Building better communities with you
The Permitting Advantages (and Challenges) of Green Infrastructure
SNEAPA 2016
October 20, 2016
Scott D. Turner, PE, AICP, LEED AP NDJennifer Johnson, PE, LEED AP BD+C, CPSWQ
@nitscheng
![Page 2: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/2.jpg)
Nitsch Engineering Building better communities with you
2015 Workload Mix
Private Sector
Public Sector
• Professional Engineers registered in 17 states and the District
of Columbia, and with NCEES
• Offices in Boston, Worcester, Lawrence & Washington DC
• 37 LEED® Accredited Professionals/Green Associates
• 7 Institute for Sustainable Infrastructure ENVSPs
• 100+ LEED Registered or Certified Projects
• Award-winning Sustainable Design Green Infrastructure
Projects
• Leaders in Sustainable Stormwater and Green Infrastructure
• Projects in 18 states and 5 countries
40%60%
![Page 3: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/3.jpg)
Nitsch Engineering Building better communities with you
![Page 4: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/4.jpg)
Project Background
Construction and Site Operation
Project Permitting
![Page 5: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/5.jpg)
Project Background
Owner/Developer
Facility Operator
ArchitectConstruction Administration
Engineer
![Page 6: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/6.jpg)
Project Background
Owner/Developer
Facility Operator
ArchitectConstruction Administration
Local
Hingham, MA
Rockland, MA
State
Mass. EOEEA
MassDOT
Engineer
![Page 7: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/7.jpg)
Project Background
Project Location
Hingham
Rockland
Boston
N
![Page 8: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/8.jpg)
Project Background
Project Location
HINGHAM
ROCKLAND
ACCORDPOND
NORW
ELL
ROUTE 3
HANOVER
N
HANNIGAN(ROCKLAND) RESERVOIR
PROJECT SITE
![Page 9: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/9.jpg)
Project Background
HINGHAM
ROCKLAND
ACCORDPOND
NORW
ELL
ROUTE 3
HANOVER
N
HANNIGAN(ROCKLAND) RESERVOIR
PROJECT SITE
Project Location
HINGHAM
ROCKLAND
NORW
ELL
ROUTE 3
HANOVER
WETLANDS
WETLANDS
ACCORDPOND
BEN MANN BROOK
N PROJECT SITE
HANNIGAN(ROCKLAND) RESERVOIR
![Page 10: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/10.jpg)
Project Background
Project Location
![Page 11: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/11.jpg)
Project Background
Project Location
![Page 12: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/12.jpg)
Why Green Infrastructure
Environmentally-Responsible Approach• Forward thinking owner/developer• Wetland and water supply protection• Suitable site conditions (Great Soils!)
Regulatory Drivers• Challenging stormwater requirements • GI/LID consistent with new (draft) MS4 permit requirements• GreenDOT initiative supports remediating highway runoff
Project Benefits• Both towns assumed to support Green Infrastructure
implementation Benefits to project schedule• Cost savings
![Page 13: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/13.jpg)
Project Background
AW Perry – Innovative Developer
Blue Cross Blue Shield
• First LEED Silver office building on south shore• Parking Deck - Limits amount of land disturbance
Two Pond Park Road • LEED Equivalent
![Page 14: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/14.jpg)
Project Background
Original Project Site Plan
![Page 15: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/15.jpg)
Project Background
Original Project Site Plan
![Page 16: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/16.jpg)
Project Background
Original Project Site Plan
![Page 17: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/17.jpg)
Project Background
Green Infrastructure Elements – Porous Asphalt• ‘Stackable Solution’• Suitable soil conditions• Reduce size + cost closed drainage system
35”
![Page 18: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/18.jpg)
Project Background
Green Infrastructure Elements – Bioretention• Dynamic landscape system with subsurface filtration and storage• Effective removal of sediment, petroleum, and nutrients• Best used as a local stormwater control, relatively small drainage areas• Pretreatment needed – catch basins and/or sediment forebay
![Page 19: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/19.jpg)
Project Background
Construction and Site Operation
Project Permitting
![Page 20: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/20.jpg)
Project Permitting
Conservation Commission
Planning Board
Zoning Board of Appeals
Conservation Commission
Planning Board
Zoning Board of Appeals
Indirect Access Permit
Direct Access Permit
Certificate - Environmental Notification Form
Order of Conditions
Special Permit (Parking)
Special Permit (Signage)
Site Plan Review
Design Review
Order of Conditions
Site Plan Review
Variances
Massachusetts Executive Office of
Energy and Environmental Affairs
Special Permit (Property Use)
![Page 21: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/21.jpg)
Project Permitting
Permitting Requirements - State
Certificate - Environmental
Notification Form
Direct Access Permit
Indirect Access Permit
Massachusetts Executive Office of Energy and
Environmental Affairs
![Page 22: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/22.jpg)
Project Permitting
MEPA Certificate
![Page 23: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/23.jpg)
Project Permitting
Local Permitting Considerations
Hingham• Full-time Planning staff
• Full-time Conservation Agent
• One peer reviewer for all boards (PB, CC, ZBA)
• Separate public hearings for all boards Rockland
• Volunteer Planning Board and Conservation Commission• Two separate (and extremely different) peer reviews• Relied heavily on the engineering peer reviews
• Joint public hearing for Planning Board and ZBA
![Page 24: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/24.jpg)
Project Permitting
Permitting Requirements – Town of Hingham
Conservation Commission
Hingham
Order of Conditions
Planning Board
Site Plan Review
Special Permit (Parking)
Zoning Board of Appeals
Special Permit (Use)
Variances
![Page 25: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/25.jpg)
Project Permitting
Hingham Review and Approval ProcessPlanning, Zoning, Conservation
• Requested additional offset from wetland line – 50 foot undisturbed Buffer
• Confirmed design met MassDEP Stormwater Management Standards and contacted UNH to confirm design assumptions
Requested the following:• Increased filter course
thickness from 8” to 12”
• Clarification on soil testing and infiltration rates
• Back-up distribution pipe in case of porous asphalt clogging
• Increased safety/treatment measures for the fueling area
![Page 26: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/26.jpg)
Project Permitting
Rockland
Conservation Commission
Order of Conditions
Site Plan Review
Design Review
Zoning Board of Appeals
Special Permit (Signage)
Planning Board
Permitting Requirements – Town of Rockland
![Page 27: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/27.jpg)
Project Permitting
Rockland Review and Approval ProcessPlanning and Zoning
Requested the following:• Confirmation that flow to
wetland will meet Rockland volume requirement
• Retrofits of existing developed area to increase treatment
• Increased cover over subsurface infiltration systems
• Increased safety/treatment measures for the fueling area
• General design clarifications on stormwater management system • No major design changes required or concerns with Green Infrastructure
• Confirmed design met MassDEP Stormwater Management Standards and Town of Rockland Stormwater Requirements
![Page 28: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/28.jpg)
Project Permitting
Rockland Review and Approval ProcessConservation
Engineering Peer Review focused on the following:• Wetland impacts and required replication• Wetland buffer preservation and tree protection• Porous asphalt suitability for the project site
![Page 29: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/29.jpg)
Project Permitting
Rockland Review and Approval ProcessConservation Peer Review - Wetland Impacts and Replication
![Page 30: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/30.jpg)
Project Permitting
Rockland Review and Approval ProcessConservation Peer Review - Buffer Protection
![Page 31: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/31.jpg)
Project Permitting
Rockland Review and Approval ProcessConservation Peer Review Water Department
Peer Review Engineer
Water Department
![Page 32: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/32.jpg)
Project Permitting
Rockland Review and Approval ProcessConservation Peer Review – Porous Asphalt Suitability
![Page 33: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/33.jpg)
Project Permitting
Rockland Review and Approval ProcessConservation Peer Review – Porous Asphalt Suitability
![Page 34: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/34.jpg)
Project Permitting
Project Changes Due to Permitting
• Redesign site layout
• Increase retaining wall height
• Convert to standard asphalt within the buffer zone
• Build underground stormwater infiltration system
• Additional cost of apx. $75,000
![Page 35: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/35.jpg)
Project Permitting
Project Changes Due to Permitting
![Page 36: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/36.jpg)
Project Permitting
Permitting Requirements - State
Certificate - Environmental
Notification Form
Direct Access Permit
Indirect Access Permit
Massachusetts Executive Office of Energy and
Environmental Affairs
![Page 37: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/37.jpg)
Project Permitting
Public/Private Partnership - MassDOT
1) Increase visibility from highway 2) Mitigate existing highway run-off
![Page 38: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/38.jpg)
Project Permitting
MassDOT – Trimming Policy
![Page 39: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/39.jpg)
Project Permitting
MassDOT – GreenDOT Initiative
![Page 40: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/40.jpg)
Project Permitting
ROW Landscaping and Stormwater Improvements
![Page 41: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/41.jpg)
Project Permitting
Pre Construction – Right-Of-Way
![Page 42: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/42.jpg)
Project Permitting
Post Construction – Right-Of-Way
![Page 43: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/43.jpg)
Project Background
Construction and Site Operation
Project Permitting
![Page 44: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/44.jpg)
Construction and Site Operation
During Construction – Porous Asphalt
![Page 45: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/45.jpg)
Construction and Site Operation
During Construction – Porous Asphalt
![Page 46: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/46.jpg)
Construction and Site Operation
Post Construction – Porous Asphalt
![Page 47: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/47.jpg)
Construction and Site Operation
Pre Construction – Right-Of-Way
![Page 48: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/48.jpg)
Construction and Site Operation
Post Construction - Right-Of-Way
![Page 49: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/49.jpg)
Construction and Site Operation
During Construction - Bioretention
![Page 50: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/50.jpg)
Construction and Site Operation
Post Construction - Bioretention
![Page 51: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/51.jpg)
Construction and Site Operation
Post Construction - Bioretention
![Page 52: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/52.jpg)
Construction and Site Operation
During Construction – Wetland Replication
![Page 53: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/53.jpg)
Construction and Site Operation
Post Construction – Wetland Replication
![Page 54: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/54.jpg)
Construction and Site Operation
Post Construction – Pavement Transition
![Page 55: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/55.jpg)
Construction and Site Operation
Post Construction – Pavement Transition
![Page 56: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/56.jpg)
Construction and Site Operation
Post Construction – Pavement Transition
![Page 57: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/57.jpg)
Construction and Site Operation
Post Construction – Pavement Transition
https://www.youtube.com/watch?v=V4lJagzSYTk
![Page 58: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/58.jpg)
Construction and Site Operation
Post Construction – Overflow Outfall
![Page 59: The permitting advantages and challenges of green infrastructure](https://reader035.fdocuments.in/reader035/viewer/2022062503/58ec99621a28ab503d8b46c7/html5/thumbnails/59.jpg)
Q+A on Green Infrastructure
Scott D. Turner, PE, AICP, LEED AP ND [email protected]
Jennifer Johnson, PE, LEED AP BD+C, CPSWQ [email protected]
• What can other Cities and Towns do to encourage the use of Green Infrastructure?
• What are Planners roles in educating their Town staff, boards and public on the benefits of Green Infrastructure?
• Small MS4s will be required to include LID strategies/Green Infrastructure into Town regulations
• What are the operations and site maintenance considerations for Green Infrastructure?