Square 4268 Retail Development
a project by WV Urban Developments
Project Update presented March 24, 2011
-
8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511
2/31
Previous Site Plan dated Feb 17, 2011
-
8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511
3/31
Explain how the garageconnects the pedestrian tothe shopping
Improve and define thepedestrian connections
Place sidewalks andgreen space in theparking areas and garage
Make the verticalcirculation (elevators,escalators and stairs)easily accessible
Incorporate Multi-use Trailand Bike facilities
Create hardscaped areasor parks for shoppers Strengthen New York
Avenue edge
Activate the New York
Avenue street front Enliven the MontanaAvenue elevation
Improve the pedestrianexperience on
Bladensburg Road andthe upper level Accommodate future
density
Comments Addressed March 12th:
-
8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511
4/31
Comments Addressed March 12th
Please pick up the hand-out if you were unable to attend March 12th!
-
8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511
5/31
Give more thought topark areas, how theyconnect and work forshoppers and employees
Create a meeting placeon the upper level of thegarage
Explain what the Walmartstore looks like
Wrap glass and lightaround the New YorkAvenue corner toMontana Avenue
Explain the design onMontana Avenue Work on the Bladensburg
Road design, add interestand turn the corners ofthe buildings
Accommodate bus stops Explain the traffic study
and how traffic will bemanaged
Comments to be addressed today:
-
8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511
6/31
Level 1: New York Avenue
-
8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511
7/31
Level 2: Montana Avenue
-
8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511
8/31
Level 3: Bladensburg Road
-
8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511
9/31
Focus: Pedestrians and Parks
-
8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511
10/31
Focus: Parks on New York Avenue
-
8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511
11/31
Focus: Park on Upper Level
-
8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511
12/31
Focus: Walmart on New York Avenue
-
8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511
13/31
Focus: Walmart Entranceon Upper Level
-
8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511
14/31
Focus: Montana Avenue
-
8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511
15/31
Focus: Montana Avenue
-
8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511
16/31
Focus: Montana Avenue
-
8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511
17/31
Focus: Montana Avenue
-
8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511
18/31
Focus: Montana Avenue
-
8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511
19/31
Focus: Bladensburg Road
-
8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511
20/31
Focus: Bladensburg Road
-
8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511
21/31
Focus: Bladensburg Road
-
8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511
22/31
Focus: Transportation
-
8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511
23/31
Focus: Transportationand Alternate Modes
-
8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511
24/31
Focus: Bus Stops (proposed)
Bus Stop
-
8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511
25/31
Focus: Bus Stops
*This stop operates only when school is open. Alteration would include operating year round and during peak hours.
Metro Bus Route B2Existing Stop for Route B2*Metro Bus Route S41
Metro Bus Route E2/E3Metro Bus Route D3Metro Bus Route D4Metro Bus Route D8Potential ExtensionExisting Stop for Routes D3,
D4, and D8Existing Stop for Routes D3,
D4, and E2/E3
-
8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511
26/31
0
200
400
600
800
1000
1200
1400
1600
1800
2000
AM Peak Hour PM Peak Hour
Vehicle/Hour
Trip Generation Comparison
Existing Site Trips
Previously Approved
Mixed Use PUD
Currently Proposed By-
Right Development
Focus: Transportation Studyand Effective Planning
F T t ti St d
-
8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511
27/31
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
New York Ave. / 16thAve.
New York Ave. /Bladensburg Rd.
Montana Ave. /Bladenburg Rd.
New York Ave./ SBMontana Ave.
New York Ave./ NBMontana Ave.
AMPeakVolume(V/H)
Intersection
AM Peak Hour Proportional Impact
2.7
3.3%
5.5
%
3.0%
1.7%
2011 Existing Volumes 2013 Regional Growth Total Site Trips
Focus: Transportation Studyand Effective Planning
F T
i S d
-
8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511
28/31
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
New York Ave. / 16thAve.
New York Ave. /Bladensburg Rd.
Montana Ave. /Bladenburg Rd.
New York Ave./ SBMontana Ave.
New York Ave./ NBMontana Ave.
PMPeakVolume(V/H)
Intersection
PM Peak Hour Proportional Impact
5.7%
11.3
%
5.9%
3.0%
2011 Existing Volumes 2013 Regional Growth Total Site Trips
Focus: Transportation Studyand Effective Planning
-
8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511
29/31
Focus: Transportation Studyand Effective Planning
Reduce the number of curb cuts (driveways)from 32 to 9
Construct right turn lanes on New YorkAvenue for vehicles to pull out of traffic andmerge into traffic
Install a traffic signal on Bladensburg Road
to enable site access for vehicles andpedestrians
Work with WMATA to extend bus routes andservice to the project
-
8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511
30/31
Construction Period
General Contractor to beselected with prerequisiteto provide opportunitiesfor local, minority andwomen-ownedbusinesses to participatein the project
Opportunity fairs forsubcontractors
Est. 500 constructionjobs
Operations
Developer will work withlocal communities andDistrict resources to
establish a proximity-based recruitment andhiring program forretailers
Job candidate pool will be
marketed as projectamenity to tenant retailers Est. 650-800 permanent
jobs
Focus: Jobs
-
8/7/2019 The Point at Arboretum Update presentation 032411 Compressed 032511
31/31
Design:
Substantial completion July 2011
Permitting:
July - November 2011
Groundbreaking:
Late Fall 2011
Construction Period:
12-16 months
Occupancies:
Winter 2012
Project Schedule