The New Vision with SPE Core - Intergraph · Upgrade of water injection unit for Gullfaks B...
Transcript of The New Vision with SPE Core - Intergraph · Upgrade of water injection unit for Gullfaks B...
SmartPlant Enterprise in Grenland Group
The New Vision with SPE Core
P2C2 - 2010
Insert Company Logo Here
Tonia PedersenTerje Ørbeck Grenland Group, Norway
Grenland Group
� An experienced oil & gas engineering, procurement and construction company
� Strong customer focus
� Uncompromising attitude in HSE matters
� An attractive employer for highly qualified
SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 2 –
� An attractive employer for highly qualified personnel
� 1200 employees in Norway and Asia
Business areas
• World leading fabricator of subsea equipment
• NOK 683m in revenues in 2008
• Major supplier of maintenance & modification services to
the Norwegian continental shelf
• NOK 566.5m in revenues in 2008
Grenland Group Fabrication
Grenland GroupOffshore Partner
SmartPlant Enterprise – Experience The PowerNovember 3, 2010 – 3 –
• Leading supplier of engineering & procurement services
worldwide
• NOK 402m in revenues in 2008
Grenland Group Solutions
• Grenland Industri: Blue-collar resource company – NOK 137.8m in revenues in 2008
• GGEA: Onshore and offshore electrical & automation services, NOK 64.4m in revenues in 2008
Independent Subsidiaries
GLOBAL ENGINEERING
GG locations
GG representative Offices
�
Oslo
Drammen
Tønsberg
Stokke
Sandefjord
Langesund
Stathelle
Skien
�
�
�
�
�
�
SmartPlant Enterprise – Experience The Power– 4 –
�
�
�
�
HoustonNingbo/Shanghai, China
Kuala Lumpur
Szczecin, Poland
��
� Korea
�
Mexico�Qatar
�Spain
�
�
Aberdeen
India
Brasil
�
�
�Egypt
Skien
Porsgrunn
Notodden
Skudeneshavn
Stavanger
Harstad
�
�
��
�
November 3, 2010
Design & studies
� Rig design, Semisubmersible’s & Drillship design
SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 5 –
Design studies
� Well intervention Equipment & Products
SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 6 –
EXISTING CAD SYSTEM IN GG, 2006
� Complicated CAD Picture
� To many CAD/ Design system
� Innefficient data sharing
PDMS 3D MODELLING PIP/STR.
TEKLA-XSTEEL STRUCTURE
SMARTPLANT INSTRUMENTATION
PLANTSPACE - PIPING
PDS - PIPING
SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 7 –
� Difficult to support all projects/ end users
� Key business driver to identify ’one’-system which could improve this picture dramatically
MICROSTATION
PLANTSPACE - PIPING
AUTOCAD
PROSESS. - manuel
MANUEL SYST.
EXCEL
Consolidated with SmartPlant Enterprise
DISIPLINE TOOLS
Pip
ing
Sm
artP
l 3D
Stru
ktu
r
Sm
artP
l 3D
Pro
sess
Sm
artPl P
&ID
Elec|tro
/Instr
Sm
artPl In
str.
Hvac
Sm
artPl 3D
Mech
an
ical
So
lid m
od
elling
Solid 2D/Review
Dra
ugh
ting
Sm
artS
ketch
DN
V
Na
uticu
s/Sesa
n
Intellish
ip
Ana
lysis
Sm
p R
eview
Sm
p M
ark
up
SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 8 –
Sm
artPl P
&ID
Sm
artPl In
str.
So
lid m
od
elling
IFS
Financial
IFS
ProjectIFS
Purchasing
Sm
p M
ark
up
HIDOC
DOCUMENT
MANAGEMENT
SMARTPLANT FOUNDATION
A New Focus with SPE Core
SPE Core /
SmartPlant
Foundation
. Tag Register
. Doc Register
. Reporting Tool
Sm
artP
lant
Des
ign
Tool
s
Customer Systems
SmartMarine/SmartPlant 3D
SmartPlant Enterprise – Experience The PowerNovember 3, 2010 – 9 –
. Workflow
. Progress
. Asset Register
Sm
artP
lant
Des
ign
Engineering to Order and Project
Delivery
IFS
Lotus Notes
HiDoc
SmartPlant Electrical
SmartPlant Instrumentation
SmartPlant P&ID
Projects with SPE Core
� Åsgard Swivel, October 2010-present
Complete replacement of existing offshore swivel for
Åsgard A.
� Disciplines: Piping, Structural, Electro, Process,
SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 10 –
Instrumentation
� Deliveries: Piping Isometrics, Piping MTO, Weight & CoG data,
client procurement data, Structural Arrangements & Detail
manufacturing drawings. Tag Master List, Tag-Document and
Tag-Tag relationships.
Projects with SPE Core
� Gullfaks B, June 2010-present
Upgrade of water injection unit for Gullfaks B
� Disciplines: Process, Piping, Structural, Electro, Instrument,
HVAC
SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 11 –
� Deliverables: Delivery P&ID Drawing, Linelist, Valvelist,
Equipment list, Piping Isometrics, Piping MTO, Piping &
Layout Arrangement drawings, Structural Arrgt . Drawings,
Structural Foundation Drawings. Tag Master List, Tag-
Document and Tag-Tag relationships.
SPF/SPE "In Use"
� Type Hierarchies
� Plant Break Down Structure
� Tag Type Hierarchy
� Document Type Hierarchy
SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 12 –
� Classification Types
SPF/SPE "In Use"
� Configuration Spreadsheets
� Plant Break Down Structure
� Tag Type Hierarchy
� Document Type Hierarchy
SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 13 –
� User Access
SPF/SPE "In Use"
Tag Registry
� Central registry of all tags for each project.
� Central tag creation point for SmartPlant tools
SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 14 –
� tag hierarchy reflects the individual tool
requirements for tag typing.
SPF/SPE "In Use"
Data Loading Spreadsheets
� Bulk Tag Loading
� Easy to configure
SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 15 –
SPF/SPE "In Use"
Tag Publish
� SPE supports tag publish
to the SmartPlant tools.
SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 16 –
SPF/SPE "In Use"
Tag Retrieve
� SPE published tags are
correlated with the tags
retrieved from Tools
SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 17 –
SPF/SPE "In Use"
Inconsistency Checking
� Central Tag Registry with ”Shared Objects” provides for easier checking of
tag data across disciplines.
SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 18 –
SPF/SPE "In Use"
Document Registry
� SmartPlant Foundation updated regularly with Document meta data from
HiDoc via XML load files.
� HiDoc : central document
registry for transmittals
SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 19 –
� SPF: tag-document
relationship registry
SPF/SPE "In Use"
Tag - Document Linking
� SmartPlant published documents
incorporate tag-document links.
� Drag and Drop supported within
SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 20 –
SPE Core between SPX Tags
and SPX Documents.
� Tag – Document relationship
report from SPF.
SPF/SPE "In Use"
Published Document Workflow� HiDoc is updated with approved engineering documents via workflow.
� Published documents to be sent on
transmittal are first approved using a
SPF workflow step
SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 21 –
� Approved documents are output via
SPE Core ’internal transmittal’
workstep for retrieval by HiDoc.
SPF/SPE "In Use"
Engineering Data Reporting� Bringing together engineering tag data
� Tag data distributed across
SmartPlant domains.
SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 22 –
� Shared Object references
’Last-In’ data
Short Term
� Full integration of tags between SPE and SPF and SmartPlant Tools
� Asset Managment
� Tag – Asset linking and reporting
SPF/SPE ”Next Steps"
SmartPlant Enterprise – Experience The Power
� More comprehensive tag data reporting from SPF
November 23, 2010 – 23 –
SPF/SPE ”Next Steps"
Longer Term
� ENS management of tags and documents in SPF
� Central Document Registry
� Document Transmittal
SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 24 –
� Document Progress
Grenland Group can compete in a ”higher engineering division”.
� Centralized tag registry
� Tag – Document management
Benefits
SmartPlant Enterprise – Experience The Power
� Tag – Document management
� Centralized documentmanagement
November 23, 2010 – 25 –
� Workflow management
� End-User Access
� SPE Worksheets
Benefits (cont..)
� Transmittals
� ENS Management
� Asset Management
SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 26 –
Challenges
� Integration between SPF and the Tools is crucial for a central tag registry.� Currently integration does not exist for all tag types for the ’ootb’ applications
� This is an ’Off the Shelf System’. � Require in-house configuration according to company standards.
� Requires time to determine what is ’Out of the Box’
� What is required to be configured to ensure an ’up and running’ system.
SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 27 –
� Each tool requires a talented Administrator� Require much more knowledge in IT (operating system, networking and databases)
� Still require good engineering knowledge
� Positive ’can-do’ attitude
� Management Support� Support for time and resources is essential
� This is not a tool that is immediately ’up and running’ after installation
Challenges (cont..)
� Communication and Training� Effective communication channels
� Between tool administrators and between administrators and end-users
� End-user training of tools and work processes
� This is a new approach to engineering and is confronting for some engineers.
� Testing� Easy to introduce problems.
SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 28 –
� Easy to introduce problems.
� Remember this is an integrated system
� Change Management� Configuration and data dictionary changes must be co-ordinated and managed
� Work Process Management� Determining a effective engineering work processes
� Managing exceptions to the defined work processes
� This is a vision we believe in!
� And although we face many challenges….
If you start such a project and want to succeed:
LAST WORDS…..
SmartPlant Enterprise – Experience The Power
� Be prepared to stick your head out
� Be ready for a ’fight’!
� Never give up!!
November 23, 2010 – 29 –
”ONE TEAM-ONE SYSTEM”ALL WINNERS
SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 30 –
www.grenlandgroup.com Thank youTonia Pedersen / Terje ØrbeckGrenland Group