1

Department of

Design and Construction

Ana Barrio

Acting Commissioner

THE NEW STATEN ISLAND 1 & 3 GARAGE AND REHABILITATION OF THE BOROUGH REPAIR SHOP FACILITY FOR DSNYPRE-PROPOSAL CONFERENCE

1

Page 2: THE NEW STATEN ISLAND 1 & 3 GARAGE AND … AND REHABILITATION OF THE BOROUGH REPAIR SHOP ... Staffing Plan (Attachment 3) 2. One ... M/WBE Prime Vendor (2) ...

Project Personnel

Location

Scope

Floor Plans

Site Visit

SANITATION UNITAssistant Commissioner: Bogdan Pestka, FAIA

Program Director: Glenn Brue

Deputy Program Director: John Ziedonis, AIA

Senior Project Managers: Nicole

Hoppenworth, AIA

Juan Francisco

Barajas Orozco

Page 3: THE NEW STATEN ISLAND 1 & 3 GARAGE AND … AND REHABILITATION OF THE BOROUGH REPAIR SHOP ... Staffing Plan (Attachment 3) 2. One ... M/WBE Prime Vendor (2) ...

Project Personnel

Location

Scope

Floor Plans

Site Visit

SITE:1000 WEST SERVICE

ROAD

STATEN ISLAND, 10314

Page 4: THE NEW STATEN ISLAND 1 & 3 GARAGE AND … AND REHABILITATION OF THE BOROUGH REPAIR SHOP ... Staffing Plan (Attachment 3) 2. One ... M/WBE Prime Vendor (2) ...

Project Personnel

Location

Scope

Floor Plans

Site Visit

SITE:1000 WEST SERVICE

ROAD

STATEN ISLAND, 10314

Page 5: THE NEW STATEN ISLAND 1 & 3 GARAGE AND … AND REHABILITATION OF THE BOROUGH REPAIR SHOP ... Staffing Plan (Attachment 3) 2. One ... M/WBE Prime Vendor (2) ...

EXISTING SI 3

GARAGE

EXISTING BOROUGH

REPAIR SHOP

Project Personnel

Location

Scope

Floor Plans

Site Visit

Page 6: THE NEW STATEN ISLAND 1 & 3 GARAGE AND … AND REHABILITATION OF THE BOROUGH REPAIR SHOP ... Staffing Plan (Attachment 3) 2. One ... M/WBE Prime Vendor (2) ...

Project Personnel

Location

Scope

Floor Plans

Site Visit

EXISTING CONDITIONS SITE DIAGRAM

Page 7: THE NEW STATEN ISLAND 1 & 3 GARAGE AND … AND REHABILITATION OF THE BOROUGH REPAIR SHOP ... Staffing Plan (Attachment 3) 2. One ... M/WBE Prime Vendor (2) ...

Project Personnel

Location

Scope

Floor Plans

Site Visit

SCOPE OF WORK:

• CONSTRUCT NEW GARAGE FOR STATEN ISLAND DISTRICTS 1 & 3

• NEW GARAGE WILL BE APPROXIMATELY 120,000 SF

• DISTRICT 1 WILL BE RELOCATED TO THE SITE

• RENOVATION OF EXISTING BOROUGH REPAIR SHOP

• EXISTING BUILDING WILL HOUSE WEATHER SENSITIVE VEHICLES

• EXISTING BOROUGH REPAIR WILL BE RECONFIGURED TO INCLUDE 16

LARGE REPAIR BAYS & 6 ADDITIONAL BAYS WILL BE ADDED IN THE

EXISTING SI 3 GARAGE SPACE AND SEPARATED FROM VEHICLE STORAGE

SPACE

• A 10’ WIDE FORKLIFT RAMP WILL CONNECT THE EXISTING SI 3 GARAGE

AND THE EXISTING BOROUGH REPAIR SHOP

• ROOF REPLACEMENT & HVAC EQUIPMENT REPLACEMENT TO TAKE PLACE

UNDER A SEPARATE PROJECT

• SITE

• ADDITIONAL 6 ACRES RECLAIMED FROM THE LANDFILL TO INCREASE THE

SITE TO 13.55 ACRES

• NEW GRADING AND DRAINAGE

• NEW SURFACE PARKING for DSNY VEHICLES AND EMPLOYEE VEHICLES

• NEW OUTDOOR FREE STANDING FUELING FACILITY

• NEW HOUSEHOLD WASTE DROP-OFF

• NEW SALT STORAGE FACILITY FOR 2,000 TONS

• NEW SANITARY LINE TO CONNECT TO DEP SEWER SYSTEM

Page 8: THE NEW STATEN ISLAND 1 & 3 GARAGE AND … AND REHABILITATION OF THE BOROUGH REPAIR SHOP ... Staffing Plan (Attachment 3) 2. One ... M/WBE Prime Vendor (2) ...

Project Personnel

Location

Scope

Floor Plans

Site Visit

PHASING:

• PERSONNEL AND EQUIPMENT WILL CONTINUE TO OPERATE FROM THE

EXISTING STATEN ISLAND DISTRICT 3 GARAGE AND BOROUGH REPAIR

SHOP UNTIL COMPLETION OF THE NEW GARAGE.

• VEHICLE MAINTENANCE AND REPAIR WILL CONTINUE TO FUNCTION FROM

THE BOROUGH REPAIR SHOP THROUGHOUT CONSTRUCTION.

Page 9: THE NEW STATEN ISLAND 1 & 3 GARAGE AND … AND REHABILITATION OF THE BOROUGH REPAIR SHOP ... Staffing Plan (Attachment 3) 2. One ... M/WBE Prime Vendor (2) ...

EXISTING CONDITIONS

Page 10: THE NEW STATEN ISLAND 1 & 3 GARAGE AND … AND REHABILITATION OF THE BOROUGH REPAIR SHOP ... Staffing Plan (Attachment 3) 2. One ... M/WBE Prime Vendor (2) ...

Project Personnel

Location

Scope

Floor Plans

Site Visit

DDC PROJECTED MILESTONE SCHEDULE:

PRE-CONSTRUCTION PHASE* (INCLUDES DESIGN PHASE AND CONSTRUCTION

PROCUREMENT)

• 928 CCDs

CONSTRUCTION PHASE*

• 1,460 CCDs

POST-CONSTRUCTION PHASE

• 183 CCDs

* Timeline to be confirmed at the end of Design Development

Page 11: THE NEW STATEN ISLAND 1 & 3 GARAGE AND … AND REHABILITATION OF THE BOROUGH REPAIR SHOP ... Staffing Plan (Attachment 3) 2. One ... M/WBE Prime Vendor (2) ...

Project Personnel

Location

Scope

Floor Plans

Site Visit

EXISTING PLAN – FIRST FLOOR

Page 12: THE NEW STATEN ISLAND 1 & 3 GARAGE AND … AND REHABILITATION OF THE BOROUGH REPAIR SHOP ... Staffing Plan (Attachment 3) 2. One ... M/WBE Prime Vendor (2) ...

Project Personnel

Location

Scope

Floor Plans

Site Visit

EXISTING PLAN – SECOND FLOOR

Page 13: THE NEW STATEN ISLAND 1 & 3 GARAGE AND … AND REHABILITATION OF THE BOROUGH REPAIR SHOP ... Staffing Plan (Attachment 3) 2. One ... M/WBE Prime Vendor (2) ...

Equity East Flatbush Library

Sustainability Rescue Company 2

Design - Lenses

13

Jerome Avenue, Bronx

ResiliencyEastside Coastal

Resiliency Initiative

Healthy LivingMontefiore Square Park

13

GrowthTimes Square

Page 14: THE NEW STATEN ISLAND 1 & 3 GARAGE AND … AND REHABILITATION OF THE BOROUGH REPAIR SHOP ... Staffing Plan (Attachment 3) 2. One ... M/WBE Prime Vendor (2) ...

Project Personnel

Location

Scope

Floor Plans

Site Visit

PRE-PROPOSAL

SITE WALK THROUGH:

TUESDAY JULY, 11, 2017 at

1:00 PM

1000 WEST SERVICE ROAD

STATEN ISLAND, 10314

Page 15: THE NEW STATEN ISLAND 1 & 3 GARAGE AND … AND REHABILITATION OF THE BOROUGH REPAIR SHOP ... Staffing Plan (Attachment 3) 2. One ... M/WBE Prime Vendor (2) ...

Inquiries:

Must be requested in writing no later than Wednesday, July 19, 2017.

Due Date:

Wednesday, July 26, 2017, by 4:00 p.m.

(DDC Entrance is on 30th Place, not Thomson Avenue)

Acknowledgement of Addenda:

All addenda shall become part of the requirements of the RFP. Please sign and return Attachment 6 with your portfolio

15Helpful Reminders

Page 16: THE NEW STATEN ISLAND 1 & 3 GARAGE AND … AND REHABILITATION OF THE BOROUGH REPAIR SHOP ... Staffing Plan (Attachment 3) 2. One ... M/WBE Prime Vendor (2) ...

Proposal Package Contents (RFP-13)

STAGE ONE

Three separate packages will be required for submission:

1. Portfolio (1 Original and 6 Copies)

Items listed in Section IV.B of the RFP

Statement of Understanding and Certification (Attachment 1)

Iran Divestment Act Compliance Rider (Attachment 2)

Acknowledgement of Addenda (Attachment 6)

2. One electronic version of the Portfolio saved as a PDF on a

clearly labeled CD or USB drive

3. Doing Business Data Form (1 original) (Attachment 9)

16Helpful Reminders

Page 17: THE NEW STATEN ISLAND 1 & 3 GARAGE AND … AND REHABILITATION OF THE BOROUGH REPAIR SHOP ... Staffing Plan (Attachment 3) 2. One ... M/WBE Prime Vendor (2) ...

STAGE TWO (Applicable to Stage One Short-List Proposers Only)

Three separate packages will be required for submission:

1. Technical Proposal (1 Original and 6 Copies)

Items listed in Section IV.C of the RFP

Completed SF330 Form for the Prime and Subconsultants

Statement of Understanding and Certification (Attachment 1)

Staffing Plan (Attachment 3)

2. One electronic version of the Technical Proposal saved as a PDF on a

clearly labeled CD or USB drive

3. Schedule B: M/WBE Utilization Plan (Attachment 8)

17Helpful Reminders

Page 18: THE NEW STATEN ISLAND 1 & 3 GARAGE AND … AND REHABILITATION OF THE BOROUGH REPAIR SHOP ... Staffing Plan (Attachment 3) 2. One ... M/WBE Prime Vendor (2) ...

JULY 1, 2015 18Helpful Reminders

Proposal Evaluation Criteria

STAGE ONE:

Fit, finish and construction quality-35%

Timeliness of Completion-35%

The quality of the cost management-30%

STAGE TWO:

Experience of the Firms & Subconsultants- 30%

Staffing Plan-25%

Management Strategy- 20%

Project Schedule-25%

Page 19: THE NEW STATEN ISLAND 1 & 3 GARAGE AND … AND REHABILITATION OF THE BOROUGH REPAIR SHOP ... Staffing Plan (Attachment 3) 2. One ... M/WBE Prime Vendor (2) ...

JULY 1, 2015 19Helpful Reminders

VENDEX (RFP-15, Section V)

Proposers are advised to read the entire section

General Information (RFP-17, Section VI)

Proposers are advised to read the entire section

Page 20: THE NEW STATEN ISLAND 1 & 3 GARAGE AND … AND REHABILITATION OF THE BOROUGH REPAIR SHOP ... Staffing Plan (Attachment 3) 2. One ... M/WBE Prime Vendor (2) ...

20M/WBE Participation Requirement

M/WBE PARTICIPATION REQUIREMENT

M/WBE GOAL 23%

M/WBE requirement can be achieved by:

(1) M/WBE Prime Vendor

(2) Qualified M/WBE Joint Venture

(3) M/WBE Subcontractor(s)

New York City Department of Small Business Service certified M/WBE firms is listed at:

http://mtprawvwsbswtp1-1.nyc.gov/Search.aspx

Page 21: THE NEW STATEN ISLAND 1 & 3 GARAGE AND … AND REHABILITATION OF THE BOROUGH REPAIR SHOP ... Staffing Plan (Attachment 3) 2. One ... M/WBE Prime Vendor (2) ...

HIRENYC: GOODS AND SERVICES

HireNYC Goods and Services is a hiring process that requires businesses that contract with the City to share entry and mid-level positions with the City, and interview the qualified candidates that the City refers.

Consultants will be required to:

• Enroll with the HireNYC Portal within thirty (30) days after registration of the contract;

• Indicate if entry to mid-level opportunities will arise from the contract; if no applicable employment opportunity related to a contract arose, to certify as such;

• Post job openings for entry and mid-level positions arising from the contract

21HIRENYC: Goods and Services

Page 22: THE NEW STATEN ISLAND 1 & 3 GARAGE AND … AND REHABILITATION OF THE BOROUGH REPAIR SHOP ... Staffing Plan (Attachment 3) 2. One ... M/WBE Prime Vendor (2) ...

QUESTIONS

If you need additional guidance on HireNYC, please contact

Donna Pope at [email protected].

For questions about the HireNYC Portal, [email protected]

22HIRENYC: Goods and Services

Page 23: THE NEW STATEN ISLAND 1 & 3 GARAGE AND … AND REHABILITATION OF THE BOROUGH REPAIR SHOP ... Staffing Plan (Attachment 3) 2. One ... M/WBE Prime Vendor (2) ...