The NET Power Process

21 February, 2013 1

This material contains the intellectual property of NET Power, Toshiba Corp, Exelon Corp, and CB&I.

NET Power uses a novel, high-pressure, oxy-fuel, supercritical carbon dioxide cycle to produce extremely low-cost electricity from natural gas, coal or biomass.

• No atmospheric emissions: no CO2, SOX, NOX, Hg, and particulates; CO2 is produced at pipeline conditions with no parasitic load

• High target efficiency: 59% LHV for natural gas, 52% LHV for coal, both with 100% carbon capture

• Low capital and operating costs, w/out any value for CO2 sales or credits: on par w/ NGCC systems; much lower than SCPC systems

• Smaller plant: simple cycle; high pressure; fewer components

• Low water usage: can use ZERO water with a 3% reduction in efficiency by using air cooling

• Platform technology: LNG regasification, solar-natural gas hybrid, and direct EOR applications.

The result: low-cost, truly clean fossil fuel-based electric power.

CB&I, Toshiba, Exelon have partnered w/ NET Power to develop a 50MWt gas plant.

NET Power is starting development of its coal cycle, which builds off of the natural gas demonstration and integrates with currently available gasifiers.

21 February, 2013 2 This material contains the intellectual property of NET Power, Toshiba Corp, Exelon Corp, and CB&I.

21 February, 2013 This material contains the intellectual property of NET Power, Toshiba Corp, Exelon Corp, and CB&I.

3

Oxy-fuel, closed-loop, CO2 working fluid

High-pressure-low-pressure ratio

200-400 bar; 6-12 pressure ratio

Target efficiency 59% (LHV with 100% CC)

CO2 and water are the only by-products

1 Fuel Combustion

5

1

2

3

4 7

2 CO2 Turbine

3 Heat Rejection

4 Water Separation

5 Compression and Pumping

6 Additional Heat Input

7 Heat Recuperation

6

TURBINE ASSEMBLY

21 February, 2013 This material contains the intellectual property of NET Power, Toshiba Corp, Exelon Corp, and CB&I.

4

2

1 Coal Gasification

2 Impurity Cleanup

H20 H2SO4 HNO3

Hg

Co

al C

ycle

A

dd

itio

ns Adds gasification & cleanup

52% target eff. (LHV with 100% CC)

Uses existing gasification technology

1

NET Power’s low cost (with 100% carbon capture) when compared to competing technologies is driven by:

21 February, 2013 5

Low capital costs

• Elimination of all steam components

• Smaller components and footprint due to high pressure

• Elimination of emissions control equip.

• No additional CO2 capture equipment

• Prefabrication

• Use of lower-cost materials

250M

WCo

nve

ntio

nal

Coal

Pla

nt

250M

WN

ET P

ow

erCo

al P

lan

t(8

0% s

mal

ler)

NET Power Coal

Conventional Supercritical Coal

Natural Gas w/ 100% CO2 Capture (@300 bar)

Energy Components

HHV LHV

Gross Turbine Output

75% 83%

CO2 Compressor

Power -11% -12%

Plant Parasitic Power

(primarily ASU) -11% -12%

Net Efficiency 53% 59%

High target efficiency

This material contains the intellectual property of NET Power, Toshiba Corp, Exelon Corp, and CB&I.

21 February, 2013 This material contains the intellectual property of NET Power, Toshiba Corp, Exelon Corp, and CB&I.

6

Completed

Toshiba, NET Power, CB&I and Exelon developing 25MWe natural gas plant.

Successful ignition and initial operation of test combustor.

Preliminary turbine design.

25MWe Pre-FEED.

Funding from DECC.

2013

25MW FEED & 250MW pre-FEED are near completion.

Completion of DECC coal work.

Begin taking orders for and developing 250MWe plants.

End of 2014

25MWe natural gas plant begins operations.

2015 Begin construction of first

250MWe natural gas plants.

2017 Commercial plants operational.

21 February, 2013 This material contains the intellectual property of NET Power, Toshiba Corp, Exelon Corp, and CB&I.

7

Inventor and developer of the technology. Responsible for overall project development, systems engineering and commercial deployment.

Developing the NET Power turbine and combustor.

Provided substantial investment in NET Power (as The Shaw Group). Performing EPC services.

Assisting with the siting, permitting, and commissioning of the natural gas demo facility; providing operations and maintenance support.

For inquiries, please contact NET Power at:

+1 (919) 667-1800

www.NETPower.com

[email protected]

21 February, 2013 8

This material contains the intellectual property of NET Power, Toshiba Corp, Exelon Corp, and CB&I.