ENGINEERING AND CONSTRUCTION COMPANY THE POWER OF INTEGRATION

Transcript of THE POWER OF INTEGRATION - PSI Group€¦ · CREW COMPETENCE PSI construction workforce competence...

ENGINEERING AND CONSTRUCTION COMPANY

THE POWER OF INTEGRATION

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

PSI Group is a full service provider of Engineering and Construction services for Commercial and Industrial customers. We regularly handle multi-discipline design and construction projects on a prime, turn-key basis. Our main focus is mid size and large, local and international mining and oil and gas firms operating in Republic of Kazakhstan and Mongolia.

For years we have worked hard gaining experience at Bechtel, Fluor, Worley Parsons, General Electric, ABB, Sedgman, Ausenco, Rio Tinto and Total and now we all have united at PSI to serve clients at our home – in Kazakhstan. Many of our former colleague friends have joined us and more will join to contributing their knowledge and expertise for the success of our clients.

OUR TEAM

Engineering is more than just something we do. Technology inspires us helping to overcome most complex challenges, to operate in very hostile environment, to make things happen sooner, to unlock true potential of any asset generating best value for our Clients. Our aim is to provide quality services and meet client expectations operating in compliance with industry best practice.

OUR MISSION

PSI AT A GLANCE

More than 1 500 000man-hour on site2013-2014

Growth rates (3yr average) – 212%

Total number of employees

more than 1000

Investments in Systems, Software & Employee

Development from 2013 to 2015 ~ US $2M

Value of Machinery and Equipment

~ US $15M

Accidents with temporary loss of employability -0.

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

COMPANY STRUCTURE

PSI Group is 100% Kazakhstan Company with head office in Almaty. The «PSI Engineering» is a parent company that holds 100% interest in subsidiary companies «PSI Stroy Industria» and «PSI Energy and Control». Additionally in 2015 PSI Engineering created 50% JV in Mongolia.

PSI Engineering complete engineering services provider for mid scale and large industrial projects. PSI Engineering holds 1st category engineering license.

PSI Energy and Control is providing complete solution services related to procurement, assembly, supply and comissioing of power distribution equipment, control panels and substations. Company also provides plant automation services, including development and implementation of SCADA.

PSI Stroy Industria is a general contractor company holding 1st category construction license. Works perfomed by PSI Stroyindustriya in general contractor capacity include: Construction of Aktogay 25 000 ton/year SX/EW plant (Kazminerals), Semizbay Uranium mine reconstruction and scale up project, construction projects for Katco (Areva), Inkay (Cameco) uranium mines, Energy infrostructure projects for Vicat Cement, 36km DN800, DN450 water supply project for Kazminerals, Sulfuric Acid Storage and reagent dosing facility for KazChrome New Ferroalloy Plant (ENRC), 1500 man permanent camp and camp infrostructure (Kazminerals), 1400 ha pivot irrigation project for Amiran diary farm.

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

PROJECT MANAGEMENT

PSI continuously improving project planning and management system. PSI is motivating project managers to complete PMI's training course compliant with Project Management Body of Knowledge standards. To manage programs and projects PSI is using Primavera P6 software by Oracle.

Definition of Project Core

Team

Definition of aims and project objectives

Scope Planing

A

B C

D E F

Project Execution

Plan

A

B

C

D

E

F

Resource allocation and risk

assesment

Budget ApprovalSchedule Approval

ABC

Progress Data Accumulation and Reporting

Progress Analysis

A B C Progress Data Accumulation and Reporting

Project completion

and handover

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

ENGINEERING

PSI Engineering uses latest engineering and modeling software that allows to deliver projects compliant with modern day requirements and meeting any client expectations. In 2012-2014 PSI implemented engineering system upgrade program with participation of Autodesk certified instructors. Implemented software packages include: AutoCAD® P&ID, AutoCAD® Plant 3D, AutoCAD® Structural Detailing, Autodesk® Revit® Structure, Autodesk® Navisworks® Simulate, Autodesk® Showcase®, Autodesk® SketchBook® Designer, P&ID, Plant 3D suite, Inventor, Civil 3D, Revit, Revit MEP, Autodesk Revit MEP,Autodesk Inventor Professional,Model Studio CS ЛЭП v.2, LIRA 9.6, ERA–Waste & ERA–Air.

Engenering software upgrade program and company accumulated expertise has allowed PSI to participate in some benchmark mining projects, such us: detailed design of Aktogay 25 000 ton Cu/year SX/EW Plant (Kazminerals), Zholimbet 2 mln ton CIP Gold Plant detailed design (KazGold), Eurasia Copper 3 000 ton Cu/year SX/EW Plant, Acid Storage Facility and Reagent dosing plant (KazChrome), Semizbay uranium mine reconstruction and scale up, Appak uranium mine reconstruction and scale up.

Scope Definition

Cost, Time, Resource Schedule preperation and approval

Conceptual Process and P&ID Definition and approval

Budget revision and scope approval

Basic Design StageApproval

Detailed Design Stage

Project approval by relevant authorities

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

ENGINEERING OFFICE SOFTWARE

PSI Engineering uses latest engineering and modeling software that allows to deliver projects compliant with modern day requirements and meeting any client expectations. PSI Engineering holds 50 fully licensed Work Stations with full access to following software packages:

PSI uses custom engineered Document Control system based on Microsoft Share Point.

Autodesk Plant Design Suite Premium 2013 (AutoCAD®, AutoCAD® P&ID, AutoCAD® Plant 3D, AutoCAD® Structural Detailing, Autodesk® Revit® Structure, Autodesk® Navisworks® Simulate, Autodesk® Showcase®, Autodesk® SketchBook® Designer).

Autodesk Building Design Suite Premium 2013 (AutoCAD®, AutoCAD® Architecture, AutoCAD® MEP, AutoCAD® Structural Detailing, Autodesk® Showcase®, Autodesk® SketchBook® Designer, Autodesk® Revit®, Autodesk® 3ds Max® Design, Autodesk® Navisworks® Simulate.

Autodesk AutoCAD® Civil 3D® AutoCAD®.

Autodesk Revit MEP 2013.

Autodesk Inventor Professional 2013.

Model Studio CS ЛЭП v.2.

LIRA 9.6 (Structural Engineering).

ERA–Waste & ERA–Air (Environmental Impact Control, Waste Management Software).

1. 3.

4.

5.

6.

7.

8.

2.

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

In 2014 PSI Acquired full colour architectural grade proffesional 3D Printer ProJet® 660Pro by 3D Systems. This has allowed us apart from Project Visualization and Animation services to provide our clients with printed scaled 3D Models of structures, equipment and industrial plant units.

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

CREW COMPETENCE

PSI construction workforce competence is assured by European as well as local Certification Programs.

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

QUALITY MANAGEMENT SYSTEM

The PSI Group has consistently developed and implemented a quality management system based on the principles of "process approach". Process approach considers the governance as a continuous series interrelated management functions: planning, organization, motivation, coordination, control and communication processes - communication and decision-making.

Our quality management system is certified to ST RK ISO 9001: 2009 standards by the “Kazakhstan Quality Center(KQC)”.

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

FULLY AUTOMATED, STATE OF THE ART STRUCTURAL STEEL PLANT

To deliver high quality services in timely and risk free manner PSI Group is currently constructing structural steel plant with production capacity 3000 ton/month of steel structures. Most adavnced metal fabrication equipment has been procured by PSI from industry leaders: Kaltenbach (Germany), Ficep (Italy), Nuova CMM (Italy).

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

CONSTRUCTION EQUIPMENT

AGGREGATES AND CONCRETE

1. Chieftain (by Terex) mobile crushing and screening plant, 100-200 ton/hour

2. Мobile Batching Plant Semix 100m3/hour (Fully Winterized)

3. Mobile Concrete Pumps and Mixersa. Carmix 5,5 XL self loading concrete mixers, 5 m3 capacity – 1 unitb. Dieci F 7000, L5300 self loading concrete mixers, 3,5 - 5 m3 capacity – 3 unitsc. Concrete Pumps Scorpion CP 40.318 with hydraulic boom, 40 м3/час – 2 unitsd. Concrete Mixers, 8m3 - 3 units

4. Excavatorsa. Hitachi ZX400 – 2 unitsb. Doosan DX 225 (with hammer) – 1 unitc. Doosan DL 210 (wheel) – 2 unitsd. Cukurova backhoe – 2 units

5. Wheel Loadersa. Hyundai 770-7 – 1 unitb. Doosan DL505 – 2 units

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

6. Telescopic handlersa. Manitou 1740 (with man basket) – 2 unitsb. Faresin 1342 (with man basket) – 1 unitc. Faresin 1740 (with man basket) – 5 units

7. Cranesa. Tadano ATF 110G-5, WSL 110 ton – 1 unitb. KS-65721 «Galichanin», WSL 60 ton – 2 unitc. Sany Palfinger QY50C, WSL 50 ton – 1 unitd. Sany Palfinger QY25C, WSL 25 ton – 4 unitse. KS-65721 «Chelyabinets», WSL 25 ton, 6x6, – 4 unitsf. DEK 251, trucked crane, WSL 25 ton – 2 units

8. Бульдозерыa. Komatsu D155– 1 unitb. Komatsu D65 – 1 unit

CONSTRUCTION EQUIPMENT

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

9. Trucksa. MAN 6x4 with 70 ton low bed trailer – 1 unitb. Kamaz 6x6 semi trailer – 2 unitsc. Dum truck Shacman 6x4 – 6 unitsd. KAMAZ 6x6, 10m3 water truck– 1 unite. KAMAZ 6x6, diesel truck -1 unitf. Isuzu NQ70, delivery truck – 1 unitg. Isuzu Crew Bus – 3 unitsh. Mitsubishi L200 – 3 unitsi. Toyota Hilux – 2 units

10. HDPE Pipe Welding Machinesa. McElroy TracStar® 900 (OD 630–900 mm) – 2 unitsb. McElroy® 824, GF (OD 355 – 630 mm) – 3 unitsc. McElroy TracStar® 412, RITMO (OD 110–315 mm) -3 unitsd. McElroy® 250, RITMO (OD63-250mm)– 3 unite. McElroy Pit Bull® (OD32-110mm) – 2 unitsf. FRIAMAT electrofusion box – 3 unitsg. HDPE Membrane welding machine Leister – 2 unitsh. Hand extruder 4kg/hr Leister – 2 units

CONSTRUCTION EQUIPMENT

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

11. Welding Equipment and Gen Setsa. Welding machine MIG/MAG Mosa 400A – 6 unitsb. Welding machine MIG/MAG Lincoln Ranger 250A – 10 unitsc. Gen Set AKSA 500 kVA 380V- 2 unitsd. Gen Set GenPower 60 kVA 380V – 5 unitse. Gen Set GenPower 30 kVA 380V – 10 units

12. Other Machines and Equipmenta. MESA professional heavy duty formwork – 4 000 m2b. Shot blusting machines - 2 setsc. GRACO V Max painting machines – 4 setsd. Compactor ATLAS WEYCOR, 13 ton – 2 unitse. Compactor AMMANN - AVH 6030- 4 unitsf. Trench Compactor AMMANN RW 1503-FK – 1 unitg. Compressors Atlas Copco XAS 47, 5 м3 – 2 unitsh. Dewatering pumps – 6 unitsi. Grader XCMG GR215 – 1 unitj. Service truck with crane 10 – 2 unit

CONSTRUCTION EQUIPMENT

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

OUR PROJECTS

2014–2015, KAZ Minerals plc, Aktogay Copper Project, 25 000 ton/year Cu SX/EW Plant and Plant Infrastructure, Engineering, Procurement and Construction

2014–2015 / KAZ MINERALS PLC

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

2015, Tengizchevroil, OBH TP-4. 380V MCC REPLACEMENT Project. Engineering, Procurement, fabrication and supply to Tengiz.

2015, Tengizchevroil, Outdoor 35kV SWG Upgrade Project, (supply of 35kV reclosers, disconnectors, CTs, VTs, portal under equipment, busbars), Engineering, Procurement, fabrication and supply to Tengiz.

2015–2016 / TENGIZCHEVROIL

2015, TCO (Tengizchevroil) – OBH TP-4. 380V MCC REPLACEMENT Project. Engineering, Procurement, fabrication and supply to Tengiz.

2015 / TENGIZCHEVROIL

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

2014–2015, KazGold, Zholymbet Gold Project, 2 mln ton/year CIP Gold Plant, Detailed Design.

2014–2015 / LLP KAZ GOLD

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

2014–2015, KAZ Minerals PLC, Aktogay Copper Project, 1 500 man permanent camp and camp infrastructure, engineering and construction.

2014–2015 / KAZ MINERALS PLC

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

Adaptation of Engineering Documentation for non standard structural steel modules, recommendations and structural calculations.

2014 / KOKSHE CEMENT

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

Ayakodzhan Copper Project, 3 000 ton/year Cu SX/EW Plant, detailed design.

2013–2014 / EURASIA COPPER OPERATING LLP

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

36 km DN800 & DN450, 2000 & 450 m3/hour Zhuzagash Water Pipeline, including main and booster pump stations, 10 000 m3 and 1 200 m3 water tanks and power infrastructure. Engineering and construction.

2013–2014 / KAZ MINERALS PLC.

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

New FerroAlloy Plant, Sulfuric Acid Storage and Reagent Dosing Facility,Engineering, Procurement and Construction.

2013–2014 / EURASIAN RESOURCES GROUP, TNC KAZCHROME

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

1400 ha Land Irrigation Project, Engineering and Construction.

2013–2014 / AMIRAN AGRO LLP

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

TCO K3 WASTE WATER UPGRADE PROJECT and PLANT FIREWATER UPGRADE PROJECT

2013–2014 / TENZGIZCHEVROIL(ABB)

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

2013 - 2014, Tengizchevroil, Drill Cuttings Pad Project, (Complete Package Substation 1000kVA, 10/0,4kV), Engineering and Project Support.

2013 - 2014, Tengizchevroil , Water Injection System Upgrade Project, (3 set of compact Complete Package Substations 400kVA, 10/0,4kV), Engineering and Project Support.

2013–2014 / TENGIZCHEVROIL (ABB)

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

Engineering Support of Logicams (Australia) in preperation of feasibility Study for Lomonosovskoye Iron Ore Project.

2013 / KAZAX MINERALS LLP

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

Appak Uranium Mine reconstruction and scale up project, detailed design.

2013 / JV APPAK LLP

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

Semizbay Uranium Mine, 1st and 2nd stage Plant Reconstruction andScale up Project, engineering and construction.

2012–2013 / JV SEMIZBAY

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

Uranium Process Plant Reconstruction Project, PPr and SS Plant piping, Ventilation Piping installation.

2012–2013 / JV KATKO (AREVA-KAZATOMPROM)

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

Tortkuduk South Uranium Plant Expansion Project, HDPE DN 800 & 710 piping, DN1000 FRP piping, plant mechanical installations.

2011–2012 / JV KATKO (AREVA-KAZATOMPROM)

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

KazCopper LLP. Benkala Copper SX/EW Project.1. 10/0,4 Power Substations(EPC) 2. Installation, Commissioning of Transformer Rectifier Unit 5,8 MVA, 36 000 A, 10/0, 126 kV 3. Installation of EW Busbar for DC Currant 4. EPC of the Plant Lighting, 5. Power supply of SX/EW Plant, Pump station, Sulfuric Acid storages and Crushing and Agglomeration plant

2010–2012 / KAZCOPPER LLP

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

KazCopper LLP. Benkala Copper SX/EW Project.1. Two 250x250 m HDPE 1mm lining system Heap Leach Pads Construction; 2. Installation of Irrigation System; 3. Construction of Three 40x25 m, One 50x50 m, One 100x50m HDPE 1,5mm Ponds; 4. Erection of Sulfuric Storage Facility at railway spur with loading and unloading system (2000 ton); 5. Acid Storage Facility at Plant (2000 ton); 6. Pump Station Piping and mechanical installations; 7. SX/EW Plant Piping and Mechanical Installations.

2010–2012 / KAZCOPPER LLP

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

Installation of the Gas piston power generators and Diesel generators for Compressor Station 2 and 7. EPC of the cooling and exhaust system.

2011–2012 / CENTRAL ASIAN GAS PIPELINE

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

220/35/6 kV 50MVA substations, EPCM, SCADA implementation, ASKUE on Schneider Electric and Siemens equipment.

2010–2011 / MYNARAL TAS LLP

THE POWER OF INTEGRATION

ENGINEERING AND CONSTRUCTION COMPANY

THE POWER OF INTEGRATION

Instalation of pipe heat tracing Sulfuric acid and Flare area .

2011 / AGIP KCO (CCC)

ENGINEERING AND CONSTRUCTION COMPANY

THE POWER OF INTEGRATION

• Project Supervision, Engineering and Quality Control.• 10kV OHTL, 10/0,4 kV substations, EPCC.• 35 kV switchgear (Schneider), 35 kV OHTL, EPCM.• Pit Power Distribution and Supply Project, 6kV Cable lines, 6kV switchgear (Schneider), EPCM.

2009–2010 / VICAT СEMENT

ENGINEERING AND CONSTRUCTION COMPANY

THE POWER OF INTEGRATION

THANK YOUFOR ATTENTION!