The Mariners Load Releasing Hitch
-
Upload
amena-hunt -
Category
Documents
-
view
41 -
download
5
description
Transcript of The Mariners Load Releasing Hitch
The Mariners Load The Mariners Load Releasing HitchReleasing Hitch
• Required Materials:• Two Large Carabiners• One 60” Rescue Runner• One Dissimilar Carabiner
Clip one end of the rescue runner Clip one end of the rescue runner into a large carabinerinto a large carabiner
Run the opposite end through Run the opposite end through the second carabinerthe second carabiner
Continue back through the first Continue back through the first carabinercarabiner
Pull carabiners 8”-10” apart and Pull carabiners 8”-10” apart and begin to wrap the rescue runner begin to wrap the rescue runner around the two parallel strandsaround the two parallel strands
Wrap around the parallel Wrap around the parallel strands a minimum of four timesstrands a minimum of four times
Pass the end of the rescue runner Pass the end of the rescue runner between the two strands near the between the two strands near the
second carabinersecond carabiner
Attach the dissimilar carabiner to Attach the dissimilar carabiner to the end of the rescue runnerthe end of the rescue runner
Attach the dissimilar carabiner to Attach the dissimilar carabiner to the second carabinerthe second carabiner
To transfer a load - Start by unclipping To transfer a load - Start by unclipping the dissimilar carabiner & re-clipping it the dissimilar carabiner & re-clipping it
around the parallel strands.around the parallel strands.
Slowly unwind the wraps which Slowly unwind the wraps which transfers the loadtransfers the load