with paint

- To keep space for trailers to line up in 4 rows and mark the stop lines on a road with

paint

(2) Relocation of the Survey Area

The Survey Area shall be relocated about 130m forward.

(3) Full Time Allocation of Traffic Control Persons

One traffic control person around the No Parking Area and another traffic control person

around Customs Reception Area shall be allocated on a full time basis. They will be

responsible for ensuring that trailers drivers follow the operation rules.

Page 108: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

4. Com

5. Ope

(1) Trai

P

ChPT Tr

Containe

Trailer D

Customs

mposition a

eration Rul

iler drivers

Players

affic Dept.

er Terminals

Drivers

Officers

Fi

Fig

and Roles

les

shall observ

Improvem

Allocation

Relocatio

Improvem

Efficiency

Observati

Improvem

Efficiency

gure 1. Lay

gure 2. Div

ve the oper

Roles

ment of Acces

n of Traffic C

on of Survey A

ment of Recep

y

ion of Operat

ment of Recep

y

The Proj

A-18

yout around th

version from t

ration rules

ss Road

Control Perso

Area

ption Procedu

tion Rules

ption Procedu

ject on Impro

he DPW IN G

the DPW IN G

and follow

Allocat

gates, i

white m

ons Allocat

Reloca

ure Alloca

providi

times

ure Alloca

providi

all time

ovement of Ch

Gate

Gate

w instruction

De

ting space

implementing

marker, fixing

ting two perso

ting Survey A

ating sufficie

ing efficient

ating suffic

ing efficient C

es

hennai Port OFin

ns by traffic

etails

in front of

g Exit Lane

g lane separat

ons 24 hours

Area130 m fo

ent gate cl

gate process

cient offic

Customs pro

Operation nal Report

c control

f terminal

, painting

tion, etc.

a day

orward

lerks and

sing at all

ers and

ocessing at

Page 109: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

The Project on Improvement of Chennai Port Operation Final Report

A-19

persons, surveyors, and terminal gate clerks at all times.

(2) Trailer drivers shall proceed along the lane in order without keeping too much distance

from the other trailers. They shall not pass the other trailers or cut into queue without an

instruction from traffic control persons, etc.

(3) Empty trailers shall use the dedicated terminal gate (north gate for DPW and dedicated

lane for PSA). Terminal IN gates shall not accept empty trailers.

(4) Parking shall not be allowed along the access road to the terminal IN gate. Moreover,

parking shall be strictly prohibited between the Survey Area and Gate Area to ensure

sufficient space for trailer traffic.

(5) Trailers which are allowed to proceed following the container survey shall proceed to the

Customs Reception Area promptly. On the other hand, trailers which are not allowed to

proceed shall exit via the Exit Lane immediately. They shall remain at a waiting area until

everything is in order and then line up again.

(6) Documentation check by Customs is conducted after the survey is completed while a

trailer is parked in the Customs Reception Area. After its completion, trailers proceed to

the Gate Area for the reception procedure of a terminal. Trailers which do not clear the

documentation check by Customs must exit via the Exit Lane when instructed by a traffic

control person.

(7) OOG (Out Of Gauge) trailers which arrive prior to the CY-Open shall be allowed to wait

inside a terminal until the CY opens.

Page 110: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

The Project on Improvement of Chennai Port Operation Final Report

A-20

6. Operation Procedure

A)

Tra

iler

Dri

ver

1) T

o lin

e up

by

4 tr

aile

rs e

ach

in 3

row

s w

ithin

the

Sur

vey

Are

a an

d

sto

p.2)

To

get o

ff tr

aile

r an

d de

liver

y do

cum

ents

to a

sur

veyo

r.

Afte

r th

e ch

eck

by a

sur

veyo

r, to

rece

ive

the

docu

men

ts w

ith s

tam

p

and

con

tain

er n

umbe

r, s

eal n

umbe

r, d

amag

e in

fo, e

tc. f

illed

in.

3) T

o pr

ocee

d to

the

Cus

tom

s R

ecep

tion

Are

a.4)

To

exit

via

the

Exi

t Lan

e if

any

issu

e is

det

ecte

d du

ring

the

d

ocum

enta

tion

chec

k by

a s

urve

yor.

The

n, to

par

k at

the

w

aitin

g ar

ea th

roug

h th

e di

vers

ion

rout

e (r

efer

to F

igur

e 2.

)

1) T

o pr

ocee

d to

a w

aitin

g qu

eue

in o

ne o

f 4

row

s in

the

Cus

tom

s

Rec

eptio

n A

rea

and

stop

.2)

To

get o

ff an

d w

alk

dow

n to

the

Cus

tom

s w

indo

w a

nd le

t a C

usto

ms

o

ffice

r ch

eck

the

docu

men

tatio

n.3)

To

wai

t for

Gat

e re

cept

ion

afte

r co

mpl

etin

g C

usto

ms

c

heck

.4)

A tr

aile

r w

ho is

the

first

in li

ne s

hall

proc

eed

imm

edia

tely

into

a

gat

e la

ne, i

f the

gat

e re

cept

ion

win

dow

bec

omes

ava

ilabl

e.

1) T

o de

liver

doc

umen

ts to

a te

rmin

al r

ecep

tion

cler

k.2)

To

depa

rt fr

om th

e ga

te la

ne to

war

ds th

e in

stru

cted

yar

d lo

catio

n

in

the

term

inal

afte

r co

mpl

etin

g th

e ga

te r

ecep

tion

proc

edur

e,

B)

Sur

veyo

r

1) T

o ch

eck

the

docu

men

ts r

ecei

ved

from

a d

river

and

che

ck c

onta

iner

n

umbe

r, s

eal n

umbe

r, d

amag

e of

the

cont

aine

r. T

o pr

ess

stam

p

and

writ

e co

ntai

ner

num

ber,

sea

l num

ber,

etc

on

the

docu

men

ts,

i

f the

doc

umen

ts a

re O

K.

2) T

o re

turn

the

docu

men

ts to

the

driv

er a

nd le

t him

pro

ceed

.3)

To

info

rm th

e tra

iler

num

ber

to a

traf

fic c

ontr

ol p

erso

n an

d in

stru

ct

him

to h

ave

the

trai

ler

exit

thro

ugh

the

Exi

t Lan

e if

any

issu

e is

f

ound

.4)

To

conf

irm if

driv

er w

ants

to w

ait i

nsid

e th

e te

rmin

al fo

r

O

OG

trai

lers

whi

ch s

hall

wai

t unt

il C

Y-O

PE

N d

ate.

a. T

o in

stru

ct a

traf

fic c

ontr

ol p

erso

n to

let t

he tr

aile

r ex

it th

roug

h

th

e E

xit L

ane

if he

wan

ts to

wai

t out

side

the

term

inal

. b

. To

inst

ruct

a tr

affic

con

trol

per

son

to le

t the

trai

ler p

roce

ed to

the

term

inal

if h

e w

ants

to w

ait i

nsid

e th

e te

rmin

al.

5) T

o st

op s

urve

ying

if a

traf

fic c

ontr

ol p

erso

n in

form

s hi

m

tha

t the

Rec

eptio

n A

rea

is fu

ll.

C)

Tra

ffic

Con

trol

P

erso

ns (

at N

o

Par

kin

g A

rea

&

Cus

tom

s

Rec

epti

on A

rea )

1)

To

stop

sur

vey

oper

atio

ns if

the

Cus

tom

s R

ecep

tion

Are

a is

full.

T

he s

urve

y sh

all b

e re

-sta

rted

soo

n af

ter

spac

e be

com

es

ava

ilabl

e.2)

To

dire

ct a

trai

ler

who

doe

s no

t pas

s th

e do

cum

enta

tion

chec

k

by

Cus

tom

s to

the

Exi

t Lan

e pr

ompt

ly.

3) T

o di

rect

trai

lers

who

do

not p

roce

ed to

Cus

tom

s w

indo

w o

r

do

not m

ove

afte

r C

usto

ms

chec

k to

pro

ceed

to th

e ne

xt p

roce

ss.

4) T

o en

sure

the

smoo

th fl

ow o

f tra

ilers

by

dire

ctin

g th

em to

pas

s

thr

ough

or s

witc

h la

nes

if a

trai

ler

has

stop

ped

due

to m

echa

nica

l

pro

blem

s, e

tc.

D)

Cus

tom

s O

ffic

er

1) T

o re

ceiv

e do

cum

ents

from

a d

river

and

che

ck th

em.

2) T

o st

amp

them

and

ret

urn

to th

e dr

iver

if th

ey a

re O

K.

3) T

o ef

ficie

ntly

con

duct

the

docu

men

tatio

n ch

eck

at a

ll tim

es.

E)

Ter

min

al

Rec

epti

on C

lerk

1) T

o re

ceiv

e th

e do

cum

ents

from

the

traile

r dr

iver

.2)

To

ente

r da

ta in

to T

OS

acc

ordi

ng to

the

docu

men

ts a

nd in

stru

ct

the

driv

er to

go

to th

e lo

catio

n di

rect

ed b

y T

OS

.3)

To

effic

ient

ly c

ondu

ct th

e re

cept

ion

proc

edur

e at

all

times

.4)

Em

pty

trai

lers

sha

ll no

t be

rece

ived

. The

y sh

all b

e in

stru

cted

t

o pr

ocee

d to

the

nort

h ga

te.

F)

OO

G T

raile

r

D

rive

r

1) T

o lin

e up

in th

e rig

ht m

ost r

ows

in a

wai

ting

queu

e an

d st

op a

t the

r

ight

sid

e of

the

Sur

vey

Are

a.2)

To

have

sur

veyo

r's c

heck

, the

sam

e as

the

abov

e A

).3)

To

proc

eed

to th

e te

rmin

al a

nd r

eque

st to

wai

t ins

ide

the

term

inal

if

the

CY

is n

ot o

pen

1) T

o pr

ocee

d to

term

inal

if w

aitin

g in

side

the

term

inal

is r

eque

sted

.2)

Or

follo

w th

e sa

me

proc

ess

as in

abo

ve A

) fo

r ca

ses

othe

r tha

n 1)

1) T

o ha

ve th

e sa

me

proc

ess

for t

raile

rs w

ho d

o no

t wai

t

ins

ide

the

term

inal

2) T

o w

ait i

nsid

e th

e te

rmin

al u

ntil

the

CY

-Ope

n da

te.

a.

To

wal

k do

wn

to th

e C

usto

ms

win

dow

for

the

docu

men

tatio

n

c

heck

whe

n th

e C

Y o

pens

.

b. T

hen,

to w

alk

to th

e te

rmin

al g

ate

win

dow

for

the

rece

ptio

n

p

roce

dure

by

the

term

inal

.

c. T

o pr

ocee

d to

the

term

inal

yar

d af

ter

the

com

plet

ion

of

te

rmin

al r

ecep

tion

proc

edur

e.

Sur

vey

Are

aC

usto

ms

Rec

epti

on A

rea

Gat

e A

rea

Ent

ry P

roce

ssin

g of

Ter

min

al G

ate

  

  

  

 P

lace

Pla

yer

Rec

epti

on fl

ow

Page 111: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

F) Wrritten Reqquest of EExtension

The Proj

A-21

of the Pr

ject on Impro

roject for

ovement of Ch

one Year

hennai Port OFin

Operation nal Report

Page 112: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

The Proj

A-22

ject on Improovement of Chhennai Port OFin

Operation nal Report

Page 113: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

G) Vis

sualized PPresentatiion Mater

The Proj

A-23

rials (Eng

ject on Impro

glish Vers

ovement of Ch

ion) (Jun

hennai Port OFin

ne 2016)

Operation nal Report

Page 114: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

The Proj

A-24

ject on Improovement of Chhennai Port OFin

Operation nal Report

Page 115: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

The Proj

A-25

ject on Improovement of Chhennai Port OFin

Operation nal Report

Page 116: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

The Proj

A-26

ject on Improovement of Chhennai Port OFin

Operation nal Report

Page 117: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

The Proj

A-27

ject on Improovement of Chhennai Port OFin

Operation nal Report

Page 118: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

The Proj

A-28

ject on Improovement of Chhennai Port OFin

Operation nal Report

Page 119: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

The Proj

A-29

ject on Improovement of Chhennai Port OFin

Operation nal Report

Page 120: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

The Proj

A-30

ject on Improovement of Chhennai Port OFin

Operation nal Report

Page 121: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

The Proj

A-31

ject on Improovement of Chhennai Port OFin

Operation nal Report

Page 122: The Project On Improvement of Chennai Port Operation Final Reportopen_jicareport.jica.go.jp/pdf/12269890.pdf · 2017-02-01 · List of Abbreviation and Terminology Abbreviation Description

The Proj

A-32

ject on Improovement of Chhennai Port OFin

Operation nal Report