The Project for the Establishment of Three (3) Multimedia Language Laboratories in Iraq The Project...

5
e Project for the Establishment of Three ( Multimedia Language Laboratories in Iraq February 5, 2010

Transcript of The Project for the Establishment of Three (3) Multimedia Language Laboratories in Iraq The Project...

Page 1: The Project for the Establishment of Three (3) Multimedia Language Laboratories in Iraq The Project for the Establishment of Three (3) Multimedia Language.

The Project for the Establishment of Three (3) Multimedia Language Laboratories in Iraq

The Project for the Establishment of Three (3) Multimedia Language Laboratories in Iraq

February 5, 2010February 5, 2010

Page 2: The Project for the Establishment of Three (3) Multimedia Language Laboratories in Iraq The Project for the Establishment of Three (3) Multimedia Language.

1. 1st Workshop Overview ( Feb. 1 to Feb. 5 )

Meetings

Equipment Introduction

Field Trip

Page 3: The Project for the Establishment of Three (3) Multimedia Language Laboratories in Iraq The Project for the Establishment of Three (3) Multimedia Language.

2. Settlement Summary

Categories MOPDC Baghdad Univ. Univ of Tech

1. Design NO ChangeModified Floor Plan byFeb. 10 to KOICA

NO Change

2. Altered Equipments Beam Projector Beam Projector Beam Projector

3. Additional Requirements

Security SystemDigital Frame

Security SystemTV Monitor(2)Digital Frame

Security SystemTV Monitor(2)Digital Frame

4. Role & Responsibility

Transporting 1. KOICA: Korea to Umqasir port in Iraq2. Iraq: Unloading, Inland Transportation, and Tax procedures from the

Port to Sites in Iraq

Page 4: The Project for the Establishment of Three (3) Multimedia Language Laboratories in Iraq The Project for the Establishment of Three (3) Multimedia Language.

3. Project Schedule

Category Description Date Notice

1st Remote Workshop

Equipment design and the final settlement Trainee Qualification

Feb.1 ~ Feb.5,2010

Complete

Trainee Selection Send copy of the Trainee list and passport Until Feb.28

To KOICA

Equipment Selection/Support

Select Equipments Suppliers

March. thru April.2010

Training Systematic installation & operation of the

equipments for 3 weeksApril, 2010

Delivery & Installation

All Equipment Shipped Installation on Site (UB, UOT, MOPDC)

May, 2010August, 2010

2nd Remote Workshop

Monitoring Operation status of the Equipments and Installations

Early Sept.

Page 5: The Project for the Establishment of Three (3) Multimedia Language Laboratories in Iraq The Project for the Establishment of Three (3) Multimedia Language.

شكرا المتاعب من الكثير البارد الطقس في .صعوبة