    Square 4268 Retail Development

    a project by WV Urban Developments

    Project Update presented March 24, 2011

  • 8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511

    2/31

    Previous Site Plan dated Feb 17, 2011

  • 8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511

    3/31

    Explain how the garageconnects the pedestrian tothe shopping

    Improve and define thepedestrian connections

    Place sidewalks andgreen space in theparking areas and garage

    Make the verticalcirculation (elevators,escalators and stairs)easily accessible

    Incorporate Multi-use Trailand Bike facilities

    Create hardscaped areasor parks for shoppers Strengthen New York

    Avenue edge

    Activate the New York

    Avenue street front Enliven the MontanaAvenue elevation

    Improve the pedestrianexperience on

    Bladensburg Road andthe upper level Accommodate future

    density

    Comments Addressed March 12th:

  • 8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511

    4/31

    Comments Addressed March 12th

    Please pick up the hand-out if you were unable to attend March 12th!

  • 8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511

    5/31

    Give more thought topark areas, how theyconnect and work forshoppers and employees

    Create a meeting placeon the upper level of thegarage

    Explain what the Walmartstore looks like

    Wrap glass and lightaround the New YorkAvenue corner toMontana Avenue

    Explain the design onMontana Avenue Work on the Bladensburg

    Road design, add interestand turn the corners ofthe buildings

    Accommodate bus stops Explain the traffic study

    and how traffic will bemanaged

    Comments to be addressed today:

  • 8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511

    6/31

    Level 1: New York Avenue

  • 8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511

    7/31

    Level 2: Montana Avenue

  • 8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511

    8/31

    Level 3: Bladensburg Road

  • 8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511

    9/31

    Focus: Pedestrians and Parks

  • 8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511

    10/31

    Focus: Parks on New York Avenue

  • 8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511

    11/31

    Focus: Park on Upper Level

  • 8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511

    12/31

    Focus: Walmart on New York Avenue

  • 8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511

    13/31

    Focus: Walmart Entranceon Upper Level

  • 8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511

    14/31

    Focus: Montana Avenue

  • 8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511

    15/31

    Focus: Montana Avenue

  • 8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511

    16/31

    Focus: Montana Avenue

  • 8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511

    17/31

    Focus: Montana Avenue

  • 8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511

    18/31

    Focus: Montana Avenue

  • 8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511

    19/31

    Focus: Bladensburg Road

  • 8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511

    20/31

    Focus: Bladensburg Road

  • 8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511

    21/31

    Focus: Bladensburg Road

  • 8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511

    22/31

    Focus: Transportation

  • 8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511

    23/31

    Focus: Transportationand Alternate Modes

  • 8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511

    24/31

    Focus: Bus Stops (proposed)

    Bus Stop

  • 8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511

    25/31

    Focus: Bus Stops

    *This stop operates only when school is open. Alteration would include operating year round and during peak hours.

    Metro Bus Route B2Existing Stop for Route B2*Metro Bus Route S41

    Metro Bus Route E2/E3Metro Bus Route D3Metro Bus Route D4Metro Bus Route D8Potential ExtensionExisting Stop for Routes D3,

    D4, and D8Existing Stop for Routes D3,

    D4, and E2/E3

  • 8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511

    26/31

    0

    200

    400

    600

    800

    1000

    1200

    1400

    1600

    1800

    2000

    AM Peak Hour PM Peak Hour

    Vehicle/Hour

    Trip Generation Comparison

    Existing Site Trips

    Previously Approved

    Mixed Use PUD

    Currently Proposed By-

    Right Development

    Focus: Transportation Studyand Effective Planning

    F T t ti St d

  • 8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511

    27/31

    0

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    8000

    9000

    10000

    New York Ave. / 16thAve.

    New York Ave. /Bladensburg Rd.

    Montana Ave. /Bladenburg Rd.

    New York Ave./ SBMontana Ave.

    New York Ave./ NBMontana Ave.

    AMPeakVolume(V/H)

    Intersection

    AM Peak Hour Proportional Impact

    2.7

    3.3%

    5.5

    %

    3.0%

    1.7%

    2011 Existing Volumes 2013 Regional Growth Total Site Trips

    Focus: Transportation Studyand Effective Planning

    F T

    i S d

  • 8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511

    28/31

    0

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    8000

    9000

    10000

    New York Ave. / 16thAve.

    New York Ave. /Bladensburg Rd.

    Montana Ave. /Bladenburg Rd.

    New York Ave./ SBMontana Ave.

    New York Ave./ NBMontana Ave.

    PMPeakVolume(V/H)

    Intersection

    PM Peak Hour Proportional Impact

    5.7%

    11.3

    %

    5.9%

    3.0%

    2011 Existing Volumes 2013 Regional Growth Total Site Trips

    Focus: Transportation Studyand Effective Planning

  • 8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511

    29/31

    Focus: Transportation Studyand Effective Planning

    Reduce the number of curb cuts (driveways)from 32 to 9

    Construct right turn lanes on New YorkAvenue for vehicles to pull out of traffic andmerge into traffic

    Install a traffic signal on Bladensburg Road

    to enable site access for vehicles andpedestrians

    Work with WMATA to extend bus routes andservice to the project

  • 8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511

    30/31

    Construction Period

    General Contractor to beselected with prerequisiteto provide opportunitiesfor local, minority andwomen-ownedbusinesses to participatein the project

    Opportunity fairs forsubcontractors

    Est. 500 constructionjobs

    Operations

    Developer will work withlocal communities andDistrict resources to

    establish a proximity-based recruitment andhiring program forretailers

    Job candidate pool will be

    marketed as projectamenity to tenant retailers Est. 650-800 permanent

    jobs

    Focus: Jobs

  • 8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511

    31/31

    Design:

    Substantial completion July 2011

    Permitting:

    July - November 2011

    Groundbreaking:

    Late Fall 2011

    Construction Period:

    12-16 months

    Occupancies:

    Winter 2012