INNORAIL 2019 ConferenceBudapest - 14/11/2019
The National Railways Company “CFR” S.A.
Railway development plans in RomaniaCFR’s investments priorities
1
2
The main components and technical facilities of railway infrastructure managed by CFR-SA
• The public Railway Infrastructure on the Romanianterritory belongs to the Romanian State and is awarded inconcession to The National railways Company CFR-SA(Compania Nationala de Cai Ferate “CFR”-SA) in itscapacity as Infrastructure Manager.
• The concrete elements of the public RailwayInfrastructure are defined in Annex 2 to GovernmentDecison no. 581/1998 on setting-up The Nationalrailways Company CFR-SA (“CFR”-SA), with its furtheramendments and in Annex 1 to Law no. 202/2016.
• The main components and technical facilities of railwayinfrastructure managed by “CFR”-SA for the year 2019are:
- 10,628 km railway network;- 19,837 km network lines carried in use;- 2,917 km double track;- 7,711 km single track;- 4,030 km electrified railway line;- 171 tunnels with a total length of 6 809 km;- 17.694 bridges and culverts;- 909 railway stations (section point).
• The access to the Romanian railway infrastructure isgranted on a non-discriminatory basis to all the RUs thatfulfil the necessary and sufficient conditions, and requireand conclude an access contract with “CFR”-SA or anallocation convention in case of the other Applicants.
CFR NETWORK STATEMENT 2019
http://www.cfr.ro/index.php/ct-menu-item-125?id=4116
3
Administrative Organization
4
The map of the Railway Network with its main characteristics
5
Trans-European Transport Corridors - December 2013
Trans-European Transport Core Network - December 2013
TEN – T Corridors in ROMANIA
- ORIENT/EAST-MED CORRIDOR - (Kolin – Pardubice – Brno – Wien/Bratislava –Budapest – Arad – Timişoara – Craiova – Calafat – Vidin – Sofia)
- RHINE-DANUBE CORRIDOR - (Wien/Bratislava – Budapest – Arad – Brasov /Craiova – Bucuresti – Constanta – Sulina)
Rail Freight Corridor 7 (Orient / East-Med Freight Corridor)
Core Network Corridors (CNC) in Romania
6
Strategy for the railway sector - GMPT 2016
• Increasing of the rail transport attractivenessMission
• Improvement of the travel conditions bymodernizing and developing the national railnetwork services
Objectives
• TEN-T railway network modernization
• TEN-T network railway electrification
• Implementation of rail services, routes withincreased speed, quick-wins and acquisition of newrolling stock
• Economic railway modernization
• Touristic railway modernization
Strategies
7
Development needs in the railway field
De
ve
lop
me
nt
in t
he
ra
ilw
ay
fie
ld
Ensuring adequate financial resources for investments andmaintenance, together with specific safety and security solutions;
Increasing the accessibility of regions and individuals by rehabilitatingand modernizing the railway network to European standards;
Increasing the competitiveness of the railway transport through reformmeasures, including the improvement of the management, services andquality of the rolling stock, together with the optimization of thenetwork size.
Global objectives of the railway infrastructure development strategy
Integration in the Single European Railtransport Area
Increasing the rail transport competitivenesson internal market
Increasing the rail infrastructure performances
Increasing the train traffic management performances
Increasing the energy efficiency and reducing the emissions level
Improving the competitiveness of passenger rail transport
Improving the competitiveness of freight rail transport
Rehabilitation and modernization of European Corridors infrastructure
Rehabilitation and modernization of TEN-T infrastructure
Development of high-speed rail infrastructure
8
9
Railway projects in the General Master Plan for Transport
Status of the railway projects 2019
10
Rhine – Danube Corridor
1.461 km
Rehabilitation of European Corridors (1)
11
Rehabilitation of European Corridors (2)
698 km
Orient / East Mediterranean Corridor
12
Rehabilitation of TEN-T Core European Network
618 km
Corridor IX
13
TEN-T network modernization targets for 2050
14
Financing Needs 2015-2030
ObjectiveEstimated costs [M €]
2015-2020 2021-2030 TOTAL
Infrastructure current maintenance 1 350.0 2 700.0 4 050.0
Recovery of current repair backlogs 275.0 100.0 375.0
Recovery of renewal backlogs 4 000.0 8 000.0 12 000.0
Subtotal Maintenance and Renewal 5 625.0 10 800.0 16 425.0
Rehabilitation the Rhine – Danube Corridor the Northern Branch 2 526.0 2 526.0
Rehabilitation the Rhine – Danube Corridor the Southern Branch 836.0 1 349.2 2 185.2
Rehabilitation/modernization the Orient/East-Med Corridor 182.4 182.4
Rehabilitation/modernization the Core TEN-T network 1 885.2 2 148.6 4 033.8
Rehabilitation/modernization the Comprehensive TEN-T network 4 044.1 4 044.1
Subtotal Rehabilitation/Modernization 5 429.6 7 541.9 12 971.5
TOTAL 11 054.6 18 341.9 29 396.5
Source: CFR SA Strategy & Romanian General Master Plan of Transport
15
Source of financing : ❑LIOP 2014-2020 / 2021 - 2027 (CF and ERDF)❑CEF 2014-2020 / 2021 - 2027 (CF)❑State Budget
CFR Project Status of Corridor Rehabilitation
16
Status of railway projects on Rhine-Danube Corridor - 30/09/2019
17
No. Section / SubsectionStatus
Percentagephysical progress
Source of financing / Programme
ExpectedCompletion date:
1 HU/RO Border - Curtici - Arad - Km 614 Operational tests 99 %Cohesion fund/State Budget
SOP-T 2007-201330.12.2017
2 Km 614 - Gurasada - Simeria 30.11.2021
2.1. km 614-Bârzavaunder construction
29.10 %Cohesion fund/State Budget
POIM 2014-202031.07.2021
2.2 Bârzava – Ilteuunder construction
31.00 %Cohesion fund/State Budget
POIM 2014-202031.07.2021
2.3 Ilteu - GurasadaUnder construction
10.50 %Cohesion fund/State Budget
POIM 2014-202030.11.2021
2.4 Gurasada - Simeriaunder construction
17.95 %Cohesion fund/State Budget
POIM 2014-202031.10.2021
3 Simeria – Coslariu 31.12.2019
3.1. Vintu de Jos- Coslariu under construction 92.31 %Cohesion fund/State Budget
SOP-T 2007-2013 / POIM 2014-202030.07.2020
3.2. Vintu de Jos - Simeria under construction 98.15 %POS-Cohesion/State Budget
SOP-T 2007-2013 / POIM 2014-202030.10.2019
3.3. ERTMS Coslariu - Simeria under construction 69.50 %Cohesion fund/State Budget
SOP-T 2007-2013 / POIM 2014-202031.12.2020
4 Coslariu - Sighisoara 31.12.2018
4.1. Coslariu - Micasasa under construction 99.80 %Cohesion fund/State Budget
SOP-T 2007-2013 / POIM 2014-202030.10.2019
4.2. Micasasa - Atel under construction 97.68 %Cohesion fund/State Budget
SOP-T 2007-2013 / POIM 2014-202031.12.2019
4.3. Atel - Sighisoara under construction 98.90 %Cohesion fund/State Budget
SOP-T 2007-2013 / POIM 2014-202031.12.2019
4.4. ERTMS Sighisoara - Coslariu under construction 81.00 %Cohesion fund/State Budget
SOP-T 2007-2013 / POIM 2014-202031.12.2020
5 Sighisoara–Brasov 31.12.2023
5.1.Cata – Sighisoara, including ERTMS Acquisition of works is under tendering procedure 0 %
Cohesion fund/State BudgetCEF 2014-2020
31.12.2023
5.2.Apata – Cata, including ERTMS Acquisition of works is under tendering procedure 0 %
Cohesion fund/State BudgetCEF 2014-2020
31.12.2023
5.3Brasov - Apata, including ERTMS Acquisition of works is under tendering procedure 0 %
Cohesion fund/State BudgetCEF 2014-2020
31.12.2023
6Brasov - Predeal Acquisition of FS is under tendering procedure NA
Cohesion fund/State BudgetCEF 2014-2020
NA
7 Predeal - Campina completed – financed by ISPA completed ISPA 2012
8 Campina - Ploiesti completed - financed by ISPA completed EIB June 2004
9 Ploiesti - Bucuresti completed - financed by ISPA completed EIB June 2004
10 Bucuresti - Constanta completed - financed by ISPA completed ISPA/JBIC 2011
11 Bucuresti - Craiova Terms of reference for the Feasibility Study NA NA NA
3Predeal - Campina
290,173,369
EuroISPA 2012
5 Bucuresti - Constanta 607,398,296 Euro ISPA/JBIC 2011
4 Campina – Ploiesti -
Bucuresti
271,125.000
Euro
EIB2004
Finalized Railway sections
18
Finalized Railway sections
19
1. HU-RO Border - Curtici - Km 614
(41.185 km)•Value: EUR 242,352,876
•Status: completed
•Financing: Cohesion Fund (2007 - 2013) + the
State Budget
2. ERTMS pilot Brazi-Buciumeni (38 km)•Value: EUR 36,392,377
•Status: completed
•Financing: Cohesion Fund (2007 - 2013) + the
State Budget
Arad station after the rehabilitation
20
✓ Reabilitation of railway line Border-Curtici-Arad-km.614;✓ Operational project pilot for ETCS/ERTMS level 2 application;✓ Modernizaton of Pitesti and Ramnicu Valcea railway station;✓ Rehabilitation of bridges, culverts and tunnels - SRCF Constanta, SRCF Iasi,
SRCF Timisoara, SRCF Brasov, SRCF Cluj;✓ Danube Bridges.
Objectives Achieved in 2016-2019
21
Movie HURO Border - Arad
Modernization of the electro-mechanical
interlocking systems situated on the Ilia-
Lugoj Section
Status: Contract for works finalised.
Operational tests.
Modernization of the electro-mechanical
interlocking systems situated on the
Siculeni – Adjud Section
Status: Contract for works finalised.
Operational tests.
•Interlocking in Videle railway station
Status: Contract for works finalised.
Operational tests.
Projects for increasing traffic safety
23
Introduction on large scale of Hot Axle Box and
Blocked Brake Detectors in 21 locations
Status: Contract for works finalised.
Operational tests.
Projects for increasing traffic safety
24
On going works
25
Km 614 – Gurasada - Simeria (144 km)
(km 614-Bârzava / Bârzava – Ilteu / Ilteu – Gurasada /Gurasada-Simeria)
Value of works: EUR 1,707,190,632.00
Status: In execution 29.10% / 31% / 10.50% / 17.95%
Financing: Cohesion Fund (2014 - 2020) + the State
Budget
Expected completion date: 2022
Coslariu - Simeria (74.43 km)(Simeria – Vințu de Jos / Vințu de Jos - Coșlariu)
•Value of works: EUR 464,246,059
•Status: in execution (98.50%/92.31%)
•Financing: Cohesion Fund (2007 – 2013 and 2014-
2020) + the State Budget
•Estimated completion date: 2020
KM 614 – Simeria – under construction
26
On going works
27
Coslariu - Simeria (74.43 km)(Simeria – Vințu de Jos / Vințu de Jos - Coșlariu)
•Value of works: EUR 464,246,059
•Status: in execution (98.50%/92.31%)
•Financing: Cohesion Fund (2007 – 2013 and 2014-
2020) + the State Budget
•Estimated completion date: 2020
Coslariu-Sighisoara (99.04 km)
Coșlariu-Micăsasa / Micasas-Atel / Atel-Sighisoara•Value of works : EUR 517,426,920
•Status: in execution (99.80% / 97.68% / 98.90%)
•Financing: Cohesion Fund (2007 – 2013 and
2014-2020) + the State Budget
•Estimated completion date: 2019
Development of the multimodal Hub București
28
Modernization / rehabilitation of the Gara de Nord București railway station -
Feasibility study
Doubling the railway line betweenthe Mogoșoaia and Balotești
railway stations - Works
Railway connection between the railway station Gara de Nord București and the
International Airport Henri Coandă -works
The railway rig of Bucharest -Feasibility study
Subsections:
1.Brasov – Apata (37.80 km)
3.Cata – Sighisoara (46.76 km)
•Status: tender procedure for acquisition of works
ongoing
•Estimated eligible costs for works:
EUR 797,340,070.00
•Financing: CF (CEF)+ the State Budget for works
Subsection:
2.Apata – Cata (28 km)
•Status: tender procedure for acquisition of
works ongoing
•Estimated eligible costs for works: EUR
538,300,852
•Financing: CF (CEF) + the State Budget for
works
Brasov - Predeal (26 km)•Status: Tender procedure for FS
ongoing
•Estimated value of works: 418
mil. Euro
•Financing: Cohesion Fund
(CEF)+ the State Budget
Works in tender procedures
Modernization of Sighisora - Brasov – Predeal railway sections
29
Modernization of railway level-
crossings – 150 level-crossings
•Status: Public procurement procedure
for FS (revision) currently ongoing
Projects for increasing traffic safety
30
Craiova – Caransebes (227 km)•Status: Service contract for the elaboration of thefeasibility study on going•Financing for FS: CF (CEF) + the State Budget•Estimated value for works: 1,520 mil. Euro
Arad - Caransebes (155 km)• Status: Service contract for the elaboration ofthe feasibility study on going• Financing for FS: The State Budget• Estimated value for works: 1,147 mil. Euro
Craiova – Calafat (108 km) •Status: Contract for revision of the feasibilitystudy on going•Financing for FS: CF (CEF) + the State Budget•Estimated value for works: 397 mil. Euro
FS for the modernization of the railway section on OEM Corridor
31
Cluj – Oradea - Episcopia Bihor (165 km)
•Status: Contract for revision of the feasibility study ongoing;
•Financing: Cohesion Fund 2014 - 2020 + the State
Budget
•Estimated value for works: 1,588 mil Euro
On going Feasibility studies
Bucureşti Nord – Jilava - Giurgiu Nord - Border
with Bulgaria (99.980 km)
Status: Contract for elaboration of the feasibilitystudy on goingFinancing: Cohesion Fund 2014-2020 + the State Budget•Estimated value for works: 113 mil. Euro
Bucureşti Nord
Giurgiu Nord
Railway infrastructure Constanta Port(180 km)Status: Contract for revision of the feasibilitystudy on goingEstimated value of works: 220 mil. Euro Financing: Cohesion Fund (CEF)+ the StateBudget
32
FS for upgrading Cluj – Oradea - Episcopia Bihor section
33
• electrification and rehabilitation 166.216 km + 7.1 km to the border for maximum speeds of 80 km / h for freight trains and 120 km / h for passenger trains• 10 stations, 12 stops and 21 stopping points• 32 bridges• 215 culverts• 5 tunnels• 8 lower and upper passages• electronic interlocking in 21 locations• ERTMS • 3 new traction power stations• 1 traffic coordination center• 1 maintenance center
Rehabilitation of bridges and tunnels
❑First stage: 98 objectives in
execution
34
❑Second stage: 173 objectives
in preparation / tender
procedures
34
Rehabilitation / modernization of the railway stations
15 railway station finalised in 2007-2015 47 railway station in preparation for 2016-2020
• The project includes the rehabilitation and modernization of railway stations during stages.
- 35 railway stations finalised
- 47 railway stations in preparation
• The scheduled works are: modernization of platforms, canopies, commercial spaces, pedestrian tunnels, internal
sanitary installations, sewage and electrical systems, as well as rehabilitation of the passenger buildings.
BENEFITS
• Decrease in the maintenance and operating costs.
• Improvement of the quality of CFR’s services supplied to the public.
• Increase in the revenues from renting of the commercial spaces.
35
Rehabilitation / modernization of the railway stations
Zalau
Giurgiu
Braila
Botosani
Resita Sud
36
Projects in preparation - FS
No. Section / Subsection Status Source of financing / Programme
1 Ploiești Triaj – Focșani / Focșani – Roman/ Roman – Iași – Border RO-MD
In tender procedure for the acquisition of theFS for upgrading with train speeds higherthan 16o km/h
CF+state budgetPOIM 2014-2020
2 Pașcani–Dărmănești / Dărmănești -Vicșani – Border RO-UA
In tender procedure for the acquisition of theFS for upgrading with train speeds higherthan 16o km/h
CF+state budgetPOIM 2014-2020
3 ERTMS implementation on railway sectionPredeal-București-Constanța
In preparation tender documentation foracquisition of the FS
ERDF+state budgetPOIM 2014-2020
4 Modernization of the BUCHARESTRAILWAY COMPLEX (urbanization anddevelopment of Gara de Nord railwaystation area)
In tender procedure for the acquisition of theFS
ERDF+state budgetPOIM 2014-2020
37
Ploiești Triaj – Focșani / Focșani – Roman / Roman – Iași
– Border RO-MD (430 km)
•Status: tender procedures for acquisition of the FS ongoing•Estimated value of works: 1,687 mil. Euro
•Financing proposal: FEDR (POIM)+ the State Budget
Projects in tender procedures
38
INTEROPERABILITY
39
Parameter Value
Maximum design speed (km/h) for passenger trains 160
Maximum design speed (km/h) for freight trains 120
Standard track gauge (mm) 1435
Distance between axes rail wires (m) min. 4.20
Minimum radius of the curve (m) 1500
Cant (mm) 130
Maximum slopes new railway (‰) 12
Maximum length of platforms (m) 400
The height of the platforms + NSS (cm) 55
Electrified Yes (25 kV)
Max axle load 22.5 t/axle
Signalling ERTMS Level II + INDUSI incl. electronic interlocking
Minimum length of sidings (m) 740 (750)
Loading gauge C
The basic parameters of the subsystem "infrastructure" that correspondto the essential requirements regarding rail interoperability in Romania
40
ERTMS deployment in Romania
ETCS level 1 (without GSM-R):finalized:•Predeal-Brazi;•Buftea-Constanța;(FS proposing update solutions).
ERTMS/ETCS level 2 + GSM-R:a) finalized:•Buftea-Brazi (Pilot Project);•km 614-HU border.b) under construction: •Sighișoara-Simeria; •Simeria-km 614.c) tendering procedure:•Brașov-Sighișoarad) feasibility studies: •Caransebeș-Arad; •Craiova-Caransebeș;•Craiova-Calafat;•Predeal-Brașov;•București-Giurgiu-BG border;•Ploiești Triaj-Focșani-Roman-Iași-MD border.
41
ERTMS implementation at CFR
ETCS level 1
ERTMS/ETCS level 2
CFR opted to maintain the national signals in order to also allow access for trains without ETCS OBU.
GSM-R network
• NSS (Network Switching Subsystem) installedduring the ETCS level 2 Pilot Project, with 2 MSCs(Bucharest and Ploiesti) configured for hotredundancy.
• BSS (Base Station Subsystem), OMC-R, CTSinstalled gradually, during the rehabilitationprojects.
INTEROPERABILITY
Operational:
• no stopping at the borders;
• no changing of the locomotive or driver.
Technical: standardized trackside + onboard installations for ensuring operational interoperability.
TSI (Technical Specifications for Interoperability) – control command and signaling – ERTMS
42
CFR’s offer - Cross-border benefits
Cross-border benefits in Curtici railway station1) The Curtici railway station is a common MAV / CFR cross-border station and modernized to Europeanstandards;2) It is a high-security area; the average time spent on border for the police control in order to preventillegal trafficking (immigrants) is less than 1 hour;3) The tracks no. 8 and 9 will be allocated for the ATTI (trusted handover) trains.Network benefits for international trains1) The CFR-SA grants to the RUs the following facilities / reductions of the track access charges for theutilization of the infrastructure on the basis of conventions signed between the CFR and the RUs, validduring the access contract, as follows:
a) 33% in the case of full international trains that are transiting CFR's network;b) 33% for complete trains in intermodal traffic.
2) Facilities in the railway stations for RO-LA transport (Ex. : pilot in 2018 – CFR Freight/CFR Marfa).Digital Benefits:1) CFR manages IT systems used at European level by RailNetEurope organization in order to facilitateinternational traffic on the European railway infrastructure, such as:
a) Pathfinder – IT system for facilitating the request for international path;b) EICIS (European Infrastructure Charging Information System) - a web application that can
calculate the cost of using the international trains paths, including toll charges, station taxesand maneuver fees;
c) EUROPTIRAIL – IT system for visualizing the movement of international trains;d) TIS (Train Information System) - IT system with Information about international trains.
2) CFR SA manages the IMComm IT application for the interactive programming of the internationaltrains’ traffic between CFR and MAV.
43
ATTI (trusted handover) trains
ATTI (trusted handover) trains is a RUs agreement (under UIC umbrella);
The main purpose is to reduce at minimum the transfer process of the international freight trains
on the border (handover) stations. The involved RUs insert data about used rolling stocks into a
common database, with all the maintenance activities. That means all the involved RUs will have
access to all relevant data of the maintenance activities of rolling stocks.
The process include distinct phases for a specific train, with the same rolling stocks and on fixed
journey route:
1. In the first phase, during minimum 3 months, the RUs has a common technology where every
train is checked in details for technical shape. The detected technical deficiency are marked
and put in the statistics.
2. If after 3 months the content of list with technical deficiency has no significant problems the
involved RUs can decide to start the trusted handover process.
3. During the trusted handover period the involved RUs can perform a separate or common
check activities, not for every trains but for a significant sample number.
4. If one of the involved RUs detect new technical deficiency the process can be started again
from the beginning (with phase no 1).
In Curtici railway station the tracks no. 8 and 9 will be allocated for the ATTI trains.
44
Contact details for CFR-SA
45
CONTACT DETAILS of CFR-SAStreet address: Dinicu Golescu Avenue nr. 38Postcode: 010873City: BucharestRegion : District 1Country: RomaniaTelephone: +40213192401Fax: : +40213192401E-mail address: [email protected]; [email protected]: www.cfr.ro; http://www.cfr.ro/index.php/ct-menu-item-3http://www.cfr.ro/index.php/ct-menu-item-146/29-articles/594-article-69
DRAGOMIRESCU [email protected]