The National Ignition Facility Data Requirements Tim Frazier and Alice Koniges, LLNL SC08 BOF: Computing with Massive and Persistent Data LLNL-PRES-408909. This work performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52- 07NA27344

Transcript of The National Ignition Facility Data Requirements Tim ... · The National Ignition Facility Data...

Page 1: The National Ignition Facility Data Requirements Tim ... · The National Ignition Facility Data Requirements Tim Frazier and Alice Koniges, LLNL SC08 BOF: Computing with Massive and

The National Ignition Facility Data RequirementsTim Frazier and Alice Koniges, LLNL

SC08 BOF: Computing with Massive and Persistent Data

LLNL-PRES-408909. This work performed under theauspices of the U.S. Department of Energy by LawrenceLivermore National Laboratory under Contract DE-AC52-07NA27344

Page 2: The National Ignition Facility Data Requirements Tim ... · The National Ignition Facility Data Requirements Tim Frazier and Alice Koniges, LLNL SC08 BOF: Computing with Massive and

2

Target chamber

Page 3: The National Ignition Facility Data Requirements Tim ... · The National Ignition Facility Data Requirements Tim Frazier and Alice Koniges, LLNL SC08 BOF: Computing with Massive and
Page 4: The National Ignition Facility Data Requirements Tim ... · The National Ignition Facility Data Requirements Tim Frazier and Alice Koniges, LLNL SC08 BOF: Computing with Massive and

One Terabyte of data to be downloaded in ~50 Minutes for each shot.

Page 5: The National Ignition Facility Data Requirements Tim ... · The National Ignition Facility Data Requirements Tim Frazier and Alice Koniges, LLNL SC08 BOF: Computing with Massive and

5

FullApertureBackscatter

DiagnosticInstrumentManipulator(DIM)

DiagnosticInstrumentManipulator (DIM)X-ray imagerStreakedx-ray detector

VISARVelocityMeasurements

Static x-rayimager

FFLEXHard x-rayspectrometer

Near BackscatterImager

DANTESoft x-raytemperature

DiagnosticAlignmentSystem

Cross TimingSystem

Each Diagnostic Produces Data that Requires Analysis

Page 6: The National Ignition Facility Data Requirements Tim ... · The National Ignition Facility Data Requirements Tim Frazier and Alice Koniges, LLNL SC08 BOF: Computing with Massive and

6

Tools are being built to manage and integrate:simulations, machine state and experimental shot data

Data originate from multiplesources• Simulations• Machine state

− Configuration− Calibration− Instantiation− Inspection

• Experimental shot data

Data are generated in multipleformats

Data are analyzed in multiple,parallel work-flows with a timebudget of ~30 minutes

Data will survive beyond NIF’s 30year lifespan

Image data provided by analysis andvisualization tools

Page 7: The National Ignition Facility Data Requirements Tim ... · The National Ignition Facility Data Requirements Tim Frazier and Alice Koniges, LLNL SC08 BOF: Computing with Massive and

7

Calibration Produces Hierarchical Data Format (HDF) & Excel

Calibration Data

Non-scalar calibrationvalues in HDF

Scalar calibration valuesin Excel

12.00

0.50

Backlightertarget assembly

Drive beams:55, 56, 5822, 40, 46, 47, 52

Backlighter beams:From Leg 3:61, 65, 68

H3 H18

TCC

2.224 dia.

0.1701.780

Page 8: The National Ignition Facility Data Requirements Tim ... · The National Ignition Facility Data Requirements Tim Frazier and Alice Koniges, LLNL SC08 BOF: Computing with Massive and

8

Shot Set-up Produces XML

Campaign Management Tool (CMT)

Shot Set-up XML

Control System (ICCS)

Page 9: The National Ignition Facility Data Requirements Tim ... · The National Ignition Facility Data Requirements Tim Frazier and Alice Koniges, LLNL SC08 BOF: Computing with Massive and

9

Optics Inspection Produces High-Resolution Images andRequires Sophisticated Analysis to Identify Flaws

Final Optic DamageInspection (FODI)

FODI Image (32MB)

Flaw site size

Flaw site image via microscopy

Multiple optics in each of the 192beams are inspected after every shot

Page 10: The National Ignition Facility Data Requirements Tim ... · The National Ignition Facility Data Requirements Tim Frazier and Alice Koniges, LLNL SC08 BOF: Computing with Massive and

10

Experiments Produce Hierarchical Data Format (HDF5)

Target diagnosticdata capture

Results saved asHDF

Target diagnostics

Page 11: The National Ignition Facility Data Requirements Tim ... · The National Ignition Facility Data Requirements Tim Frazier and Alice Koniges, LLNL SC08 BOF: Computing with Massive and

11

A Common Database Platform Enables Integrated Tools

Simulations

Experiments

Data Types

Machine State

OracleDatabase

Page 12: The National Ignition Facility Data Requirements Tim ... · The National Ignition Facility Data Requirements Tim Frazier and Alice Koniges, LLNL SC08 BOF: Computing with Massive and

12

A 30+ Year Lifetime Creates an Interesting Naming Problem

urn:llnl.gov:nif:archive:534f55c6-2271-487d-9c8d-9cc20d7af3af

1 Identifies value as a Uniform Resource Name (URN)

Identifies the source of the data

3 Identifies scientific archive as the holder of the object

4 Unique identifier which is guaranteed for the life of NIF and beyond

1 2 3 4

1

2

3

4

NIF has adopted the W3C standard for naming long-lived objects

Page 13: The National Ignition Facility Data Requirements Tim ... · The National Ignition Facility Data Requirements Tim Frazier and Alice Koniges, LLNL SC08 BOF: Computing with Massive and

13

NIF depends on the integration of a variety of data• Simulations• Machine state• Experimental shot data• Status of optics (damage sites)

Data integration requires a common platform for data management & analysis tools

Between shots(~3/day), data must be quickly and carefully analyzed to properly planfor next shot• Goal is 30 min to process all data

NIF Data must:• Outlast the 30 year lifetime of the facility• Be searchable and navigable with transparent relationships• Be stored economically which implies tiered storage• Be secure and released for review on a controlled basis

Data management plays a critical role in the success of NIF